June 9, 1998~
,
Mr. G. Rainey, President
PECO Nuclear
Nuclear Group Headquarters -
Correspondence Control Desk
P. O. Box 195
Wayne, Pennsylvania 19087-0195
. SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-277/98-02,50-278/98-02;
Dear Mr. Rainey:
On May 4,1998, the NRC completed an inspection at the Peach Bottom Atomic Power
Station, Delta, Pennsylvania. The enclosed report presents the resutts of that inspection.
During the severe a .< period covered by this inspection period, the conduct of activities
L
at the Peach Bottom facility was generally characterized by safety-conscious operations
and well-coordinated maintenance activities. We also noted good engineering support of
plant operations.
Based on the results of this inspection, the NRC has determined that two violations of NRC
requirements occurred. These violations are cited in the enclosed Notice of Violation
(Notice) and the circumstances surrounding them are described in detail in the subject
inspection report. The first violation involved a high pressure coolant injection (HPCI)
system operating procedure that did not provide aGequate instructions regarding the HPCI
pump turbine vibration monitoring system. The se cond violation was the failure of health
physics versonnel to follow radiation area control grocedures regarding posting of an open
door to a potential high radiation area. Both of the violations were NRC-identified.
We are also concerned about a number of instances of plant valves being identified out of
['
_ their required or expected position. Although several of these valves were in non-safety
related systems, three valves were in safety related systems. We determined that, taken
collec+ively, these items represented a weakness in plant status control. Some of the
/
i
investigations for these issues were still in progress at the end of our inspection.
[
'
Accordingly, we have opened an unresolved item to review the results of your
j
investigations into the7 mispositionings.
/
'
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
9906160026 990609
ADOCl4 05000277
G
OFFICIAL RECORD COPY
IE:01
!
_ _ _ . - . _ _
_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _
,
l
,
Mr. G. Rainey
2
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
We appreciate your cooperation.
1
Sincerely,
f
!
()/
Clifford J. Anderson, Chief
Projects Branch 4
Division of Reactor Projects
Docket Nos.: 50-277,50-278
Enclosures:
2. Inspection Report Nos. 50-277/98-02,50-278/98-02
I
l
cc w/encis:
G. Edwards, Chairman, Nuclear Review Board and Director, Licensing
J. Doering, Vice President, Peach Bottom Atomic Power Station
J. B. Cotton, Vice President, Nuclear Station Suppert
T. Niessen, Director, Nuclear Quality Assurance
A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.
M. Warner, Plant Manager, Peach Bottom Atomic Power Station
G. J. Lengyel, Manager, Experience Assessment
J. W. Durham, Sr., Senior Vice President and General Counsel
T. M. Messick, Manager, Joint Generation, Atlantic Electric
W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas
R. McLean, Power Plant Siting, Nuclear Evaluations
J. Vannoy, Acting Secretmy of Hai'ord County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
,
'
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
l
Mr. & Mrs. Kip Adams
Commonwealth of Pennsylvania
i
State of Maryland
TMI- Alert (TMIA)
L
.
L
l
L__
_ __ __ __
_ - . _ _ _
__
J
_ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - _ - _ _ _ _ _ _
--_
>
Mr. G. Rainey
3
Distribution w/encls:
Region i Docket Room (with concurrences)
H.' Miller, RA/W. Axelson, DRA
C. Anderson, DRP
D. Florek, DRP
R. Junod, DRP
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
PUBLIC
Distribution w/ encl: (Via E-Mail)
8. McCabe, OEDO
R. Capra, PDI-2, NRR
inspection Program Branch, NRR (IPAS)
M. Thadani, NRR
B. Buckley, NRR
R. Correia, NRR
F. Talbot, Nr1R
M. Campion, ORA
DOCDESK
DOCUMENT NAME: G:\\ BRANCH 4\\PB\\PB980202. INS
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment / enclosure
"E" = Copy with attachm9nt/ enclosure
"N" = No copy
OFFICE
Rl/DRP
l
Rl/DRP
l
NAME
DFlohk/
CAnderson cp
DATE
06/ /A@
06/9 /98
'
OFFICIAL RECORD COP (
!
!
1
l
u__-_--__.
__
_:_____.-_-___
_
_
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ - _ _ - _ - _