ML20248D503: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:___ ._-
{{#Wiki_filter:___._-
5
5
                                                                                      .-.        4
.f.
                                                                                                                      .f.
4 g
        .                    g
September 28, 1989 Docket No. 50-89 Dr. Keith Asmussen, Manager Licensing and Nuclear Material and Control G.. A. Technologies Inc.
                  "                                                        September 28, 1989                         .
Docket No. 50-89                                                       .
Dr. Keith Asmussen, Manager Licensing and Nuclear Material and Control G.. A. Technologies Inc.                                                                   ,
P. O. Box 81608 San Diego, California 92138
P. O. Box 81608 San Diego, California 92138


==Dear Dr. Asmussen:==
==Dear Dr. Asmussen:==
==Subject:==
==Subject:==
Reactor Operator and Senior Reactor Operator Licensing Examinations, Addendum In a telephone conversation on September 26, 1989, between Dr. Razvi of your staff and Mr. Lew Miller, Chief, Operations Section, arrangements were made for rescheduling the administration of licensing examinations at the G. A. Technologies Inc.. TRIGA facilities.
Reactor Operator and Senior Reactor Operator Licensing Examinations, Addendum In a telephone conversation on September 26, 1989, between Dr. Razvi of your staff and Mr. Lew Miller, Chief, Operations Section, arrangements were made for rescheduling the administration of licensing examinations at the G. A. Technologies Inc.. TRIGA facilities.
The written examinations are rescheduled for October 31, 1989. The operating examinations are rescheduled for November 1-3, 1989.
The written examinations are rescheduled for October 31, 1989. The operating examinations are rescheduled for November 1-3, 1989.
All other arrangements formalized by our original administrative letter (Dennis F. Kirsch, Chief, Reactor Safety Branch, dated July 24,1989) remain in effect.
All other arrangements formalized by our original administrative letter (Dennis F. Kirsch, Chief, Reactor Safety Branch, dated July 24,1989) remain in effect.
Thank you for your consideration in this matter.         If you have any questions regarding the examination procedures-and requirements, please contact Mr. Thomas Meadows at (415) 943-3867.
Thank you for your consideration in this matter.
If you have any questions regarding the examination procedures-and requirements, please contact Mr. Thomas Meadows at (415) 943-3867.
Sincerely,
Sincerely,
                                                                    /5/
/5/
Dennis F. Kirsch Reactor Safety Branch cc:
Dennis F. Kirsch Reactor Safety Branch cc:
R. Cross,RV(2 copies)
R. Cross,RV(2 copies)
Line 40: Line 37:
J. Razvi, GA Technologies 11c.
J. Razvi, GA Technologies 11c.
A. Adams, NRR/PDSNP J, Martin, RV R. Zimmerman, RV A. Chaffee, RV l
A. Adams, NRR/PDSNP J, Martin, RV R. Zimmerman, RV A. Chaffee, RV l
D. Kirsch, RV I                       .L. Miller, RV l                         K. Perkins, NRR/LOLB L                         H. North, RV                                                                             -
D. Kirsch, RV I
RV/jk                                     $
.L. Miller, RV l
Q[/YESE4pESTCOPY]REQpESTCOPYJREQU,ESTCOPY;i
K. Perkins, NRR/LOLB L
                                  / NO ] DIS / fi0 1 GS' / N0 M
H. North, RV RV/jk M
fB go gR                                           45w MEADOWS A           L. E       T RSCH /C 9/n/89             7/ 89       9/ /89
Q[/YESE4pESTCOPY]REQpESTCOPYJREQU,ESTCOPY;i fB
__            _- -          _        -    -      - -                                    -}}
/ NO
] DIS / fi0 1 GS' / N0 go gR 45w MEADOWS A L.
E T RSCH /C 9/n/89 7/
89 9/ /89
-}}

Latest revision as of 19:21, 1 December 2024

Advises That Reactor Operator & Senior Reactor Operator Written Exams Rescheduled for 891031 & Operating Exams Rescheduled for 891101-03
ML20248D503
Person / Time
Site: General Atomics
Issue date: 09/28/1989
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Asmussen K
GENERAL ATOMICS (FORMERLY GA TECHNOLOGIES, INC./GENER
References
NUDOCS 8910040294
Download: ML20248D503 (1)


Text

___._-

5

.f.

4 g

September 28, 1989 Docket No. 50-89 Dr. Keith Asmussen, Manager Licensing and Nuclear Material and Control G.. A. Technologies Inc.

P. O. Box 81608 San Diego, California 92138

Dear Dr. Asmussen:

Subject:

Reactor Operator and Senior Reactor Operator Licensing Examinations, Addendum In a telephone conversation on September 26, 1989, between Dr. Razvi of your staff and Mr. Lew Miller, Chief, Operations Section, arrangements were made for rescheduling the administration of licensing examinations at the G. A. Technologies Inc.. TRIGA facilities.

The written examinations are rescheduled for October 31, 1989. The operating examinations are rescheduled for November 1-3, 1989.

All other arrangements formalized by our original administrative letter (Dennis F. Kirsch, Chief, Reactor Safety Branch, dated July 24,1989) remain in effect.

Thank you for your consideration in this matter.

If you have any questions regarding the examination procedures-and requirements, please contact Mr. Thomas Meadows at (415) 943-3867.

Sincerely,

/5/

Dennis F. Kirsch Reactor Safety Branch cc:

R. Cross,RV(2 copies)

T. Meadows, RV K. Asmussen, GA Technologies Inc.

J. Razvi, GA Technologies 11c.

A. Adams, NRR/PDSNP J, Martin, RV R. Zimmerman, RV A. Chaffee, RV l

D. Kirsch, RV I

.L. Miller, RV l

K. Perkins, NRR/LOLB L

H. North, RV RV/jk M

Q[/YESE4pESTCOPY]REQpESTCOPYJREQU,ESTCOPY;i fB

/ NO

] DIS / fi0 1 GS' / N0 go gR 45w MEADOWS A L.

E T RSCH /C 9/n/89 7/

89 9/ /89

-