ML20249B498: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-          __ _ - _ _ _ _ _ _ _ _ _ - _ - _ _ _ - _                                                                                      _
{{#Wiki_filter:l h
l h         !                        /* $                               %                            0 1       i                                                                                 .)
/* $
w
0 1
                                                                                                                                                )
i
PRELIMINARY NOTIFICATION
.)
                        ~
)
w PRELIMINARY NOTIFICATION
~
July 1, 6 76 l
July 1, 6 76 l
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-108                                                                               ,
PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-108 This preliminary notification constituted EARLY notice of an event of
This preliminary notification constituted EARLY notice of an event of                                                                             {
{
POSSIBLE safety or public interest significance. The information Presented is as inithily received without verification or evaluation and is basically all that is known by IE staff on this date.                                                                                                  .
POSSIBLE safety or public interest significance. The information Presented is as inithily received without verification or evaluation and is basically all that is known by IE staff on this date.
Fec.ility:                                           Commonwealth Edison, LaSalle 1 & 2 (DN 50-373 & 50-374)                                               g AA
Fec.ility:
Commonwealth Edison, LaSalle 1 & 2 (DN 50-373 & 50-374) g AA


==Subject:==
==Subject:==
CRAFT STRIKE AT LaSALLE NUCLFaR STATION Commonwealth Edison Company informed Region III that the craft strike that commenced at LaSalle on June 29, 1976, will probably continue                                                                                 a until sometime after July 4th weekend. No negotiations between the                                                                                   ,
CRAFT STRIKE AT LaSALLE NUCLFaR STATION Commonwealth Edison Company informed Region III that the craft strike that commenced at LaSalle on June 29, 1976, will probably continue a
Company and the Union are being conducted today. No violence or j                   problems have been reported.                                                                                                                             g
until sometime after July 4th weekend. No negotiations between the Company and the Union are being conducted today. No violence or j
      '                                                                                                                                                                  s         %
problems have been reported.
g s
The overall effect. of the strike has not been determined; however, it is assumed that the project construction schedule will be lengthened one day for each day of the strike.
The overall effect. of the strike has not been determined; however, it is assumed that the project construction schedule will be lengthened one day for each day of the strike.
This PN is being issued at this time because the length of the strike is expected to last longer than seven days.
This PN is being issued at this time because the length of the strike is expected to last longer than seven days.
t                      Region III received notification of this occurrence by telephone from the QA Supervisor from Commonwealth Edison Company on June 29, 1976, l                      (10:00 AM).
Region III received notification of this occurrence by telephone from t
l the QA Supervisor from Commonwealth Edison Company on June 29, 1976, (10:00 AM).
4
4


==Contact:==
==Contact:==
.RFWarnick,       IE x27261                   GWRoy,     IE x27261   DThompson, IE x27541 Distribution:
.RFWarnick, IE x27261
Chairman Rowden                                                                 Commissioner Mason                   S. J. Chilk, SECY           A
: GWRoy, IE x27261 DThompson, IE x27541 Distribution:
    ,                      Commissioner Gilinsky                                                           C. C. Kammerer, CA                   G. F. Murphy, JCAE         4 l
Chairman Rowden Commissioner Mason S. J. Chilk, SECY A
                          -Commissioner Kennedy L. V. Gossick, EDO                                                             E. Volgenau, OIE                     J. A. Harris, PA B. C. Rusche, NRR                                                               J. La Fleur, ISP                     T. J. McTiernan, AIA j                       K. R. Chapman, NMSS                                                             H. K. Shapar, ELD Transmitted:                                             P Bldg I         A. ;   HSt[                   _;  MNBBI   A. ; Luge       ;
Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE 4
    !                                                                                              PRELIMINARY NOTIFICATION
l
    >                          ,u -                                           .
-Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA j
i 9806230226 760701 PDR     I&E PNO-76-108                                                   PDR
K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted:
          -_ - - - -          -                        ---                                      __                  _                  _                _}}
P Bldg I A. ; HSt[
MNBBI A. ; Luge PRELIMINARY NOTIFICATION
,u -
i 9806230226 760701 PDR I&E PNO-76-108 PDR
_}}

Latest revision as of 14:05, 30 November 2024

PNO-76-108:on 760629,craft Strike Commenced at Plant & Will Probably Continue Until Sometime After July 4th Weekend. Effect of Strike Has Not Been Determined.Project Schedule Assumed to Be Lengthened 1 Day for Each Day of Strike
ML20249B498
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 07/01/1976
From: Roy G, Thompson D, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-108, NUDOCS 9806230226
Download: ML20249B498 (1)


Text

l h

/* $

0 1

i

.)

)

w PRELIMINARY NOTIFICATION

~

July 1, 6 76 l

PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-108 This preliminary notification constituted EARLY notice of an event of

{

POSSIBLE safety or public interest significance. The information Presented is as inithily received without verification or evaluation and is basically all that is known by IE staff on this date.

Fec.ility:

Commonwealth Edison, LaSalle 1 & 2 (DN 50-373 & 50-374) g AA

Subject:

CRAFT STRIKE AT LaSALLE NUCLFaR STATION Commonwealth Edison Company informed Region III that the craft strike that commenced at LaSalle on June 29, 1976, will probably continue a

until sometime after July 4th weekend. No negotiations between the Company and the Union are being conducted today. No violence or j

problems have been reported.

g s

The overall effect. of the strike has not been determined; however, it is assumed that the project construction schedule will be lengthened one day for each day of the strike.

This PN is being issued at this time because the length of the strike is expected to last longer than seven days.

Region III received notification of this occurrence by telephone from t

l the QA Supervisor from Commonwealth Edison Company on June 29, 1976, (10:00 AM).

4

Contact:

.RFWarnick, IE x27261

GWRoy, IE x27261 DThompson, IE x27541 Distribution:

Chairman Rowden Commissioner Mason S. J. Chilk, SECY A

Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE 4

l

-Commissioner Kennedy L. V. Gossick, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR J. La Fleur, ISP T. J. McTiernan, AIA j

K. R. Chapman, NMSS H. K. Shapar, ELD Transmitted:

P Bldg I A. ; HSt[

MNBBI A. ; Luge PRELIMINARY NOTIFICATION

,u -

i 9806230226 760701 PDR I&E PNO-76-108 PDR

_