ML20248J613: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ _ - _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _                                                                               . _ _ _ _ . _ _ .   _ . _ . _ _ _
{{#Wiki_filter:_ _ - _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _
  .       *
. _ _ _ _
      g* "' CW g                                                                          OfdlT E D ST ATE S
. _ _ .
    A               ft                                                       NUCLEAR REGULATORY COMMISSION
_ . _ . _ _ _
              ,
*
                                                                                              REGION IV
.
                    *
g* "' CW
            ' '
OfdlT E D ST ATE S
    6.    \ *#
g
                                                                                  611 RYAN PLAZA DRIVE, SUITE 400
A
    S
ft
      9                                                                            AR LINGTON. TE XAS 76011 8064
NUCLEAR REGULATORY COMMISSION
        * se*
,
                                                                                        June 4, 1998
REGION IV
          John R. McGaha, Vice President - Operations
6.
          River Bend Station
' '
          Entergy Operations, Inc.
*
          P.O. Box 220
611 RYAN PLAZA DRIVE, SUITE 400
          St. Francisville, Louisiana 70775
\\ *#
          SUBJECT: NRC INSPECTION REPORT 50-458/98-11
S
          Dear Mr. McGaha:
AR LINGTON. TE XAS 76011 8064
          From May 18-21,1998, a routine inspection was conducted at your River Bend Station reactor
9 * se*
          facility. The enclosed report presents the scope and results of that inspection.
June 4, 1998
          The results of this inspection indicate that you have implemented an inservice inspection
John R. McGaha, Vice President - Operations
          program that meets both the ASME Code and NRC regulatory requirements. However, two
River Bend Station
          oversights were identified during the inspection. The NRC inspector noted an instance where
Entergy Operations, Inc.
          100 percent of a weld was not examined and a relief request had not been submitted. In
P.O. Box 220
          sddition, a quality control nondestructive examiner identified the improper use of a calibration
St. Francisville, Louisiana 70775
          standard during the preservice and first 120-month inservice inspection interval examinations for
SUBJECT: NRC INSPECTION REPORT 50-458/98-11
          ultrasonic examination of a weld between pipes of different thickness. In each case, the subject
Dear Mr. McGaha:
          weld was not required to be examined by the ASME Code and NRC regulatory requirements.
From May 18-21,1998, a routine inspection was conducted at your River Bend Station reactor
          However, the oversights indicated a need to improve the review of your inservice inspection
facility. The enclosed report presents the scope and results of that inspection.
          data.
The results of this inspection indicate that you have implemented an inservice inspection
          It is our understanding that during the exit meeting 1 May 21,1998, Mr. Dan Pace, Director,
program that meets both the ASME Code and NRC regulatory requirements. However, two
          Engineering, stated Entergy Operations, Inc., wa                                                 perform a review of past inservice test data
oversights were identified during the inspection. The NRC inspector noted an instance where
          and relief requests to assure that appropriate                                                 sequests have been, or will be, subtritted by
100 percent of a weld was not examined and a relief request had not been submitted. In
          December 1,1998 (this date corresponds te-                                                 ..onths following the end of the first 120 month
sddition, a quality control nondestructive examiner identified the improper use of a calibration
          inservice inspection interval), and that the rev,ew will be completed by November 1,199E
standard during the preservice and first 120-month inservice inspection interval examinations for
          Additionally, Mr. Pace stated Entergy Operations, Inc., would perform a review of piping
ultrasonic examination of a weld between pipes of different thickness. In each case, the subject
          configurations that had a change in pipe thickness to determine if proper calibration standards
weld was not required to be examined by the ASME Code and NRC regulatory requirements.
          were used for the performance of ultrasonic examinations and that the review would be
However, the oversights indicated a need to improve the review of your inservice inspection
          completed by August 31,1998. Please confirm these regulatory commitments in writing within
data.
          30 days of the date of tt.is letter.
It is our understanding that during the exit meeting 1 May 21,1998, Mr. Dan Pace, Director,
          In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
Engineering, stated Entergy Operations, Inc., wa
          enclosure will be placed in the NRC Public Document Room (PDR).
perform a review of past inservice test data
                                                                                                                                                                                            \1
and relief requests to assure that appropriate
                                                                                                                                                                                            l
sequests have been, or will be, subtritted by
                9806090216 900604
December 1,1998 (this date corresponds te-
                PDR   ADOCK 05000458
..onths following the end of the first 120 month
                G                                                         PDR
inservice inspection interval), and that the rev,ew will be completed by November 1,199E
.                                                                             ..                                 -     _ _ - _ _ - _ _ _ _ _ _ _ _ _ -                   __                 .-
Additionally, Mr. Pace stated Entergy Operations, Inc., would perform a review of piping
configurations that had a change in pipe thickness to determine if proper calibration standards
were used for the performance of ultrasonic examinations and that the review would be
completed by August 31,1998. Please confirm these regulatory commitments in writing within
30 days of the date of tt.is letter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
\\ 1
l
9806090216 900604
PDR
ADOCK 05000458
G
PDR
.
..
-
_ _ - _ _ - _ _ _ _ _ _ _ _ _ -
__
.-


                                    _ - -___ ____________ ____ __ _ _ -_ _____ _ _ _ _ _ - _ - _ _ _ _ _ _ - - _ _ _ - _ ___ _ - _ _ _ _ .                           . -_
_ - -___ ____________ ____ __ _ _ -_ _____ _ _ _ _ _ - _ - _ _ _ _ _ _ - - _ _ _ - _ ___ _ - _ _ _ _ .
    .                     .
.
  ;
-_
.
.
;
l.
l.
                          Entergy Operations, in-                                                                                           -2-
Entergy Operations, in-
                          Should you have any questions concerning this inspection, we will be pleased to discuss them
-2-
                          with you.
Should you have any questions concerning this inspection, we will be pleased to discuss them
                                                                                                                                            Sincerely,
with you.
l                                                                                                                                                         ,
Sincerely,
                                                                                                                                                                W
l
                                                                                                                                            Dr. Dale A. Powers, Chief
W
                                                                                                                                            Maintenance Branch
,
                                                                                                                                            Division of Reactor Safety
Dr. Dale A. Powers, Chief
                          Docket No.:                                 50-458
Maintenance Branch
                          License No.: NPF-47
Division of Reactor Safety
                          Enclosure:
Docket No.:
                          NRC Inspection Report
50-458
                            50-458/98-11
License No.: NPF-47
                          cc w/enclocure:
Enclosure:
                          Executive Vice President and
NRC Inspection Report
                            Chief Operating Officer
50-458/98-11
                          Entergy Operations, Inc.
cc w/enclocure:
                          P.O. Box 31995
Executive Vice President and
                          Jackson, Mississippi 39286-1995
Chief Operating Officer
                                                                                                                                                                            l
Entergy Operations, Inc.
                          Vice President
P.O. Box 31995
                          Operations Support
Jackson, Mississippi 39286-1995
                          Entergy Operations, Inc.
l
                          P.O. Box 31995
Vice President
                          Jackson, Mississippi 39286-1995
Operations Support
                          General Manager
Entergy Operations, Inc.
                          Plant Operations
P.O. Box 31995
                          River Bend Station
Jackson, Mississippi 39286-1995
                          Entergy Operations, Inc.
General Manager
                          P.O. Box 220
Plant Operations
                          St. Francisville, Louisiana 70775
River Bend Station
                          Director- Nuclear Safety
Entergy Operations, Inc.
                          River Bend Station
P.O. Box 220
                          Entergy Operations, Inc.
St. Francisville, Louisiana 70775
                          P.O. Box 220
Director- Nuclear Safety
                          St. Francisville, Louisiana 70775
River Bend Station
-     _ _ _ _ - _ _ _ _ _                       - - _ _ _ _
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
-
_ _ _ _ - _ _ _ _ _
- - _ _ _ _


  t
t
    .           .
.
.
l-
l-
l
l
                Entergy Operations, Inc.               -3-
Entergy Operations, Inc.
-3-
Wise, Carter, Child & Caraway
,
,
                Wise, Carter, Child & Caraway
P.O. Box 651
'
'
                P.O. Box 651
Jackson, Mississippi 39205
                Jackson, Mississippi 39205
Mark J. Wetterbahn, Esq.
                Mark J. Wetterbahn, Esq.
Winston & Strewn
                Winston & Strewn
1401 L Street, N.W.
;
;
                1401 L Street, N.W.
                Washington, D.C. 20005-3502
'
'
                Manager- Licensing
Washington, D.C. 20005-3502
                River Bond Station -
Manager- Licensing
                Entergy Operations, Inc.
River Bond Station -
                P.O. Box 220
Entergy Operations, Inc.
                St. Francisville, Louisiana 70775
P.O. Box 220
                The Honorable Richard P. leyoub
St. Francisville, Louisiana 70775
                Attorney General
The Honorable Richard P. leyoub
                Department of Justice
Attorney General
                State of Louisiana
Department of Justice
                P.O. Dox 94005
State of Louisiana
                Baton Rouge, Louisiana 70804-9005
P.O. Dox 94005
                H. Anne Plettinger
Baton Rouge, Louisiana 70804-9005
                3456 Villa Rose Drive
H. Anne Plettinger
                Baton Rouge, Louisiana 70806
3456 Villa Rose Drive
                                                              1
Baton Rouge, Louisiana 70806
                                                              l
1
                President of West Feliciana
President of West Feliciana
                Police Jury                                 l'
l
                P.O. Box 1921
Police Jury
                St. Francisville, Louisiana 70775
l'
                William H. Spell, Administrator
P.O. Box 1921
                Louisiana Radiation Protection Division
St. Francisville, Louisiana 70775
                P.O. Box 82135
William H. Spell, Administrator
                Baton Rouge, Louisiana 70884-2135
Louisiana Radiation Protection Division
- _   _ - - - _
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
- _
_ - - - _


                  _ _     _ - _ _   _ _ _ _ _ _ _ - _ . _ _ _ _ _ _ _ _ _ _ _ _ _               _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _                   _ _ . _ _ _ _ _ - _ _ _ _ _ _ _ ___
_ _
      .- .
_ - _ _
            Entergy Operations, Inc.                                                         -4-
_ _ _ _ _ _ _ - _
            E-Mail report to T. Frye (TJF)
. _ _ _ _ _ _ _ _ _ _ _ _ _
            E-Mail report to D. Lange (DJL)
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
            E-Mail report to NRR Event Tracking System (IPAS)
_ _ . _ _ _ _ _ - _ _ _ _ _ _ _ ___
            E-Mail report to Document Control Desk (DOCDESK)
.-
            E-Mail report to Richard Correia (RPC)
.
;           E-Mail report to Frank Talbot (FXT) .
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
;
E-Mail report to Frank Talbot (FXT) .
l
l
            bec to DCD (IE01) - DHS, DRP, and Decommissioning
bec to DCD (IE01) - DHS, DRP, and Decommissioning
!
!
            bec distrib. by RIV:
bec distrib. by RIV:
            Regior.al Administrator                                                 Senior Resident inspector (Grand Gulf)
Regior.al Administrator
            DRP Director                                                             DRS-PSB
Senior Resident inspector (Grand Gulf)
            Branch Chief (DRP/C)                                                   MIS System
DRP Director
            Project Engineer (DRP/C)                                               RIV File
DRS-PSB
            Branch Chief (DRP/TSS)                                                 Resident inspector
Branch Chief (DRP/C)
            DOCUMENT NAME: R:\_RB\RB811RP.CJP
MIS System
            To receive copy or dogument, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No cop'r
Project Engineer (DRP/C)
            RIV: SRI:MS/                                               C:MB                               f                     C:PBC n j   C MB
RIV File
            CJPaulkn7b                                                 DAPowers yg                                               EEColliddR(/ DAPowersvf /7                           '
Branch Chief (DRP/TSS)
                                                                                                                                                                                            i
Resident inspector
            05AT98[                                                     0&J/98                                                   #6/%98       06/4/98
DOCUMENT NAME: R:\\_RB\\RB811RP.CJP
                                                                                                                                                  '
To receive copy or dogument, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No cop'r
                                                                                  OFFICIAL RECORD d@PY
RIV: SRI:MS/
                                                                                                                                                                                            !
C:MB
  __:--__                         --                                                                                                                                                       .i
f
C:PBC n j
C MB
CJPaulkn7b
DAPowers yg
EEColliddR(/
DAPowers f /7
v
i
05AT98[
0&J/98
#6/%98
06/4/98
'
OFFICIAL RECORD d@PY
'
!
__:--__
--
.i


  .             _                                             .
.
                                                                                                          .
_
                                                                                                                                      _
.
                                                                                                                                          _ - _ _ _ - - _ - _ _
.
                                                                            .
.
                                              -
_
_ - _ _ _ - - _ - _ _
l
l
      ...          ..
-
l.
l.
. . .
..
I
I
i
i
                      Entergy Operationse Inc.                                   -4-
Entergy Operations Inc.
-4-
e
l
l
l
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
l
l
E-Mail report to NRR Event Tracking System (IPAS) _
l
l
l                    E-Mail report to T. Frye (TJF)
' E-Mail report to Document Control Desk (DOCDESK)
                      E-Mail report to D. Lange (DJL)
E-Mail report to Richard Correia (RPC)
l                    E-Mail report to NRR Event Tracking System (IPAS) _
E-Mail report to Frank Talbot (FXT)
l                  ' E-Mail report to Document Control Desk (DOCDESK)
rgthoc to DCD (tE01)DDRSf DRP, and Dew,... 7'i's# L
                      E-Mail report to Richard Correia (RPC)
5
                      E-Mail report to Frank Talbot (FXT)
.nanau- maw
                  rgthoc to DCD (tE01)DDRSf DRP, and Dew,... 7'i's#                     5L
aw.
                    .nanau- maw                 aw.   an
an
                      bec distrib. by RIV:
bec distrib. by RIV:
                      Regional Administrator.                       Senior Resident inspector (Grand Gulf)
Regional Administrator.
                      DRP Director                                   DRS-PSB
Senior Resident inspector (Grand Gulf)
                      Branch Chief (DRP/C)                           MIS System
DRP Director
                      Project Engineer (DRP/C)                       RIV File
DRS-PSB
                      Branch Chief (DRP/TSS)                         Resident inspector
Branch Chief (DRP/C)
                      DOCUMENT NAME: R:\_RB\RB811RP.CJP
MIS System
                      To receive copy of dogument, indicate in box:"C" = Copy without enclosuras "E" = Copy with enclosures "N" = No cop'r
Project Engineer (DRP/C)
                        RIV:SRl:MSaf                       C:MB                     f     C:PBC n j                   C:MB
RIV File
                        CJPaulkMb                           DAPowers df                     EECollirM{l/               DAPowers 34 P   '
Branch Chief (DRP/TSS)
                        05AT987                             OGJ/98                         J5/498                       06/4/98
Resident inspector
                                                                                                                              '
DOCUMENT NAME: R:\\_RB\\RB811RP.CJP
                                                                  OFFICIAL RECORD Cl@PY
To receive copy of dogument, indicate in box:"C" = Copy without enclosuras "E" = Copy with enclosures "N" = No cop'r
                                        tD00E,E
RIV:SRl:MSaf
    --_-_--- _ -                 - - - _ - -
C:MB
f
C:PBC n j
C:MB
CJPaulkMb
DAPowers df
EECollirM{l/
DAPowers 34 P
05AT987
OGJ/98
J5/498
06/4/98
'
OFFICIAL RECORD Cl@PY
'
tD00E,E
--_-_--- _ -
- - - _ - -
}}
}}

Latest revision as of 14:47, 30 November 2024

Forwards Insp Rept 50-458/98-11 on 980518-21.No Violations Noted
ML20248J613
Person / Time
Site: River Bend 
Issue date: 06/04/1998
From: Powers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcgaha J
ENTERGY OPERATIONS, INC.
Shared Package
ML20248J616 List:
References
50-458-98-11, NUDOCS 9806090216
Download: ML20248J613 (5)


See also: IR 05000458/1998011

Text

_ _ - _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _

. _ _ _ _

. _ _ .

_ . _ . _ _ _

.

g* "' CW

OfdlT E D ST ATE S

g

A

ft

NUCLEAR REGULATORY COMMISSION

,

REGION IV

6.

' '

611 RYAN PLAZA DRIVE, SUITE 400

\\ *#

S

AR LINGTON. TE XAS 76011 8064

9 * se*

June 4, 1998

John R. McGaha, Vice President - Operations

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

SUBJECT: NRC INSPECTION REPORT 50-458/98-11

Dear Mr. McGaha:

From May 18-21,1998, a routine inspection was conducted at your River Bend Station reactor

facility. The enclosed report presents the scope and results of that inspection.

The results of this inspection indicate that you have implemented an inservice inspection

program that meets both the ASME Code and NRC regulatory requirements. However, two

oversights were identified during the inspection. The NRC inspector noted an instance where

100 percent of a weld was not examined and a relief request had not been submitted. In

sddition, a quality control nondestructive examiner identified the improper use of a calibration

standard during the preservice and first 120-month inservice inspection interval examinations for

ultrasonic examination of a weld between pipes of different thickness. In each case, the subject

weld was not required to be examined by the ASME Code and NRC regulatory requirements.

However, the oversights indicated a need to improve the review of your inservice inspection

data.

It is our understanding that during the exit meeting 1 May 21,1998, Mr. Dan Pace, Director,

Engineering, stated Entergy Operations, Inc., wa

perform a review of past inservice test data

and relief requests to assure that appropriate

sequests have been, or will be, subtritted by

December 1,1998 (this date corresponds te-

..onths following the end of the first 120 month

inservice inspection interval), and that the rev,ew will be completed by November 1,199E

Additionally, Mr. Pace stated Entergy Operations, Inc., would perform a review of piping

configurations that had a change in pipe thickness to determine if proper calibration standards

were used for the performance of ultrasonic examinations and that the review would be

completed by August 31,1998. Please confirm these regulatory commitments in writing within

30 days of the date of tt.is letter.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

\\ 1

l

9806090216 900604

PDR

ADOCK 05000458

G

PDR

.

..

-

_ _ - _ _ - _ _ _ _ _ _ _ _ _ -

__

.-

_ - -___ ____________ ____ __ _ _ -_ _____ _ _ _ _ _ - _ - _ _ _ _ _ _ - - _ _ _ - _ ___ _ - _ _ _ _ .

.

-_

.

.

l.

Entergy Operations, in-

-2-

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

l

W

,

Dr. Dale A. Powers, Chief

Maintenance Branch

Division of Reactor Safety

Docket No.:

50-458

License No.: NPF-47

Enclosure:

NRC Inspection Report

50-458/98-11

cc w/enclocure:

Executive Vice President and

Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

l

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

General Manager

Plant Operations

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

Director- Nuclear Safety

River Bend Station

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

-

_ _ _ _ - _ _ _ _ _

- - _ _ _ _

t

.

.

l-

l

Entergy Operations, Inc.

-3-

Wise, Carter, Child & Caraway

,

P.O. Box 651

'

Jackson, Mississippi 39205

Mark J. Wetterbahn, Esq.

Winston & Strewn

1401 L Street, N.W.

'

Washington, D.C. 20005-3502

Manager- Licensing

River Bond Station -

Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775

The Honorable Richard P. leyoub

Attorney General

Department of Justice

State of Louisiana

P.O. Dox 94005

Baton Rouge, Louisiana 70804-9005

H. Anne Plettinger

3456 Villa Rose Drive

Baton Rouge, Louisiana 70806

1

President of West Feliciana

l

Police Jury

l'

P.O. Box 1921

St. Francisville, Louisiana 70775

William H. Spell, Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135

- _

_ - - - _

_ _

_ - _ _

_ _ _ _ _ _ _ - _

. _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _

_ _ . _ _ _ _ _ - _ _ _ _ _ _ _ ___

.-

.

Entergy Operations, Inc.

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT) .

l

bec to DCD (IE01) - DHS, DRP, and Decommissioning

!

bec distrib. by RIV:

Regior.al Administrator

Senior Resident inspector (Grand Gulf)

DRP Director

DRS-PSB

Branch Chief (DRP/C)

MIS System

Project Engineer (DRP/C)

RIV File

Branch Chief (DRP/TSS)

Resident inspector

DOCUMENT NAME: R:\\_RB\\RB811RP.CJP

To receive copy or dogument, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No cop'r

RIV: SRI:MS/

C:MB

f

C:PBC n j

C MB

CJPaulkn7b

DAPowers yg

EEColliddR(/

DAPowers f /7

v

i

05AT98[

0&J/98

  1. 6/%98

06/4/98

'

OFFICIAL RECORD d@PY

'

!

__:--__

--

.i

.

_

.

.

.

_

_ - _ _ _ - - _ - _ _

l

-

l.

. . .

..

I

i

Entergy Operations Inc.

-4-

e

l

l

l

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

l

E-Mail report to NRR Event Tracking System (IPAS) _

l

' E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

rgthoc to DCD (tE01)DDRSf DRP, and Dew,... 7'i's# L

5

.nanau- maw

aw.

an

bec distrib. by RIV:

Regional Administrator.

Senior Resident inspector (Grand Gulf)

DRP Director

DRS-PSB

Branch Chief (DRP/C)

MIS System

Project Engineer (DRP/C)

RIV File

Branch Chief (DRP/TSS)

Resident inspector

DOCUMENT NAME: R:\\_RB\\RB811RP.CJP

To receive copy of dogument, indicate in box:"C" = Copy without enclosuras "E" = Copy with enclosures "N" = No cop'r

RIV:SRl:MSaf

C:MB

f

C:PBC n j

C:MB

CJPaulkMb

DAPowers df

EECollirM{l/

DAPowers 34 P

05AT987

OGJ/98

J5/498

06/4/98

'

OFFICIAL RECORD Cl@PY

'

tD00E,E

--_-_--- _ -

- - - _ - -