                                                June 9, 1998~
June 9, 1998~
,
,
      Mr. G. Rainey, President
Mr. G. Rainey, President
      PECO Nuclear
PECO Nuclear
      Nuclear Group Headquarters -
Nuclear Group Headquarters -
      Correspondence Control Desk
Correspondence Control Desk
      P. O. Box 195
P. O. Box 195
      Wayne, Pennsylvania 19087-0195
Wayne, Pennsylvania 19087-0195
    . SUBJECT:       NRC INTEGRATED INSPECTION REPORT 50-277/98-02,50-278/98-02;
. SUBJECT:
                        NOTICE OF VIOLATION
NRC INTEGRATED INSPECTION REPORT 50-277/98-02,50-278/98-02;
      Dear Mr. Rainey:
NOTICE OF VIOLATION
      On May 4,1998, the NRC completed an inspection at the Peach Bottom Atomic Power
Dear Mr. Rainey:
      Station, Delta, Pennsylvania. The enclosed report presents the resutts of that inspection.
On May 4,1998, the NRC completed an inspection at the Peach Bottom Atomic Power
      During the severe a .< period covered by this inspection period, the conduct of activities
Station, Delta, Pennsylvania. The enclosed report presents the resutts of that inspection.
L     at the Peach Bottom facility was generally characterized by safety-conscious operations
During the severe a .< period covered by this inspection period, the conduct of activities
      and well-coordinated maintenance activities. We also noted good engineering support of
L
      plant operations.
at the Peach Bottom facility was generally characterized by safety-conscious operations
      Based on the results of this inspection, the NRC has determined that two violations of NRC
and well-coordinated maintenance activities. We also noted good engineering support of
      requirements occurred. These violations are cited in the enclosed Notice of Violation
plant operations.
      (Notice) and the circumstances surrounding them are described in detail in the subject
Based on the results of this inspection, the NRC has determined that two violations of NRC
      inspection report. The first violation involved a high pressure coolant injection (HPCI)
requirements occurred. These violations are cited in the enclosed Notice of Violation
      system operating procedure that did not provide aGequate instructions regarding the HPCI
(Notice) and the circumstances surrounding them are described in detail in the subject
      pump turbine vibration monitoring system. The se cond violation was the failure of health
inspection report. The first violation involved a high pressure coolant injection (HPCI)
      physics versonnel to follow radiation area control grocedures regarding posting of an open
system operating procedure that did not provide aGequate instructions regarding the HPCI
      door to a potential high radiation area. Both of the violations were NRC-identified.
pump turbine vibration monitoring system. The se cond violation was the failure of health
      We are also concerned about a number of instances of plant valves being identified out of
physics versonnel to follow radiation area control grocedures regarding posting of an open
['   _ their required or expected position. Although several of these valves were in non-safety
door to a potential high radiation area. Both of the violations were NRC-identified.
      related systems, three valves were in safety related systems. We determined that, taken
We are also concerned about a number of instances of plant valves being identified out of
      collec+ively, these items represented a weakness in plant status control. Some of the         /
['
_ their required or expected position. Although several of these valves were in non-safety
related systems, three valves were in safety related systems. We determined that, taken
collec+ively, these items represented a weakness in plant status control. Some of the
/
i
i
investigations for these issues were still in progress at the end of our inspection.
[
'
Accordingly, we have opened an unresolved item to review the results of your
j
investigations into the7 mispositionings.
/
'
'
      investigations for these issues were still in progress at the end of our inspection.          [
You are required to respond to this letter and should follow the instructions specified in the
      Accordingly, we have opened an unresolved item to review the results of your                      j
enclosed Notice when preparing your response. The NRC will use your response, in part,
      investigations into the7 mispositionings.                                                        /
to determine whether further enforcement action is necessary to ensure compliance with
                                                                                                          '
regulatory requirements.
      You are required to respond to this letter and should follow the instructions specified in the
9906160026 990609
      enclosed Notice when preparing your response. The NRC will use your response, in part,
PDR
      to determine whether further enforcement action is necessary to ensure compliance with
ADOCl4 05000277
      regulatory requirements.
G
      9906160026 990609
PDR
        PDR   ADOCl4 05000277
OFFICIAL RECORD COPY
        G                     PDR
IE:01
                                            OFFICIAL RECORD COPY                           IE:01
!
!


                                    _ _ _ . - . _ _   _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ . - . _ _
  ,
_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _
,
l
l
  ,
,
                Mr. G. Rainey                                                                                 2
Mr. G. Rainey
2
l
l
                In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
                and its enclosures will be placed in the NRC Public Document Room (PDR).
and its enclosures will be placed in the NRC Public Document Room (PDR).
                We appreciate your cooperation.
We appreciate your cooperation.
                                                                                                                                                                              ;
;
                                                                                                                                                                              1
1
                                                                                                          Sincerely,
Sincerely,
                                                                                                                  f
f
                                                                                                                        !         ()/
!
                                                                                                          Clifford J. Anderson, Chief
()/
                                                                                                          Projects Branch 4
Clifford J. Anderson, Chief
                                                                                                          Division of Reactor Projects
Projects Branch 4
                Docket Nos.: 50-277,50-278
Division of Reactor Projects
                License Nos.: DPR-44, DPR-56
Docket Nos.: 50-277,50-278
                Enclosures:
License Nos.: DPR-44, DPR-56
                1. Notice of Violation
Enclosures:
                2. Inspection Report Nos. 50-277/98-02,50-278/98-02                                                                                                           I
1. Notice of Violation
                                                                                                                                                                              l
2. Inspection Report Nos. 50-277/98-02,50-278/98-02
                cc w/encis:
I
                G. Edwards, Chairman, Nuclear Review Board and Director, Licensing
l
                J. Doering, Vice President, Peach Bottom Atomic Power Station
cc w/encis:
                J. B. Cotton, Vice President, Nuclear Station Suppert
G. Edwards, Chairman, Nuclear Review Board and Director, Licensing
                T. Niessen, Director, Nuclear Quality Assurance
J. Doering, Vice President, Peach Bottom Atomic Power Station
                A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.
J. B. Cotton, Vice President, Nuclear Station Suppert
                M. Warner, Plant Manager, Peach Bottom Atomic Power Station
T. Niessen, Director, Nuclear Quality Assurance
                G. J. Lengyel, Manager, Experience Assessment
A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.
                J. W. Durham, Sr., Senior Vice President and General Counsel
M. Warner, Plant Manager, Peach Bottom Atomic Power Station
                T. M. Messick, Manager, Joint Generation, Atlantic Electric
G. J. Lengyel, Manager, Experience Assessment
                W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas
J. W. Durham, Sr., Senior Vice President and General Counsel
                R. McLean, Power Plant Siting, Nuclear Evaluations
T. M. Messick, Manager, Joint Generation, Atlantic Electric
                J. Vannoy, Acting Secretmy of Hai'ord County Council
W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas
                R. Ochs, Maryland Safe Energy Coalition
R. McLean, Power Plant Siting, Nuclear Evaluations
J. Vannoy, Acting Secretmy of Hai'ord County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
,
,
'
'
                J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
                Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
l
l               Mr. & Mrs. Kip Adams
Mr. & Mrs. Kip Adams
                Commonwealth of Pennsylvania
Commonwealth of Pennsylvania
i               State of Maryland
i
                TMI- Alert (TMIA)
State of Maryland
TMI- Alert (TMIA)
L
L
                                                                                                                                                                              .
.
L
L
l
l
L__ _ __ __ __         _ - . _ _ _                 __                                                                                                                       J
L__
_ __ __ __
_ - . _ _ _
__
J


                                                          _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _                                                                                           --_
_ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _
--_
>
>
              Mr. G. Rainey                                                 3
Mr. G. Rainey
              Distribution w/encls:
3
              Region i Docket Room (with concurrences)
Distribution w/encls:
              H.' Miller, RA/W. Axelson, DRA
Region i Docket Room (with concurrences)
              C. Anderson, DRP
H.' Miller, RA/W. Axelson, DRA
              D. Florek, DRP
C. Anderson, DRP
              R. Junod, DRP
D. Florek, DRP
              Nuclear Safety Information Center (NSIC)
R. Junod, DRP
              NRC Resident inspector
Nuclear Safety Information Center (NSIC)
              PUBLIC
NRC Resident inspector
              Distribution w/ encl: (Via E-Mail)
PUBLIC
              8. McCabe, OEDO
Distribution w/ encl: (Via E-Mail)
              R. Capra, PDI-2, NRR
8. McCabe, OEDO
              inspection Program Branch, NRR (IPAS)
R. Capra, PDI-2, NRR
              M. Thadani, NRR
inspection Program Branch, NRR (IPAS)
              B. Buckley, NRR
M. Thadani, NRR
              R. Correia, NRR
B. Buckley, NRR
              F. Talbot, Nr1R
R. Correia, NRR
              M. Campion, ORA
F. Talbot, Nr1R
              DOCDESK
M. Campion, ORA
              DOCUMENT NAME: G:\ BRANCH 4\PB\PB980202. INS
DOCDESK
              To receive a copy of this document, indicate in the box: "C" = Copy without
DOCUMENT NAME: G:\\ BRANCH 4\\PB\\PB980202. INS
              attachment / enclosure "E" = Copy with attachm9nt/ enclosure "N" = No copy
To receive a copy of this document, indicate in the box: "C" = Copy without
                OFFICE       Rl/DRP         l   Rl/DRP                                           l
attachment / enclosure
                NAME         DFlohk/           CAnderson cp
"E" = Copy with attachm9nt/ enclosure
                                                                                    '
"N" = No copy
                DATE          06/ /A@           06/9 /98
OFFICE
                                                OFFICIAL RECORD COP (
Rl/DRP
                                                                                                                                                                                                            !
l
                                                                                                                                                                                                            !
Rl/DRP
                                                                                                                                                                                                            1
l
NAME
DFlohk/
CAnderson cp
DATE
06/ /A@
06/9 /98
'
OFFICIAL RECORD COP (
!
!
1
l
l
u__-_--__. __ _:_____.-_-___                     _                     _                                   _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ - _ _ - _ - _
u__-_--__.
__
_:_____.-_-___
_
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ - _ _ - _ - _
}}
}}

Latest revision as of 14:26, 30 November 2024

Forwards Insp Repts 50-277/98-02 & 50-278/98-02 on 980315- 0504 & Notice of Violation Re Failure of Health Physics Personnel to Follow Radiation Area Control Procedures
ML20249A070
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/09/1998
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20249A071 List:
References
50-277-98-02, 50-277-98-2, NUDOCS 9806160026
Download: ML20249A070 (3)


See also: IR 05000277/1998002

Text

.

.. ____- _ _ _

4

June 9, 1998~

,

Mr. G. Rainey, President

PECO Nuclear

Nuclear Group Headquarters -

Correspondence Control Desk

P. O. Box 195

Wayne, Pennsylvania 19087-0195

. SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-277/98-02,50-278/98-02;

NOTICE OF VIOLATION

Dear Mr. Rainey:

On May 4,1998, the NRC completed an inspection at the Peach Bottom Atomic Power

Station, Delta, Pennsylvania. The enclosed report presents the resutts of that inspection.

During the severe a .< period covered by this inspection period, the conduct of activities

L

at the Peach Bottom facility was generally characterized by safety-conscious operations

and well-coordinated maintenance activities. We also noted good engineering support of

plant operations.

Based on the results of this inspection, the NRC has determined that two violations of NRC

requirements occurred. These violations are cited in the enclosed Notice of Violation

(Notice) and the circumstances surrounding them are described in detail in the subject

inspection report. The first violation involved a high pressure coolant injection (HPCI)

system operating procedure that did not provide aGequate instructions regarding the HPCI

pump turbine vibration monitoring system. The se cond violation was the failure of health

physics versonnel to follow radiation area control grocedures regarding posting of an open

door to a potential high radiation area. Both of the violations were NRC-identified.

We are also concerned about a number of instances of plant valves being identified out of

['

_ their required or expected position. Although several of these valves were in non-safety

related systems, three valves were in safety related systems. We determined that, taken

collec+ively, these items represented a weakness in plant status control. Some of the

/

i

investigations for these issues were still in progress at the end of our inspection.

[

'

Accordingly, we have opened an unresolved item to review the results of your

j

investigations into the7 mispositionings.

/

'

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

9906160026 990609

PDR

ADOCl4 05000277

G

PDR

OFFICIAL RECORD COPY

IE:01

!

_ _ _ . - . _ _

_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _

,

l

,

Mr. G. Rainey

2

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR).

We appreciate your cooperation.

1

Sincerely,

f

!

()/

Clifford J. Anderson, Chief

Projects Branch 4

Division of Reactor Projects

Docket Nos.: 50-277,50-278

License Nos.: DPR-44, DPR-56

Enclosures:

1. Notice of Violation

2. Inspection Report Nos. 50-277/98-02,50-278/98-02

I

l

cc w/encis:

G. Edwards, Chairman, Nuclear Review Board and Director, Licensing

J. Doering, Vice President, Peach Bottom Atomic Power Station

J. B. Cotton, Vice President, Nuclear Station Suppert

T. Niessen, Director, Nuclear Quality Assurance

A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.

M. Warner, Plant Manager, Peach Bottom Atomic Power Station

G. J. Lengyel, Manager, Experience Assessment

J. W. Durham, Sr., Senior Vice President and General Counsel

T. M. Messick, Manager, Joint Generation, Atlantic Electric

W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas

R. McLean, Power Plant Siting, Nuclear Evaluations

J. Vannoy, Acting Secretmy of Hai'ord County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

,

'

Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance

l

Mr. & Mrs. Kip Adams

Commonwealth of Pennsylvania

i

State of Maryland

TMI- Alert (TMIA)

L

.

L

l

L__

_ __ __ __

_ - . _ _ _

__

J

_ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _

--_

>

Mr. G. Rainey

3

Distribution w/encls:

Region i Docket Room (with concurrences)

H.' Miller, RA/W. Axelson, DRA

C. Anderson, DRP

D. Florek, DRP

R. Junod, DRP

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

PUBLIC

Distribution w/ encl: (Via E-Mail)

8. McCabe, OEDO

R. Capra, PDI-2, NRR

inspection Program Branch, NRR (IPAS)

M. Thadani, NRR

B. Buckley, NRR

R. Correia, NRR

F. Talbot, Nr1R

M. Campion, ORA

DOCDESK

DOCUMENT NAME: G:\\ BRANCH 4\\PB\\PB980202. INS

To receive a copy of this document, indicate in the box: "C" = Copy without

attachment / enclosure

"E" = Copy with attachm9nt/ enclosure

"N" = No copy

OFFICE

Rl/DRP

l

Rl/DRP

l

NAME

DFlohk/

CAnderson cp

DATE

06/ /A@

06/9 /98

'

OFFICIAL RECORD COP (

!

!

1

l

u__-_--__.

__

_:_____.-_-___

_

_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ - _ _ - _ - _