ML20248J613
| ML20248J613 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 06/04/1998 |
| From: | Powers D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mcgaha J ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20248J616 | List: |
| References | |
| 50-458-98-11, NUDOCS 9806090216 | |
| Download: ML20248J613 (5) | |
See also: IR 05000458/1998011
Text
_ _ - _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _
. _ _ _ _
. _ _ .
_ . _ . _ _ _
.
g* "' CW
OfdlT E D ST ATE S
g
A
ft
NUCLEAR REGULATORY COMMISSION
,
REGION IV
6.
' '
611 RYAN PLAZA DRIVE, SUITE 400
\\ *#
S
9 * se*
June 4, 1998
John R. McGaha, Vice President - Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
SUBJECT: NRC INSPECTION REPORT 50-458/98-11
Dear Mr. McGaha:
From May 18-21,1998, a routine inspection was conducted at your River Bend Station reactor
facility. The enclosed report presents the scope and results of that inspection.
The results of this inspection indicate that you have implemented an inservice inspection
program that meets both the ASME Code and NRC regulatory requirements. However, two
oversights were identified during the inspection. The NRC inspector noted an instance where
100 percent of a weld was not examined and a relief request had not been submitted. In
sddition, a quality control nondestructive examiner identified the improper use of a calibration
standard during the preservice and first 120-month inservice inspection interval examinations for
ultrasonic examination of a weld between pipes of different thickness. In each case, the subject
weld was not required to be examined by the ASME Code and NRC regulatory requirements.
However, the oversights indicated a need to improve the review of your inservice inspection
data.
It is our understanding that during the exit meeting 1 May 21,1998, Mr. Dan Pace, Director,
Engineering, stated Entergy Operations, Inc., wa
perform a review of past inservice test data
and relief requests to assure that appropriate
sequests have been, or will be, subtritted by
December 1,1998 (this date corresponds te-
..onths following the end of the first 120 month
inservice inspection interval), and that the rev,ew will be completed by November 1,199E
Additionally, Mr. Pace stated Entergy Operations, Inc., would perform a review of piping
configurations that had a change in pipe thickness to determine if proper calibration standards
were used for the performance of ultrasonic examinations and that the review would be
completed by August 31,1998. Please confirm these regulatory commitments in writing within
30 days of the date of tt.is letter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosure will be placed in the NRC Public Document Room (PDR).
\\ 1
l
9806090216 900604
ADOCK 05000458
G
.
..
-
_ _ - _ _ - _ _ _ _ _ _ _ _ _ -
__
.-
_ - -___ ____________ ____ __ _ _ -_ _____ _ _ _ _ _ - _ - _ _ _ _ _ _ - - _ _ _ - _ ___ _ - _ _ _ _ .
.
-_
.
.
l.
Entergy Operations, in-
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
l
W
,
Dr. Dale A. Powers, Chief
Maintenance Branch
Division of Reactor Safety
Docket No.:
50-458
License No.: NPF-47
Enclosure:
NRC Inspection Report
50-458/98-11
cc w/enclocure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
l
Vice President
Operations Support
Entergy Operations, Inc.
P.O. Box 31995
Jackson, Mississippi 39286-1995
General Manager
Plant Operations
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
Director- Nuclear Safety
River Bend Station
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
-
_ _ _ _ - _ _ _ _ _
- - _ _ _ _
t
.
.
l-
l
Entergy Operations, Inc.
-3-
Wise, Carter, Child & Caraway
,
P.O. Box 651
'
Jackson, Mississippi 39205
Mark J. Wetterbahn, Esq.
Winston & Strewn
1401 L Street, N.W.
'
Washington, D.C. 20005-3502
Manager- Licensing
River Bond Station -
Entergy Operations, Inc.
P.O. Box 220
St. Francisville, Louisiana 70775
The Honorable Richard P. leyoub
Attorney General
Department of Justice
State of Louisiana
P.O. Dox 94005
Baton Rouge, Louisiana 70804-9005
H. Anne Plettinger
3456 Villa Rose Drive
Baton Rouge, Louisiana 70806
1
President of West Feliciana
l
Police Jury
l'
P.O. Box 1921
St. Francisville, Louisiana 70775
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
- _
_ - - - _
_ _
_ - _ _
_ _ _ _ _ _ _ - _
. _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
_ _ . _ _ _ _ _ - _ _ _ _ _ _ _ ___
.-
.
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT) .
l
bec to DCD (IE01) - DHS, DRP, and Decommissioning
!
bec distrib. by RIV:
Regior.al Administrator
Senior Resident inspector (Grand Gulf)
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
Branch Chief (DRP/TSS)
Resident inspector
DOCUMENT NAME: R:\\_RB\\RB811RP.CJP
To receive copy or dogument, Indicate in box:"C" = Copy without enclosures "E" = Copy with enclosures "N" = No cop'r
RIV: SRI:MS/
C:MB
f
C:PBC n j
C MB
CJPaulkn7b
DAPowers yg
EEColliddR(/
DAPowers f /7
v
i
05AT98[
0&J/98
- 6/%98
06/4/98
'
OFFICIAL RECORD d@PY
'
!
__:--__
--
.i
.
_
.
.
.
_
_ - _ _ _ - - _ - _ _
l
-
l.
. . .
..
I
i
Entergy Operations Inc.
-4-
e
l
l
l
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
l
E-Mail report to NRR Event Tracking System (IPAS) _
l
' E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
rgthoc to DCD (tE01)DDRSf DRP, and Dew,... 7'i's# L
5
.nanau- maw
aw.
an
bec distrib. by RIV:
Regional Administrator.
Senior Resident inspector (Grand Gulf)
DRP Director
DRS-PSB
Branch Chief (DRP/C)
MIS System
Project Engineer (DRP/C)
RIV File
Branch Chief (DRP/TSS)
Resident inspector
DOCUMENT NAME: R:\\_RB\\RB811RP.CJP
To receive copy of dogument, indicate in box:"C" = Copy without enclosuras "E" = Copy with enclosures "N" = No cop'r
RIV:SRl:MSaf
C:MB
f
C:PBC n j
C:MB
CJPaulkMb
DAPowers df
EECollirM{l/
DAPowers 34 P
05AT987
OGJ/98
J5/498
06/4/98
'
OFFICIAL RECORD Cl@PY
'
tD00E,E
--_-_--- _ -