| Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:f I | | {{#Wiki_filter:}} |
| i Dt,v ent Transmittal #: 97568 Date: 6/20/98
| |
| /%
| |
| + i
| |
| , (vTc: NRC (DC DESK) MAC: N/A Destination:
| |
| | |
| == Description:==
| |
| j Copy Copy Totals i Document: Revision: Comment: # INFO CNTL MSTR EOP0014 04 7 1 0 0 I
| |
| i 1
| |
| I 1
| |
| -l 1 LJ Instructions to the Addressee-1 i
| |
| Pinse venfy the document (s) received agrees with the above information.
| |
| Opcrations department must attach old document (s) or portions of document (s) superseded by the above 13 this transmittal.
| |
| l The signature indicates acknowledgment of receipt of the above document (s) and that documents have l been updated. Retum signed and dated transmittal to Document Control within 15 working days of l transmittal date to mail code; j i
| |
| NA1C y l Florida Power W dion Document Controi. NA1C Crystal River Energy Complex I bl l fN ) I'J'g g,* h 2, 15760 W. Power une St.
| |
| g Crystal River, FL 34428-6708
| |
| '%d Signature of Addressee: Date:
| |
| 9906260125 990620 PDR ADOCK 05000302 F POR j
| |
| | |
| ENCLS REV 04 E0P-14 g EMERGENCY OPERATING PROCEDURE ENCLOSURES 1 SP0 Post-Trip Actions 2 PPO Post Event Actions 3 Dry OTSG Recovery 4 Letdown Recovery 5
| |
| 6 MSIV Recovery OTSG Blowdown Lineup ii k
| |
| {%
| |
| 7 EFP-2 Management b
| |
| 8 MFW Restoration 9 OTSG Contaminated Waste Water Management 10 Alternate OTSG Feedwater Supply 11 EDG A Load Management 12 OTSG TRACC Isolation 13 High PRESS Aux Spray Lineup 14 Station Blackout Main Generator Purging 15 E0P Temperature Log 16 RCP Recovery 17 Control Complex Cmergency Ventilation 18 Control Complex Chiller Startup 19 ECCS Suction Transfer 20 Boron Precipitation Control 21 RB Hydrogen Monitor Log 22 Secondary Inventory Mana emen f
| |
| Approved by MNPO f/h-[W Ob/Sa n Date 06/20/98
| |
| ~(SIGNATURE ON FILE)
| |
| E0P-14 PAGE 1 of 303 ENCLS
| |
| | |
| l BLANK PAGE g.
| |
| O ENCLS REV 04 PAGE 2 of 303 E0P-14
| |
| | |
| ENCLOSURE 1 SP0 POST-TRIP ACTIONS ACTIONS DETAILS 1.1 Jf steam is available from 1 Ensure ASV-18 " Units 1 or 2 Unit 1 or 2. Supply Iso" is open THEN ensure correct lineup (119 ft TB NW wall).
| |
| and operation of AS components. 2 Open ASV-16 " Units 1 or 2 Supply Iso" (119 ft TB by AS Hdr).
| |
| 3 Ensure ASV-26 " Units 1 or 2 Supply Control" maintains 125 to 180 psig indicated on AS-25-PI "AS PRESS" (119 ft TB by AS Hdr).
| |
| 4 Ensure ASV-27 "MS to AS Control" is closed (119 ft TB by AS Hdr).
| |
| 1.2 Ensure main turbine drain
| |
| * TDV-104 "TDV-5 Iso" isolation valves are open (119 ft TB under high
| |
| * TDV-105 "TDV-10 Iso" PRESS turbine).
| |
| The consequences of not reducing to 2 operating CX Demins are channeling and ineffective demineralization may occur.
| |
| 1.3 JE CX demin area is accessible, 1 Jf automatic off line sequence is available.
| |
| THEN reduce to 2 03erating ILLE_N depress "0FF LINE CYCLE IN CX Demins (95 ft T9. PROGRESS" " START" push button for Demins to be removed from service.
| |
| 2 Ensure inlet and outlet valves are closed for Demins removed from service.
| |
| 3 Ensure flow 2 2000 gpm/Demin through 2 Demins.
| |
| O E0P-14 REV 04 PAGE 3 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 4 of 303 ENCLS
| |
| | |
| ENCLOSURE 1 SP0 POST-TRIP ACTIONS (CONT'D) h ACTIONS DETAILS 1.4 Perform post-trip DFT
| |
| * Close HVV-103 "Deaerator Vent lineup (162 ft TB by DFT). Iso".
| |
| * Close HDV-47 "FWHE-2A Heater to Deaerator Level Control Iso".
| |
| * Close HDV-48 "FWHE-2B Heater to Deaerator Level Control Iso" 1.5 Notify Cordrol Room of completed actions.
| |
| 1.6 EXIT this enclosure.
| |
| O O
| |
| E0P-14 REV 04 PAGE 5 of 303 ENCLS
| |
| | |
| I O
| |
| BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 6 of 303 ENCLS
| |
| | |
| ENCLOSURE 2 PP0 POST EVENT ACTIONS
| |
| ( ) ACTIONS DETAILS v
| |
| 2.1 Energize DHV-3
| |
| * Unlock and close ES MCC 3Al-3C "DHV-3. DH Suction from RCS" (95 ft AB).
| |
| 2.2 Energize HPI recirc to e Unlock and close DPDP 8A-4 sump valves. "MUV-543. MUV-544" (A ES 4160V SWGR Room).
| |
| 2.3 Energize PZR vent valves.
| |
| * Unlock and close DPDP 8A-13 "RCV-159. RCV-160" (A ES 4160V SWGR Room).
| |
| I I
| |
| 2.4 Energize WS valves for H2 l
| |
| * Unlock and close DPDP 8A-14
| |
| (')
| |
| v analyzers. "WSV-28, 30. 34. 42" (A ES 4160V SWGR Room).
| |
| i
| |
| ]
| |
| I 2.5 Ensure A DC cooling
| |
| * Ensure "DH COOLER 3A OUTLET TEMP. I control is aligned to CONTROL LOCATION" switch I Control Room. "DCV-177-MS" is selected to " CONTROL ROOM" (A ES 4160V SWGR Room).
| |
| 1 v'
| |
| E0P-14 REV 04 PAGE 7 of 303 ENCLS l
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 8 of 303 ENCLS
| |
| | |
| l ENCLOSURE 2.0 PPO POST EVENT ACTIONS (CONT'D)
| |
| , ( ') ACTIONS DETAILS
| |
| \s i
| |
| 2.6 Energize HPI recirc to e Unlock and close DPDP 8B-8 sump valves. "MUV-545. MUV-546" (B ES 4160V SWGR Room).
| |
| l i
| |
| 2.7 Energize WS valves for H2
| |
| * Unlock and close DPDP 8B-21 analyzers. "WSV-26. 32, 38, 41" (B ES 4160V SWGR Room). 3 i
| |
| I l
| |
| 2.8 Ensure B DC Cooling
| |
| * Ensure "DH COOLER 3B OUTLET TEt1P.
| |
| control is aligned to CONTROL LOCATION" switch 3 Control Room. "DCV-178-MS" is selected to " CONTROL '
| |
| ROOM" (B ES 4160V SWGR Room).
| |
| l I
| |
| ("~'s 2.9 Energize A loop HPVs.
| |
| * Unlock and close DPDP 5A-1
| |
| () "RCV-157. RCV-158" (
| |
| (A ES 480V SWGR Room). i i
| |
| l 2.10 Energize WS valves for H 2 e Unlock and close DPDP 5A-2 analyzers. "WSV-29. 31. 35. 43" (A ES 480V SWGR Room),
| |
| l 1
| |
| l i
| |
| 2.11 Energize B loop HPVs.
| |
| * Unlock and close DPDP 5B-1 !
| |
| "RCV-163. RCV-164" (B ES 480V SWGR Room).
| |
| fO j
| |
| U E0P-14 REV 04 PAGE 9 of 303 ENCLS
| |
| | |
| \ O BLANK PAGE g
| |
| 9 E0P-14 REV 04 PAGE 10 of 303 ENCLS
| |
| | |
| ENCLOSURE 2 PP0 POST EVENT ACTIONS (CONT'D)
| |
| -( ACTIONS DETAILS 2.12 Energize WS valves for H 2
| |
| * Unlock and close DPDP 5B-27 analyzers. "WSV-27, 33. 39, 40" (B ES 480V SWGR Room).
| |
| NQTE Which H, analyzer to_ be used should be based on pre existing (standby) _
| |
| status of analyzers and their power supplies. If VBXS 1A is not on its normal power supply, A analyzer should not be considered available. If VBXS-1B is not on its normal power supply, B analyzer should not be considered available.
| |
| 2.13 Notify NSS to choose H2 e Check selected H2 analyzer and analyzer and containment ' sample points:
| |
| sample points to be used.
| |
| l A Analyzer B Analyzer-RB Dome RB Dome RB Recirc RB Recirc Duct Duct l
| |
| l 2.14 IE B H, analyzer is to be placed in service.
| |
| THEN GO TO Step 2.19 in this enclosure.
| |
| i O
| |
| l E0P-14 REV 04- PAGE 11 of 303 ENCLS L
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 12 of 303 ENCLS
| |
| | |
| l-ENCLOSURE 2 PP0 POST EVENT ACTIONS (CONT *D)
| |
| N ACTIONS' DETAILS L.
| |
| STATUS The A H, analyzer is to be placed in service.
| |
| 2.15 Open Containment Moritor
| |
| * IE RB Dome was selected.
| |
| H, Sampling Valves for .TH N open the following valves:
| |
| sam)le point selected (A EFIC Room, RELAY RACK WSV-30 " CONTAINMENT MON.'H 2 RR4A). SAMPLING VALVE" WSV-31 " CONTAINMENT MON. H l
| |
| SAMPLING VALVE"
| |
| * IE RB Recirc Duct was selected.
| |
| THEN open the following valves:
| |
| WSV-28." CONTAINMENT MON. H 2 SAMPLING VALVE" O wsv-29 co"T^1"se"1 "o".
| |
| SAMPLING VALVE" "2
| |
| 2.16 Open the A'Hz analyzer
| |
| * WSV-42 " CONTAINMENT MON. H 2 return valves (A EFIC SAMPLING VALVE" Room, RELAY RACK RR4A).
| |
| e WSV-43 " CONTAINMENT MON. H2-SAMPLING VALVE" 1
| |
| (U E0P-14 REV 04 PAGE 13 of 303 ENCLS
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 14 of 303 ENCLS
| |
| | |
| ENCLOSURE 2 PP0 POST EVENT' ACTIONS'(CONT'D)
| |
| ?( ACTIONS DETAILS i2.17- Energize the A H2 analyzer e Select " System Power' switch to "0N" (A EFIC Room, RELAY RACK on WS-11-CS "CONTAINi1ENT MONITOR RR4A). MAIN SYSTEM CONTROL".
| |
| 2.18' Notify Control Room that PPO post event actions are complete with the A H analyzer in service and '
| |
| EXIT this enclosure.
| |
| l L
| |
| p ,
| |
| O E0P-14 REV 04 PAGE 15 of 303 ENCLS t I t _ i
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 16 of 303 ENCLS
| |
| | |
| [NCLOSURE 2 PP0 POST EVENT ACTIONS (CONT'D)
| |
| ( ') ACTIONS DETAILS STATUS The B H, analyzer is to be placed in service.
| |
| 2.19 Open Containment Monitor o E RB Dome was selected.
| |
| H2 Sampling Valves for THEN open the following valves:
| |
| sam)le point selected (B EFIC Room. RELAY RACK WSV-38 " CONTAINMENT MON. H2 RR4B). SAMPLING VALVE" WSV-39 " CONTAINMENT MON. H 2 SAMPLING VALVE" e E RB Recirc Duct was selected.
| |
| THEN open the following valves:
| |
| WSV-26 " CONTAINMENT MON. H 2 SAMPLING VALVE"
| |
| (''
| |
| '~
| |
| ) WSV-27 " CONTAINMENT MON. H2 SAMPLING VALVE" 2.20 Open the B H2 analyzer
| |
| * WSV-41 " CONTAINMENT MON. H 2 return valves (B EFIC SAMPLING VALVE" Room. RELAY RACK RR48).
| |
| * WSV-40 " CONTAINMENT MON. H 2 SAMPLING VALVE" l
| |
| l 4
| |
| { I
| |
| .s V
| |
| E0P-14 REV 04 PAGE 17 of 303 ENCLS l
| |
| | |
| \
| |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 18 of 303 ENCLS
| |
| | |
| 4 ENCLOSURE 2 - PPO POST EVENT ACTIONS (CONT'D)
| |
| ACTIONS- DETAILS
| |
| ~2.21 Energize the B H analyzer
| |
| * Select " System Power" switch to "0N" (B EFIC Room, RELAY RACK on WS-10-CS " CONTAINMENT MONITOR RR4B). MAIN SYSTEM CONTROL".
| |
| L 2.22 Notify Control Room that PP0 post event actions are l- complete with the B Hz l analyzer-in service and l.
| |
| EXIT this enclosure.
| |
| l l
| |
| O L
| |
| L o
| |
| I l
| |
| O E0P .REV 04- PAGE 19 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 20 of 303 ENCLS
| |
| | |
| L ENCLOSURE 3 DRY OTSG REC 0VERY i ACTIONS DETAILS l
| |
| STAWS i At least.1 OTSG is dry.(s; 128 in on EFIC Low Range).
| |
| i 3.1 E only 1 OTSG is dry,
| |
| 'eND does NOT have' integrity.
| |
| ItG notify TSC to .
| |
| i consider tube to shell AT and EXIT this enclosure.
| |
| 3.2. E both OTSGs are dry.
| |
| AND both do NOT have integrity, ILE notify TSC to l consider tube to shell AT "r" 'and EXIT this enclosure.
| |
| 3.3 E both OTSGs are dry, e Notify TSC to consider tube to AND.1 OTSG does NOT have shell AT and provide guidance integrity, for feeding the OTSG without I!iG obtain TSC guidance integrity, and continue in this enclosure, o Continue in this enclosure to feed the OTSG with integrity.
| |
| I o j E0P-14 REV 04 PAGE 21 of 303 ENCLS I
| |
| i
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 22 of 303 ENCLS
| |
| | |
| l I ENCLOSURE 3 . DRY OTSG RECOVERY (CONT *D)
| |
| ACTIONS DETAILS 1 N0_JE !
| |
| L The following steps are only to be used to feed OTSGs with integrity. ;
| |
| 1 3.4 E power is available to e Isolate loads on each dry 0TSG:
| |
| l . isolation valves.
| |
| THEN isolate steam loads on each dry OTSG, A OTSG B OTSG AS MSV-179 ,
| |
| , tg ;g
| |
| ^*
| |
| DFT
| |
| [ MSV-180 GS MSV-58 MSV-57 MSR MSV-30 MSV-29 MSV-32 MSV-31 O e E the A OTSG is dry, d THEN notify SP0 to close MSV-107 "MS Supply to FWP-2A" (145 ft TB by A MFWP).
| |
| e E the B OTSG is dry.
| |
| THEN notify SP0 to close MSV-108 "MS Supply to FWP-2B" (145 ft'TB by B MFWP).
| |
| E power is NOT available e Close MSIVs for affected OTSG:
| |
| to dry OTSG 1. solation valves THENcioseMSIVsfor A OTSG B OTSG affected 0TSG.
| |
| MSV-412 MSV-413 MSV-411 MSV-414 O
| |
| E0P-14 REV 04 PAGE 23 of 303 ENCLS
| |
| _ _ _ _ _ - - _ - - _ _ _ _ _ _ _ _ _ _ . .- I
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 24 of 303 ENCLS
| |
| | |
| ENCLOSURE 3 DRY OTSG REC 0VERY (CONT *D)
| |
| ACTIONS
| |
| -{' DETAILS 3.5 E EFW is liQI available.
| |
| THEN GO TO Step 3.8 in this enclosure.
| |
| 3.6 Establish continuous EFW 1 E adequate SCM exists, flow to each available dry AND HPI PORV cooling is in OTSG. progress.
| |
| THEN feed each available dry OTSG with continuous EFW flow within the following limits:
| |
| Cooldown rate minimized while recovering OTSG level Flowrate < 300 gpm to each dry OTSG See Table 3 2 E adequate SCM exists,
| |
| (~'))
| |
| t, AND HPI PORV cooling is NOT in progress.
| |
| THEN feed each available dry OTSG with continuous EFW flow within the following limits:
| |
| Cooldown rate within limits ,
| |
| i See Table 1 !
| |
| Flowrate < 300 gpm to each dry OTSG See Table 3 3 E adequate SCM does NOT exist.
| |
| THEN feed each available dry
| |
| ' OlSG at inadequate SCM flow rate.
| |
| See Table 3
| |
| [ Rule 3. EFW Control]
| |
| O E0P-14 REV 04 PAGE 25 of 303 ENCLS
| |
| | |
| l O
| |
| BLANK PAGE O
| |
| I O
| |
| E0P-14 REV 04 PAGE 26 of 303 ENCLS
| |
| | |
| j- i t
| |
| i ENCLOSURE 3 DRY OTSG RECOVERY (CONT'D)
| |
| I''; ACTIONS DETAILS G
| |
| l '
| |
| l 3.7 WHEN level in available
| |
| ' OTSGs is > 128 in, THEN EXIT this enclosure.
| |
| 3.8 JE AFW is NOT available.
| |
| THEN GO TO Step 3.14 in -
| |
| l this enclosure.
| |
| l l
| |
| 3.9 Prepare AFW for operation.
| |
| * Notify SPO to open AFW isolation l valves tc 'TSGs (119 ft IB by east !
| |
| door):
| |
| l FWV-222 "AFW Discharge Iso to ;
| |
| A OTSG" l FWV-223 "AFW Discharge Iso to r
| |
| v} B OTSG" 3.10 Verify 4160V REACTOR AUX BUS 3 is energized.
| |
| JE 4160V REACTOR AUX BUS 3 1 Open Bkr 3223 is NOT energized.
| |
| THEN energize 4160V 2 Select MTDG-1 to "RUN" REACTOR AUX BUS 3 3 Verify "RUN/MTDG-1" light (red) is lit.
| |
| 4 Close Bkr 3225 5 Verify 4160V REACTOR AUX BUS 3 voltage is stable.
| |
| I o
| |
| E0P-14 REV 04 PAGE 27 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 28 of 303 ENCLS
| |
| | |
| ENCLOSURE 3- DRY OTSG RECOVERY (CONT'D)
| |
| ACTIONS DETAILS 3.11~ Start'FWP-7 i
| |
| 3.12 WHENFWV-222 1 lE adequate SCM exists.
| |
| 6N_D FWV-223 are'open. AND HPI PORV cooling is in lHEN establish AFW flow to progress.
| |
| each available dry 0TSG.
| |
| JTH feed'each available dry OTSG with continuous AFW flow within the following limits:
| |
| s Cooldown rate minimized while recovering OTSG level Flowrate < 300 gpm to each dry OTSG See Table 3 2 IE adequate SCM exists.
| |
| AND HPI PORV cooling is NOT in O progress.
| |
| JTH feed each available dry OTSG with continuous AFW flow within the following limits:
| |
| E Cooldown rate within limits See Table 1 Flowrate < 300 gpm to each-dry OTSG See Table 3 See Table 2 3 1E adequate SCM does NOT exist.
| |
| THEN feed each available dry OTSG at inadequate SCM flow rate.
| |
| See Table 3 See Table 2 O
| |
| L .EOP-14 REV 04. PAGE 29 of 303 ENCLS
| |
| ~ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 30 of 303 ENCLS
| |
| | |
| ENCLOSURE 3 DRY OTSG REC 0VERY (CONT'D) f i
| |
| !./ ~ ACTIONS DETAILS 3.13~ WHEN level in available OTSGs is > 128 in.
| |
| M EXIT this enclosure.
| |
| l' 3.14' IE MFW is available.
| |
| * Ensure the following valves are l
| |
| M close FW valves to closed on each dry OTSG:
| |
| , each dry OTSG.
| |
| Y- A OTSG B OTSG 1 LLBV FWV-31 FWV-32 MBV FWV-30 FWV-29 i SUCV FWV-40 FWV-39 i
| |
| LLCV FWV-37 FWV-38 I
| |
| l O-i I
| |
| l l
| |
| r
| |
| '?
| |
| l E0P-14 REV 04 PAGE 31 of 303 ENCLS L _ _ _ _ _ - _ - - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 32 of 303 ENCLS
| |
| | |
| ENCLOSURE 3 DRY OTSG RECOVERY (CONT *D)
| |
| ACTIONS DETAILS 3.15 lE MFW is s 150*F. 1 Ensure SUBVs are closed for each dry EEN establish MFW . OTSG:
| |
| flowpath to each available dry OTSG via EFW' nozzles. .
| |
| f ;; . . A OTSG B OTSG
| |
| ; SUBV FWV-36 FWV-33 l-2 IE the A OTSG is dry, AN) available.
| |
| It!3 notify PPO.to energize emergency block valve (A ES 4160V SWGR Room):
| |
| DPDP 8A-9 "FWV-35 Motor Power" i
| |
| i DPDP 8A-10 "FWV-35 Control i
| |
| l Power" 3 IE the B.0TSG is dry.
| |
| AN3 available.
| |
| l- TH3 notify PPO to energize emergency block valve L (B ES 4160V SWGR Room):
| |
| DPDP EC iJ "FWV-34 Motor ;
| |
| Power" !
| |
| DPDP 88-12 "FWV-34 Control Power" 4 Open emergency block valve for each {
| |
| available dry OTSG: '
| |
| L 1
| |
| [33p A OTSG B OTSG Emergency 4 Block FWV-35 FWV-34 i
| |
| O E0P-14 REV 04 PAGE 33 of 303 ENCLS l-
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 34 of 303 ENCLS
| |
| | |
| 1
| |
| -ENCLOSURE 3 DRY OTSG REC 0VERY (CONT'D)
| |
| ACTIONS
| |
| ( DETAILS 3.16 1E MFW TEMP is > 150*F, e Open SUBV for each available dry THEN establish MFW OTSG:
| |
| flowpath to each available dry OTSG via normal nozzles. , ,
| |
| A OTSG B OTSG l
| |
| SUBV FWV-36 FWV-33 l
| |
| 3.17 Feed each available dry
| |
| * Feed each available dry 0TSG using OTSG with continuous MFW applicable SUCV:
| |
| flow within the following limits:
| |
| Cooldown rate within
| |
| * A OTSG B OTSG limits '
| |
| SUCV FWV-40 FWV-39 See Table 1 Flowrate < 0.15 X 10' Ibm /hr to each available dry OTSG 3.18 WHEN level in available OTSGs is > 124 in.
| |
| J. HEN EXIT this enclosure.
| |
| 1 E0P-14 REV 04 PAGE 35 of 303 ENCLS l
| |
| | |
| O BLANK PAGE l
| |
| l 1
| |
| l l
| |
| O E0P-14 REV 04 PAGE 36 of 303 ENCLS
| |
| | |
| 4 ENCLOSURE 4 LETDOWN RECOVERY i
| |
| I '
| |
| : ACTIONS DETAILS LJ 4.1 Ensure letdown is 1 Close MUV-49 l isolated. '
| |
| 2 E MUV-50 has power.
| |
| THEN close MUV-50 3 E MUV-50 does NOT have power.
| |
| THEN notify PPO to close MUV-45
| |
| " Block Orifice Outlet Iso" 1 (119 ft AB Block Orifice Room). l 4 Close MUV-51 4.2 E RBIC actuation has
| |
| * E MUHE-1A.
| |
| l occurred. QB MUHE-1C is to be placed in THEN ensure SW valves to service.
| |
| letdown coolers to be THEN notify PPO to depress the
| |
| ) laced in service have following "0 PEN" push buttons
| |
| )een reset. (95 ft AB Triangle Room): j
| |
| ! ) oo r5upy l "SWV-50. A & C Letdown Cooler Return"
| |
| * E MUHE-1B is to be placed in service.
| |
| THEN notify PP0 to depress the following "0 PEN" push buttons (95 ft AB Triangle Room):
| |
| "SWV-48. B Letdown Cooler Supply" "SWV-49. B Letdown Cooler Return" O l E0P-14 REV 04 PAGE 37 of 303 ENCLS
| |
| ]
| |
| | |
| (-
| |
| l l
| |
| O I
| |
| 1 BLANK PAGE 1
| |
| O i
| |
| l l l
| |
| l l
| |
| l l
| |
| 9i E0P-14 REV 04 PAGE 38 of 303 ENCLS l
| |
| l ,
| |
| | |
| ENCLOSURE 4 LETDOWN REC 0VERY (CONT'D)
| |
| ACTIONS DETAILS 4.3 Ensure SW valves are open for letdown coolers to be MUHE-1A MUHE-1B MUHE-1C placed in service.
| |
| _ SWV-47 SWV-48 SWV-47 SWV-50 SWV-49 SWV-50 4.4 Ensure MU valves are open for letdown coolers to be MUHE-1A MUHE-1B MUHE-1C placed in service.
| |
| MUV-38 MUV-39 MUV-498 MUV-40 MUV-41 "4 g
| |
| MUV-567 MUV-567 MUV-567 l
| |
| O 4.5 E aower is available to 1 Ensure MUV-124 is open.
| |
| MU Jemin bypass valves.
| |
| i THEN bypass MU Demins. 2 Open MUV-200 j
| |
| 3 Ensure MUV-117 is open.
| |
| 4 Close MUV-116 5 Ensure MUV-133 is closed. {
| |
| E power is NOT available to MU Demin bypass valves.
| |
| THEN notify PPO to open MUV-126 "MU Demin Bypass" (119 ft AB Block l
| |
| l Orifice Room).
| |
| l l-j O
| |
| E0P-14 REV 04 PAGE 39 of 303 ENCLS i
| |
| o____________________
| |
| | |
| O BLANK PAGE g
| |
| i 1
| |
| O E0P-14 REV 04 PAGE 40 of 303 ENCLS
| |
| | |
| ! ENCLOSURE 4 IFTDOWN REC 0VERY (CONT *D) l l'''; ACTIONS DETAILS LJ 4.6 Establish a letdown 1 E a pre-filter is NOT in flowpath. service.
| |
| THEN ensure MUV-194 is open.
| |
| 2 Ensure a post-filter is in service.
| |
| 3 E a post-filter is NOT in service.
| |
| THEN ensure MUV-100 is open.
| |
| 4.7 Establish letdown flow. 1 E recovering from high TEMP.
| |
| IHEN select "MUV-49 HIGH TEMP.
| |
| BYPASS" switch to " BYPASS".
| |
| 2 Open MUV-49 3 Throttle open MUV-51 to l establish desired letdown p flowrate.
| |
| 'U 4 Open MUV-50 5 E MUV-45 is closed.
| |
| THEN notify PPO to open MUV-45
| |
| ; " Block Orifice Outlet Iso" (119 ft AB Block Orifice Room).
| |
| 6 Throttle MUV-51 to obtain desired let iown flowrate.
| |
| 4.8 WHEN letdown TEMP is
| |
| < 130*F.
| |
| THEN select "MUV-49 HIGH TEMP.' BYPASS" switch to
| |
| " NORM.".
| |
| A 1 V ]
| |
| E0P-14 REV 04 PAGE 41 of 303 ENCLS I
| |
| ! i
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 42 of 303 ENCLS
| |
| | |
| ENCLOSURE 4 ' LETDOWN RECOVERY (CONT'D)
| |
| ACTIONS DETAILS 4.9 E MUDM-1A is to be placed -1 Ensure'MUV-124'is open.
| |
| in' service, a!D power is available. 2 Open MUV-116 LH3 align.MUDM-1A 3 Close MUV-200 4 Ensure MUV-201 is closed.
| |
| 5 Close MUV-117 6 E MUV-126 "MU Demin Bypass" was-o)ened in Step 4.5.
| |
| IM notify PPO.to close MUV-126 (119 ft AB Block Orifice Room).
| |
| 4.10 E MUDM-1B is to be placed 1 Open MUV-133 in service, AND power is available. 2 Ensure MUV-117 is open.
| |
| I!B align MUDM-1B 3 Close MUV-200 4 Ensure MUV-201 is closed. !
| |
| 5 Close MUV-124 6 E MUV-126 "MU Demin Bypass" was opened in Step 4.5, THE notify PP0 to close MUV-126- ''i (119 ft AB Block Orifice Room).
| |
| : :4.11 EXIT this enclosure.
| |
| O l E0P-14 REV 04 PAGE 43 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 44 of 303 ENCLS
| |
| | |
| ENCLOSURE 5 MSIV REC 0VERY ACTIONS DETAILS
| |
| ('J(
| |
| u NOIE This enclosure only opens MSIVs associated with TBVs.
| |
| 5.1 Prepare MS lines for
| |
| * Close valves on MS lines associated repressurization. with MSIVs to-be opened:
| |
| *2 , MSV-411 MSV-413 TBVs MSV-9, 10 MSV-11, 14 GS % Es MSV-57 MSR MSV-62 MSV-59 MSV-32 MSV-29 DFT dg % MSV-180 e IF MSV-4'1 is to be opened.
| |
| TR N notify SP0 to close the o owing valves:
| |
| 'V MSV-21 "MSV-9 U) stream Iso" (119 ft TB sout1 of B hotwell)
| |
| MSV-22 "MSV-10 Upstream Iso" (119 ft TB south of B hotwell)
| |
| MSV-107 "MS Supply to FWP-2A" (145 ft TB by A MFWP) e IF MSV-413 is to be opened.
| |
| Til N notify SPO to close the o owing valves:
| |
| MSV-23 "MSV-11 Upstream Iso" (119 ft TB south of A hotwell)
| |
| MSV-24 "MSV-14 Upstream Iso" i
| |
| (119 ft TB south of A hotwell)
| |
| MSV-108 "MS Supply to FWP-2B" (145 ft TB by O B MFWP)
| |
| E0P-14 l REV 04 PAGE 45 of 303 ENCLS l
| |
| l
| |
| | |
| O I
| |
| I BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 46 of 303 ENCLS
| |
| | |
| ENCLOSURE 5-MSIVREC0VERY/ CONT *D)
| |
| ACTIONS DETAILS 5.2 Ensure proper operation of
| |
| * IE MSV-411'is to be opened.
| |
| MSDTs-on affected MS _TH_E_N notify SP0 to ensure the lines. foT10 wing MSDTs are drained of water and in service:
| |
| MSDT-4 (95 ft TB south of FWP-1A)
| |
| MSDT-8 (95 ft TB west of-SCHE-1B)
| |
| * IE MSV-413 is to be opened.
| |
| THEN notify SPO to ensure the following MSDTs are drained of water and in service:
| |
| MSDT-2 (95 ft TB' southwest corner)
| |
| MSDT-6 (119 ft TB under high PRESS turbine)
| |
| : O i
| |
| O' E0P-14: REV 04- PAGE 47 of 303 ENCLS l
| |
| = _ _ _ - - _ _ - _ _ _ _ _ _ - - _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -
| |
| | |
| , O BLANK PAGE O
| |
| i O\
| |
| E0P-14 REV 04 PAGE 48 of 303 ENCLS i
| |
| J
| |
| | |
| ENCLOSURE 5 MSIV RECOVERY (CONT *D)
| |
| /
| |
| } ACTIONS DETAILS 5.3 Pressurize MS lines e E MSV-411 is to be opened, downstream of MSIVs to be THEN notify SPD to perform the opened. following:
| |
| Unlock and open CGV-38 "MSV-411 Bypass Root Iso" (119 ft IB under MSV-411).
| |
| Open CGV-47 "MSV-411 Bypass Spool Iso" (119 ft IB under MSV-411).
| |
| Open MSV-498 "MSV-411 Bypass Spool Iso" (119 ft IB top of MS line north of MSV-411).
| |
| * E MSV-413 is to be opened.
| |
| THEN notify SP0 to perform the following:
| |
| Unlock and open CGV-36 "MSV-413 Bypass Root Iso" p (119 ft IB under MSV-413).
| |
| '^~
| |
| Open CGV-49 "MSV-413 Bypass Spool Iso" (119 ft IB under MSV-413).
| |
| Open MSV-500 "MSV-413 Bypass Spool Iso" (119 ft IB top of MS line north of MSV-413).
| |
| 5.4 Determine AP across e E A OTSG PRESS is < 800 psig, affected MSIV. THEN notify SP0 to use MS-119-PI "A2 Steam Line PRESS" to determine MSV-411 downstream PRESS (119 ft TB by MSV-10).
| |
| * E B OTSG PRESS is < 800 psig.
| |
| THEN notify SP0 to use MS-120-PI "B1 Steam Line PRESS" to determine MSV-413 downstream PRESS (119 ft TB by MSV-11).
| |
| 7
| |
| \,g/
| |
| E0P-14 REV 04 PAGE 49 of 303 ENCLS h_ _ _ . _ _ _ _ _ _ - - - - - - - - --
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 50 of 303 ENCLS
| |
| | |
| ENCLOSURE 5 MSIV REC 0VERY (CONT'D)
| |
| ACTIONS DETAILS f')
| |
| %J
| |
| .5. 5 WHEN AP across affected R5TV is < 200 psid, THEN continue in this enclosure.
| |
| 5.6 Open affected MSIVs. 1 Jf affected 0TSG PRESS is 725 psig, THEN dearess "< 725 PSI STM Gt.1 PRE 55 E IC ACT SYPASS" push buttons:
| |
| Channel A Channel B Channel C Channel D 2 Depress " TEST /RESULTS RESET" push buttons for MSLI channels A (3 and B for the affected OTSG.
| |
| 3 Select affected "MSIV TEST-NORMAL-RESET" switch to ,
| |
| " RESET"- 1 MSV-411-SV1 MSV-413-SV1 4 1
| |
| 4 Open affected MSIVs:
| |
| MSV-411 MSV-413 l
| |
| E0P-14 REV 04 PAGE 51 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 52 of 303 ENCLS
| |
| | |
| I ENCLOSURE 5 MSIV RECOVERY (CONT *D)
| |
| . ACTIONS DETAILS l 5.7 W!!EN desired MSIVs are e IE MSV-411 is open, open,- .. - THEN notify SP0 to perform the.
| |
| L _Tl!EN isolate MSIV bypass following:
| |
| i lines. ,
| |
| Close and lock CGV "MSV-411 Bypass Root Iso" (119 ft IB under MSV-411).
| |
| l
| |
| .Close CGV-47 "MSV-411 Bypass
| |
| . Spool Iso" .(119.ft' IB under-MSV-411). >
| |
| l.
| |
| Close MSV-498 "MSV-411 l Bypass Spool 1s0"'(119 ft IB-E top of MS line north of l MSV-411).
| |
| ! e lE MSV-413 is open.
| |
| l J.H_EN notify SP0 to perform the following:
| |
| Close and lock CGV-36 "MSV-413 Bypass Root Iso" l-(119.ft IB under MSV-413).
| |
| l
| |
| : l. Close CGV-49 "MSV-413 Bypass l Spool Iso" (119 ft IB under p -
| |
| MSV-413). 1
| |
| ..__ Close MSV-500 "MSV-413 Bypass Spool Iso" (119 ft IB top of MS line north of MSV-413).
| |
| l:.
| |
| i E0P-14 REV 04 PAGE 53 of 303 ENCLS L1_.____.1.___________._ _ . _ . . . . _ _ _ . . _ ._ .__ _
| |
| | |
| O l
| |
| l l
| |
| l i
| |
| l l
| |
| BLANK PAGE O'
| |
| i i
| |
| l i
| |
| l t
| |
| j l
| |
| O I E0P-14 REV 04 PAGE 54 of 303 ENCLS
| |
| | |
| ENCLOSURE 5 MSIV REC 0VERY (CONT'D)
| |
| ACTIONS PETAILS 5.8 Restore MS line isolation e Jf MSV-411.is open, valves to normal. THEN notify SP0 to open MS line isolation valves downstream of MSV-411:
| |
| MSV-21 "MSV-9 U) stream Iso" (119 ft TB sout1 of B hotwell)
| |
| MSV-22 "MSV-10 Upstream Iso" (119 ft TB south of B hotwell) e Jf MSV-413 is open.
| |
| THEN notify SP0 to open MS line isolation valves downstream of MSV-413:
| |
| MSV-23 "MSV-11 Upstream Iso" (119 ft TB south of A hotwell)
| |
| MSV-24 "MSV-14 Upstream Iso"
| |
| .s (119 ft TB south of- i A hotwell) i i
| |
| l l
| |
| i E0P-14 REV 04- PAGE 55 of 303 ENCLS u________--_-_-.-_-----._--_-- - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
| |
| | |
| O i
| |
| BLANK PAGE l
| |
| l 9 1 E0P-14 REV 04 PAGE 56 of 303 ENCLS
| |
| | |
| ENCLOSURE 5 MSIV REC 0VERY (CONT *D)
| |
| ACTIONS DETAILS CAUTION l
| |
| l Initiating steam flow in a line without proper operation of associated steam trap could result in equipment damage.
| |
| 5.9 Notify SP0 to verify proper operation of MSDTs
| |
| ; on any lines that were depressurized.
| |
| 5.10 EXIT this enclosure.
| |
| l l
| |
| O 1
| |
| I l
| |
| I i 1 l
| |
| l O
| |
| l E0P-14 REV 04 PAGE 57 of 303 ENCLS
| |
| | |
| 1 1
| |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 58 of 303 ENCLS
| |
| .1
| |
| | |
| E l ENCLOSURE 6 OTSG BLOWDOWN LINEUP l
| |
| ACTIONS DETAILS l
| |
| CAUTION l Initiating blowdown from an OTSG with tube leakage will increase radiation dose rates near associated piping and valves.
| |
| l I
| |
| 1
| |
| .N_0TE The following items are required to perform this evolution:
| |
| 1 yellow hose and fittings for MSV 524 (on hose reel at 95 ft TB west of CX Demin Panel) 1 medium pipe wrench I small valve wrench !
| |
| l 1 medium valve wrench j l
| |
| 1 y2110w hose and fittings for MSV 542 l
| |
| '(
| |
| 6.1 Notify Control Room to e MSV-130 ensure OTSG blowdown isolation valves are
| |
| * MSV-148 closed.
| |
| 6.2 Ensure blowdown isolation e MSV-518 "0TSG Blowdown / Drain to r
| |
| at hotwell is closed. Condenser Iso" (95 ft TB east of hotwell) l l
| |
| l I
| |
| O !
| |
| E0P-14 REV 04 PAGE 59 of 303 ENCLS l
| |
| l 1
| |
| l L - - _ --._--_--- -----_---------
| |
| | |
| O
| |
| \
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 60 of 303 ENCLS
| |
| | |
| ENCLOSURE 6 OTSG BLOWDOWN LINEUP (CONT'D)
| |
| (^
| |
| Q_,3 1 ACTIONS DETAILS 6.3 Fill and vent OTSG 1 Connect hose between the following blowdown line, valves:
| |
| CXV-358 " Regen DW Inlet Line Drain" 1 (95 ft TB west of Demins)
| |
| MSV-524 "0TSG Blowdown / Drain Line Fill / Drain Iso" (95 ft TB east of hotwell) 2 Ensure blowdown flow control valves are closed (95 ft TB east of hotwell):
| |
| MSV-516 "0TSG Blowdown / Drain Hand Control" MSV-517 "0TSG Blowdown / Drain Hand Control Bypass" l
| |
| 3 Ensure MSV-514 "0TSG Blowdown / Drain Iso" is open (95 ft TB south of SCPs in (V) overhead).
| |
| 4 Fill blowdown Hdr by opening:
| |
| MSV-524 l CXV-358 5 Remove ca) from MSV-542 "0TSG Blowdown /3 rain Line Vent" (119 ft IB south of Ventilation MCC 3A overhead).
| |
| 6 Install connectors and drain hose >n MSV-542 (E0B-1).
| |
| 7 Vent blowdown Hdr by opening MSV-542 8 WHEN lines are full.
| |
| T!iFJ close MSV-542 I 9 Close CXV-358
| |
| ,y 10 Close MSV-524
| |
| (,i E0P-14 REV 04 PAGE 61 of 303 ENCLS l
| |
| l
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 62 of 303 ENCLS
| |
| | |
| ENCLOSURE 6 OTSG BLOWDOWN LINEUP (CONT *D) l 1
| |
| (3 L.)
| |
| ACTIONS DETAILS 1
| |
| 6.4 Notify Control Room to open affected 0TSG A OTSG B OTSG l
| |
| blowdown isolation valve. {
| |
| MSV-130 MSV-148 i 6.5 Warm up OTSG blowdown line 1 Open MSV-518 "0TSG (95 ft TB east of Blowdown / Drain to Condenser hotwell). Iso".
| |
| 2 Throttle MSV-517 "0TSG I Blowdown / Drain Hand Control Bypass" 1 turn open.
| |
| 6.6 Notify Control Room of completed actions and ,
| |
| i request desired flowrate. !
| |
| )
| |
| 'wJ 6.7 WHEN notified by Control e Throttle blowdown flow at s 500 gpm Room, indicated on MS-117-FI to avoid THEN throttle blowdown water hammer:
| |
| flow control valves as required (95 ft TB east of MSV-516 "0TSG Blowdown / Drain hotwell). Hand Control" MSV-517 "0TSG Blowdown / Drain Hand Control Bypass" 6.8 EXIT this enclosure.
| |
| ,r )
| |
| E0P-14 REV 04 PAGE 63 of 303 ENCLS
| |
| | |
| O 1
| |
| i BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 64 of 303 ENCLS
| |
| | |
| ENCLOSURE 7 EFP-2 MANAGEMENT I
| |
| /~'T ACTIONS DETAILS V. j' NOTE f
| |
| IF EFP 2 is the only available FW source, then not aligning Unit 1 or 2 steam may require EFP-2 to be cycled on and off based on available steam pressure.
| |
| 7.1 E Unit 1 or 2 steam is 1 Throttle AS.-t5 "AS Iso to available. EFP-2" 1 turn open (119 ft TB NW 1
| |
| AND 95 ft IB is stairs).
| |
| accessible.
| |
| THEN notify SPO to perform 2 WHEN steam PRESS is equalized warmup and pressurization around ASV-15, of AS line to EFP-2 THEN open ASV-15 '
| |
| 3 Blowdown condensate from ASOT-2 by opening ASV-110 "ASDT-2 Blowdown" as required (95 ft TB behind Atmospheric Drain Tank).
| |
| o 4 WHEN AS lines are warmed and
| |
| (") free of condensate.
| |
| THEN notify Contr.ol Room, 7.2 E Unit 1 or 2 steam is
| |
| * Blowdown condensate from MSDT-21 by available, throttling open MSV 290 "MSDT-21 AND AS lines are warmed Blowdown" (95 ft IB by EFP-2).
| |
| and pressurized.
| |
| THEN notify PPO to blowdown MSDT-21 C/
| |
| E0P-14 REV 04 PAGE 65 of 303 ENCLS L__ __ _ _ _-- -
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 66 of 303 ENCLS
| |
| | |
| E!G.050RE 7. ' EFP-2 MANAGEMENT (CONT'D)
| |
| ACTIONS DETAILS 17.3' IE at'any time all of the 1 Open EFP-2 steam supply valves:
| |
| following conditions-exist: ASV-204 FWP is NOT ava'lable ASV-5
| |
| ;- 0TSG PRESS is 2 Depress "EFW INITIATE" push
| |
| : > 500 psig
| |
| ' buttons on EFIC channels A and B.
| |
| EFP-2 has been stopped- <
| |
| due to low supply 1
| |
| PRESS
| |
| , [ Rule 3. EFW Control)
| |
| IBEN start EFP-2 r.
| |
| 9 L EFP 1 is not considered available if stopped for EDG A load management.
| |
| y '
| |
| l' 7,4' 'lE EFP-1 is-available.
| |
| AM) is NQI running, IB M start EFP-1
| |
| , -[ Rule 5. EDG Control]
| |
| l L
| |
| 1: 7.5 IE EFP-1 is NOT available. I
| |
| !- THEN GO TO Step 7.10 in L this enclosure'.-
| |
| i
| |
| : i. !
| |
| l' .
| |
| ~7.6 l l WHEN OTSG PRESS i s; 250 psig, IBEN continue this l 1
| |
| ~
| |
| enclosure.
| |
| O ~
| |
| E0P-14: REV 04 PAGE 67 of 303 ENCLS l
| |
| l
| |
| __________--_-_-__._--_-_-_-_____-___-_______-__--_____________________-_-____-___________-____-_.__-__-__A
| |
| | |
| l
| |
| ?
| |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 68 of 303 ENCLS
| |
| | |
| r L
| |
| ENCLOSURE 7' EFP 2 MANAGEMENT (CONT *D)
| |
| -ACTIONS DETAILS E
| |
| -7.7 E Unit 1 or 2 steam is l' Ensure MSDT-21 is free of available. .
| |
| condensate and close MSV-290-
| |
| - JAN AS is ready to be "MSDT-21 Blowdown" aligned to EFP-2, (95 ft IB by EFP-2).
| |
| '. M notify PPO to align Unit 1-or 2' steam to EFP-2 2 Open ASV-23 " Units 1 or 2 Steam to EFP-2" (95 ft IB by EFP-2). 3 i
| |
| ' 7.8 '- E Unit 1 or 2 steam is 1 M OTSG PRESS is at 200 psig NOT available.
| |
| 1 (180 to 220 psig).
| |
| l - M stop EFP-2 M ensure additional.140 KW margin exists on EDG A.
| |
| [ Rule 5. EDG Control]
| |
| 2 Depress " MANUAL PERMISSIVE" push buttons on EFIC channels A and B.
| |
| 3 Close ASV-204 4 Close ASV-5 5 Notify PPO to'de-energize EFP-2 steam supply valves;
| |
| " DPDP 8A-17 "ASV-204 Motor Power" (A ES 4160V SWGR Room)-
| |
| l DPDP 8B-5 "ASV-5 Motor Power" t
| |
| (B ES.4160V SWGR Room) 6 WHEN steam supply valves are de energized.
| |
| l T_HLN depress "EFW INITIATE" push buttons on EFIC channels A and B.
| |
| [ Rule 3. EFW Control]
| |
| 7.9 ' EXIT this enclosure.
| |
| O E0P-14. REV 04 PAGE-69 of 303 ENCLS
| |
| | |
| O l
| |
| l BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 70 of 303 ENCLS
| |
| | |
| ENCLOSURE 7 EFP-2 MANAGEMENT (CONT'0)
| |
| ACTIONS DETAILS STATUS EFP 2 is the only available EFW pump.
| |
| HQIE IF EFP 2 is'the only available FW source, then not aligning Unit 1 or 2.
| |
| steam may require EFP 2 to be cycled on and off based on available steam pressure.
| |
| 7.10 JF any of the following conditions exist:
| |
| Unit 1 or 2 steam is NOT available 95 ft IB is NOT accessible.
| |
| . T_HE!! GO TO Step 7.13 in
| |
| _this enclosure.
| |
| l 7.11- }LHEN OTSG PRESS is 1 Ensure MSDT-21 is free of s 250 psig, condensate and close MSV-290
| |
| , AND AS is ready to be "MSDT-21 Blowdown" aligned to EFP-2. (95 ft IB by EFP-2).
| |
| THEN notify PPO to align Unit 1 or 2 steam to EFP-2 2 Open ASV-23 " Units 1 or 2 Steam to EFP-2" (95 ft IB by EFP-2).
| |
| 7.12 EXIT this enclosure.
| |
| O E0P-14 REV 04 PAGE 71 of 303 ENCLS L
| |
| | |
| O
| |
| .I BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 72 of 303 ENCLS
| |
| | |
| ENCLOSURE 7 EFP 2 MANAGEMENT (CONT'D)
| |
| ACTIONS DETAILS STATUS i
| |
| e EFP 2 is the only EFW pump running.
| |
| e Unit 1 or 2 steam is not available or 95 ft IB is NOT accessible.
| |
| 1 7.13 WH_LN OTSG PRESS is s 250 psig.
| |
| T_Hf3 continue in this
| |
| . enclosure, l
| |
| )
| |
| 7.14 E FWP-'7 is available.
| |
| I!dFN GO TO Step 7.22 in this enclosure'.
| |
| O 7.15- Attempt to restore an additional 0TSG feedwater source.
| |
| 7.16 E OTSG PRESS is e Control OTSG PRESS using TBVs and s 200 psig. ADVs.
| |
| AND adequate primary to secondary heat transfer exists.
| |
| IHEJ stop RCS cooldown.
| |
| O E0P-14 REV 04 PAGE 73 of 303 ENCLS 1
| |
| I
| |
| .__._ _________ J
| |
| | |
| O BLANK PAGE g!
| |
| I I
| |
| O l \
| |
| EDP-14 REV 04 PAGE 74 of 303 ENCLS
| |
| {
| |
| _ _ _ _ _ - - _ - - - - - - - - - ^---- ~~~ _ _ - - - __-_ - - -
| |
| | |
| ! ENCLOSURE 7 EFP 2 MANAGEMENT (CONT'D)
| |
| 'N, ACTIONS
| |
| '(G c
| |
| DETAILS l 7.17 W
| |
| ._H_EN OTSG PRESS is at 1 Depress " MANUAL PERMISSIVE" push 160 psig (140 to buttons on EFIC channels A 180 psig), and B.
| |
| THEN stop EFP-2 2 Close EFP-2 steam supply valves: ;
| |
| ASV-204 ASV-5 3 Close all ADVs and MSIVs:
| |
| MSV-25 I MSV-26 !
| |
| MSV-412 MSV-413 MSV-414 q MSV-411
| |
| ! (_)
| |
| l l
| |
| l l
| |
| l l-
| |
| /
| |
| /
| |
| E0P-14 REV 04 PAGE 75 of 303 ENCLS I
| |
| c_ _ _ - _ _ - - _ _ _ _. _ - _ - _ - - __ _ _ _ . _ _ ._ A
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 76 of 303 ENCLS
| |
| | |
| e
| |
| . ENCLOSURE-7L EFP 2 MANAGEMENT (CONT'D)
| |
| ~
| |
| ACTIONS DETAILS STATUS EFP 2 has been stopped due to low. supply PRESS.
| |
| 7.18L E at any time. OTSG PRESS
| |
| * Depress "EFW INITIATE" push buttons is > 500 psig. . on EFIC channels A and B. .
| |
| AND EFP-2 was stopped due to low supply PRESS. [ Rule 3. EFW Control]
| |
| g IBEN start EFP-2 7 19- IE at any time. OTSG PRESS 1 Depress " MANUAL PERMISSIVE" push is at 160 psig (140 t-o buttons on EFIC channels A 180 psig). and B.
| |
| I. HEN stop EFP 2 Close EFP-2. steam supply valves:
| |
| ASV-204 ASV-5
| |
| ~ 7.20 ' Attempt to restore an OTSG' feedwater source.
| |
| 7.21 WHEN any of the following i conditions exists:
| |
| EFP-1 available
| |
| [ FWP-7 available Unit *1 or 2 steam available-IBEN GO TO Step 7.1 in
| |
| .this enclosure.
| |
| O E0P-14' REV 04. PAGE 77 of 303 ENCLS
| |
| | |
| e )
| |
| O lI BLANK PAGE g
| |
| i 1
| |
| i i
| |
| i O
| |
| E0P-14 REV 04 PAGE 78 of 303 ENCLS
| |
| | |
| i ENCLOSURE 7 EFP 2 MANAGEMENT (CONT *D)
| |
| ACTIONS DETAILS STATUS e EFP 2 is running.
| |
| . e FWP-7 is available.
| |
| e Unit l'or 2 steam is not available.
| |
| l-I e 7.22 Verify 4160V REACTOR AUX l BUS 3 is energized.
| |
| l-lE 4160V REACTOR AUX BUS 3 1 Open Bkr 3223 h
| |
| is NOT energized.
| |
| i: -
| |
| THEN energize 4160V 2 Select MTDG-1 to "RUN".
| |
| ! REACTOR AUX BUS 3 3 Verify "RUN/MTDG-1" light (red) is lit.
| |
| 1 4 Close Bkr 3225 J 5 Verify 4160V REACTOR AUX BUS 3 voltage is stable.
| |
| 7.23 Start FWP-7 l
| |
| 1' Lo E0P-14 REV 04- PAGE 79 of 303 ENCLS
| |
| | |
| O 1
| |
| i BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 80 of 303 ENCLS
| |
| | |
| ENCLOSURE 7 EFP 2 MANAGEMENT (CONT'D)
| |
| (~') ACTIONS DETAILS LJ 7.24 Prepare AFW for operation.
| |
| * Notify SPD to open AFW isolation valves to OTSGs (119 ft IB by east door):
| |
| FWV-222 "AFW Discharge Iso to A OTSG" FWV-223 "AFW Discharge Iso to B OTSG" 7.25 WHEN OTSG PRESS is at 1 Depress " MANUAL PERMISSIVE" push I 200 psig (180 to buttons on EFIC channels A 220 psig). and B.
| |
| T.H HEN stop EFP-2 2 Close EFP-2 steam supply valves:
| |
| ASV-204 ASV-5 CAUTION Simultaneous feeding with EFW and AFW could cause OTSG tube damage due to tube cross flow limitations.
| |
| 7.26 WHEN FWV-222
| |
| * Control OTSG 1evel with AFW control I AND FWV-223 are open, valves: !
| |
| THEN establish AFW flow. '
| |
| FWV-216 FWV-217 See Table 2 1
| |
| 7.27 EXIT this enclosure.
| |
| t
| |
| }
| |
| E0P-14 REV 04 PAGE 81 of 303 ENCLS
| |
| | |
| 1 O
| |
| BLANK PAGE i
| |
| O E0P-14 REV 04 PAGE 82 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 HFW RESTORATION T ACTIONS DETAILS STATUS-e Neither OTSG is isolated.
| |
| e At least 1 MFWP and 1 MFWBP is available.
| |
| e Controlled primary to secondary heat transfer exists.
| |
| 8.1 jf MFW is available, l' Ensure all MFW block and control AND NOT running, valves are closed:
| |
| THEN prepare MFW system for feeding OTSGs.
| |
| Valve A Train B Train LLBV FWV-31 FWV-32 MBV FWV-30 FWV-29 SUBV FWV-36 FWV-33 SUCV FWV-40 FWV-39 LLCV FWV-37 FWV-38 2 Notify PPO to obtain keys 11, 74 and 75 from Control Room.
| |
| 3 Notify PPO to ensure EFIC MFW isolation pum) trip key switches are selected to "30TH":
| |
| "EFIC CHANNEL A MAIN FW ISOLATION MAIN FW PUMP TRIP" (CRD Room. AUX RELAY CAB. RR3A)
| |
| "EFIC CHANNEL B MAIN FW ISOLATION MAIN FW PUMP TRIP" (B EFIC Room. AUX RELAY CAB RR581) 4 WHEN EFIC MFW isolation pump l trip key switches are selected to "BOTH".
| |
| ,e) THEN ensure FWV-28 is open.
| |
| ()
| |
| l E0P-14 REV 04 PAGE 83 of 303 ENCLS
| |
| | |
| O l
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 84 of 303 ENCLS
| |
| | |
| 1 ENCLOSURE 8 MFW RESTORATION (CONT'D)
| |
| /~'N ACTIONS DETAILS Lj' 8.2 E 1 MFWBP is running.
| |
| THEN GO TO Step 8.23 in this enclosure.
| |
| 8.3 E FWP-1A is NOT )
| |
| i available.
| |
| THEN GO TO Step 8.14 in :
| |
| this enclosure.
| |
| ,S LJ
| |
| \
| |
| (/
| |
| w E0P-14 REV 04 PAGE 85 of 303 ENCLS L____________ .__ _- --
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 86 of 303 ENCLS
| |
| _ ____ a
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT *D)
| |
| ''s ACTIONS DETAILS
| |
| ~-)
| |
| STATUS FWP-1A startup is desired.
| |
| 8.4 Notify SP0 to prepare
| |
| * Ensure cooling water aligned to !
| |
| FWP-1A for startup. lube oil coolers. l
| |
| * I Ensure normal levels in lube oil l sump and motor bearings. t I
| |
| I 8.5 Ensure FWP-1A startup
| |
| * Ensure FWV-8 is closed.
| |
| alignment. l
| |
| * Select FWV-47 to "AUT0" I
| |
| * Ensure FWV-1 is open.
| |
| L)
| |
| L 8.6 Ensure FWP-6A is running.
| |
| 8.7 IE DFT TEMP is > ambient.
| |
| * Notify SPD to ensure the following THEN warm up FWP-1A valves are open (95 ft TB above Nitrogen Storage Area):
| |
| FWV-143 "FWP-1A Warmup Iso" FWV-149 "FWP-1A Warmup Throttle" l
| |
| s,,
| |
| E0P-14 REV 04 PAGE 87 of 303 ENCLS w_________-___-____ __ _ _ _ _ _. _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
| |
| | |
| l O
| |
| l
| |
| \,
| |
| BLANK PAGE g
| |
| I I
| |
| l
| |
| )
| |
| O E0P-14 REV 04 PAGE 88 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D)
| |
| - (, ) ACTIONS DETAILS i
| |
| 8.8 Verify FWP-1A permit i lights (white) are lit. LUBE OIL PRESS l FWV-1 OPEN FWV-8 CLOSE !
| |
| 1 8.9 Start FWP-1A i
| |
| 8.10 Onen FWV-8 l
| |
| i 8.11 Stop FWP-6A
| |
| ,m
| |
| \") 8.12 _ . Ensure FWP-1A warmup line o Notify SP0 to ensure the following isolated. valves are closed (95 ft TB above Nitrogen Storage Area):
| |
| l FWV-149 "FWP-1A Warmup Throttle" FWV-143 "FWP-1A Warmup Iso" l
| |
| 8.13 GO TO Step 8.23 in this enclosure.
| |
| n U
| |
| E0P-14 REV 04 PAGE 89 of 303 ENCLS
| |
| | |
| O I
| |
| BLANK PAGE g
| |
| O gp.14 REV 04 PAGE 90 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D)
| |
| (J) LGULS. DETAILS SE.va?
| |
| STATUS FWP-1B startup is desired.
| |
| 8.14 Notify SP0 to prepare o Ensure cooling water aligned to FWP-1B for startup. lube oil coolers.
| |
| * Ensure normal levels in lube oil sump and motor bearings.
| |
| 8.15- Ensure FWP-1B startup e Ensure FWV-7 is closed.
| |
| alignment.
| |
| e Select FWV-48 to "AUT0".
| |
| o Ensure FWV-2 is open.
| |
| O 8.16 Ensure FWP-6B is running.
| |
| 8.17 JF DFT TEMP is > ambient, e Notify SP0 to ensure the following i
| |
| ]_ HEN warm up FWP-1B valves are open (95 ft TB above !
| |
| Nitrogen Storage Area): ;
| |
| FWV-144 "FWP-1B Warmup Iso" FWV-150 "FWP-1B Warmup Throttle" l
| |
| l
| |
| )
| |
| O ,
| |
| E0P-14 REV 04 PAGE 91 of 303 ENCLS L____-_______-_________________________. _ _ _ _ _ .__ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . ______________L
| |
| | |
| O J
| |
| BLANK PAGE O
| |
| l I
| |
| i l
| |
| O E0P-14 REV 04 PAGE 92 of 303 ENCLS j
| |
| | |
| l l
| |
| ENCLOSURE 8 MFW RESTORATION (CONT'D) !
| |
| l
| |
| /~'s ACTIONS DETAILS
| |
| 'd I 8.18 Verify FWP-1B permit ;
| |
| lights (white) are lit. LUBE OIL PRESS FWV-2 OPEN FWV-7 CLOSE 8.19 Start FWP-1B l
| |
| 8.20 Open FWV-7 l
| |
| 8.21 Stop FWP-6B 7-0 8.22 Ensure FWP-1B warmup line e Notify SP0 to ensure the following isolated. valves are closed (95 ft TB above ;
| |
| Nitrogen Storage Area): '
| |
| FWV-150 "FWP-1B Warmup Throttle" FWV-144 "FWP-1B Warmup Iso" l
| |
| l g
| |
| lL)
| |
| E0P-14 REV 04 PAGE 93 of 303 ENCLS
| |
| | |
| O BLANK PAGE O!
| |
| l l
| |
| 1 l
| |
| I l
| |
| 1 l l
| |
| l O
| |
| E0P-14 REV 04 PAGE 94 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D)
| |
| / ACTIONS DETAILS STATUS At least 1 MFWBP is running.
| |
| 8.23 IE 1 HFW pump is running.
| |
| M GO TO Step 8.52 in this enclosure.
| |
| 8.24 LF_ FWP-2A is NOT available.
| |
| M GO TO Step 8.39 in
| |
| ; this enclosure.
| |
| 8.25 Notify SP0 to ensure-1O4 cooling water is aligned to FWP-2A lube oil coolers.
| |
| ^
| |
| 8.26 Ensure at least 1 FWP-2A lube oil pump is running. FWP-3A FWP-4A 8.27 Ensure FWP-2A startup e Select FWV-18 to "AUT0".
| |
| alignment.
| |
| * Ensure FWV-14 is open, e Notify SP0 to ensure FWV-145 "FWP-2A Warmup Recirc Iso" is open (145 ft TB by DFT).
| |
| E0P-14 REV 04 PAGE 95 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 96 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 HFW RESTORATION (CONT'D)
| |
| ACTIONS DETAILS 8.28 Verify FWP-2A is rotating.
| |
| LF FWP-2A is NOT rotating, 1 Verify all "TG MOTOR
| |
| .T_H_M place FWP-2A on PERMISSIVES" lights (white) l't.
| |
| turning gear.
| |
| 2 Select FWM-1A to " ENGAGE".
| |
| ~3 Verify FWP-2A turning gear
| |
| " Engage" and " Motor" lights lit.
| |
| 4 Notify. SPO to ensure FWP-2A on turning gear.
| |
| 8.29- !
| |
| Notify SPO to ensure e TDV-27 "TDV-26 Inlet. Iso" FWP-2A manual turbine drain valves are open. e TDV-34 "TDV-32 Inlet Iso" 8.30 Open FWP-2A turbine drain valves. TDV-26 TDV-16 TDV-32 )
| |
| i 8.31 Establish minimum MFW e Ensure both FW loop masters are demand. set to "0" e Ensure FWP-2A " GOV SPEED CNTRL" indicating light (green) lit. ,
| |
| e Ensure FWP-2A Bailey demand set to "0" l 1
| |
| O E0P-14 REV 04 PAGE 97 of 303 ENCLS
| |
| | |
| l O
| |
| BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 98 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 HFW RESTORATION (CONT'D)
| |
| (^T ACTIONS V DETAILS 8.32 Verify high PRESS and low
| |
| * Verify the following:
| |
| PRESS trip valves are closed. ASV-3 closed ASV-1 closed
| |
| " TRIP" light lit 8.33 Start FWP-2A 1 Ensure FWP-2A has been on turning gear or rotating for at least 3 hours prior to start.
| |
| 2 Depress and hold "FWP-2A MISSING SIGNAL BYPASS START" push button.
| |
| 3 Verify all permit lights (white) are lit.
| |
| 4 Select " RESET / TRIP" switch to V,/~'s " RESET".
| |
| 5 Verify ASV-3 and ASV-1 open.
| |
| 6 Increase Governor Speed Control to = 1000 RPM.
| |
| 7 WHEN > 100 RPM is indicated.
| |
| THEN release "FWP-2A MISSING l SIGNAL BYFASS START" push button.
| |
| 8 Verify the following:
| |
| Turning gear disengages Turning gear motor stops 9 Ensure FWV-18 opens.
| |
| Q ,!
| |
| E0P-14 REV 04 PAGE 99 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 100 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT *D)
| |
| ACTIONS DETAILS l
| |
| 8.34 Open FWV-22 8.35 Maintain turbine at a e Record time at 1000 RPM.
| |
| minimum speed of = 1000 RPM for 2: 30 minutes for hrs warmup period.
| |
| 8.36 Verify turbine vibration.
| |
| * No alarms.
| |
| shaft eccentricity, and shaft position are within limits.
| |
| 8.37 Increase turbine speed to e Adjust with " GOV SPEED CNTRL" (red
| |
| = 3.550 RPM. light lit).
| |
| 8.38 GO TO Step 8.52 in this enclosure.
| |
| O E0P-14 REV 04 PAGE 101 of 303 ENCLS
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 102 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D) a ACTIONS x_ ) DETAILS I l
| |
| STATUS l
| |
| * At least 1 HFWBP is running.
| |
| * FWP 2B startup is desired.
| |
| 8.39 Notify SPO to ensure l cooling water is aligned to FWP-28 lobe oil coolers.
| |
| i 8.40 Ensure at least 1 FWP-2B lube oil pump is running. FWP-33 FWP-4B
| |
| ~
| |
| : )
| |
| v_./
| |
| 8.41 Ensure FWP-2B startup
| |
| * Select FWV-19 to "AUT0".
| |
| alignment.
| |
| * Ensure FWV-15 is open.
| |
| * Notify SPO to ensure FWV-146 "FWP-2B Warmup Recirc Iso" is open (145 ft TB by DFT).
| |
| l L)
| |
| E0P-14 REV 04 PAGE 103 of 303 ENCLS
| |
| | |
| O BLANK PAGE g
| |
| 9 E0P-14 REV 04 PAGE 104 of 303 ENCLS
| |
| | |
| ' ENCLOSURE 8 'MFW RESTORATION (CONT'D) h..
| |
| DETAILS ACTIONS.
| |
| 8.42~ ' Verify FWP-28 is rotating.
| |
| JE FWP-2B'is NOT rotating, 1 Verify all "TG MOTOR T]f,N place FWP 2B on PERMISSIVES" lights (white) lit.
| |
| _ turning gear.
| |
| 2 Select FWM-1B to " ENGAGE".
| |
| 3 Verify FWP-2B turning gear
| |
| " Engage" and " Motor" lights lit.
| |
| 4 ' Notify SP0 to ensure FWP-2B on turning gear.
| |
| 8.43 Notify-SP0 to ensure o TDV-24 "TDV-23 Inlet Iso" l FWP-2B manual turbine l drain valves are open. e .__ TDV-35 "TDV-33 Inlet Iso" 8.44 Open FWP-2B turbine drain valves. TDV-23 TDV-30 TDV-33
| |
| '- 8.45 Establish minimum MFW e Ensure both FW loop masters are demand. set to "0" e Ensure FWP-2B " GOV SPEED CNTRL" i
| |
| ind.icating light (green) lit i.
| |
| * Ensure FWP-2B Bailey demand set l to "0" l
| |
| O i l
| |
| E0P-14 REV 04 PAGE 105 of 303 ENCLS l o_--_--_____ -- -- _ 1
| |
| | |
| O BLANK PAGE g
| |
| 9 E0P-14 REV 04 PAGE 106 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D)
| |
| ( ACTIONS DETAILS 8.46 Verify high PRESS and low e Verify the following:
| |
| PRESS trip valves are closed. ASV-4 closed ASV-2 closed j
| |
| " TRIP" light lit 8.47 Start FWP-2B 1 Ensure FWP-2B has been on turning gear or rotating for at least 3 hours prior to start.
| |
| 2 Depress and hold "FWP-28 MISSING SIGNAL BYPASS START" push button.
| |
| 3 Verify all permit lights (white) are lit.
| |
| I''T 4 Select " RESET / TRIP" switch to C " RESET".
| |
| 5 Verify ASV-4 and ASV-2 open.
| |
| 6 Increase Governor Speed Control to = 1000 RPM.
| |
| 7 WHEN > 100 RPM is indicated.
| |
| THEN release "FWP-2B MISSING SIGNAL BYPASS START" push button.
| |
| 8 Verify the following:
| |
| Turning gear disengages Turning gear motor stops 9 Ensure FWV-19 opens.
| |
| l
| |
| ,~.
| |
| f i
| |
| %.)
| |
| E0P-14 REV 04 PAGE 107 of 303 ENCLS t - - - - - . - - - - - _ - - - - - - - - - - - - - _ - - _ _ - - _ _
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 108 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D)
| |
| (
| |
| ) ACTIONS DETAILS 8.48 Open FWV-23 8.49 Maintain turbine at a e Record time at 1000 RPM.
| |
| minimum speed of == 1000 RPM for 2 30 minutes for hrs warmup period.
| |
| 8.50 Verify turbine vibration.
| |
| * No alarms.
| |
| shaft eccentricity, and shaft position are withir, limits.
| |
| 8.51 Increase turbine speed to e Adjust with " GOV SPEED CNTRL" (red
| |
| , ~N = 3,550 RPM. light lit).
| |
| L) l
| |
| ,, ~.
| |
| ..)
| |
| E0P-14 REV 04 PAGE 109 of 303 F" 3
| |
| | |
| O BLANK PAGE g-O E0P-14 REV 04 PAGE 110 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D) l l
| |
| l l'~') ACTIONS DETAILS w/
| |
| STATUS
| |
| * At least 1 MFWBP and 1 MFWP is running.
| |
| * OTSG feed is desired.
| |
| j l
| |
| l l
| |
| 8.52 IE desired to feed A OTSG, 1 Open FWV-36 THEN establish FW flow to l i
| |
| A OTSG. 2 Control running MFWP at l
| |
| = 80 psi AP.
| |
| 3 Throttle FWV-40 for desired flow.
| |
| 4 WHEN A OTSG is at desired level.
| |
| THEN select FWV-40 to "AUT0" 5 LF. EFW is feeding A OTSG, I
| |
| _.' THEN select EFW control valves i
| |
| ( i to " HAND" and close:
| |
| L.) '
| |
| EFV-58 EFV-56 6 lE AFW is feeding A OTSG, THEN close FWV-216 7 Ensure FWV-40 1s controlling A OTSG level.
| |
| l
| |
| ,r\
| |
| 'm.
| |
| E0P-14 REV 04 PAGE 111 of 303 ENCLS i
| |
| l L_______-- __
| |
| | |
| i BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 112 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D) t ACTIONS DETAILS 8.51 lE desired to feed B OTSG, 1 Open FWV-33 IHEN establish FW flow to B OTSG. 2 Control running MFWP at
| |
| = 80 psi AP.
| |
| 3 Throttle FWV-39-for desired flow.
| |
| 4 W!!EN B OTSG is at desired level.
| |
| It!EN' select FWV-39 to "AUT0".
| |
| 5 IE EFW is feeding B OTSG.
| |
| THEN select EFW control valves to " HAND" and close:
| |
| EFV-57 EFV-55 i
| |
| 6 IE AFW is feeding B OTSG,- )'
| |
| IHEN close FWV-217 l 7 Ensure FWV-39 is controlling i B OTSG level.
| |
| i i
| |
| 1 i
| |
| O E0P-14 REV 04 PAGE 113 of 303 ENCLS
| |
| | |
| ____________----------7 O
| |
| {
| |
| i BLANK PAGE g
| |
| i O
| |
| E0P-14 REV 04 PAGE 114 of 303 ENCLS
| |
| | |
| l ENCLOSURE 8 MFW RESTORATION (CONT *D)
| |
| ()
| |
| ,\ i ACTIONS DETAILS 8.54 Transfer FW Pump Station 1 Select " MEAS. VAR." on both FW 1 to "AUT0". pump speed controls.
| |
| 2 lE both OTSGs are being fed.
| |
| THEN adjust " RAISE / LOWER" switch to obtain = 80 psi AP on the i lowest loop. )
| |
| i 3 IE only one OTSG is being fed. !
| |
| THEN adjust " RAISE / LOWER" switch !
| |
| to obtain = 80 psi AP. ;
| |
| 4 Monitor OTSG levels and FW flow for prop?" FW valve control. !
| |
| 5 Select "POS." on running FW I pump.
| |
| 6 Depress "AUT0" push button until '
| |
| red light is lit.
| |
| ,_.x 7 Ensure MFWP is controlling
| |
| = 80 psi AP.
| |
| (v) l 8.55 WHEN MFW is controlling OTSG level, THEN continue in this enclosure.
| |
| i l'h U
| |
| E0P-14 REV 04 PAGE 115 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| l O
| |
| E0P-14 REV 04 PAGE 116 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'0) !
| |
| ( ACTI0f6 DETAILS 8.56 IE EFW requires shutdown, 1 Bypass or reset HPI channels.
| |
| THEN restore EFW to standby. 2 1E an EFIC actuation signal i exists, j
| |
| THEN depress " MANUAL PERMISSIVE" 1 push buttons on EFIC channels A !
| |
| and B.
| |
| 1 3 lE an EFIC actuation signal does '
| |
| NOT exist, i THEN depress " TEST ;
| |
| RESULTS/ RESET" push buttons on !
| |
| EFIC channels A and B. I 4 Stop EFP-1 5 Close EFP-2 steam supply valves:
| |
| ASV-204 i ASV-5 l
| |
| t' 6 Notify PPO to reset EFIC trip
| |
| \s] modules:
| |
| Cabinet A, Module A-4-10.
| |
| EF-100-ZY (A EFIC Room)
| |
| Cabinet B. Module B-4-10.
| |
| EF-200-ZY (B EFIC Room) l 7 Select EFIC Control valves to J "AUT0".
| |
| i EFV-58 1 i
| |
| EFV-57
| |
| {
| |
| l EFV-56 i
| |
| EFV-55 l !
| |
| i t''T
| |
| %.)
| |
| E0P-14 REV 04 PAGE 117 of 303 ENCLS
| |
| | |
| l 0
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 118 of 303 ENCLS
| |
| | |
| ENCLOSURE 8 MFW RESTORATION (CONT'D)
| |
| ( ') ACTIONS DETAILS 8.57 Jf AFW requires shutdown, 1 Ensure AFW control valves are THEN restore AFW to closed:
| |
| standby.
| |
| FWV-216 FWV-217 2 Stop FWP-7 3 Notify SPD to close AFW isolation valves to OTSGs (119 ft IB by east door):
| |
| FWV-222 "AFW Discharge Iso to A OTSG" FWV-223 "AFW Discharge Iso to B OTSG"
| |
| % 8.58 EXIT this enclosure.
| |
| ("J L \
| |
| l i
| |
| E0P-14 REV 04 PAGE 119 of 303 ENCLS
| |
| | |
| O i
| |
| BLANK PAGE l
| |
| l O
| |
| E0P-14 REV 04 PAGE 120 of 303 ENCLS
| |
| --------_-----.J
| |
| | |
| ENCLOSURE 9 OTSG CONTAMINATED' WASTE' WATER MANAGEMENT ACTIONS DETAILS 9.1 ' Align FSP recirc Hdr to 1 Ensure FSV-28 "FST-1B Inlet Iso"
| |
| : l. FST-1B is open (119 ft Berm between
| |
| ! FSTs).
| |
| t 2 _ _ Close FSV-27 "FST-1A Inlet Iso"-
| |
| (119 ft-Berm between FSTs).
| |
| 3 Open FSV-24 "FSP Recirc Line to FST Iso" (119 ft FSPH northwest wall).
| |
| .9.2. Verify FSP-2B is available.
| |
| IE FSP-2B 'is NOT
| |
| .available.
| |
| IHEN G0'TO Step 9.8 in this enclosure.
| |
| O 9.3 Ensure FSV-41 "FSP Suction Hdr Cross-Tie" is closed (119 ft FSPH north wall).
| |
| 9.4 1E FSP-1 is HQI available, THEN GO TO Step 9.10 in l
| |
| .this enclosure, i
| |
| i
| |
| , O E0P-14 REV 04 PAGE 121 of 303 ENCLS
| |
| | |
| > 0 l
| |
| l BLANK PAGE t
| |
| O E0P-14 REV 04 PAGE 122 of 303 ENCLS
| |
| | |
| .E_NCLOSURE 9 OTSG CONTAMINATED WASTE WATER MANAGEMENT (CONT'D) l ACTIONS DETAILS STATUS
| |
| * FSP 2B is available to support FS.
| |
| * FSP 1 is to be used to transfer FST 1A to FST-18.
| |
| ; 9.5 Establish recirc flow to 1 . Throttle open FSV-18 "FSP-1 f: FST-1B Recirc Iso" (119 ft'FSPH south l wall) to establish 2000 gpm L (1800 to 2200 gpm) as indicated l on FS-12-FIS 2 Verify FSP-1 is running, j 3 Notify Control Room that FST-1A transfer is in progress and request to be notified when FST-1A level is 5 ft (4 to 9.6 WBEN notified by Control 1 Close FSV-18 "FSP-1 Recirc Iso"
| |
| ! _ Room that FST-1A level is (119 ft FSPH south wall).
| |
| l 5 ft (4 to 6 ft).
| |
| IHEN stop recirc flow. 2 Stop FSP-l'(119 ft FSPH) 3 Close FSV-24 "FSP Recirc Line to FST Iso" (119 ft FSPH northwest wall).
| |
| 9.7 GO TO Step 9.12 in this enclosure.
| |
| O E0P-14 REV 04 PAGE 123 of 303 ENCLS i
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 124 of 303 ENCLS
| |
| }
| |
| | |
| ENCLOSURE 9 OTSG CONTAMINATED WASTE WATER MANAGEMENT (CONT'D)
| |
| ACTIONS- DETAILS STATdS e: FSP 2B is not available.
| |
| e FSP-1 is available-to support FS.
| |
| e _FSP-2A is to be used to transfer FST-1A to FST 1B.
| |
| 9.8 Open FSV-41 "FSP Suction Hdr Cross-Tie" (119 ft FSPH north wall).
| |
| 9.9- Close FSV-13 "FSP Suction Hdr Cross-Tie" (119 ft FSPH north wall).
| |
| I i
| |
| l i
| |
| i O l
| |
| .E0P-14 REV 04 PAGE 125 of 303 ENCLS L
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 126 of 303 ENCLS
| |
| | |
| ENCLOSURE 9 OTSG CONTAMINATED WASTE WATER MANAGEMENT (CONT'D) l ACTIONS DETAILS STATUS
| |
| * FS support is provided by FSP-2B or by FSP 1 with suction aligned to FST 18.
| |
| e- FSP 2A is to be used to transfer FST-1A to FST 18, 9.10 Establish recirc flow to 1 Notify Control Room to start FST-1B FSP-2A 2 Verify FSP-2A is running (119 ft FSPH).
| |
| 3 Throttle open FSV-23 "FSP-2A l Recirc Iso" (119 ft FSPH )
| |
| southeast wall) to establish 2000 gpm (1800 to 2200 gpm) as indicated on FS-12-FIS 4 Notify Control Room that FST-1A
| |
| (],-
| |
| /
| |
| transfer is in progress and l
| |
| request to be notified when FST-1A level is 5 ft (4 to 6 ft).
| |
| 9.11 WHEN notified by Control 1 Close FSV-23 "FSP-2A Recirc Iso" Room that FST-1A level is (119 ft FSPH southeast wall).
| |
| 5 ft (4 to 6 ft).
| |
| T1LEN stop recirc flow. 2 Select FSP-2A " START MODE SELECTOR SWITCH" to "0FF" (119 ft FSPH).
| |
| 3 WHEN FSP-2A stops, THEN select FSP-2A " START MODE SELECTOR SWITCH" to "AUT0" (119 ft FSPH).
| |
| 4 Close FSV-24 "FSP Recirc Line to FST Iso" (119 ft FSPH northwest wall).
| |
| E0P-14 REV 04 PAGE 127 of 303 ENCLS
| |
| | |
| O BLANK PAGE g i O
| |
| E0P-14 REV 04 PAGE 128 of 303 ENCLS
| |
| )
| |
| i
| |
| | |
| ENCLOSURE 9 OTSG CONTAMINATED WASTE WATER MANAGEMENT (CONT'D)
| |
| ,n
| |
| () ACTIONS DETAILS STATUS FST 1A level is 5 ft (4 to 6 ft) and FST transfer is complete.
| |
| 9.12 Align FSP suctions to 1 Ensure the following pumps are FST-1B stopped (119 ft FSPH): q FSP-1 FSP-2A 2 Close FSV-3 "FST-1A Outlet Iso" (119 ft Berm behind FST-1A).
| |
| 3 Open FSV-41 "FSP Suction Hdr Cross-Tie" (119 ft FSPH north wall).
| |
| .r w 4 Ensure FSV-13 "FSP Suction Hdr
| |
| (
| |
| '' ) Cross-Tie" is open (119 ft FSPH north wall).
| |
| 9.13 Notify Control Room of e FST-1A is pumped down and FST-1A status. isolated.
| |
| * FST-1A and CDT-1 are to be cross-tied.
| |
| es s,
| |
| ,V E0P-14 REV 04 PAGE 129 of 303 ENCLS
| |
| | |
| (
| |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 130 of 303 ENCLS
| |
| | |
| i
| |
| : ENCLOSURE 9 OTSG CONTAMINATED WASTE WATER MANAGEMENT (CONT'D) i
| |
| ( ACTIONS DETAILS 9.14 Cross-tie FST-1A to CDT-1 1 Close CDV-290 "CDT-1 to EFP Suction" (119 ft Berm in covered valve box by FST-1A).
| |
| 2 Close CDV-288 "FST to CDT-1 Cross-Tie Drain" (119 ft Berm by FST-1A).
| |
| l 3 Open CDV-289 "FST to CDT-1 Cross-Tie Iso" (119 ft Berm by FST-1A).
| |
| 4 Open FSV-918 "FST to CDT-1 Cross-Tie Iso" (119 ft Berm by FST-1A).
| |
| 5 Open CDV-103 "CDT-1 to EFP Suction" (119 ft Berm by CDT-1).
| |
| l(v,')
| |
| 9.15 EXIT this enclosure.
| |
| l l
| |
| l l
| |
| }
| |
| n n..
| |
| E0P-14 REV 04 PAGE 131 of 303 ENCLS l I
| |
| t______ _ J
| |
| | |
| O I
| |
| BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 132 of 303 ENCLS
| |
| | |
| ~ ENCLOSURE 10 blTERNATE OTSG FEEDWATER SUPPLY O\J ACTIONS- DETAILS 10.1 Prepare AFW for operation, e Notify SPD to open AFW isolation valves to OTSGs (119 ft IB by east door):
| |
| FWV-222 "AFW Discharge Iso to A OTSG"
| |
| ~
| |
| FWV-223 "AFW Discharge Iso to B OTSG" 10.2 Verify 4160V REACTOR AUX BUS 3 is energized.
| |
| lE 4160V REACTOR AUX BUS 3.- 1 Open Bkr 3223 is NQI energized.
| |
| TH.!EN energize 4160V 2 Select MTDG-1 to "RUN".
| |
| _ REACTOR AUX BUS 3 3 Verify "RUN/MTDG-1" light (red)
| |
| A is lit.
| |
| ' O. 4 Close Bkr 3225 5 Verify 4160V REACTOR AUX' BUS 3 voltage is stable.
| |
| I i
| |
| l l
| |
| O E0P-14 REV 04 PAGE 133 of 303 ENCLS 1 L
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 134 of 303 ENCLS
| |
| | |
| r ENCLOSURE 10 ALTERNATE OTSG FEEDWATER SUPPLY ACTIONS DETAILS 10.3 Start FWP-7 CAUTION Simultaneous feeding with EFW and AFW could cause OTSG tube damage due to tube cross flow limitations.
| |
| i l
| |
| 10.4 WHEN FWV-222
| |
| * Control OTSG level with AFW control AND FWV-223 are open, valves:
| |
| THEN establish AFW flow.
| |
| FWV-216 FWV-217 See Table 2 10.5 EXIT this enclosure.
| |
| i i
| |
| I t
| |
| O !
| |
| E0P-14 REV 04 PAGE 135 of 303 ENCLS
| |
| | |
| l BLANK PAGE O
| |
| i l
| |
| 1 O
| |
| E0P-14 REV 04 PAGE 136 of 303 ENCLS
| |
| | |
| ENCLOSURE l EDG A LOAD MANAGEMENT L , ACTIONS DETAILS STATUS'
| |
| ,e : EDG A is supplying the A ES 4160V Bus.
| |
| 11.1 E B ES 4160V Bus is energized.
| |
| T,H.fM GO TO Step 11.11 in-
| |
| _this' enclosure.
| |
| M The following steps cross-tie EFWPs to allow shutdown of EFP 1 for-
| |
| - EDG A load management.
| |
| i 11.2' Verify EFP-1 is running.
| |
| J ' '
| |
| j l LF EFP-1 is JN T running,
| |
| 'TIEN notify TSC.
| |
| 11.3. Verify.~ EFP-2 is running.
| |
| * E EFP-2 discharge block valves are open, gverify EF-62-FI indicates
| |
| * E EFP-2 discharge block valves ,
| |
| L are NOT open. I THEN verify the following:
| |
| ASV-204 indicates open ,
| |
| L ,
| |
| l ASV-50 is not tripped -!
| |
| (Annunciator H-08-04 not :
| |
| lit)
| |
| LF EFP-2 is JN _T running.
| |
| 'TIEN notify TSC and EXIT ;
| |
| F' this enclosure.
| |
| ( '
| |
| - E0P.-14 REV 04 PAGE 137 of 303 ENCLS j m_ _ _ _. _ _ _ _ _ _ _ _
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 138 of 303 ENCLS
| |
| | |
| ENCLOSURE 11 EDG A LOAD MANAGEMENT (CONT'D)
| |
| ^
| |
| l / \
| |
| ACTIONS DETAILS L/I 1
| |
| 11.4 Ensure EFP-2 normal 1 Depress " MANUAL PERMISSIVE" push discharge path is buttons on EFIC channels A isolated. and B.
| |
| 2 Close EFP-2 discharge block valves:
| |
| EFV-11 EFV-32 3 Notify PPO to open EFP-2 discharge block valve sw) ches (A ES 480V SWGR Room): '
| |
| DPDP 8C-1 "EFV-11 Motor Power" DPDP 8C-3 "EFV-32 Motor Power" 11.5 Ensure level in available r OTSGs is at or trending
| |
| ( ,N1 '~ toward required level with EFP-1
| |
| [ Rule 3. EFW Control] ,
| |
| l L)
| |
| E0P-14 REV 04 PAGE 139 of 303 ENCLS
| |
| | |
| O l
| |
| l l
| |
| l BLANK PAGE O
| |
| I O
| |
| l E0P-14 REV 04 PAGE 140 of 303 ENCLS l
| |
| | |
| l ENCLOSURE 11 EDG A LOAD MANAGEMENT (CONT'D)
| |
| ACTIONS DETAILS.
| |
| 11.6 Notify PPO to cross 1 Unlock and close EFV-12 switches L . connect EFW trains, (A ES 480V SWGR Room):
| |
| DPDP 8C-5 "EFV-12 MOTOR POWER" DPDP 8C-6 "EFV-12 CONTROL POWER" 2 Depress the open push button for EFV-12-MST (A ES 480V SWGR Room).
| |
| 3 WHEN EFV-12. is open.
| |
| THEN open and lock EFV-12 switches (A ES 480V SWGR Room):
| |
| [ DPDP 8C-5 "EFV-12 MOTOR POWER" DPDP 8C-6 "EFV-12 CONTROL POWER" 4 Notify Control Room that EFV-12 is open.
| |
| 11.7 WHEN EFP-2 is aligned to L su) ply EFW to OTSGs.
| |
| THEN select EFP-1 to
| |
| " PULL-TO LOCK" 11.8 . Depress both "EFW INITIATE" push buttons on EFIC channels A and B.
| |
| 11.9 Ensure EFW flow is controlled.
| |
| [ Rule 3. EFW Control]
| |
| 11.10 EXIT.this enclosure.
| |
| E0P-14 REV 04 PAGE 141 of 303 ENCLS I
| |
| | |
| O, j
| |
| l BLANK PAGE O
| |
| j I
| |
| 1 1 O
| |
| E0P-14 REV 04 PAGE 142 of 303 ENCLS l
| |
| | |
| )
| |
| ENCL.0SURE 11 EDG A LOAD MANAGEMENT (CONT'D) 1
| |
| /'''')
| |
| NJ ACTIONS DETAILS I l
| |
| l STATUS
| |
| (
| |
| B ES 4160V Bus is energized.
| |
| ~
| |
| f l
| |
| 11.11 Verify SWP-1B and RWP-2B are running. SWP-1B l
| |
| l RWP-2B i
| |
| (
| |
| l JE SWP-18.
| |
| @ RWP-2B is NOT running, THEN notify TSC and EXIT j this enclosure.
| |
| 1 11.12 e) Select SWP-1A to
| |
| " PULL TO LOCK" i
| |
| 11.13 Select RWP-2A to
| |
| " PULL TO LOCK".
| |
| 1 11.14 Defeat EFP-1 500 psig
| |
| * Select "EFP-1 TRIP DEFEAT" switches trip. to " DEFEAT" position (ES cabinets): i ACT. CHAN. CAB. #1 ACT, CHAN. CAB. #2 1 ACT. CHAN. CAB. #3 s 11.15 EXIT this enclosure.
| |
| ( ) 1 E0P-14 REV 04 PAGE 143 of 303 ENCLS
| |
| - - _ - _ _ _ _ _ _ _ ~
| |
| | |
| O BLANK PAGE g
| |
| 1 O
| |
| E0P-14 REV 04 PAGE 144 of 303 ENCLS
| |
| | |
| fNCLOSURE 12 OTSG TRACC ISOLATION
| |
| ( ' ACTIONS DETAILS
| |
| _NQIE The following criteria is'to be used during isolation determination:
| |
| * High OTSG level (Isolate any OTSG that can not be maintained s 90% due to tube rupture.)
| |
| * Low BWST level.(Isolate any OTSG with tube rupture.)
| |
| * Atmospheric' steaming time limit (Isolate the OTSG with the' largest primary.to secondary leak rate.)
| |
| 12.1 IE blowdown is available.
| |
| * Notify SP0 to throttle blowdown flow THEN maintain OTSG level at s 500 gpm indicated on MS-117-FI s 90% using 0TSG blowdown (95 ft TB east of hotwell):
| |
| lines.
| |
| MSV-516 "0TSG Blowdown / Drain Hand Control"
| |
| , () '
| |
| T 's -MSV-517 "0TSG B1owdown/ Drain Hand Control Bypass" 12.2- E either OTSG PRESS
| |
| * Depress "<-725 PSI.STM GEN PRESS
| |
| < 725'psig. EFIC ACT BYPASS" push buttons:
| |
| T1 G bypass EFIC isolation
| |
| _actuations. Channel A l
| |
| ! 4 Channel B Channel C l
| |
| ; Channel D !
| |
| L 12.3 E adequate SCM exists.
| |
| -AND HPI bypass permits l
| |
| ' exist, i THEN bypass HPI.
| |
| See Table 3 E0P-14 REV 04 PAGE 145 of 303 ENCLS
| |
| | |
| I 1
| |
| l 9 l
| |
| BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 146 of 303 ENCLS
| |
| | |
| ENCLOSURE 12 OTSG TRACC ISOLATION (CONT'0) o
| |
| ( ,) ACTIONS DETAILS NOTE Emergency cooldown limits apply when RCS TEMP is > 500*F.
| |
| 12.4 IE RCS TEMP is > 480*F.
| |
| * Adjust TBVs (preferred) or ADVs THEN establish RCS to achieve cooldown rate.
| |
| cooldown.
| |
| See Table 1 12.5 Isolate MSDTs on affected
| |
| * IE A OTSG is affected.
| |
| OTSGs. THEN notify SP0 to close MSDT isolations (119 ft IB):
| |
| MSV-297 "MSDT-22 Root Iso"
| |
| ,-s MSV-299 "MSDT-23 Root Iso"
| |
| )
| |
| v'
| |
| * IE B OTSG is affected.
| |
| THEN notify SP0 to close MSDT isolations (119 ft IB):
| |
| MSV-301 "MSDT-24 Root Iso" MSV-303 "MSDT-25 Root Iso" 12.6 WHEN RCS TEMP s; 480*F.
| |
| * Use any of the following to control THEN ensure RCS PRESS RCS PRESS:
| |
| s; 950 psig.
| |
| PZR spray PORV PZR HPVs Letdown flow l ,
| |
| \,
| |
| E0P-14 REV 04 PAGE 147 of 303 ENCLS I
| |
| i
| |
| | |
| l l
| |
| l BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 148 of 303 ENCLS
| |
| | |
| L ENCLOSURE 12 OTSG TRACC ISOLATION (CONT'D)
| |
| ACTIONS DETAILS i
| |
| 12.7 IE EFIC is actuated.
| |
| THEN depress " MANUAL PERMISSIVE" push buttons on EFIC channels A and B. {
| |
| 12.8' Isolate all feedwater
| |
| * Close the following valves on sources to affected 0TSG. affected 0TSG:
| |
| ,, ?"Sg A OTSG B OTSG AFW ..
| |
| Control FWV-216 FWV-217 EFW EFV-14 EFV-33 Blocks EFV EFV-32 j Emergency Blocks FWV-35 FWV-34 LLBV FWV-31 FWV-32 MBV FWV-30 FWV-29.
| |
| SUBV FWV FWV-33
| |
| '12.9 Close MS supply valve to EFP-2 from affected OTSG. A OTSG B OTSG MSV-55. MSV-56 I
| |
| l j
| |
| 4 l
| |
| E0P-14 REV 04 PAGE 149 of 303 ENCLS
| |
| | |
| O l
| |
| BLANK PAGE l
| |
| O E0P-14 REV 04 PAGE 150 of 303 ENCLS
| |
| | |
| ENCLOSURE 12 OTSG TRACC ISOLATION (CONT'D)
| |
| ACTIONS DETAILS 12.10 WHEN RCS PRESS controlled 1 Close MSIVs on affected OTSG:
| |
| s 950. psig.
| |
| It!M complete isolating affected 0TSG. A OTSG B OTSG MSV-412- MSV-413 MSV-411 MSV-414-2 Select ADV to " HAND" and closed on affected OTSG:
| |
| A OTSG B OTSG MSV-25 MSV-26 3 Close blowdown line isolation on affected OTSG:
| |
| A OTSG B OTSG MSV-130 MSV-148 12.11 Maintain RCS PRESS e Use any of the following to control s 950 psig. RCS PRESS:
| |
| PZR spray PORV PZR HPVs o
| |
| Letdown flow l'
| |
| 12.12 Jf both OTSGs are unavailable for heat transfer.
| |
| THEN GO TO E0P-04,
| |
| . Inadequate Heat Transfer, beginning with Step 3.1 O
| |
| E0P-14 REV 04 PAGE 151 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 152 of 303 ENCLS
| |
| | |
| I i
| |
| ENCLOSURE 12 OTSG TRACC ISOLATION (CONT *D) i
| |
| /^ ' ; ACTIONS DETAILS I l L..J
| |
| \
| |
| 12.13 Control RCS TEMP using
| |
| * Adjust TBVs or ADV to control RCS available (not isolated) TEMP.
| |
| OTSG.
| |
| l 12.14 De-energize MS supply to 1 Jf MSV-55 is closed.
| |
| EFP-2 from affected OTSG. THEN notify PPO to open DPDP 8B-13 "MSV-55 MOTOR POWER" (B ES 4160V SWGR Room). '
| |
| 2 Jf MSV-56 is closed, ;
| |
| THEN notify PPO to open 1 DPDP 8B-15 "MSV-56 MOTOR POWER" (B ES 4160V SWGR Room).
| |
| 1
| |
| ,~
| |
| LJ l
| |
| i l
| |
| l
| |
| \_)
| |
| E0P-14 REV 04 PAGE 153 of 303 ENCLS
| |
| | |
| O l
| |
| BLANK PAGE O
| |
| O
| |
| , E0P-14 REV 04 PAGE 154 of 303 ENCLS l
| |
| | |
| ENCLOSURE-12 OTSG TRACC ISOLATION (CONT'D) f ACTIONS DETAILS l~ 12.15 De-energize EFW block
| |
| * E A OTSG was isolated..
| |
| . valves for affected OTSG. LHEN notify PP0 to open the l following switches:
| |
| DPDP 8C-1 "EFV-11 Motor Power" (A ES 480V SWGR Room)
| |
| DPDP 8D-1 "EFV-14 Motor Power" (B ES 480V SWGR Room)
| |
| * E B OTSG was isolated.
| |
| ItLN notify PPO to open the following switches:
| |
| DPDP 8C-3 "EFV-32 Motor-Power" (A ES 480V SWGR. Room)
| |
| DPDP 8D-3 "EFV-33 Motor Power" (B ES 480V SWGR Room) 12.16 E EFIC is actuated.
| |
| JEEN depress "EFW INITIATE" push buttons on EFIC channels A and B.
| |
| 1 12.17 EXIT this enclosure.
| |
| E0P-14 REV 04 PAGE 155 of 303 ENCLS I l
| |
| | |
| O' i
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 156 of 303 ENCLS
| |
| | |
| ENCLOSURE 13 HIGH PRESS AUX SPRAY LINEUP ACTIONS DETAILS 13.1 Isolate Aux spray line DH. 1 Ensure DHV-91 is closed, piping.'
| |
| '2 Notify PPO to ensure DHV-92 "DH to PZR Spray Root Iso" is open (75 ft AB A DH Roomh
| |
| ' 13.2 Align.MU system to supply 1- .Close RCV-53 Aux spray.
| |
| 2 Close RCV-13 3 Notify PPO to perform the following (119 ft AB penetration area):
| |
| Ensure MUV-520 "HU to DH High PRESS Aux Spray Drain" is closed.
| |
| Open MUV-273'"MU to DH_High PRESS Aux Spray Iso".
| |
| ' O en DHV-95 "MU to DH High PRESS A x Spray Iso".
| |
| Throttle DHV-126 "MU to DH High PRESS Aux Spray Throttle"
| |
| = 2 turns open.
| |
| 13.3- Manually control seal e Select MUV-16 to " HAND".
| |
| injection flow rate.
| |
| l-l l
| |
| 4
| |
| ( 4
| |
| ' E0P REV 04 PAGE 157 of 303 ENCLS
| |
| _ l
| |
| | |
| l l
| |
| BLN4K PAGE O
| |
| O E0P-14 REV 04 PAGE 158 of 303 ENCLS
| |
| | |
| ENCLOSURE 13 HIGH PRESS AUX SPRAY LINEUP (CONT'D)
| |
| ACTIONS DETAILS Aux spray flow is determined by subtracting individual seal flow from total seal flow.
| |
| 13.4 WHEN directed by the e Throttle RCV-53 to maintain controlling procedure, continuous high PRESS Aux spray THEN throttle flows as flow to limit PZR thermal desired. cycles.
| |
| e Throttle.MUV-16 to maintain desired individual seal injection flows.
| |
| e _ E necessary to obtain additional Aux spray flow.
| |
| THEN notify PPO to throttle DHV-126 "MU to DH High PRESS Aux Spray Throttle" (119 ft AB penetration area).
| |
| 13.5 IE at any time, additional 1 Throttle RCV-53 closed until flow is required, total seal injection flowrate THEN bypass seal injection -lowers.
| |
| filters.
| |
| 2 Open MUV-452 3 lE MUV-452 does NOT have power.
| |
| THEN notify PP0 to manually open MUV-452 " Seal Injection Filter Bypass" (119 ft AB by penetration area).
| |
| 4 Throttle RCV-53 to maintain
| |
| '~
| |
| continuous high PRESS Aux spray flow to limit PZR thermal cycles.
| |
| 5 Throttle MUV-16 to maintain desired individual seal injection flows.
| |
| ('T \
| |
| i E0P-14 REV 04 PAGE 159 of 303 ENCLS
| |
| | |
| Applicable carry-over steps:
| |
| 13.5 E additional flow is required, THEN bypass seal injection filters.
| |
| O O
| |
| E0P-14 REV 04 PAGE 160 of 303 ENCLS
| |
| | |
| ENCLOSURE 13 HIGH PRESS AUX SPRAY LINEUP (CONT'D) i
| |
| /7 ACTIONS U DETAILS
| |
| .13.6 WHEN high PRESS Aux spray 1 Throttle MUV-16 as necessary to is no longer required. maintain desired individual seal
| |
| , T R align MU and DH injection flows.
| |
| systems for normal meration. 2 Throttle RCV-53 closed to stop high PRESS Aux spray flow.
| |
| 3 blHEN RCV-53 is fully closed.
| |
| THEN notify PPO to close the following valves (119 ft AB penetration area):
| |
| MUV-273 "MU to DH High PRESS Aux Spray Iso" DHV-126 "MU to DH High PRESS Aux Spray Throttle" DHV-95 "MU to DH High PRESS Aux Spray Iso"
| |
| .. 4 Ensure MUV-452 is closed.
| |
| 5 WHEN high PRESS Aux spray is
| |
| _ isolated.
| |
| A_D N desired individual seal injection flowrates are established.
| |
| IHEN select MUV-16 to "AUT0".
| |
| l l
| |
| 13.7 EXIT this enclosure.
| |
| L
| |
| .O E0P-14 REV 04 PAGE 161 of 303 ENCLS
| |
| _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ . _ _ _ . _ - . . _ - - - - _ - - - - - - - - - - - - - - - " - - - - - - - - - - - - - - - - ' - - - - - - ~ - - - - - - - - - - - - - - - - - - - - - - - - - ~ ~ ~ ~ ~
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PKiE 162 of 303 ENCLS
| |
| | |
| ENCLOSURE 14 . STATION BLACK 0UT MAIN GENERATOR PURGING
| |
| / ACTIONS' DETAILS l m
| |
| *- Unless other locations are provided, valves and PRESS indicator (TB 156 P1) used in this enclosure are located on 95 ft TB by the J Hydrogen Panel.
| |
| *~ The venting process should take. = 20 min.
| |
| 14.1 Vent main generator H. 2 1 Close H 2 isolation valves:
| |
| HYV-28 "H2 Supply to Generator" GGV-213 "H2 Supply to Controller" GGV-220 " Generator Gas Manifold Inlet Iso" 2 Open Hr. vent valves:
| |
| ./~S
| |
| 't) GGV-232 " Generator Vent" GGV-274 " Vent Iso" 3 Verify main generator PRESS !
| |
| lowering on TB-156-PI l
| |
| 14.2 )[HW main generator PRESS
| |
| * GGV-233 " Carbon Dioxide Feed lowers to = 0 psig Line Iso" indicated on TB-156-PI, )
| |
| TH M open main generator e GGV-234 " Carbon Dioxide Iso" purge valves.
| |
| i l
| |
| .( .
| |
| E0P-14 REV 04 PAGE 163 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 164 of 303 ENCLS
| |
| | |
| ENCLOSURE 14 STATION BLACK 0UT MAIN GENERATOR PURGING ACTIONS DETAILS 14.3 'Begin N2 purge of main 1 Ensure both N 2 tank outlet valves generator, are open (119 ft Berm at N tanks):
| |
| NGV-260 "LP N2 Tank (North) Iso"
| |
| 'NGV-261 "LP N2 Tank (South) Iso" 2 Record N 2 tank levels:
| |
| NG-97-LI (south tank level):
| |
| in NG-98-LI (north tank level):
| |
| in 3 Open N 2 purge supply valves (119 ft TB west of Cardox tank):
| |
| NGV-325 "NG to GG Cross-Tie Root Iso" NGV-326 "NG to GG Cross-Tie Iso"
| |
| .tO
| |
| - Ny 4 Record purge start. time:
| |
| hrs I
| |
| rr l
| |
| )
| |
| i i
| |
| :(
| |
| E0P REV 04 PAGE 165 of 303 ENCLS L_ .,
| |
| :__=_______- . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _____-__--_-_______-______-_____A
| |
| | |
| O l
| |
| BLANK PAGE ,
| |
| l l i l
| |
| O E0P-14 REV 04 PAGE 166 of 303 ENCLS
| |
| _____- a
| |
| | |
| ENCLOSURE 14 STATION BLACK 0UT MAIN GENERATOR PURGING (CONT'D)
| |
| [')i u
| |
| ACTIONS DETAILS 14.4 WHEN main generator has 1 Record N tank levels:
| |
| 2 been purged for 1.5 hours using both N tanks NG-97-LI (south tank level):
| |
| 'QRatotalok20"ofN 2 in has been used.
| |
| T!LW isolate purge lineup.
| |
| NG-98-LI (north tank level):
| |
| __. in l
| |
| 2 Record purge stop time:
| |
| hrs 3 Close the following valves:
| |
| NGV-325 "NG to GG Cross-Tie Ror*.
| |
| Iso" (119 ft TB west of Cardox tank)
| |
| NGV-326 "NG to GG Cross-Tie Iso" (119 ft TB west of Cardox tank)
| |
| GGV-232 " Generator Vent" (95 ft i TB by Hydrogen Panel) !
| |
| GGV-233 " Carbon Dioxide Feed Line Iso" (95 ft TB by Hydrogen Panel)
| |
| GGV-234 " Carbon Dioxide Iso" (95 ft TB by Hydrogen Panel)
| |
| __ GGV-274 " Vent Iso" (95 ft TB by Hydrogen Panel) 14.5 Notify Control Room that main generator purge is complete and TBP-3 may be stopped.
| |
| Q).
| |
| b E0P-14 REV 04 PAGE 167 of 303 ENCLS l
| |
| | |
| i l
| |
| O' l
| |
| l l
| |
| l l
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 168 of 303 ENCLS l
| |
| | |
| ENCLOSURE 14 STATION BLACK 0UT MAIN GENERATOR PURGING (CONT'D) f')
| |
| 'a ACTIONS DETAILS 14.6 De-energize TBP-10 1 Open DPDP 3B-17 "TBP-10 Control (119 ft TB north of Power". i FWHE-3A).
| |
| ~
| |
| 2 Open DPDP 3B-13 "TBP-10 Motor Power".
| |
| 14.7 EXIT this enclosure.
| |
| i
| |
| .(~'s !
| |
| L) j i
| |
| I J
| |
| ,r^g)
| |
| G E0P-14 REV 04 PAGE 169 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 170 of 303 ENCLS
| |
| | |
| ENCLOSURE 15 E0P TEMPERATURE LOG M
| |
| Maxbum interval between readings is 30 min.
| |
| RCS Heatup or Cooldown Rate b, < Time A Time (min) RCS TEMP A RCS TEMP A RCS TEMP / 4 hr (Note 1) (Note 2) (Note 3) (Notes 4 and 5) t0 kib5]hm'' 'sd@485 in'Md3@fD$$.
| |
| t1 t2 t3 t4 t5 t6 t7
| |
| , p.
| |
| ( t8 l t9 t10 I
| |
| til t12
| |
| ( t13 Notes:
| |
| ! 1. Example: A Time = Time,i - Time,a I
| |
| ; 2. Use Tinem for RCS TEMP ,
| |
| l'
| |
| : 3. Example: A RCS TEMP = RCS TEMP,i - RCS TEMP,3 ,
| |
| : 4. A RCS TEMP /. 4 hr - A RCS TEMP x 30 A Time (min)
| |
| : 5. A positive number indicates a heatup and a negative number indicates a cooldown.
| |
| E0P-14 REV 04 PAGE 171 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 172 of 303 ENCLS
| |
| .. .. . . . . . . _ . _ . J
| |
| | |
| ENCLOSURE 15 E0P TEMPERATURE LOG (CONT *D)
| |
| - <O PZR Heatup and Cooldown Limits-
| |
| .U PZR TEMP Normal Heatup/Cooldown Rate OTSG Tube Rupture Cooldown Rate
| |
| > 520'F < 100*F/hr < 130'F/15 min s 520*F < 100*F/hr < 100'F/hr PZR Heatup or Cooldown Rate
| |
| ^E Time A Time (min) PZR TEMP
| |
| ' A PZR TEMP A PZR TEMP / hr
| |
| ~
| |
| (Note 1) (Note 2) (Note 3) (Notes 4 and 5) t0 '
| |
| N' AE # 4 E!* G '
| |
| * t1 t2 t3 l t4 t5 t6 t7
| |
| %d t8 t9 t10 til l- t12 t13 Notes:
| |
| : 1. Maximum interval between readings is 15 min until PZR TEMP < 520*F. then interval may be increased to 30 min.
| |
| : 2. Example: A Time = Time,i - Time,o
| |
| : 3. Example: A PZR TEMP = PZR TEMP,, - PZR TEMP,o I
| |
| L 4. A PZR TEMP /hr - A PZR TEMP x 60 l- A Time (min)
| |
| : 5. A positive number indicates a heatup and a negative number indicates a cooldown.
| |
| 7
| |
| .V E0P-14 REV 04 PAGE 173 of 303 ENCLS L-_______--__.-__________--
| |
| | |
| O' BLANK PAGE O
| |
| i l
| |
| l l
| |
| l 9
| |
| i E0P-14 REV 04 PAGE 174 of 303 ENCLS l
| |
| | |
| ENCLOSURE 16 RCP RECOVERY ACTIONS DETAILS STATUS Adequate SCM exists.
| |
| '16.1 E HPI PORV . cooling is in 1 E adequate.SCM has NQI been progress, lost.
| |
| JTH determine if RCP ANQ adequate SCM exists on both start conditions are met. hot legs.
| |
| ETN GO TO Step 16.5 in this enclosure.
| |
| [ See Table 3 2 E OTSGs have been -fed while performing HPI PORV cooling.
| |
| .THEN GO TO Step 16.3 in this enclosure-.
| |
| 3 E OTSGs have NOT been fed while t -m:- performing HPI PORV cooling, V
| |
| .THEN GO TO Step 16.4'in this enclosure.
| |
| 16.2 E adequate SCM has NOT been lost.
| |
| THEN G0 TO Step 16.5 in '
| |
| this enclosure.
| |
| Y See Table 3 l
| |
| l O
| |
| E0P-14 REV 04 PAGE 175 of 303 ENCLS.
| |
| i,
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 176 of 303 ENCLS
| |
| | |
| ENCLOSURE 16 RCP RECOVERY (CONT'D)
| |
| A ACTIONS U DETAILS 16.3 WHEN the following exist:
| |
| Stable, subcooled 2 loop Nat Circ
| |
| > 60 min Adequate SCM plus 30*F See Table 3 RCS PRESS > 260 psig 08 the following exist:
| |
| Adequate SCM plus 25'F See Table 3 RCS PRESS > 210 psig f
| |
| Stable, subcooled single-loop Nat Circ and HPI flow exists o for minimum time:
| |
| (_)
| |
| Flow (gpm) Minimum Time
| |
| ~
| |
| 2 1000 > 3 hr 30 min 2 900 > 4 hr 2 800 > 4 hr 30 min 2 700 > 5 hr 15 min !
| |
| 2 600 > 5 hr 30 min 2 500 > 6 hr 45 min 2 400 > 8 hr 30 min 2 300 > 11 hr 30 min 2 200 > 19 hr THEN GO TO Step 16.5 in this enclosure.
| |
| n b
| |
| E0P-14 REV 04 PAGE 177 of 303 ENCLS
| |
| | |
| O BLANK PAGE l
| |
| {
| |
| j O
| |
| E0P-14 REV 04 PAGE 178 of 303 ENCLS
| |
| | |
| ENCLOSURE 16 RCP REC 0VERY (CONT'D)
| |
| ACTIONS DETAILS 16,4 WBHEN RCS PRESS is
| |
| < 415 psig, THEN continue in this enclosure.
| |
| 1 1
| |
| )
| |
| l i
| |
| i 1
| |
| E0P-14 REV 04- PAGE 179 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 180 of 303 ENCLS
| |
| | |
| ENCLOSURE 16 RCP RECOVERY (CONT'D)
| |
| '] ACTIONS DETAILS STATUS RCS conditions exist for RCP restart.
| |
| 16.5 E RCP seal services (seal injection and SW cooling) have been maintained, JJJG GO TO Step 16.20 in this enclosure.
| |
| CAUTION Isolation of CB0 on a running RCP could result in RCP seal damage.
| |
| i p 16.6 E seal injection has NOT (j
| |
| been maintained. RCP CB0 Valve THEN ensure CB0 valves are closed for idle RCPs. RCP-1A MUV-258 RCP-1B MUV-259 RCP-1C MUV-260 RCP-1D MUV-261 16.7 ~~ Ensure SW isolation valves are open. RCP-1A SWV-80 SWV-84 RCP-1B SWV-79 SWV-83 I
| |
| RCP-1C SWV-82 SWV-86 RCP-10 SWV-81 SWV-85 E0P-14 REV 04 PAGE 181 of 303 ENCLS l
| |
| l
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 182 of 303 ENCLS
| |
| | |
| [NCLOSURE16 RCP REC 0VERY (CONT *Di ACTIONS O]
| |
| 'w '
| |
| DETAILS I
| |
| \
| |
| 16.8 E SW cooling.
| |
| AND seal injection was lost for > 30 minutes.
| |
| THEN GO TO Step 16.18 in this enclosure. .
| |
| i 16.9 E seal injection has been ;
| |
| maintained to RCPs. 1 THEN GO TO Step 16.20 in this enclosure. !
| |
| 16.10 E CB0 for idle pumps was !
| |
| 1solated within 14 min of loss of seal injection.
| |
| THEN GO TO Step 16.20 in this enclosure.
| |
| []
| |
| V l
| |
| l /''s
| |
| 'd E0P-14 REV 04 PAGE 183 of 303 ENCLS w _ _ __ _ _____- _ ___ -______ _. . _ - - _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ -
| |
| | |
| O BLANK PAGE g .
| |
| O E0P-14 REV 04 PAGE 184 of 303 ENCLS
| |
| | |
| ENCLOSURE 16- RCP RECOVERY (CONT'D) 7% ' ACTIONS d DETAILS 116.11- -Verify RCP third stage 1 Calculate RCP third stage seal seal integrity. PRESS limit (2 80% RCS PRESS):
| |
| osig X 0.8 -
| |
| (RCS PRESS) . (limit)psig-2 Record RCP third stage seal PRESS:
| |
| RCP-1A psig -1 RCP-1C psig
| |
| , RCP-1B psig RCP-10 psig i
| |
| ETE The order of the following steps minimizes the time that CB0 valves' are open without seal injection in service,
| |
| : i. 16.12 lE RCP'thir'dstage. seal -e Ensure MUV-253 is open.
| |
| PRESS verified in i
| |
| . Step 16.11 is 2 80% RCS
| |
| * Ensure open:
| |
| PRESS.
| |
| L TH_Lii open CB0 valves.
| |
| RCP CB0 Valve RCP-1A MUV-258 RCP-1B MUV-259 i
| |
| RCP-l'C MUV-260 L
| |
| RCP-10 MUV-261 O
| |
| E0P-14. REV 04 PAGE 185 of 303 ENCLS i'
| |
| o
| |
| | |
| 1 l
| |
| l O
| |
| I
| |
| \
| |
| \
| |
| i BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 186 of 303 ENCLS I
| |
| l J
| |
| | |
| ENCLOSURE 16 RCP RECOVERY (CONT'D)
| |
| ACTIONS DETAILS d 1 i
| |
| 16.13 Record RCP seal PRESS for 1 Record third stage seal PRESS of RCPs with open CB0 valves. RCPs with CB0:
| |
| i RCP-1A psig RCP-1C psig i
| |
| RCP-1B psig ;
| |
| RCP-1D psig i 2 Record second stage seal PRESS of RCPs with CB0:
| |
| RCP 1A psig RCP-1C psig RCP-1B psig RCP-10 psig
| |
| 'QO CAUTION Isolation of CBD on a running RCP could result in RCP seal damage.
| |
| 16.14 se CB0 valves for idle RCP CB0 Valve i RCP-1A MUV-25B RCP-1B HUV-259 I RCP-1C MUV-260 l
| |
| RCP-1D MUV-261 1
| |
| l j
| |
| E0P-14 REV 04 PAGE 187 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 188 of 303 ENCLS
| |
| | |
| ENCLOSURE 16 RCP RECOVERY (CONT'D) c'"3 ACTIONS DETAILS L_)
| |
| 16.15 Calculate acceptable
| |
| * Calculate RCP third stage seal ranges for RCP seal PRESS. PRESS acceptable range (2 20%
| |
| and s 65% of RCS PRESS):
| |
| -)sig X 0.2 - psig (RCS PRESS) (lower limit) asig X 0.65 = psig (RCS PRESS) (upper limit) e Calculate RCP second stage seal PRESS acceptable range ( 2 40%
| |
| and s 80% of RCS PRESS):
| |
| asig X 0.4 - psig EPRESS) (lower limit) asig X 0.8 = psi (RCS PRESS) (upper limit)g m 16.16 Determine RCP seal 1 Compare RCP seal staging PRESS (x/ ) integrity. recorded in Step 16.13 with the acceptable ranges calculated in Step 16.15 2 Record RCPs with acceptable second and third stage seal PRESS:
| |
| RCP Acceptable RCP-1A RCP-1B RCP-1C RCP-1D i 16.17 Jf any RCP seal integrity i
| |
| is acceptable.
| |
| THEN GO TO Step 16.20 in this enclosure.
| |
| p
| |
| \)
| |
| l E0P-14 REV 04 PAGE 189 of 303 ENCLS I l
| |
| | |
| 1 i
| |
| i e
| |
| l BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 190 of 303 ENCLS
| |
| | |
| i ENCLOSURE 16 RCP RECOVERY (CONT'D)
| |
| (3 v) ACTIONS DETAILS 16.18 Restore seal injection. 1 Ensure MUV-16 is closed. I 2 Ensure a MVP is running.
| |
| 3 ' Ensure MUV-18 is open.
| |
| l 4 Throttle open MUV-16 to establish seal injection flow rate of 3 gpm/ pump over a two minute time period. l Time 3 gpm established -
| |
| 5 WHEN 10 minutes have elapsed with seal injection of 3 gpm/ pump.
| |
| THEN increase seal injection flow to 6 gpm/ pump.
| |
| Time 6 gpm established -
| |
| 6 WHEN 10 minutes have elapsed
| |
| /m. with seal injection of
| |
| ('~') 6 gam / pump, THE4 increase seal injection flow to 10 gpm/ pump. ,
| |
| i i-m.
| |
| 1 j \
| |
| LJ E0P-14 REV 04 PAGE 191 of 303 ENCLS
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 192 of 303 ENCLS
| |
| | |
| ENCLOSURE 16 RCP REC 0VERY (CONT'D)
| |
| , ' ') ACTIONS DETAILS
| |
| ~. J 16.19 JF any of the following conditions exist:
| |
| SW and seal injection was lost for > 30 min RCP seal integrity does NOT exist THf.N EXIT this enclosure.
| |
| 16.20 Ensure NPSH exists for RCP e Operate PZR heaters as necessary to start. establish RCS TEMP and PRESS for RCP NPSH.
| |
| I See Figure 1
| |
| )
| |
| See Figure 2 !
| |
| ,~
| |
| ' _\)./
| |
| i 16.21 WHEN all the following l
| |
| conditions exist:
| |
| 6900V bus power RCP start permissives (seal injection and '
| |
| CB0 may be exceptions)
| |
| Adequate RCP NPSH See Figure 1 See Figure 2 THEN continue in this enclosure.
| |
| ,)
| |
| E0P-14 REV 04 PAGE 193 of 303 ENCLS
| |
| | |
| O 1
| |
| l l
| |
| l l
| |
| BLANK PAGE g
| |
| O E0P 14 REV 04 PAGE 194 of 303 ENCLS
| |
| | |
| ENCLOSURE 16 RCP RECOVERY (CONT'D)
| |
| - (v) ACTIONS DETAILS 16.22 IE at any time, adequate 1 Depress "HPI MAN ACT" push SCM is lost, ' button on Train A and B.
| |
| THEN ensure full HPI.
| |
| 2 Ensure HPI is controlled.
| |
| See Table 3
| |
| [ Rule 2. HPI Control]
| |
| 16.23 IE at any time, adequate 1 Trip all RCPs.
| |
| SCM is lost, AND NOT recovered within 2 lE seal injection does NOT 2 min, exist, THEN trip all RCPs and THEN ensure all CB0 valves are GO TO E0P-03 closed within 18 min of tripping RCPs.
| |
| See Table 3 3 GO TO E0P-03. Inadequate Subcooling Margin, beginning at Step 2.1
| |
| ,, x U
| |
| l N.. .]
| |
| E0P-14 REV 04 PAGE 195 of 303 ENCLS
| |
| _ _ _ _ _ _ _ _ _ _ _ __ a
| |
| | |
| Applicable carry-over steps:
| |
| 16.22 lE adequate SCM is lost. THEN ensure full HPI. $
| |
| 16.23 IE adequate SCM is lost. AND NOT recovered within 2 min, THEN trip all RCPs and GO TO E0P-03 O
| |
| O E0P-14 REV 04 PAGE 196 of 303 ENCLS
| |
| | |
| ENCLOSURE 16 RCP REC 0VERY (CONT'D)
| |
| ( ACTIONS DETAILS NOTE i
| |
| If adequate SCM is lost during RCP restart, Rule 1 performance may be delayed for a maximum of 2 min.
| |
| 16.24 Start RCPs based on the 1 Ensure MUV-253 is open.
| |
| following:
| |
| 2 Ensure CB0 valves are open for NPSH affected RCPs:
| |
| l L
| |
| OTSG heat transfer MUV-258 Seal integrity MUV-259 L MUV-260 MUV-261 3 Jf all start permissives are met except seal injection.
| |
| O- It!EN bypass RCP start permissives using key 50 4 Jf-HPI flow does NOT exist.
| |
| THEN ensure full makeup flow just prior to RCP start.
| |
| 5 Start first RCP (loop with OTSG heat transfer is preferred).
| |
| 6 Jf OTSG heat transfer' exists.
| |
| THEN start second RCP based on available RCS NPSH and RCP seal integrity (2/0 pump combination preferred).
| |
| See Figure 1 See Figure 2 O
| |
| E0P REV 04 PAGE 197 of 303 ENCLS l
| |
| | |
| O BLANK PAGE g
| |
| \
| |
| O E0P-14 REV 04 PAGE 198 of 303 ENCLS
| |
| _. ___-_______________________-_-____A
| |
| | |
| ENCLOSURE 16 RCP REC 0VERY (CONT'D)
| |
| (], ACTIONS DETAILS 16.25 Ensure operating RCP 1 Verify operating RCP seal TEMP normal seal parameters are progressing to normal ranges.
| |
| restored.
| |
| 2 Verify operating RCP parameters continue to normal ranges:
| |
| Seal PRESS Seal leakage Pump vibration 3 lE any RCP seal parameters are NOT in the normal range, M stop affected RCP and close the associated CB0 valve.
| |
| 16.26 IE seal injection has been maintained to RCPs.
| |
| (''T G'
| |
| THEN EXIT this enclosure.
| |
| 16.27 M operating RCP seal performance is normal, QB RCPs are stopped.
| |
| THEN continue in this enclosure.
| |
| 1 m
| |
| E0P-14 REV 04 PAGE 199 of 303 ENCLS l - - - . - _ - - - - - - - - - - - - - - - - - - - - - - - - _
| |
| | |
| l BLANK PAGE l
| |
| O E0P-14 REV 04 PAGE 200 of 303 ENCLS t
| |
| | |
| ENCLOSURE 16 RCP REC 0VERY (CONT'D)
| |
| ! ) ACTIONS DETAILS w'
| |
| 16.28 Restore seal injection. 1 Ensure MUV-16 is closed.
| |
| 2 Ensure a MUP is running.
| |
| 3 Ensure MUV-18 is open.
| |
| 4 Throttle open MUV-16 to establish seal injection flow rate of 3 gpm/ pump over a two minute time period.
| |
| Time 3 gpm established -
| |
| 5 WHEN 10 minutes have elapsed with seal injection of 3 gpm/ pump.
| |
| THEN increase seal injection flow to 6 gpm/ pump.
| |
| Time 6 gpm established -
| |
| 6 WHEN 10 minutes have elapsed
| |
| (~'%, with seal injection of v 6 gam / pump, THE1 increase seal injection flow to 10 gpm/ pump.
| |
| 16.29 EXIT this enclosure.
| |
| ry L.)
| |
| l E0P-14 REV 04 PAGE 201 of 303 ENCLS l
| |
| o
| |
| | |
| O BLANK PAGE g
| |
| j l
| |
| l E0P-14 REV 04 PAGE 202 of 303 ENCLS
| |
| | |
| ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION t i ACTIONS DETAILS G'
| |
| 17.1 Align control complex
| |
| * Select " CONTROL COMPLEX HVAC ISOLATE ventilation in recirc. RESET" switches to "150"-
| |
| A Train B Train 17.2 Verify control complex is
| |
| * Verify the following dampers are isolated. closed:
| |
| AHD-12 AHD-12D AHD-2C AHD-2E e AHD-1C i ;
| |
| AHD-1E 17.3 Ensure ventilation fans are shutdown. A Train B Train AHF-17A AHF-17B AHF-19A AHF-19B
| |
| ,o l
| |
| f V)
| |
| E0P-14 REV 04 PAGE 203 of 303 ENCLS 1
| |
| | |
| i l
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 204 of 303 ENCLS
| |
| | |
| ENCLOSURE 17 CONTROL' COMPLEX EMERGENCY VENTILATION (CONT'D)'
| |
| '( ACTIONS DETAllS Performance of the next ste) ensures adequate EDG load margin available to start all fans required >y this enclosure.
| |
| 17.4 1F EDG Bkrs are closed.
| |
| THEN verify EDG load is Max Allowable Load 3280 KW
| |
| < max allowable load. (BSP running)
| |
| Max Allowable Load 2960 KW (BSP shutdown)
| |
| A EDG Load KW B EDG Load KW l NOTE B Train fans are preferred for EDG load concerns.
| |
| ~17,5 Establish CC ventilation 1 Ensure AHD-3 is open.
| |
| in emergency recirc.
| |
| 2 Ensure only one train of CC ventilation running: j A Train B Train AHF-18A AHF-18B AHF-19A AHF-19B l
| |
| i
| |
| , r k
| |
| E0P-14 REV 04 PAGE 205 of 303 ENCLS
| |
| | |
| i O
| |
| 1 i
| |
| BLANK PAGE O
| |
| : O i E0P-14 REV 04 PAGE 206 of 303 ENCLS l
| |
| | |
| ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION (CONT'D)
| |
| ACTIONS DETAILS o
| |
| 17.6 Ensure 1 EFIC fan running.
| |
| * E starting AHF-54A.
| |
| THEN perform the following:
| |
| Select " TEMP CONT. VV.
| |
| CHV-113" switch to " MOD" position.
| |
| Start AHF-54A e E starting AHF-54B. i THEN perform the following: I Select " TEMP CONT. VV.
| |
| CHV-100" switch to " MOD" position.
| |
| Start AHF-54B 17.7 Establish' ventilation for e Ensure only one train of ventilation chemistry sampling. running:
| |
| A Train B Train AHF-20A AHF-20B in " SLOW" in " SLOW" AHF-44A AHF-44B 1
| |
| I l
| |
| )
| |
| O ,
| |
| E0P-14 REV 04 PAGE 207 of 303 ENCLS
| |
| | |
| I O
| |
| I BLANK PAGE *-)Ts
| |
| ~O O
| |
| E0P-14 REV 04 PAGE 208 of 303 ENCLS
| |
| | |
| ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION (CONT *D) ,
| |
| ' [l ACTIONS DETAILS
| |
| %)
| |
| NOTE
| |
| *- If both CC coolers are isolated, the CC chiller may trip on low chill water flowrate.
| |
| * If both CC coolers are in service, the chill water pump may trip on overcurrent.
| |
| 17.8 E AHF-18A is running. 1 Notify PPO to verify chill water is I!i@ ensure chill water is aligned to AHF-18A:
| |
| aligned.
| |
| CHV-4 "CC Cooler A Outlet Iso" is open (164 ft CC between AHHE-5A and AHHE-58)
| |
| CHV-2 "CC Cooler B Outlet Iso" is closed (164 ft CC by 1 Ventilation Room door) '
| |
| l 7 2 E chill water is NOT aligned to i AHF-18A. !
| |
| THEN notify PPO to perform the following in order:
| |
| Throttle CHV-2 "CC Cooler. B !
| |
| Outlet Iso" 10 turns closed.
| |
| Throttle CHV-4 "CC Cooler A Outlet Iso" one turn open.
| |
| Close CHV-2 "CC Cooler B Outlet Iso" Open CHV-4."CC Cooler A Outlet Iso" l
| |
| O E0P-14 REV 04 PAGE 209 of 303 ENCLS
| |
| ___=_ ___ -
| |
| | |
| l O
| |
| I f
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 210 of 303 ENCLS
| |
| | |
| ENCLOSURE 17 CONTROL COMPLEX EMERGENCY VENTILATION (CONT *D)
| |
| J'~'s ACTIONS DETAILS L)
| |
| NOTE e
| |
| If both CC coolers are isolated, the CC chiller may trip on low chill water flowrate.
| |
| If both CC coolers are in service, the chill water pump may trip on overcurrent.
| |
| 17.9 IE AHF-18B is running. 1 Notify PPO to verify chill water is THEN ensure chill water aligned to AHF-18B:
| |
| aligned.
| |
| CHV-2 "CC Cooler B Outlet Iso" is open (164 ft CC by Ventilation Room door)
| |
| CHV-4 "CC Cooler A Outlet Iso" is closed (164 ft CC between AHHE-5A and AHHE-5B) r)
| |
| i m
| |
| 2 lE chill water is NOT aligned to AHF-18B, THEN notify PP0 to perform the following in order:
| |
| Throttle CHV-4 "CC Cooler A Dutlet Iso" 10 turns closed.
| |
| Throttle CHV-2 "CC Cooler B Outlet Iso" one turn open.
| |
| Close CHV-4 "CC Cooler A Dutlet Iso" Open CHV-2 "CC Cooler B Outlet Iso" 17.10 EXIT this enclosure.
| |
| (~'s, V
| |
| E0P-14 REV 04 PAGE 211 of 303 ENCLS 1
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 212 of 303 ENCLS
| |
| | |
| 1 EELOSURE 18 CONTROL COMPLEX CHILLER STARTUP ACTIONS DETAILS
| |
| (
| |
| sat i B Train chiller is preferred for EDG load concerns. i j
| |
| 18.1 Ensure chill water is e E AHF-18A is running.
| |
| -aligned. THEN ensure chill water aligned:
| |
| CHV-4 "CC Cooler A Outlet Iso" is o)en (164 ft CC L
| |
| between AiHE-5A and AHHE-5B)
| |
| CHV-2 "CC Cooler B Outlet Iso" is closed (164 ft CC by 1 Ventilation Room door) l e IE AHF-18B is running.
| |
| THEN ensure chill water aligned:
| |
| CHV-2 "CC Cooler B Outlet Iso" is open (164 ft CC by lO -Ventilation Room door)
| |
| CHV-4 "CC Cooler A Outlet Iso" is closed (164 ft CC between AHHE-5A and AHHE-5B) 18.2 Notify Control Room to close selected chiller CHHE-1A Bkr-.
| |
| CHHE-1B L
| |
| L 18.3 lE CHHE-1A is selected. 1 Ensure SWV-60 "SW Iso to THEN ensure cooling water CHHE-1B" is closed.
| |
| is. aligned to CHHE-1A (164 ft CC above 2 Ensure SWV-59 "SW Iso to chillers). CHHE-1A" is open.
| |
| O E0P REV 04 PAGE 213 of 303 ENCLS s
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 214 of 303 ENCLS
| |
| | |
| ENCLOSURE 18 CONTROL COMPLEX CHILLER STARTUP (CONT'D)
| |
| . ACTIONS DETAILS 18.4 'IECHHE-1Bisselected. 1 Ensure SWV-59 "SW Iso to IHEN ensure cooling water CHHE-1A" is closed.
| |
| is aligned to CHHE-1B (164 ft CC above 2 Ensure SWV-60 "SW Iso to chillers). CHHE-1B" is open.
| |
| 18.5 Prepare desired chiller o Ensure " TEMPERATURE CONTROL unit'for startup. POINT" is at marked setpoint.
| |
| e- Ensure " MAX. LOAD ADJUSTMENT IN %" is-at 100 e Ensure "PRER0TATION VANES" switch is selected to " HOLD".
| |
| I e Depress "STOP-RESET"' l push button. Js e Ensure " AUX. OIL PUMP" switch is selected to "AUT0" e Record "0ll PRESSURE":
| |
| psig e Verify "0ll HEATER" light ,
| |
| (white) is lit. I e Ensure " PURGE UNIT" switch is l selected to "0FF". l e Verify "0ll/ MOTOR TEMP" light (red) is off.
| |
| i i
| |
| 1 E0P-14 REV 04 PAGE 215 of 303 ENCLS L
| |
| 1 I
| |
| C____________________--_--
| |
| | |
| O l
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 216 of 303 ENCLS
| |
| | |
| ENCLOSURE 18 CONTROL COMPLEX CHILLER STARTUP (CONT'D)
| |
| [VT ACTIONS DETAILS 18.6 Start chill water pump. 1 Notify Control Room to ensure adequate EDG margin exists to start chill water pump.
| |
| [ Rule 5. EDG Control]
| |
| 2 Start selected unit chill water pump:
| |
| CHP-1A "A Chilled Water Pump" CHP-1B "B Chilled Water Pump"
| |
| {
| |
| 3 Verify "CH WATER FLOW" light (amber) is off.
| |
| 18.7 Start chiller unit 1 Notify Control Room to ensure compressor. adequate EDG margin exists to start chiller.
| |
| (~)'i
| |
| : q. [ Rule 5. EDG Control] !
| |
| 2 Depress " COMPRESSOR START" push ;
| |
| button.
| |
| 3 Verify " AUX. OIL PUMP" light 4 (white) is lit. l 4 Verify "0Il PRESSURE" increases to = 35 psig above prestart "0ll PRESSURE" and record:
| |
| psig 5 Verify compressor auto starts after = 30 sec time delay.
| |
| 6 Record chiller start time.
| |
| 7 Verify " AUX. OIL PUMP" light (white) is off = 3 mins after compressor starts.
| |
| 8 Verify "Oll PRESSURE" stabilizes between 60 and 75 psig.
| |
| E0P-14 REV 04 PAGE 217 of 303 ENCLS
| |
| | |
| O BLANK PAGE g
| |
| 9 E0P-14 REV 04 PAGE 218 of 303 ENCLS
| |
| | |
| ENCLOSURE 18 CONTROL COMPLEX CHILLER STARTUP (CONT *D)
| |
| ) ACTIONS DETAILS 18.8 Verify chiller operating a "0IL PRESSURE" 60 to 75 psig conditions.
| |
| " CONDENSER PRESSURE" 1 to
| |
| * _ 14.5 psig l
| |
| * " SYSTEM RUN" light (white) lit
| |
| * " ANTI-RECYCLE" light Camber) lit
| |
| * All other lights off 18.9 IE at any time, while 1 Jog "PRER0TATION VANES" switch manually loading chiller, between "CLOSE" and " HOLD" until surging of load exists, surging of load stops.
| |
| THEN reduce load prior to subsequent reload. 2 WHEN chiller surging has stopped THEN continue manually loading chiller. ,
| |
| , m. ,
| |
| \___
| |
| 18.10 WHEN chiller has been 1 Jog "PRER0TATION VANES" switch running for > 3 min, between "0 PEN" and " HOLD" until one THEN manually load of the following conditions exist:
| |
| chiller.
| |
| " CONDENSER PRESSURE" stabilizes at = 14 psig.
| |
| Jogging open "PRER0TATION VANES" switch causes no increase of
| |
| " CONDENSER PRESSURE" 2 Select "PRER0TATION VANES" switch to "AUT0" 3 Notify Control Room that chiller is loaded.
| |
| 18.11 EXIT this enclosure i
| |
| N ,/
| |
| E0P-14 REV 04 PAGE 219 of 303 ENCLS u_____
| |
| | |
| O l
| |
| BLANK PAGE ,
| |
| O!!
| |
| l 1
| |
| 1 1
| |
| I I
| |
| l O
| |
| E0P-14 REV 04 PAGE 220 of 303 ENCLS l
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER ACTIONS DETAILS CAUTION DHV-34 and DHV-35 must be closed prior to BWST level < 7 ft.
| |
| 19.1 LF 1 LPI pump is aligned for DHR.
| |
| THEN GO TO Step 19.17 in this enclosure.
| |
| 19.2 Ensure LPI pumps and 1 Ensure BWST to DHP valves are open:
| |
| required cooling water systems are running. DHV-34
| |
| [ Rule 5. EDG Control] DHV-35 2 Ensure LPI pumps and required cooling water pumps are running:
| |
| DCP-1A DCP-1B RWP-3A RWP-3B DHP-1A DHP-1B 3 Ensure LPI control valves in "AUT0" and set for 3000 gpm:
| |
| DHV-110 DHV-111 19.3 Adjust LPI flowrate for RB e Throttle and maintain each LPI train sump operation. to achieve maximum flowrate without exceeding 2200 gpm/ train using the following:
| |
| DHV-5 DHV-6 E0P-14 REV 04 PAGE 221 of 303 ENCLS
| |
| | |
| i l
| |
| O
| |
| )
| |
| i 1
| |
| BLANK PAGE l
| |
| l O I E0P-14 REV 04 PAGE 222 of 303 ENCLS I
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT'D)
| |
| ACTIDNS DETAILS 19.4 WHEN BWST level is
| |
| * Select 1200 gpm and " LOCAL" for BSP
| |
| < 15 ft, discharge valves:
| |
| THEN adjust BS for RB sump operation. BSV-3 BSV-4 19.5 Align LPI pump discharge
| |
| * H DHP-1A is running, to MUP suction. THEN open DHV-11
| |
| * E DHP-1B is running.
| |
| THEN open DHV-12 CAUTION Aligning ECCS to RB sump may cause high radiation in AB.
| |
| O 19.6 Align ECCS pump suction to
| |
| * Open RB sump to DHP valves:
| |
| RB sump.
| |
| DHV-42 DHV-43 19.7 Isolate BWST from LPI.
| |
| * Close BWST to DHP valves:
| |
| DHV-34 DHV-35 O
| |
| E0P-14 REV 04 PAGE 223 of 303 ENCLS
| |
| | |
| l O
| |
| BLANK PAGE g
| |
| i l
| |
| O E0P-14 REV 04 PAGE 224 of 303 ENCLS
| |
| --_------____________________________________________j
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT *D)
| |
| ( ) ACTIONS DETAILS 19.8 Isolate flow to MUT.
| |
| * Close the following valves:
| |
| MUV-49 MUV-253 19.9 E adequate SCM exists, lHEN stop all RCPs. RCP-1A See Table 3 RCP-1C
| |
| [ Rule 4. PTS] RCP-1B RCP-1D
| |
| ,e y 19.10 E no RCPs are running, (v) THEN close MUV-18 19.11 E MUP recirc valves are 1 Open HPI recirc to sump valves:
| |
| open.
| |
| THEN align recirc flow to MUV-543 RB sump.
| |
| MUV-544 MUV-545 MUV-546 2 Close MVP recirc to MUT valves:
| |
| MUV-53 MUV-257 l
| |
| > s ,
| |
| ! (r ') _
| |
| l Q E0P-14 REV 04 PAGE 225 of 303 ENCLS I
| |
| | |
| O BLANK PAGE 1
| |
| E0P-14 REV 04 PAGE 226 of 303 ENCLS
| |
| | |
| I l
| |
| l ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT'D)
| |
| ()
| |
| v ACTIONS DETAILS 19.12 Stop any MUP not aligned e E DHP-1A is NOT running, to a running LPl pump. @ DHV-11 is NOT open.
| |
| THEN stop the A ES selected MUP.
| |
| * E DHP-1B is NOT running.
| |
| @ DHV-12 is NOT open THENstoptheBESseiectedMUP.
| |
| 19.13 lE AB is accessible, o Notify PPO to close MUV-64 "MUT IH Q isolate MUT. Outlet" (95 ft AB outside RC evaporator).
| |
| 19.14 Isolate BWST from HPI. 1 Notify PPO to bypass MUT low level interlocks:
| |
| Obtain key 47 for remote f~S shutdown transfer cabinet.
| |
| Select "BWST ISOL. VALVE INTERLOCK BYPASS MUV-58" switch to "BYPAS$" (B ES 4160V SWGR Room "RS AUX B" cabinet).
| |
| Select "BWST ISOL. VALVE INTERLOCK BYPASS MUV-73" switch to " BYPASS" (A ES 4160V SWGR Room "RS AUX A" cabinet).
| |
| 2 WHEN MUT low level interlocks have been bypassed.
| |
| THEN close BWST to MVP valves while observing MUPs for signs of cavitation:
| |
| MUV-73 j
| |
| MUV-58 E0P-14 REV 04 PAGE 227 of 303 ENCLS I
| |
| | |
| l O! 1 l
| |
| l l
| |
| l i
| |
| 1 BLANK PAGE j l
| |
| O E0P-14 REV 04 PAGE 228 of 303 ENCLS I
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT *D)
| |
| ('') ACTIONS DETAILS V-)
| |
| 19.15 Notify Chemistry to
| |
| ) periodically perform
| |
| ':H-6320 Sampling and Analysis of the Reactor Building Sump, for boron concentration.
| |
| 19.16 EXIT this enclosure.
| |
| %.J i
| |
| i l l l
| |
| l
| |
| /''N j
| |
| \s
| |
| ( E0P-14 REV 04 PAGE 229 of 303 ENCLS
| |
| )
| |
| L-_ ------ - - --
| |
| | |
| i O
| |
| BLANK PAGE g
| |
| 9 E0P-14 REV 04 PAGE 230 of 303 ENCLS
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT *D)
| |
| ACTIONS DETAILS STATUS
| |
| : e. HPI or LPI flow exists.
| |
| e 1 LPI pump is aligned for DHR.
| |
| 19.17 gHP-1Bisalignedfor-I_HE_N GO TO Step 19.31 in this enclosure.
| |
| .19.18 ' Ensure DHP-1B and required 1 Ensure DHV-35 is open.
| |
| cooling water systems are running. 2 Ensure LPI pump and required cooling water pumps are running:
| |
| [ Rule 5. EDG Control]
| |
| DCP-1B RWP-3B DHP-1B 19.19 Adjust LPI flowrate for RB e Throttle and maintain DHV-6 to sump operation. achieve maximum flowrate without exceeding 2200 gpm.
| |
| l l
| |
| 1.
| |
| i E0P-14 REV 04 PAGE 231 of 303 ENCLS
| |
| | |
| O BLANK PAGE 1
| |
| O E0P-14 REV 04 ,5 5 . ,f 303 ENCLS
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT *D)
| |
| ACTIONS DETAILS 19.20 WHEN BWST level is
| |
| * Select 1200 gpm and " LOCAL" for G ft. BSV-4 THEN adjust BS for RB sump operation.
| |
| 19.21 Open DHV-12
| |
| )
| |
| CAUTION Aligning ECCS to RB sump may cause high radiation in AB.
| |
| 19.22 Open DHV-43 19.23 Close DHV-35 19.24 1solate flow to MUT.
| |
| * Close the following valves:
| |
| MUV-49 MUV-253 O
| |
| E0P-14 REV 04 PAGE 233 of 303 ENCLS 1
| |
| _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ ]
| |
| | |
| O BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 234 of 303 ENCLS
| |
| | |
| ENCLOSURE 19 :ECCS SUCTION TRANSFER (CONT'D)
| |
| . ,O) - ACTIONS ' DETAILS W.
| |
| L19.25 "F adequate SCM exists.
| |
| lll_NstopAllRCPs.
| |
| f RCP-1A-See Table 3 RCP-1C
| |
| [ Rule 4, PTS)' RCP-1B RCP-1D 19.26 lF no'RCPs are running, HEN close MUV-18 19.27 'IE MVP recirc valves are 1 Open HPI recirc to sump valves:
| |
| o)en.
| |
| : TD align recirc flow to.- MUV-543
| |
| - R3 sump.
| |
| MUV-544 MUV-545 MUV-546-2 Close MUP recirc to MUT valves:
| |
| MUV-53 MUV-257 1
| |
| E0P-14 REV 04 PAGE 235 of 303 ENCLS i
| |
| , I i
| |
| i
| |
| | |
| i i
| |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 236 of 303 ENCLS
| |
| | |
| L ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT'D) o i l
| |
| ! j ACTIONS' DETAILS l 19.28 ;FABisaccessible..
| |
| * Notify PP0 to close MUV-64 "MUT
| |
| ,,3ENisolateMUT; Outlet" (95 ft AB outside RC evaporator). o l
| |
| l 19.29 -Isolate BWST from HPI. 1 Notify PPO to bypass MUT low level interlock:
| |
| Obtain key 47 for remote shutdown transfer cabinet.
| |
| Select "BWST ISOL. VALVE INTERLOCK BYPASS MUV-58" switch to " BYPASS" (B ES 4160V SWGR Room "RS AUX B" cabinet).
| |
| 2 lLHEN MUT low level interlock has men bypassed.
| |
| THpfor flu signs: of cavitation.close MUV-58 whil
| |
| ,p V 19.30 EXIT this enclosure.
| |
| i l
| |
| l l
| |
| i I
| |
| (
| |
| I O
| |
| E0P-14 REV 04 PAGE 237 of 303 ENCLS
| |
| | |
| O1 BLANK PAGE O
| |
| 1 l
| |
| l E0P-14 REV 04 PAGE 238 of 303 ENCLS l
| |
| | |
| q 1 ENCLOSURE 19 ECCS SUCTION-TRANSFER (CONT'D)
| |
| (T . ACTIONS DETAILS
| |
| :()
| |
| STATUS e HPI or LPI flow exists.
| |
| e .DHP 1B is' aligned for DHR.
| |
| 19.31- Ensure DHP-1A and required 1 Ensure DHV-34 is open.
| |
| cooling water systems are running. '2 Ensure LPI pump and required cooling water pumps are running:
| |
| [ Rule 5. EDG Control)
| |
| DCP-1A RWP-3A DHP-1A
| |
| / 19,32 Adjust LPI flowrate for RB e Throttle and maintain DHV-5 to sump operation. achieve maximum flowrate without exceeding 2200 gpm, A l O.. !
| |
| E0P-14 REV 04 PAGE 239 of 303 ENCLS
| |
| )
| |
| _ _ _ _ _ _ _ _ _ _ = _ _ _ _ _
| |
| | |
| O
| |
| (
| |
| BLANK PAGE O ,
| |
| l E0P-14 REV 04 PAGE 240 of 303 ENCLS
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT *D)
| |
| ACT]QNS DETAILS 19.33 WHEN BWST level is
| |
| * Select 1200 gpm and " LOCAL" for G ft. BSV-3 THEN adjust BS for RB sump operation.
| |
| 19.34 Open DHV-11 CAUTION Aligning ECCS to RB sump may cause high radiation in AB.
| |
| 19.35 Open DHV-42 19.36 Close DHV-34 19.37 Isolate flow to MUT.
| |
| * Close the following valves:
| |
| MUV-49 MUV-253 I
| |
| 1 I
| |
| l O
| |
| E0P-14 REV 04 PAGE 241 of 303 ENCLS
| |
| | |
| I O'
| |
| BLANK PAGE g
| |
| 9 E0P-14 REV 04 PAGE 242 of 303 ENCLS
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT'D) j l
| |
| ,e'"} ACTIONS DETAILS
| |
| \ J 19.38 IF adequate SCM exists.
| |
| EfNstopallRCPs. RCP-1A See Table 3 RCP-1C
| |
| [ Rule 4. PTS) RCP-1B RCP-10 l
| |
| 19.39 lFENcloseMUV-18F no RCPs are running.
| |
| 19.40 If MUP recirc valves are 1 Open HPI recirc to sump valves:
| |
| 03en.
| |
| TiF,_N ali MUV-543 R3 sump.gn recirc flow to i i
| |
| MUV-544 '
| |
| ,~
| |
| () MUV-545 MUV-546 :
| |
| 2 Close MVP recirc to MUT valves:
| |
| MUV-53 MUV-257 l l
| |
| ,, J '
| |
| ; E0P-14 REV 04 PAGE 243 of 303 ENCLS I
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 244 of 303 ENCLS
| |
| | |
| ENCLOSURE 19 ECCS SUCTION TRANSFER (CONT'D)
| |
| / ') ACTIONS DETAILS U
| |
| 19.41 o Notify PPO to close MUV-64 "MUT lBENisolateMUT.F AB is accessible, Outlet" (95 ft AB outside RC evaporator).
| |
| 19.42 Isolate BWST from HPI. 1 Notify PPO to bypass MUT low level interlock:
| |
| Obtain key 47 for remote shutdown transfer cabinet.
| |
| Select "BWST ISOL. VALVE INTERLOCK BYPASS MUV-73" switch to " BYPASS" (A ES 4160V SWGR Room. "RS AUX A" cabinet).
| |
| 2 WHEN MUT low level interlock has been bypassed.
| |
| THEN close MUV-73 while observing Ffor signs of cavitation.
| |
| 7 19.43 EXIT this enclosure.
| |
| 1 l
| |
| l I
| |
| 1
| |
| <8
| |
| ' j E0P-14 REV 04 PAGE 245 of 303 ENCLS 1
| |
| _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __. ._. -J
| |
| | |
| O BLANK PAGE g
| |
| 9 l E0P-14 REV 04 PAGE 246 of 303 ENCLS
| |
| | |
| )
| |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL ACTIONS DETAILS STATUS e Adequate SCM does not exist. i e- ECCS pump suction transfer to RB sump is complete.
| |
| e TSC has determined that boron precipitation control is required. ,
| |
| 20.1 LF TSC has directed use of !
| |
| Aux spray from LPI for i
| |
| boron precipitation ;
| |
| control, '
| |
| THEN GO TO Step 20.24 in-this enclosure.
| |
| 20.2 _HLN W average Tincne
| |
| * Determine average Tinene from any of
| |
| < 286*F. the following:
| |
| : f. ,I
| |
| ' .T_HLN continue in this i enclosure. SPDS
| |
| %) 1 Average of 'all operable inputs to Tinene. recorders.
| |
| 20.3 LF B Train ES equipment is-aTigned as follows:
| |
| DHP-1B running B ES selected HPI pump running or available BSP-1B running or available THEN GO TO Step 20.14 in
| |
| , this enclosure.
| |
| l ..
| |
| n O
| |
| E0P-14 REV 04 PAGE 247 of 303 ENCLS
| |
| ~ _ _ _ _ _ _ _ _ _ _. . - _ _ _ _
| |
| | |
| O BLANK PAGE g
| |
| i O
| |
| E0P-14 REV 04 PAGE 248 of 303 ENCLS E j
| |
| | |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT *D)~
| |
| _, ACTIONS- DETAILS
| |
| )(-
| |
| * STATUS
| |
| ~
| |
| DHP 1A is running with suction aligned to RB sump.
| |
| *~ A ES selected HPI pump is running or'available. -
| |
| l e BSP-1A is running or-available.
| |
| 1 ,
| |
| * B Train ECCS will be aligned from drop line to RB sump.
| |
| to' DHV 3 is energized.
| |
| -20.4 Verify A ES selected HPI pump is running. MUP-1A -
| |
| MUP-1B jf A ES selected HPI pump 1 lf LPI flow is > 2200 'gpm.
| |
| is NOT running,- ,HJJ throttle and maintain LPI
| |
| :/ 'THEs. start the A ES low at 2000 gpm (1800 to A
| |
| selected HPI pump. 2200 gpm) using DHV-5 i
| |
| '2 Open DHV-11
| |
| '3 Open at least l'_HPI valve, t
| |
| 4 Start A:ES selected HPI pump.
| |
| l [ Rule 5, E'DG Control]'
| |
| l 5 Open all HPI valves.
| |
| 1
| |
| -20.5 LF. BSP-1B is running, 1 Close BSV-3 Ah E)d start BSP-1ABSP-1A~ is 2_NHTSelect running, 1200 gpm and " LOCAL" for BSV-3
| |
| , 3 Start BSP-1A
| |
| [ Rule 5. EDG Control]
| |
| O E0P-14. REV 04 PAGE 249 of 303 ENCLS i e-__ __ - - _ - -
| |
| | |
| O BLANK PAGE O
| |
| l l
| |
| 1 O
| |
| E0P-14 REV 04 PAGE 250 of 303 ENCLS
| |
| | |
| l ENCLOSURE 20: BORON PRECIPITATION CONTROL (CONT *D) i
| |
| /~T - ' ACTIONS DETAILS V
| |
| 20.6 Ali Stop the B ES selected HPI pump.
| |
| -lin!nBTrainES.fordrop flow to RB sump.
| |
| 1 2 Close DHV-12 3 Stop the following:
| |
| DHP-1B BSP-1B 4 Notify for B ESPP0 pumpsto Bop(en DC knife ES 4160V SWGR- switches Room):
| |
| 4160V ES BUS 3B-6 "MUP-18. B Makeup Pump (B Feed)"
| |
| 3 4160V ES BUS 3B-5 "MUP-1C. C Makeup Pump" 4160V ES BUS 3B-11 "DHP-1B. B Decay Heat Pump" 4160V ES BUS 3B-7 "BSP-1B.
| |
| B Building Spray Pump" 5 Select BSV-4 to " MAN" and closed.
| |
| 6 Select DHV-111 to " MAN" and closed.
| |
| 7 Ensure the following valves are closed: 1 DHV-35 DHV-43 DHV-7 i DHV-6 l'
| |
| l O I L. V E0P-14 REV 04 PAGE 251 of 303 ENCLS I
| |
| | |
| O BLANK PAGE O l l
| |
| I I
| |
| O E0P-14 REV 04 PAGE 252 of 303 ENCLS l
| |
| | |
| l ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT *D) f'~1 ACTIONS DETAILS L.)
| |
| l 20.7 Ensure DHV-39 is closeri, 20.8 Defeat DHV-43 seal-in e Notify Electric Shop personnel to ci rcuits. o)en the following sliding links for DiV-43 seal-in circuits ('nside MCB behind ES B panel bottom section):
| |
| TB6-18 (open seal-in)
| |
| TB6-16 (close seal-in) 20.9 Adjust DHP-1A low amp 1 Unlock setpoint.
| |
| alarm (inside MCB on l DH-56-IR). 2 Adjust potentiometer setting to a value slightly lower than the operating amperage.
| |
| ,, 3 Lock setpoint.
| |
| I e/'
| |
| ')
| |
| 20.10 WHEN DHV-43 seal-in 1 Open DHV-4 circuits are defeated, AND DHP-1A low amp alarm 2 Open DHV-41 is adjusted.
| |
| l
| |
| )
| |
| _TH LN establish drop line 3 Open DHV-40 flow to RB sump.
| |
| 4 Select DHV-43 to "0 PEN" position for 6 seconds and release, l 5 WHEN at least 2 min have ela) sed.
| |
| THE4 verify DHV-43 open indication light (red) is not lit.
| |
| 6___1F DHV-43 open indication light (red) is lit.
| |
| THEN EXIT this enclosure and notify TSC for further guidance.
| |
| 7 Open DHV-3
| |
| ,ry E0P-14 REV 04 PAGE 253 of 303 ENCLS
| |
| | |
| O BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 254 of 303 ENCLS
| |
| | |
| 1 1
| |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D)
| |
| \
| |
| ('~~T ACTIONS DETAILS L,) {
| |
| i 20.11 J_F at any time, any of the following conditions exist: I DHP-1A motor amps fluctuating BSP-1A motor amps !
| |
| fluctuating A Train LPI flowrate fluctuating A Train BS flowrate fluctuating THEN close DHV-43 l
| |
| 20.12 J_F at any time. A Train LPI is lost.
| |
| THEN stop A ES selected IIPI pump and GO T0
| |
| (~/')
| |
| t Step 20.39 in this enclosure.
| |
| 20.13 Notify TSC for further guidance and EXIT this enclosure.
| |
| l 1
| |
| %s E0P-14 REV 04 PAGE 255 of 303 ENCLS
| |
| | |
| i l
| |
| BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 256 of 303 ENCLS
| |
| | |
| i ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D) i
| |
| -Q ACTIONS DETAILS d_)
| |
| STATUS e
| |
| DHP 1B is running with suction aligned to RB sump.
| |
| o B ES selected HPI pump is running or available.
| |
| e BSP 1B is running or available.
| |
| e A Train ECCS will be aligned from drop line to RB sump.
| |
| e DHV 3 is energized.
| |
| 20.14 Verify B ES selected HPI pump is running. MUP-1B MUP-1C Jf B ES selected HPI pump 1 IF LPI flow is > 2200 gpm.
| |
| 1s NOT running.
| |
| .L/f.i THEN start B ES selected TlR N throttle and maintain LPI flow at 2000 gpm (1800 to HPTpump. 2200 gpm) using DHV-6 2 Open DHV-12 3 Open at least 1 HPI valve. I 4 Start B ES selected HPI pump.
| |
| [ Rule 5. EDG Control) 5 Open all HPI valves.
| |
| 20.15 JF BSP-1A is running. 1 Close BSV-4 AND BSP-1B is NOT running. !
| |
| E start BSP~lli 2 Select 1200 gpm and " LOCAL" for BSV-4 3 Start BSP-1B l
| |
| [ Rule 5. EDG Control] j I
| |
| E0P-14 REV 04 PAGE 257 of 303 ENCLS
| |
| | |
| O BLANK PAGE Oi I
| |
| I 1
| |
| I O 4 E0P-14 REV 04 PAGE 258 of 303 ENCLS l l
| |
| | |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D) r]
| |
| C/
| |
| ACTIONS DETAILS 20.16 ' Align A Train ES for drop 1 Stop the A ES selected HPI pump.
| |
| line flow to RB sump.
| |
| 2 Close DHV-11 3 Stop the following:
| |
| DHP-1A BSP-1A en DC knife switches 4 Notify for A ESPPO pumpsto op(A ES 4160V SWGR
| |
| )
| |
| Room):
| |
| 4160V ES BUS 3A-10 "MVP-1A. A Makeup Pump" 4160V ES BUS 3A-9 "MUP-1B, B Makeup Pump (A Feed)"
| |
| 4160V ES BUS 3A-4 "DHP-1A. A Decay Heat Pump" 4160V ES BUS 3A-8 "BSP-1A.
| |
| (G ; A Building Spray Pump" 5 Select BSV-3 to " MAN" and closed.
| |
| 6 Select DHV-110 to " MAN" and l; closed.
| |
| 7 Ensure the following valves are closed:
| |
| DHV-34 DHV-42 i DHV-8 DHV-5 (q ./
| |
| E0P-14 REV 04 PAGE 259 of 303 ENCLS
| |
| | |
| O'
| |
| )
| |
| BLANK PAGE O
| |
| {
| |
| O E0P-14 REV 04 PAGE 260 of 303 ENCLS
| |
| | |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D)
| |
| (] ACTIONS DETAILS V
| |
| 20.17 Ensure DHV-40 is closed.
| |
| 20.18 Defeat DHV-42 seal-in
| |
| * Notify Electric Shop personnel to circuits. o]en the following sliding links for DiV-42 seal-in circuits (inside MCB behind ES A panel bottom section):
| |
| TB16-8 (open seal-in)
| |
| TB16-6 (close seal-in) 20.19 Adjust DHP-1B low amp 1 Unlock setpoint.
| |
| alarm (inside MCB on DH-57-IR). 2 Adjust potentiometer setting to a value slightly lower than the
| |
| , operating amperage.
| |
| 3 Lock setpoint.
| |
| ( 't v
| |
| 20.20 WHEN DHV-42 seal-in 1 Open DHV-4 circuits are defeated. .
| |
| A_N_D DHP-1B low amp alarm 2 Open DHV-41
| |
| .1s adjusted.
| |
| TH Q establish drop line 3 Open DHV-39 TTow to RB sump.
| |
| 4 Select DHV-42 to "0 PEN" position for 6 seconds and release.
| |
| 5 WHEN at least 2 min have 1 ela) sed.
| |
| THE1 verify DHV-42 open indication light (red) is not lit.
| |
| 6 LF DHV-42 open indication light (red) is lit.
| |
| THEN EXIT this enclosure and notify TSC for further guidance.
| |
| 7 Open DHV-3 V'
| |
| E0P-14 REV 04 PAGE 261 of 303 ENCLS
| |
| | |
| O BLANK PAGE g
| |
| f i
| |
| O EDP-14 REV 04 PAGE 262 of 303 ENCLS
| |
| | |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D)
| |
| ,r's ACTIONS DETAILS V,
| |
| 20.21 IF at any time, any of the T5110 wing conditions exist:
| |
| DHP-1B motor amps fluctuating BSP-1B motor amps fluctuating B Train LPI flowrate fluctuating B Train BS flowrate fluctuating THEN close DHV-42 20.22 LF at any time, B Train LPI is lost, THEN stop B ES selected Q
| |
| .' v e IIPI pump and GO TO Step 20.49 in this enclosure.
| |
| 20.23 Notify TSC for further guidance and EXIT this enclosure.
| |
| l I
| |
| l
| |
| : 7. s
| |
| (_)
| |
| E0P-14 REV 04 PAGE 263 of 303 ENCLS
| |
| | |
| l O
| |
| BLANK PAGE g
| |
| O E0P-14 REV 04 PAGE 264 of 303 ENCLS I
| |
| | |
| ENCLOSURE 20 -BORON PRECIPITATION CONTROL (CONT'D)
| |
| ACTIONS' DETAILS STATUS Aux spray from LPI.is required for boron precipitation control.
| |
| 20.24 WHEN LPI flow exists in -
| |
| injection- line.
| |
| 'T continue in this osure.
| |
| 20.25
| |
| [El_N.GOTOStep20.31inF DHP-1A is NOT running.
| |
| this enclosure.
| |
| O j
| |
| o 1 l
| |
| E0P-14 'REV 04 PAGE 265 of 303 ENCLS c - ___ __ _ - - .
| |
| i
| |
| | |
| l l
| |
| 9 BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 266 of 303 ENCLS
| |
| | |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D)
| |
| ACTIONS DETAILS STATUS DHP-1A is running.
| |
| 20.26 Throttle and maintain LPI flow at 1200 gpm (1100 to 1300 gpm) using DHV-5 20.27 Ensure MUV-18 is closed.
| |
| 20.28 Open DHV-91 0 2o.29 ope" acv-s3 20.30 Notify TSC for further guidance and EXIT this enclosure.
| |
| O E0P-14 REV 04 PAGE 267 of 303 ENCLS
| |
| | |
| l BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 268 of 303 ENCLS
| |
| | |
| ENCLOSURE 20 BORON PRECIPITAT ON CONTROL (CONT *D) l ACTIONS DETAILS STATUS
| |
| * DHP 1B is running.
| |
| * DHP-1A is not running.
| |
| 20.31 Throttle and maintain LPI flow at 1200 gpm (1100 to 1300 gpm) using DHV-6 20.32 Stop BSP-1A 20.33 Disable A ES pumps.
| |
| * Natify PPO to open DC knife switches for A ES pumps (A ES 4160V SWGR Room):
| |
| 4160V ES BUS 3A-10 "MUP-1A. A Makeup Pump" 4160V ES BUS 3A-9 "MUP-1B. B Makeup Pump (A Feed)"
| |
| 4160V ES BUS 3A-4 "DHP-1A. A Decay Heat Pump" 4160V ES BUS 3A-8 "BSP-1A.
| |
| A Building Spray Pump" 20.34 Select BSV-3 to " MAN" and closed.
| |
| O E0P-14 REV 04 PAGE 269 of 303 ENCLS
| |
| | |
| O BLANK PnGE g
| |
| f 9
| |
| E0P-14 REV 04 PAGE 270 of 303 ENCLS
| |
| | |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D)
| |
| '()
| |
| l ACTIONS DETAILS LJ )
| |
| 20.35 Align A Train for Aux 1 Ensure the following valves are spray from DHP-1B I closed:
| |
| DHV-34 DHV-39 I DHV-42 l DHV-5 i
| |
| DHV-11 2 Open DHV-8 3 Select DHV-110 to " MAN" and I open.
| |
| l 20.36 Ensure MUV-18 is closed.
| |
| l LJ l 20.37 Establish Aux spray flow 1 Open DHV-7 from DHP-1B 2 Open DHV-91 !
| |
| 3 Open RCV-53 20.38 Notify TSC for further guidance and EXIT this enclosure.
| |
| . ,c3
| |
| \, ,)
| |
| E0P-14 REV 04 PAGE 271 of 303 ENCLS
| |
| | |
| O BLANK PAGE O,
| |
| I l
| |
| l I
| |
| O E0P-14 REV 04 PAGE 272 of 303 ENCLS l
| |
| i
| |
| | |
| - ENCLOSURE 20~ BORON'PR$CIPITATIONCONTR0b(CONT'D)
| |
| ACTIONS DETAILS
| |
| . STATUS
| |
| -* A Train LPI failed.
| |
| e
| |
| .B Train LPI-is aligned for drop line flow to RB sump.
| |
| e No core cooling is in progress.
| |
| ri
| |
| :The'following steps' realign B Train for LPI.
| |
| . Isolate drop line flow to.
| |
| 20.39 1 Close DHV-3 RB sump ~.
| |
| 2 Close DHV-4 3 Close DHV-41 4 Close DHV-40 t
| |
| ' 5 Ensure DHV-111 in " MAN" and closed.
| |
| L 20.40 7 RB PRESS is < 10 psig.
| |
| TIEN open DHV-35 t
| |
| l:
| |
| l L- - 20.41 Ensure DHV-43 is full open.
| |
| l l-
| |
| : 20.42 Ensure ES actuations are o Auto bypassed or reset e Manual i l
| |
| 1 E0P-14 REV 04 PAGE 273 of 303 ENCLS
| |
| =_ .___._._ _ _ _ _ _ _ _ _ -
| |
| | |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 274 of 303 ENCLS l
| |
| | |
| l ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D)
| |
| ('')
| |
| v ACTIONS DETAILS 20.43 Ensure control aower is e Notify PPO to close DC knife switch available for dip-1B for 4160V ES BUS 3B-11 "DHP-18.
| |
| B Decay Heat Pump" (B ES 4160V SWGR Room) 20.44 Close DHV-35 20.45 Open DHV-6 20.46 Start DHP-1B and required cooling water systems. DCP-1B
| |
| [ Rule 5. EDG Control] RWP-3B
| |
| - DHP-1B I
| |
| k._f#
| |
| l 20.47 Establish B Train LPI 1 Open DHV-111 to establish flow. 1000 gpm (800 to 1200 gpm) flow while monitoring for cavitation.
| |
| 2 lE,no indication of cavitation exists.
| |
| THEN open DHV-111 to increase N to 2000 gpm (1800 to 2200 gpm).
| |
| 20.48 Notify TSC for further i guidance and EXIT this enclosure.
| |
| l
| |
| ( -_
| |
| l l
| |
| E0P-14 REV 04 PAGE 275 of 303 ENCLS !
| |
| 1 J
| |
| | |
| 0 l
| |
| BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 276 of 303 ENCLS
| |
| | |
| ENCLOSURE 20 BORON PRECIPITATION CONTROL (CONT'D)
| |
| ACTIONS DETAILS STATUS e B Train LPI failed.
| |
| A Train LPI is aligned for drop line flow to RB sump.
| |
| * No core cooling is in progress.
| |
| 0
| |
| .N_01E The following steps realign A Train for LPI.
| |
| 20.49 Isolate drop line flow to 1 Close DHV-3 RB sump.
| |
| 2 Close DHV-4 3 Close DHV-41 4 Close DHV-39
| |
| _[ 5 Ensure DHV-110 in " MAN" and closed.
| |
| 20.50 IF RB PRESS is < 10 psig.
| |
| T_ilEN open DHV-34 20.51 Ensure DHV-42 is full open.
| |
| l l
| |
| 20.52 Ensure ES actuations are
| |
| * Auto l
| |
| bypassed or reset.
| |
| * Manual l
| |
| l v
| |
| 1
| |
| \.
| |
| I E0P-14 REV 04 PAGE 277 of 303 ENCLS L_ --- -
| |
| | |
| 0 BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 278 of 303 ENCLS
| |
| | |
| ENCLOSUPE 20 BORON PRECIPITATION CONTROL (CONT'D1 O ac'io"s oe'ai's 20.53 Ensure control )ower is e Notify PP0 to close DC-knife switch available.for dip-1A for 4160V.ES BUS 3A-4."DHP-1A.
| |
| A Decay Heat Pump" (A ES 4160V SWGR Room).
| |
| I 20.54- Close'DHV-34 i
| |
| 20.55- Open DHV-5 r
| |
| 20.56 ' Start DHP-1A and required .
| |
| cooling water systems. DCP-1A
| |
| [ Rule 5. EDG Control] RWP-3A g DHP-1A V.
| |
| 20.57 Establish A Train LPI 1 Open DHV-110 to establish-flow. 1000 gpm (800 to 1200.gpm) flow while monitoring- for cavitation.
| |
| 2 lE no indication of cavitation-exists.
| |
| _T_HLN open DHV-110 to increase tlow to 2000 gpm (1800 to 2200 gpm). j 20.58 Notify TSC for further guidance and EXIT this enclosure '
| |
| . I
| |
| .a(7 E0P-14 REV 04 PAGE 279 of 303 ENCLS f-
| |
| | |
| i I
| |
| O BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 280 of 303 ENCLS
| |
| | |
| ENCLOSURE 21 RB HYDROGEN HONITOR LOG (q) - NOIE Maximum interval between readings is 4 hrs. Only one sample point is required
| |
| * Time A Analyzer A Analyzer B Analyzer B Analyzer Dome Sample Duct Sample Dome Sample Duct Sample
| |
| (% H2 ) (% H2 ) (% H2 ) (% H2 )
| |
| t0 t1 t2 t3 t4 t5 t6 O 17 kJ t8 t9 t10 til t12 t13 t14 t15 t16 t17 t18 i
| |
| : 2. -
| |
| ! n l
| |
| ( -
| |
| E0P-14 REV 04 PAGE 281 of 303 I ENCLS
| |
| | |
| O BLA%K PAGE l
| |
| l l
| |
| l l
| |
| l I
| |
| O E0P-14 REV 04 PAGE 282 of 303 ENCLS (
| |
| )
| |
| - - - - - - - - - i
| |
| | |
| . ENCLOSURE 22 SECONDARY INVENTORY-MANAGEMENT ACTIONS DETAILS i 22.1- WH N EFT-2. 1 Close all MSIVs:
| |
| DT-1 level is s; 9 ft,
| |
| _H_fJi break condenser MSV-412 vacuum.
| |
| MSV-413 MSV-414 MSV-411 2 Control 0TSG PRESS with ADVs.
| |
| 3 Select condenser ARPs to
| |
| " PULL TO LOCK":
| |
| ARP-1A ARP-1B 4 Open condenser vacuum Bkrs:
| |
| ARV-48 ARV-49 L
| |
| 1 O
| |
| E0P-34 REV 04 PAGE 283 of 303 ENCLS
| |
| | |
| O l
| |
| BLANK PAGE O
| |
| E0P-14 REV 04 PAGE 284 of 303 ENCLS
| |
| | |
| . - _ _ _ _ - _ _ _ _ _ _ - _ _ - _ _ _ _ - _ - _ - _ _ _ _ - . . _ . . _ _ _ _ _ _ _ _ _ = _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
| |
| ,(, -
| |
| ENCLOSURE 22 SECONDARY INVENTORY MANAGEMENT (CONT'D) b)
| |
| V ACTIONS DETAILS
| |
| . 22.2 ;f ct any time. EFT-2 1 ; desired to stop EFP-1, evel s 8.5 ft, select EFP-1 to " PULL T0 i
| |
| 2E!! ensure only 1 EFWP in l L
| |
| operation at reduced flow.
| |
| 2 "F desired to stop EFP-2.
| |
| .'7_Di perform the following in order:
| |
| Depress " MANUAL PERMISSIVE" push buttons on EFIC i
| |
| channels A and B.
| |
| i Close ASV-204 I
| |
| Close ASV-5 l
| |
| l 3 ;,FEFP-2isstopped.
| |
| PN j Ek notify 2 steam PPO to de-energize supply valves:
| |
| l
| |
| ' DPDP 8A-17 "ASV-204 Motor Power"
| |
| ;- (A ES 4160V SWGR Room) l >
| |
| i, - . DPDP BB-5 "ASV-5 Motor Power" (B ES 4160V SWGR Room) t
| |
| !- 4 LF EFP-2 is stopped.
| |
| 'EEN perform the following in order:
| |
| ' Ensure EFP-2 steam supply valves are de-energized.
| |
| Depress "EFW INITIATE" push buttons on EFIC channels A and B.
| |
| 5 Maintain total EFW flow s maximum alloweble flow based on hotwell TEMP.
| |
| i See Figure 3 1'
| |
| u-j ..
| |
| O E0P-14 REV 04 PAGE 285 of 303 ENCLS l
| |
| 4 i____ _____z.J. . . _ . __ __ _
| |
| j
| |
| | |
| l Applicable carry-over steps: l 22.2 1E EFT-2 level s 8.5 ft, THEN ensure only 1 EFWP. h 9
| |
| O E0P-14 REV 04 PAGE 286 of 303 ENCLS
| |
| | |
| l ENCLOSURE 22 SECONDARY INVENTORY MANAGEMENT (CONT'D)
| |
| [3 ACTIONS DETAILS L) 22.3 Isolate N, to EFT-2 e Notify' SP0 to close NGV-243 "N2 to EFT-2 (119 ft TB by FWHE-28).
| |
| 22.4 lE hotwell TEMP 1s i
| |
| > 140*F. )
| |
| OR hotwell level < 72 in. 1 TilEN GO TO Step 22.11 in this enclosure. I i
| |
| CAUTION Transfer to hotwell must be completed prior to EFT-2 level < 2 ft or CDT-1 level < 5 ft.
| |
| 22.5 IF at any time. CDT-1 1 Verify hotwell at atmospheric TEvel s 7 ft. PRESS.
| |
| THEN align FWP-7 suction
| |
| /
| |
| ( from hotwell. 2 Notify SP0 to open EFV-36 "EFW &
| |
| AFW Suction Iso from Hotwell" (95 ft TB between C & D inlet waterboxes).
| |
| 3 WHFN EFV-36 is open.
| |
| TIFR notify SP0 to align FWP-7 suction from hotwell in the following order:
| |
| l Open FWV-213 "FWP-7 Suction from i Hotwell" (95 ft TB by FWP-7).
| |
| Close FWV-214 "FWP-7 Suction i from CDT-1" (95 ft TB by FWP-7).
| |
| l 4 F FWP-7 is running.
| |
| ;~ HEN maintain total FWP-7 flow s maximum allowable flow based on hotwell TEMP.
| |
| See Figure 3 I
| |
| v E0P-14 REV 04 PAGE 287 of 303 ENCLS l l
| |
| | |
| Applicable carry-over steps:
| |
| 22.2 E EFT-2 level s 8.5 ft, THEN ensure only 1 EFWP. .h l 22.5 E CDT-1 level s 7 ft. THEN align FWP-7 suction from hotwell.
| |
| O i
| |
| O E0P-14 REV 04 PAGE 288 of 303 ENCLS
| |
| | |
| l ENCLOSURE 22 SECONDARY INVEEORY MANAGEMENT (CONT'0) i AC~ IONS DETAILS l
| |
| CAUTION Transfer to hotwell must be completed prior to EFT 2 level < 2 ft or CDT-1 level < 5 ft.
| |
| 22.6 lF at any time. EFT-2 1 Verify hotwell at atmospheric evel s 6 ft. PRESS.
| |
| l TH N align EFWP suctions from hotwell. 2 Notify SP0 to ensure EFV-36 "EFW
| |
| & AFW Suction Iso from Hotwell" is open (95 ft TB between C & D inlet waterboxes).
| |
| 3 WH 3 EFV-36 is open.
| |
| TIIEN notify PPO to align EFP-1 suction from hotwell in the following order:
| |
| Open EFV-2 "EFP-1 Suction from Condenser" (95 ft IB by EFP-1).
| |
| i I Close EFV-3 "EFP-1 Suction from EFT-2" (95 ft IB by EFP-1).
| |
| 4 WHEN EFP-1 suction is aligned.
| |
| TIIFR notify PPO to align EFP-2 suction from hotwell in the following order:
| |
| Open EFV-1 "EFP-2 Suction from Condenser" (95 ft IB by EFP-2).
| |
| Close EFV-4 "EFP-2 Suction from EFT-2" (95 ft IB by EFP-2).
| |
| i 5 1F either EFWP is running.
| |
| TilEN maintain total EFW flowrate s maximum flowrate based on hotwell TEMP.
| |
| See Figure 3 O
| |
| l E0P-14 REV 04 PAGE 289 of 303 ENCLS
| |
| | |
| Applicable carry-over steps:
| |
| 22.2 E EFT-2 level s 8.5 ft. THEN ensure only 1 EFWP. . .
| |
| 22.5 E CDT-1 level s 7 ft, THEN align FWP-7 suction from hotwell.
| |
| h 22.6 E EFT-2 level s 6 ft, THEN align EFWP suctions from hotwel'.
| |
| 1 1
| |
| O O
| |
| E0P-14 REV 04 PAGE 290 of 303 ENCLS
| |
| | |
| ENCLOSURE 22 SECONDARY INVENTORY MANAGEMENT (CONT'D)
| |
| (3 ACTIONS DETAILS L_.)
| |
| 22.7 WHEN hotwell level is 1 Close CDV-288 "FST to CDT-1 s 36 in. Cross-Tie Drain" (119 ft Berm by THEN notify SPD to FST-1A).
| |
| cross-tie FSTs to CDT-1 and EFT-2 2 Open CDV-289 "FST to CDT-1 Cross-Tie Iso" (119 ft Berm by FST-1A).
| |
| 3 Open FSV-918 "FST to CDT-1 Cross-Tie Iso" (119 ft Berm by FST-1A).
| |
| CAUTION Transfer to EFT 2 and CDT-1 must be completed prior to hotwell level s 24 in.
| |
| 22.8 WHEN hotwell level is 1 Notify SP0 to align FWP-7 suction s 26 in, from CDT-1 in the following order:
| |
| THEN align suction from
| |
| (~'s EFT 2 and CDT-1
| |
| 'vl 0)en FWV-214 "FWP-7 Suction from C)T-1" (95 ft TB by FWP-7).
| |
| Close FWV-213 "FWP-7 Suction from Hotwell" (95 ft TB by FWP-7),
| |
| 2 WHEN FWP-7 suction is aligned, i TREN notify PPO to align EFP-1 suction from EFT-2 in the following )
| |
| order:
| |
| 0]en EFV-3 "EFP-1 Suction from E T-2" (95 ft IB by EFP-1).
| |
| Close EFV-2 "EFP-1 Suction from Condenser" (95 ft IB by EFP-1).
| |
| 3 WHEN EFP-1 suction is aligned.
| |
| TEN notify PPO to align EFP-2 suction from EFT-2 in the following order:
| |
| 0)en EFV-4 "EFP-2 Suction from E T-2" (95 ft IB by EFP-2).
| |
| Close EFV-1 "EFP-2 Suction from o Condenser" (95 ft IB by EFP-2).
| |
| (.)
| |
| E0P-14 REV 04 PAGE 291 of 303 ENCLS
| |
| | |
| 1 Applicable carry-over steps: l
| |
| ) i
| |
| [ 22.2 E EFT-2 level s 8.5 ft, THEN ensure only 1 EFWP. . j 22.5 E CDT-1 level 5 7 ft. THEN align FWP-7 suction from hotwell.
| |
| 22.6 E EFT-2 level s 6 ft. THEN align EFWP suctions from hotwell.
| |
| l O
| |
| l l
| |
| O E0P-14 REV 04 PAGE 292 of 303 ENCLS
| |
| | |
| ENCLOSURE 22 SECONDARY INVENTORY MANAGEMENT (CONT *D)
| |
| ACTIONS- DETAILS 22.9 Jf additional secondary inventory is required.
| |
| _THf_N notify SP0 to o)en FSV-41 "FSP Suction idr Cross-Tie" (119 ft FSPH north wall).
| |
| 22.10- EXIT this. enclosure, I
| |
| 1
| |
| ?
| |
| r
| |
| : l. E0P-14 REV 04 PAGE 293 of 303 ENCLS
| |
| | |
| i Applicable carry-over steps: 1 22.2 lE EFT-2 level :s; 8.5 ft. ThEN ensure only 1 EFWP. ,
| |
| i O
| |
| O E0P-14 REV 04 PAGE 294 of 303 ENCLS
| |
| | |
| 1 ENCLOSURE 22 SECONDARY INVENTORY MANAGEMENT (CONT *D)
| |
| ! ,- s ACTIONS (x..-) DETAILS l STATUS Hotwell is unavailable due to TEMP > 140"F or level < 72 in.
| |
| 1 ,
| |
| 22.11 Notify SPO to cross-tie 1 Close CDV-288 "FST to CDT-1 FSTs to CDT-1 and EFT-2 Cross-Tie Drain" (119 ft Berm by FST-1A).
| |
| 2 Open CDV-289 "FST to CDT-1 j Cross-Tie Iso" (119 ft Berm by i
| |
| FST-1A).
| |
| 3 Open FSV-918 "FST to CDT-1 Cross-Tie Iso" (119 ft Berm by FST-1A).
| |
| 4 lE additional secondary inventory is required.
| |
| THEN notify SP0 to open FSV-41 "T5P Suction Hdr Cross-Tie"
| |
| /'l (119 ft FSPH north wall).
| |
| G j 22.12 EXIT this enclosure.
| |
| I o
| |
| G :
| |
| I E0P-14 REV 04 PAGE 295 of 303 ENCLS l
| |
| | |
| O BLANK PAGE l
| |
| l l
| |
| f l
| |
| l l
| |
| 9 E0P-14 REV 04 PAGE 296 of 333 ENCLS
| |
| | |
| 4.0 FIGURE 1 RCS PRESS AND TEMP (WIDE RANGE)
| |
| O ,,,,
| |
| =g , , , , ,,,,,,,,,,, , ,
| |
| Rgkn ,_,
| |
| 2500 I I > / /
| |
| / / l il/
| |
| f j !
| |
| 23,, )
| |
| NDT LIMIT IV /
| |
| _ 2100 am..no e a gi ,_
| |
| .f }
| |
| /
| |
| i /
| |
| i ,. Ii / / /
| |
| E I / /
| |
| 1700 e / / /
| |
| e i I h J i I O I1500 /. I /
| |
| .l/ I!
| |
| 1300 l( Adequate scu f
| |
| 1100 / i J
| |
| / /
| |
| / 1 a; ,
| |
| , / ,,
| |
| 1 1 /
| |
| 700 1 JR 1 /
| |
| l l ll l l RCP NPSH lll r,; ,i,i ! ,,..
| |
| 500 250 300 350 400 450 600 550 600 650 RCS TEMP (*F) See Note 1 Note 1: Use Tc for NDT limit when no Tc anomaly exists. Use Tinem for all O other RCS TEMP.
| |
| E0P-14 REV 04 PAGE 297 of 303 ENCLS i
| |
| | |
| O 1
| |
| BLANK PAGE I
| |
| O E0P-14 REV 04 PAGE 298 of 303 ENCLS
| |
| | |
| 4.0 FIGURE 2 RCS PRESS AND TEMP (LOW RANGE) l O 550 O l l I !
| |
| Unacceptable l
| |
| ~--
| |
| : 5. .
| |
| ne- 1 i F 1 l l j' 7-j NDT LIMIT l l l Lif
| |
| .- . ~ n j
| |
| - li N I l
| |
| {
| |
| 1 l ''
| |
| ,/ I; E 350 I l /
| |
| ! Il / / /
| |
| 90, / / / II ;
| |
| } RCP NPSH
| |
| / / / l O E'' l*-??k 3 E i L ii\u' V
| |
| Al
| |
| $ /
| |
| l/
| |
| /
| |
| 1 lllllll l l r!II ^* ad a ~ 'a 8 . .. .......,i ,
| |
| yl l ;; ;; ;
| |
| 150
| |
| ' IIIIII'!IIJ ! I m.? ."""
| |
| Above and to the Left
| |
| [ V f !
| |
| im IIIIIIIII 'I II 50 '
| |
| l I I I ISaturation Curvej O 1 50 100 150 200 250 300 350 400 450 500 i
| |
| RCS TEMP (*F) See Note 1 Note 1: Use Tc for NDT limit when no Tc anomaly exists. Use Tincare for all other RCS TEMP.
| |
| E0P-14 REV 04 PAGE 299 of 303 ENCLS l
| |
| | |
| O BLANK PAGE g
| |
| l 1
| |
| O l E0P-14 REV 04 PAGE 300 of 303 ENCLS 1
| |
| | |
| 4.0 ' FIGURE 3 TOTAL FEEDWATER FLOW VERSUS HOTWELL TEMP
| |
| \ f)
| |
| '%..)
| |
| soo
| |
| .A
| |
| \
| |
| sso \
| |
| E
| |
| \
| |
| NA a
| |
| ! \
| |
| : i. N nO { N ;
| |
| .a 3 N
| |
| $ 3s ,
| |
| \ i i
| |
| 450 1
| |
| 400 33o 120 130 ''
| |
| Hotwell TEMP (*F)
| |
| > Or
| |
| (__/
| |
| E0P-14 REV 04 PAGE 301 of 303 ENCLS
| |
| | |
| i l
| |
| 1
| |
| )
| |
| BLANK PAGE O
| |
| O E0P-14 REV 04 PAGE 302 of 303 ENCLS
| |
| | |
| RCP RCS TEMP Normal Emergency Status a 1 RCP > 500'f s 50 F/8 hr s 240 F/hr s 500 to > 280 F s 50 F/h hr s 50 F/8 hr l
| |
| Table 1:
| |
| Cooldown limits s 280 to > 150 F s 25 F/h hr s 25*F/8 hr No RCPs > 500 f s 25 F/h hr s 240 F/hr s 500 to > 280 F s 25 F/8 hr s 25 F/8 hr s 280 to > 150 F s 25*F/8 hr s 25 F/8 hr One OTSG lwo OTSGs inadequate SCM > 450 to < 600 gpm > 250 to
| |
| < 300 gpm/0TSG Table 2:
| |
| AFW flow limits Adequate SCM < 300 gpm < 300 gpm/0TSG s 128 in Adequate SCM < 600 gpm < 300 gpm/0TSG
| |
| > 128 in Note: See Figures 1 and 2 when Tsat margin monitors and SPDS are unavailable.
| |
| RCS SCM qa SCM > 1500 psig a 30 F s 1500 to > 350 psig a 50 f s 350 psig SPDS s 160 F N/A E0P-14 REV 04 PAGE 303 of 303 (LAST PAGE) ENCLS}}
| |