January 5,1978                   h PRELIMINARY NOTIFICATION OF EVENT OR UNt'SUAL OCCURRENCE--PNO-78-01                                     ,
PRELIMINARY NOTIFICATION
This preliminary notification constitutes EARLY notice of an' event of POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is casically all that is known by IE staff on this date.             b Facility:           James A. FitzPatrick '(DN 50-333)
[/
        ,                                          Scriba, New York
h January 5,1978 PRELIMINARY NOTIFICATION OF EVENT OR UNt'SUAL OCCURRENCE--PNO-78-01 This preliminary notification constitutes EARLY notice of an' event of POSSIBLE safety or public interest significance.
The information presented is as initially received without verification or evaluation and is casically all that is known by IE staff on this date.
b Facility:
James A. FitzPatrick '(DN 50-333)
Scriba, New York


==Subject:==
==Subject:==
0FF-GAS SYSTEM The licensee experienced problems in placing the hydrogen 0;f-Gas i       Recombiner Syst.em in operation on January 4,1978. It appears that I       a sustained hydrogen combustion is occurring in the piping between the Air Ejectors used on.the main turbine condenser and the hydrogen l        Off-Gas Recombiner. Temperature and' pressure instrumentation moni-toring this section of piping are operating below thei'r alarm setpoints.
0FF-GAS SYSTEM The licensee experienced problems in placing the hydrogen 0;f-Gas i
                      !        The plant is operating at 100 percent power level. Radiation release rates have not been affected.
Recombiner Syst.em in operation on January 4,1978.
It appears that I
a sustained hydrogen combustion is occurring in the piping between the l
Air Ejectors used on.the main turbine condenser and the hydrogen Off-Gas Recombiner. Temperature and' pressure instrumentation moni-toring this section of piping are operating below thei'r alarm setpoints.
The plant is operating at 100 percent power level. Radiation release rates have not been affected.
This cendition' has previously been identified by the General Electric
This cendition' has previously been identified by the General Electric
                        = - Company to the licensee by their Service Letter No. SIL 246.
.= - Company to the licensee by their Service Letter No. SIL 246.
This service letter described the. sustained combustion condition based
This service letter described the. sustained combustion condition based
                          'N , _upon' occurrences at other plants. The licensee plans to attempt to "N*~~MTxTinctish the combustion this evening in accordance with the service                                                       ,
'N, _upon' occurrences at other plants. The licensee plans to attempt to "N*~~MTxTinctish the combustion this evening in accordance with the service li. 'ter i' instructions.
li. 'ter i' instructions.
f Media interest is ' expected because ofl sensitivity to BWR Off-Gas System probler:s. The State ~of New York has been. informed.
f                   Media interest is ' expected because ofl sensitivity to BWR Off-Gas System probler:s . The State ~of New York has been . informed. 'A press release is                   [
'A press release is
            .'                  not planned by the. lic'ensee nor .NRC.
[
D NRC, Region I, (Philadelphia)' received ' notification of this occurrence                     A i                  by telephone from the Plant Superir.tendent at 8 45 a.m., January 5,1978.                     o Contac : GKlingler IE, .x28019 FNolan IE x28019' JSniezek IE, x28019 i                 Distribution:         Transmitted H St / .N
not planned by the. lic'ensee nor.NRC.
                                .Chaiman Hendrie             ~
D NRC, Region I, (Philadelphia)' received ' notification of this occurrence A
Commissioner Bradford Commissioner Kennedy .               S. J. Chilk, SECY         C.. C. Kammerer, CA                   i Commissioner Gilinsky .                                         (For Distribution)                   I Transtr.itted: MNBB'2)D3.             P Bldg in o 7           _E; Volgenau. IE L. V. Gossick,. EDO                   E. G. Case, NRR           Region 5 1.             l /f S. H. :-ianauer, EDO                                                                             ,
by telephone from the Plant Superir.tendent at 8 45 a.m., January 5,1978.
ip               J. J. Fouchar,d,. PA                 SS Bldg 1 :( 0             (MAIL) i ;<
o i
R. Har: field MIPC ,                 C. V. Smith, NMSS         R. J. McTiernan, OIA V'<                                                                                 .    .
Contac :
R. G. Ryan,' OSP                                               R. Minogue, SD                   l
GKlingler IE,.x28019 FNolan IE x28019' JSniezek IE, x28019 i
                          /.
Distribution:
H. K. Shapar, ELD
Transmitted H St /.N Commissioner Bradford
                                              ~
.Chaiman Hendrie
l
~
[_,                                         PRELIMINARY NOTIFICATION g
Commissioner Kennedy.
e   s                                           *
S. J. Chilk, SECY C.. C. Kammerer, CA i
!                    9806160089 780105 l                   PDR       I&E l                   PNO-78-OO1                 PDR                                                                                   ;
Commissioner Gilinsky.
L_--______________.                                                                                                                     i}}
(For Distribution)
I Transtr.itted:
MNBB'2)D3.
P Bldg in o 7
_E; Volgenau. IE L. V. Gossick,. EDO E. G. Case, NRR Region 5
: 1. l /f S. H. :-ianauer, EDO ip J. J. Fouchar,d,. PA SS Bldg 1 :( 0 (MAIL)
V'<
R. Har: field MIPC,
C. V. Smith, NMSS R. J. McTiernan, OIA i ;<
/.
R. G. Ryan,' OSP R. Minogue, SD l
H. K. Shapar, ELD l
~
[_,
PRELIMINARY NOTIFICATION g
e s
9806160089 780105 l
PDR I&E l
PNO-78-OO1 PDR L_--______________.
i}}

Latest revision as of 14:24, 30 November 2024

PNO-78-001:on 780104,licensee Experience Problems Placing Hydrogen Off-Gas Recombiner Sys in Operation Due to Occurrence of Sustained Hydrogen Combustion.Problem Previously Identified in GE Svc Ltr SIL 246
ML20249A129
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/05/1978
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-78-001, PNO-78-1, NUDOCS 9806160089
Download: ML20249A129 (1)


Text

NMit 0/ @'ll & fjg,

~

PRELIMINARY NOTIFICATION

[/

h January 5,1978 PRELIMINARY NOTIFICATION OF EVENT OR UNt'SUAL OCCURRENCE--PNO-78-01 This preliminary notification constitutes EARLY notice of an' event of POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is casically all that is known by IE staff on this date.

b Facility:

James A. FitzPatrick '(DN 50-333)

Scriba, New York

Subject:

0FF-GAS SYSTEM The licensee experienced problems in placing the hydrogen 0;f-Gas i

Recombiner Syst.em in operation on January 4,1978.

It appears that I

a sustained hydrogen combustion is occurring in the piping between the l

Air Ejectors used on.the main turbine condenser and the hydrogen Off-Gas Recombiner. Temperature and' pressure instrumentation moni-toring this section of piping are operating below thei'r alarm setpoints.

The plant is operating at 100 percent power level. Radiation release rates have not been affected.

This cendition' has previously been identified by the General Electric

.= - Company to the licensee by their Service Letter No. SIL 246.

This service letter described the. sustained combustion condition based

'N, _upon' occurrences at other plants. The licensee plans to attempt to "N*~~MTxTinctish the combustion this evening in accordance with the service li. 'ter i' instructions.

f Media interest is ' expected because ofl sensitivity to BWR Off-Gas System probler:s. The State ~of New York has been. informed.

'A press release is

[

not planned by the. lic'ensee nor.NRC.

D NRC, Region I, (Philadelphia)' received ' notification of this occurrence A

by telephone from the Plant Superir.tendent at 8 45 a.m., January 5,1978.

o i

Contac :

GKlingler IE,.x28019 FNolan IE x28019' JSniezek IE, x28019 i

Distribution:

Transmitted H St /.N Commissioner Bradford

.Chaiman Hendrie

~

Commissioner Kennedy.

S. J. Chilk, SECY C.. C. Kammerer, CA i

Commissioner Gilinsky.

(For Distribution)

I Transtr.itted:

MNBB'2)D3.

P Bldg in o 7

_E; Volgenau. IE L. V. Gossick,. EDO E. G. Case, NRR Region 5

1. l /f S. H. :-ianauer, EDO ip J. J. Fouchar,d,. PA SS Bldg 1 :( 0 (MAIL)

V'<

R. Har: field MIPC,

C. V. Smith, NMSS R. J. McTiernan, OIA i ;<

/.

R. G. Ryan,' OSP R. Minogue, SD l

H. K. Shapar, ELD l

~

[_,

PRELIMINARY NOTIFICATION g

e s

9806160089 780105 l

PDR I&E l

PNO-78-OO1 PDR L_--______________.

i