{{#Wiki_filter:Cheryl A. Gayheart 3535 Colonnade Parkway Regulatory Affairs Director Birmingham, AL 35243 205 992 5316
{{#Wiki_filter:Cheryl A. Gayheart Regulatory Affairs Director 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5316 cagayhea@southernco.com February 1, 2022 NL-22-0062 Docket Nos. 50-321 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation On December 13, 2021, pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested a license amendment to Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Renewed Facility Operating License DPR-57 and Unit 2 Renewed Facility Operating License NPF-5 (ADAMS Accession Number ML21347A385). The proposed amendment requested adoption of TSTF-227, Revision 0, involving clarification to the End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Technical Specifications (TS), and TSTF-297, Revision 1, involving enhancements to Feedwater and Main Turbine High Water Level Trip, EOC-RPT, and Anticipated Transient Without Scram (ATWS)-RPT TS.
 
cagayhea@southernco.com
 
February 1, 2022 NL-22-0062
 
Docket Nos. 50-321 50-366
 
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001
 
Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revi se Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation
 
On December 13, 2021, pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested a license amendment to Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Renewed Facility Operating License DPR-57 and Unit 2 Renewed Facility Operating License NPF-5 (ADAMS Accession Number ML21347A385). The pr oposed amendment requested adoption of TSTF-227, Revision 0, involving clarification to the End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Technical Specifications (TS), and TSTF-297, Revision 1, involving enhancements to Feedwater and Main Turbine High Water Level Trip, EOC-RPT, and Anticipated Transient Without Scram (ATWS)-RPT TS.
 
Subsequent to the submittal, SNC identified the need for editorial corrections not affecting technical content as described in Enclosure 1 of this letter.
Subsequent to the submittal, SNC identified the need for editorial corrections not affecting technical content as described in Enclosure 1 of this letter.
 
SNC requests the same approval and implementation schedule as requested in its original application. The conclusions of the No Significant Hazards Consideration Determination and Environmental Consideration contained in the original application have been reviewed and are unaffected by this supplement.
SNC requests the same approval and implementation schedule as requested in its original application. The conclusions of the No Significant Hazards Consideration Determination and Environmental Consideration contained in the orig inal application have been reviewed and are unaffected by this supplement.
 
This letter contains no regulatory commitments.
This letter contains no regulatory commitments.
If you should have any questions regarding this submittal, please contact Ryan Joyce at 205.992.6468.


If you should have any questions regarding this submittal, please contact Ryan Joyce at 205.992.6468.
U.S. Nuclear Regulatory Commission NL-22-0062 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1st day of February 2022.
 
Respectfully submitted, Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company CAG/tle  
U.S. Nuclear Regulatory Commission NL-22-0062 Page 2
 
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1st day of February 2022.
 
Respectfully submitted,
 
Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company
 
CAG/tle


==Enclosure:==
==Enclosure:==
Editorial Corrections - Description, Corrections, and Assessment
Editorial Corrections - Description, Corrections, and Assessment Attachments: 1. Revised Proposed Technical Specifications Changes (Mark-Up)
 
: 2. Revised Technical Specifications Pages cc:
Attachments: 1. Revised Proposed Technical Specifications Changes (Mark-Up)
Regional Administrator, Region II NRR Project Manager - Hatch Senior Resident Inspector - Hatch Director, Environmental Protection Division - State of Georgia RType: CHA02.004  
: 2. Revised Technical Specifications Pages
 
cc: Regional Administrator, Region II NRR Project Manager - Hatch Senior Resident Inspector - Hatch Director, Environmental Protection Division - State of Georgia RType: CHA02.004 Edwin I. Hatch Nuclear Plant - Units 1 and 2


Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation
Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation Enclosure Editorial Corrections - Description, Corrections, and Assessment


Enclosure
Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment E-1
 
Editorial Corrections - Description, Corrections, and Assessment Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment


===
===
Background===
Background===
On December 13, 2021, pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested a license amendment to Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Renewed Facility Operating License DPR-57 and Unit 2 Renewed Facility Operating License NPF-5 (ADAMS Accession Number ML21347A385). The proposed amendment requested adoption of TSTF-227, Revision 0, involving clarification to the End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Technical Specifications (TS), and TSTF-297, Revision 1, involving enhancements to Feedwater and Main Turbine High Water Level Trip, EOC-RPT, and Anticipated Transient Without Scram (ATWS)-RPT TS.
On December 13, 2021, pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested a license amendment to Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Renewed Facility Operating License DPR-57 and Unit 2 Renewed Facility Operating License NPF-5 (ADAMS Accession Number ML21347A385). The proposed amendment requested adoption of TSTF-227, Revision 0, involving clarification to the End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Technical Specifications (TS), and TSTF-297, Revision 1, involving enhancements to Feedwater and Main Turbine High Water Level Trip, EOC-RPT, and Anticipated Transient Without Scram (ATWS)-RPT TS.
Subsequent to the submittal, SNC identified the need to editorially correct certain non-technical aspects of the request. The table below identifies provides a description of each issue as well as corrections to the original request and an assessment of each correction. Each correction has been assessed to be of an editorial nature and none impact the technical or regulatory basis for the Technical Specifications changes requested in the original submittal, dated December 13, 2021.
Subsequent to the submittal, SNC identified the need to editorially correct certain non-technical aspects of the request. The table below identifies provides a description of each issue as well as corrections to the original request and an assessment of each correction. Each correction has been assessed to be of an editorial nature and none impact the technical or regulatory basis for the Technical Specifications changes requested in the original submittal, dated December 13, 2021.
to this Enclosure provides the marked-up pages for HNP Units 1 and 2. provides revised (clean) TS pages. These pages have incorporated changes that address the editorial corrections described in the table below. Note that all HNP TS pages that were included in the original submittal are included in Attachments 1 and 2; this includes the pages corrected in this supplement as well as the pages that are unchanged by this supplement. All pages are included for clarity and convenience as this provides all marked-up and clean pages in a single submittal. Therefore, Attachments 1 and 2 of this Enclosure replace, in their entirety, Attachments 1 and 2, respecti vely, of the December 13, 2021, submittal.
to this Enclosure provides the marked-up pages for HNP Units 1 and 2. provides revised (clean) TS pages. These pages have incorporated changes that address the editorial corrections described in the table below. Note that all HNP TS pages that were included in the original submittal are included in Attachments 1 and 2; this includes the pages corrected in this supplement as well as the pages that are unchanged by this supplement. All pages are included for clarity and convenience as this provides all marked-up and clean pages in a single submittal. Therefore, Attachments 1 and 2 of this Enclosure replace, in their entirety, Attachments 1 and 2, respectively, of the December 13, 2021, submittal.
 
Description Correction to Original Request Assessment The acronym EOC-RPT is spelled out as End of Cycle Reactor Pump Trip in two locations (first paragraph of the cover letter and page E7 of the Enclosure of the original request). It should appear as End of Cycle Recirculation Pump Trip in both locations.
Description Correction to Original Assessment Request
Please consider End of Cycle Reactor Pump Trip to read End of Cycle Recirculation Pump Trip in the two locations identified.
 
It is noted the acronym is correctly spelled out in the majority of instances in the original amendment request.
The acronym EOC-RPT is Please consider End of Cycle It is noted the acronym is spelled out as End of Cycle Reactor Pump Trip to read correctly spelled out in the Reactor Pump Trip in two End of Cycle Recirculation majority of instances in the locations (first paragraph of Pump Trip in the two original amendment request.
This is a typographical correction.
the cover letter and page E7 locations identified. This is a typographical of the Enclosure of the correction.
original request). It should appear as End of Cycle Recirculation Pump Trip in both locations.
 
E-1 Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment
 
Description Correction to Original Assessment Request


In the Enclosure of the original Please consider Section 4.1, As stated in the original request, Section 4.1, 10 CFR 50.36, Technical request, TS 3.3.4.2, Anticipated Applicable Regulatory specifications, Item (D), of the Transient Without Scram Requirements, 10 CFR original request to read: Recirculation Pump Trip 50.36(c)(2)(ii)(D), Criterion 4 is (D) Criterion 4. A (ATWS-RPT) Instrumentation, misquoted. structure, system, or satisfies Criterion 4 of 10 CFR component which 50.36(c)(2)(ii).
Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment E-2 Description Correction to Original Request Assessment In the Enclosure of the original request, Section 4.1, Applicable Regulatory Requirements, 10 CFR 50.36(c)(2)(ii)(D), Criterion 4 is misquoted.
operating experience or Although incorrect regulation probabilistic risk text was cited, the appropriate assessment has shown regulatory criterion was to be significant to public addressed in support of the health and safety. regulatory analysis of the proposed changes to the TS.
Please consider Section 4.1, 10 CFR 50.36, Technical specifications, Item (D), of the original request to read:
(D) Criterion 4. A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.
As stated in the original request, TS 3.3.4.2, Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation, satisfies Criterion 4 of 10 CFR 50.36(c)(2)(ii).
Although incorrect regulation text was cited, the appropriate regulatory criterion was addressed in support of the regulatory analysis of the proposed changes to the TS.
Therefore, this editorial correction does not impact the technical or regulatory basis for the proposed changes to the HNP TS.
Therefore, this editorial correction does not impact the technical or regulatory basis for the proposed changes to the HNP TS.
In the Enclosure of the original request, Section 4.1, Applicable Regulatory Requirements, a paragraph addressing the requirements of 10 CFR 50.62, Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants, erroneously cited 10 CFR 50.36(c)(5). The paragraph should cite 10 CFR 50.62(c)(5).
In Section 4.1, 10 CFR 50.62, Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants, please consider 10 CFR 50.36(c)(5) to read 10 CFR 50.62(c)(5) in both locations.
Although the incorrect regulation number was cited, the appropriate regulatory requirement was addressed in support of the regulatory analysis of the proposed changes to the TS. Therefore, this editorial correction does not impact the technical or regulatory basis for the proposed changes to the HNP TS.


In the Enclosure of the original In Section 4.1, 10 CFR 50.62, Although the incorrect request, Section 4.1, Requirements for reduction of regulation number was cited, Applicable Regulatory risk from anticipated transients the appropriate regulatory Requirements, a paragraph without scram (ATWS) events requirement was addressed in addressing the requirements of for light-water-cooled nuclear support of the regulatory 10 CFR 50.62, Requirements power plants, please consider analysis of the proposed for reduction of risk from 10 CFR 50.36(c)(5) to read changes to the TS. Therefore, anticipated transients without 10 CFR 50.62(c)(5) in both this editorial correction does scram (ATWS) events for light-locations. not impact the technical or water-cooled nuclear power regulatory basis for the plants, erroneously cited proposed changes to the HNP 10 CFR 50.36(c)(5). The TS.
Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment E-3 Description Correction to Original Request Assessment In the Attachments of the original request, the markups and clean-typed pages for HNP Unit 1, TS 3.3.4.2, Note for Required Action D.1 did not match the TSTF-297 proposed wording. The TSTF-297 proposed wording, as well as the wording proposed in Section 2.3 of the Enclosure of the original request, read Only applicable if inoperable channel is the result of an inoperable RPT breaker. In the Attachments of the original request, the second instance of the word inoperable was inadvertently omitted from the Required Action D.1 Note. to this submittal provides the affected TS pages revised to correctly show the HNP TS 3.3.4.2, Required Action D.1 Note, i.e., the previously omitted word inoperable is included in the Note. For convenience, Attachments 1 and 2 contain all the TS pages included in the original request.
paragraph should cite 10 CFR 50.62(c)(5).
The HNP Unit 1, TS 3.3.4.2, Required Action D.1 Note is corrected to be consistent with the TSTF-297 proposed wording.
 
This is a typographical correction.
E-2
In the Attachments of the original request, the markups and clean-typed pages for HNP Unit 1 and Unit 2, TS 3.3.2.2 Note for Required Action C.1 did not match the wording proposed in Section 2.3 of the Enclosure of the original request. Specifically, the markups and clean-typed pages for TS 3.3.2.2 omitted the word an in the Note for Required Action C.1. to this submittal provides the affected TS pages revised to correctly show the HNP Unit 1 and Unit 2, TS 3.3.2.2 Note for Required Action C.1, i.e., the previously omitted word an is included in the Note. For convenience, Attachments 1 and 2 contain all the TS pages included in the original request.
 
The addition of the word an does not change the intent of the Note but is a grammatical improvement.
Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment
This is a typographical correction.  
 
Description Correction to Original Assessment Request
 
In the Attachments of the Attachment 1 to this submittal The HNP Unit 1, TS 3.3.4.2, original request, the markups provides the affected TS pages Required Action D.1 Note is and clean-typed pages for HNP revised to correctly show the corrected to be consistent with Unit 1, TS 3.3.4.2, Note for HNP TS 3.3.4.2, Required the TSTF-297 proposed Required Action D.1 did not Action D.1 Note, i.e., the wording.
match the TSTF-297 proposed previously omitted word This is a typographical wording. The TSTF-297 inoperable is included in the correction.
proposed wording, as well as Note. For convenience, the wording proposed in Attachments 1 and 2 contain all Section 2.3 of the Enclosure of the TS pages included in the the original request, read Only original request.
applicable if inoperable channel is the result of an inoperable RPT breaker. In the Attachments of the original request, the second instance of the word inoperable was inadvertently omitted from the Required Action D.1 Note.
 
In the Attachments of the Attachment 1 to this submittal The addition of the word an original request, the markups provides the affected TS does not change the intent of and clean-typed pages for pages revised to correctly the Note but is a grammatical HNP Unit 1 and Unit 2, TS show the HNP Unit 1 and Unit improvement.
3.3.2.2 Note for Required 2, TS 3.3.2.2 Note for This is a typographical Action C.1 did not match the Required Action C.1, i.e., the correction.
wording proposed in Section previously omitted word an 2.3 of the Enclosure of the is included in the Note. For original request. Specifically, convenience, Attachments 1 the markups and clean-typed and 2 contain all the TS pages for TS 3.3.2.2 omitted pages included in the original the word an in the Note for request.
Required Action C.1.
 
E-3
 
Edwin I. Hatch Nuclear Plant - Units 1 and 2
 
Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation
 
Attachment 1
 
Revised Proposed Changes (Mark-Up)
 
Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2
 
3.3 INSTRUMENTATION


3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation
Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation Revised Proposed Changes (Mark-Up)
 
LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.
 
APPLICABILITY: 7+(50$/32:(5 % RTP.
 
ACTIONS


Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2 HATCH UNIT 1 3.3-21 Amendment No. 266 3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.
APPLICABILITY:
7+(50$/32:(5% RTP.
ACTIONS
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
Separate Condition entry is allowed for each channel.
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One feedwater and main turbine high water level trip channel inoperable.
A.1 Place channel in trip.
7 days B.
Two or more feedwater and main turbine high water level trip channels inoperable.
B.1 Restore feedwater and main turbine high water level trip capability.
2 hours C.
Required Action and associated Completion Time not met.
C.1
-----------NOTE-----------
Only applicable if inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.
Remove affected feedwater pump(s) and main turbine valve(s) from service.
OR C.2 Reduce THERMAL POWER to < 24% RTP.
4 hours 4 hours


CONDITION REQUIRED ACTION COMPLETION TIME
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-28 Amendment No. 266 3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1
 
: a.
A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable.
Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
 
: 1.
B. Two or more feedwater and B.1 Restore feedwater and 2 hours main turbine high water main turbine high water level trip channels level trip capability.
Turbine Stop Valve (TSV) - Closure; and
inoperable.
: 2.
 
Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.
C. Required Action and C.1 -----------NOTE-----------
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.
 
Remove affected 4 hours feedwater pump(s) and main turbine valve(s) from service.
 
OR C.2 Reduce THERMAL 4 hours POWER to < 24% RTP.
 
HATCH UNIT 1 3.3-21 Amendment No. 266 EOC-RPT Instrumentation 3.3.4.1
 
3.3 INSTRUMENTATION
 
3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation
 
LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
: 1. Turbine Stop Valve (TSV) - Closure; and
: 2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.
 
OR
OR
: b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
: b.
 
LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
APPLICABILITY: THERMAL 32:(5 573
APPLICABILITY:
 
THERMAL 32:(5573
ACTIONS
ACTIONS  
 
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
Separate Condition entry is allowed for each channel.
Separate Condition entry is allowed for each channel.
 
CONDITION REQUIRED ACTION COMPLETION TIME A.
CONDITION REQUIRED ACTION COMPLETION TIME
One or more required channels inoperable.
 
A.1 Restore channel to OPERABLE status.
A. One or more required A.1 Restore channel to 72 hours channels inoperable. OPERABLE status.
OR A.2  
 
-----------NOTE------------
OR
 
A.2 -----------NOTE------------
Not applicable if inoperable channel is the result of an inoperable breaker.
Not applicable if inoperable channel is the result of an inoperable breaker.
Place channel in trip.
72 hours 72 hours (continued)


Place channel in trip. 72 hours
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-29 Amendment No. 266 ACTIONS (continued)
 
CONDITION REQUIRED ACTION COMPLETION TIME B.
(continued)
One or more Functions with EOC-RPT trip capability not maintained.
 
AND MCPR limit for inoperable EOC-RPT not made applicable.
HATCH UNIT 1 3.3-28 Amendment No. 266 EOC-RPT Instrumentation 3.3.4.1
B.1 Restore EOC-RPT trip capability.
 
OR B.2 Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR.
ACTIONS (continued)
2 hours 2 hours C.
CONDITION REQUIRED ACTION COMPLETION TIME
Required Action and associated Completion Time not met.
 
C.1  
B. One or more Functions with B.1 Restore EOC-RPT trip 2 hours EOC-RPT trip capability not capability.
-----------NOTE------------
maintained.
Only applicable if inoperable channel is the result of an inoperable RPT breaker.
OR AND B.2 Apply the MCPR limit 2 hours MCPR limit for inoperable for inoperable EOC-RPT not made EOC-RPT as specified applicable. in the COLR.
Remove the associated affected recirculation pump from service.
 
OR C.2 Reduce THERMAL POWER to < 27.6%
C. Required Action and C.1 -----------NOTE------------
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.
 
Remove the associated 4 hours affected recirculation pump from service.
 
OR
 
C.2 Reduce THERMAL 4 hours POWER to < 27.6%
RTP.
RTP.
 
4 hours 4 hours SURVEILLANCE REQUIREMENTS  
SURVEILLANCE REQUIREMENTS
 
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Program (continued)


SURVEILLANCE FREQUENCY
ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 1 3.3-32 Amendment No. 266 ACTIONS (continued)
 
CONDITION REQUIRED ACTION COMPLETION TIME C.
SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program
Both Functions with ATWS-RPT trip capability not maintained.
 
C.1 Restore ATWS-RPT trip capability for one Function.
(continued)
1 hour D.
 
Required Action and associated Completion Time not met.
HATCH UNIT 1 3.3-29 Amendment No. 266 ATWS-RPT Instrumentation 3.3.4.2
D.1  
 
-----------NOTE------------
ACTIONS (continued)
Only applicable if inoperable channel is the result of an inoperable RPT breaker.
CONDITION REQUIRED ACTION COMPLETION TIME
Remove the associated affected recirculation pump from service.
 
OR D.2 Be in MODE 2.
C. Both Functions with C.1 Restore ATWS-RPT trip 1 hour ATWS-RPT trip capability capability for one not maintained. Function.
6 hours 6 hours SURVEILLANCE REQUIREMENTS  
 
D. Required Action and D.1 -----------NOTE------------
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.
 
Remove the associated 6 hours affected recirculation pump from service.
 
OR
 
D.2 Be in MODE 2. 6 hours
 
SURVEILLANCE REQUIREMENTS
 
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains ATWS-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains ATWS-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Program (continued)


SURVEILLANCE FREQUENCY
Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2 HATCH UNIT 2 3.3-21 Amendment No. 210 3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.
 
APPLICABILITY:
SR 3.3.4.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program
7+(50$/32:(5 24% RTP.
 
ACTIONS  
(continued)
 
HATCH UNIT 1 3.3-32 Amendment No. 266 Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2
 
3.3 INSTRUMENTATION
 
3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation
 
LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.
 
APPLICABILITY: 7+(50$/32:(5 24% RTP.
 
ACTIONS
 
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
Separate Condition entry is allowed for each channel.
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One feedwater and main turbine high water level trip channel inoperable.
A.1 Place channel in trip.
7 days B.
Two or more feedwater and main turbine high water level trip channels inoperable.
B.1 Restore feedwater and main turbine high water level trip capability.
2 hours C.
Required Action and associated Completion Time not met.
C.1
------------NOTE-----------
Only applicable if inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.
Remove affected feedwater pump(s) and main turbine valve(s) from service.
OR C.2 Reduce THERMAL POWER to < 24% RTP.
4 hours 4 hours


CONDITION REQUIRED ACTION COMPLETION TIME
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-28 Amendment No. 210 3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1
 
: a.
A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable.
Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
 
: 1.
B. Two or more feedwater and B.1 Restore feedwater and 2 hours main turbine high water main turbine high water level trip channels level trip capability.
Turbine Stop Valve (TSV) - Closure; and
inoperable.
: 2.
 
Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.
C. Required Action and C.1 ------------NOTE-----------
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.
 
Remove affected 4 hours feedwater pump(s) and main turbine valve(s) from service.
 
OR
OR
 
: b.
C.2 Reduce THERMAL 4 hours POWER to < 24% RTP.
LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
 
APPLICABILITY:
HATCH UNIT 2 3.3-21 Amendment No. 210 EOC-RPT Instrumentation 3.3.4.1
7+(50$/32:(5 27.6% RTP.
 
ACTIONS  
3.3 INSTRUMENTATION
 
3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation
 
LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
: 1. Turbine Stop Valve (TSV) - Closure; and
: 2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.
OR
: b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
 
APPLICABILITY: 7+(50$/32:(5 27.6% RTP.
 
ACTIONS
 
-----------------------------------------------------------NOTE----------------------------------------------------------
-----------------------------------------------------------NOTE----------------------------------------------------------
Separate Condition entry is allowed for each channel.
Separate Condition entry is allowed for each channel.
 
CONDITION REQUIRED ACTION COMPLETION TIME A.
CONDITION REQUIRED ACTION COMPLETION TIME
One or more required channels inoperable.
 
A.1 Restore channel to OPERABLE status.
A. One or more required A.1 Restore channel to 72 hours channels inoperable. OPERABLE status.
OR A.2  
 
------------NOTE-----------
OR
 
A.2 ------------NOTE-----------
Not applicable if inoperable channel is the result of an inoperable breaker.
Not applicable if inoperable channel is the result of an inoperable breaker.
Place channel in trip.
72 hours 72 hours (continued)


Place channel in trip. 72 hours
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-29 Amendment No. 210 ACTIONS (continued)
 
CONDITION REQUIRED ACTION COMPLETION TIME B.
(continued)
One or more Functions with EOC-RPT trip capability not maintained.
 
AND MCPR limit for inoperable EOC-RPT not made applicable.
HATCH UNIT 2 3.3-28 Amendment No. 210 EOC-RPT Instrumentation 3.3.4.1
B.1 Restore EOC-RPT trip capability.
 
OR B.2 Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR.
ACTIONS (continued)
2 hours 2 hours C.
CONDITION REQUIRED ACTION COMPLETION TIME
Required Action and associated Completion Time not met.
 
C.1  
B. One or more Functions with B.1 Restore EOC-RPT trip 2 hours EOC-RPT trip capability not capability.
-----------NOTE------------
maintained.
Only applicable if inoperable channel is the result of an inoperable RPT breaker.
OR AND B.2 Apply the MCPR limit 2 hours MCPR limit for inoperable for inoperable EOC-RPT not made EOC-RPT as specified applicable. in the COLR.
Remove the associated affected recirculation pump from service.
 
OR C.2 Reduce THERMAL POWER to < 27.6%
C. Required Action and C.1 -----------NOTE------------
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.
 
Remove the associated 4 hours affected recirculation pump from service.
 
OR
 
C.2 Reduce THERMAL 4 hours POWER to < 27.6%
RTP.
RTP.
 
4 hours 4 hours SURVEILLANCE REQUIREMENTS  
SURVEILLANCE REQUIREMENTS
 
-----------------------------------------------------------NOTE----------------------------------------------------------
-----------------------------------------------------------NOTE----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Program (continued)


SURVEILLANCE FREQUENCY
ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 2 3.3-32 Amendment No. 210 ACTIONS (continued)
 
CONDITION REQUIRED ACTION COMPLETION TIME C.
SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program
Both Functions with ATWS-RPT trip capability not maintained.
 
C.1 Restore ATWS-RPT trip capability for one Function.
(continued)
1 hour D.
HATCH UNIT 2 3.3-29 Amendment No. 210 ATWS-RPT Instrumentation 3.3.4.2
Required Action and associated Completion Time not met.
 
D.1  
ACTIONS (continued)
-----------NOTE------------
CONDITION REQUIRED ACTION COMPLETION TIME
Only applicable if inoperable channel is the result of an inoperable RPT breaker.
 
Remove the associated affected recirculation pump from service.
C. Both Functions with C.1 Restore ATWS-RPT trip 1 hour ATWS-RPT trip capability capability for one not maintained. Function.
OR D.2 Be in MODE 2.
 
6 hours 6 hours SURVEILLANCE REQUIREMENTS  
D. Required Action and D.1 -----------NOTE------------
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.
 
Remove the associated 6 hours affected recirculation pump from service.
 
OR
 
D.2 Be in MODE 2. 6 hours
 
SURVEILLANCE REQUIREMENTS
 
-----------------------------------------------------------NOTE----------------------------------------------------------
-----------------------------------------------------------NOTE----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains ATWS-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains ATWS-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Program (continued)


SURVEILLANCE FREQUENCY
Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation Revised Technical Specifications Pages
 
SR 3.3.4.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program
 
(continued)
 
HATCH UNIT 2 3.3-32 Amendment No. 210 Edwin I. Hatch Nuclear Plant - Units 1 and 2
 
Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation
 
Attachment 2
 
Revised Technical Specifications Pages Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2
 
3.3 INSTRUMENTATION
 
3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation
 
LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.
 
APPLICABILITY: 7+(50$/32:(5 % RTP.
 
ACTIONS


Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2 HATCH UNIT 1 3.3-21 Amendment No.
3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.
APPLICABILITY:
7+(50$/32:(5% RTP.
ACTIONS
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
Separate Condition entry is allowed for each channel.
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One feedwater and main turbine high water level trip channel inoperable.
A.1 Place channel in trip.
7 days B.
Two or more feedwater and main turbine high water level trip channels inoperable.
B.1 Restore feedwater and main turbine high water level trip capability.
2 hours C.
Required Action and associated Completion Time not met.
C.1
-----------NOTE-----------
Only applicable if inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.
Remove affected feedwater pump(s) and main turbine valve(s) from service.
OR C.2 Reduce THERMAL POWER to < 24% RTP.
4 hours 4 hours


CONDITION REQUIRED ACTION COMPLETION TIME
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-28 Amendment No.
 
3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1
A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable.
: a.
 
Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
B. Two or more feedwater and B.1 Restore feedwater and 2 hours main turbine high water main turbine high water level trip channels level trip capability.
: 1.
inoperable.
Turbine Stop Valve (TSV) - Closure; and
 
: 2.
C. Required Action and C.1 -----------NOTE-----------
Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.
 
Remove affected 4 hours feedwater pump(s) and main turbine valve(s) from service.
 
OR C.2 Reduce THERMAL 4 hours POWER to < 24% RTP.
 
HATCH UNIT 1 3.3-21 Amendment No.
EOC-RPT Instrumentation 3.3.4.1
 
3.3 INSTRUMENTATION
 
3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation
 
LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
: 1. Turbine Stop Valve (TSV) - Closure; and
: 2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.
 
OR
OR
: b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
: b.
 
LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
APPLICABILITY: 7+(50$/32:(5 573
APPLICABILITY:
 
7+(50$/32:(5573
ACTIONS
ACTIONS  
 
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
Separate Condition entry is allowed for each channel.
Separate Condition entry is allowed for each channel.
 
CONDITION REQUIRED ACTION COMPLETION TIME A.
CONDITION REQUIRED ACTION COMPLETION TIME
One or more required channels inoperable.
 
A.1 Restore channel to OPERABLE status.
A. One or more required A.1 Restore channel to 72 hours channels inoperable. OPERABLE status.
OR A.2  
 
-----------NOTE------------
OR
 
A.2 -----------NOTE------------
Not applicable if inoperable channel is the result of an inoperable breaker.
Not applicable if inoperable channel is the result of an inoperable breaker.
Place channel in trip.
72 hours 72 hours (continued)


Place channel in trip. 72 hours
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-29 Amendment No.
 
(continued)
 
HATCH UNIT 1 3.3-28 Amendment No.
EOC-RPT Instrumentation 3.3.4.1
 
ACTIONS (continued)
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
CONDITION REQUIRED ACTION COMPLETION TIME B.
 
One or more Functions with EOC-RPT trip capability not maintained.
B. One or more Functions with B.1 Restore EOC-RPT trip 2 hours EOC-RPT trip capability not capability.
AND MCPR limit for inoperable EOC-RPT not made applicable.
maintained.
B.1 Restore EOC-RPT trip capability.
OR AND B.2 Apply the MCPR limit 2 hours MCPR limit for inoperable for inoperable EOC-RPT not made EOC-RPT as specified applicable. in the COLR.
OR B.2 Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR.
 
2 hours 2 hours C.
C. Required Action and C.1 -----------NOTE------------
Required Action and associated Completion Time not met.
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.
C.1  
 
-----------NOTE------------
Remove the affected 4 hours recirculation pump from service.
Only applicable if inoperable channel is the result of an inoperable RPT breaker.
 
Remove the affected recirculation pump from service.
OR
OR C.2 Reduce THERMAL POWER to < 27.6%
 
C.2 Reduce THERMAL 4 hours POWER to < 27.6%
RTP.
RTP.
 
4 hours 4 hours SURVEILLANCE REQUIREMENTS  
SURVEILLANCE REQUIREMENTS
 
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Program (continued)


SURVEILLANCE FREQUENCY
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-30 Amendment No.
 
SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program
 
(continued)
HATCH UNIT 1 3.3-29 Amendment No.
EOC-RPT Instrumentation 3.3.4.1
 
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
SURVEILLANCE FREQUENCY SR 3.3.4.1.2 Verify TSV - Closure and TCV Fast Closure, Trip Oil Pressure - Low Functions are not bypassed ZKHQ7+(50$/32:(5LV573
 
In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.3 Perform CHANNEL CALIBRATION. The Allowable Values shall be:
SR 3.3.4.1.2 Verify TSV - Closure and TCV Fast Closure, Trip In accordance with Oil Pressure - Low Functions are not bypassed the Surveillance ZKHQ7+(50$/32:(5LV 573 Frequency Control Program
TSV - &ORVXUHFORVHGDQG TCV Fast Closure, Trip Oil Pressure - /RZSVLJ
 
In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation.
SR 3.3.4.1.3 Perform CHANNEL CALIBRATION. The In accordance with Allowable Values shall be: the Surveillance Frequency Control TSV - &ORVXUH  FORVHG DQG Program
In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.5  
 
---------------------------NOTE------------------------------
TCV Fast Closure, Trip Oil Pressure - /RZ  SVLJ
 
SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST In accordance with including breaker actuation. the Surveillance Frequency Control Program
 
SR 3.3.4.1.5 ---------------------------NOTE------------------------------
Breaker interruption time may be assumed from the most recent performance of SR 3.3.4.1.6.
Breaker interruption time may be assumed from the most recent performance of SR 3.3.4.1.6.
Verify the EOC-RPT SYSTEM RESPONSE TIME is within limits.
In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.6 Determine RPT breaker interruption time.
In accordance with the Surveillance Frequency Control Program


Verify the EOC-RPT SYSTEM RESPONSE TIME In accordance with is within limits. the Surveillance Frequency Control Program
ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 1 3.3-32 Amendment No.
 
SR 3.3.4.1.6 Determine RPT breaker interruption time. In accordance with the Surveillance Frequency Control Program
 
HATCH UNIT 1 3.3-30 Amendment No.
ATWS-RPT Instrumentation 3.3.4.2
 
ACTIONS (continued)
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
CONDITION REQUIRED ACTION COMPLETION TIME C.
 
Both Functions with ATWS-RPT trip capability not maintained.
C. Both Functions with C.1 Restore ATWS-RPT trip 1 hour ATWS-RPT trip capability capability for one not maintained. Function.
C.1 Restore ATWS-RPT trip capability for one Function.
 
1 hour D.
D. Required Action and D.1 -----------NOTE------------
Required Action and associated Completion Time not met.
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.
D.1  
 
-----------NOTE------------
Remove the affected 6 hours recirculation pump from service.
Only applicable if inoperable channel is the result of an inoperable RPT breaker.
 
Remove the affected recirculation pump from service.
OR
OR D.2 Be in MODE 2.
 
6 hours 6 hours SURVEILLANCE REQUIREMENTS  
D.2 Be in MODE 2. 6 hours
 
SURVEILLANCE REQUIREMENTS
 
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains ATWS-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains ATWS-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Program (continued)


SURVEILLANCE FREQUENCY
ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 1 3.3-33 Amendment No.
 
SR 3.3.4.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program
 
(continued)
 
HATCH UNIT 1 3.3-32 Amendment No.
ATWS-RPT Instrumentation 3.3.4.2
 
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
SURVEILLANCE FREQUENCY SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST.
 
In accordance with the Surveillance Frequency Control Program SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The Allowable Values shall be:
SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program
: a.
 
Reactor Vessel Water Level -
SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The In accordance with Allowable Values shall be: the Surveillance Frequency Control
ATWS-537/HYHO-73 inches; and
: a. Reactor Vessel Water Level - Program ATWS-537/HYHO -73 inches; and
: b.
: b. Reactor Steam Dome Pressure -
Reactor Steam Dome Pressure -  
+LJK  SVLJ
+LJKSVLJ
 
In accordance with the Surveillance Frequency Control Program SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation.
SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST In accordance with including breaker actuation. the Surveillance Frequency Control Program
In accordance with the Surveillance Frequency Control Program  
 
HATCH UNIT 1 3.3-33 Amendment No.
Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2
 
3.3 INSTRUMENTATION
 
3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation
 
LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.
 
APPLICABILITY: 7+(50$/32:(5 24% RTP.
 
ACTIONS


Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2 HATCH UNIT 2 3.3-21 Amendment No.
3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.
APPLICABILITY:
7+(50$/32:(5 24% RTP.
ACTIONS
-----------------------------------------------------------NOTE------------------------------------------------------------
-----------------------------------------------------------NOTE------------------------------------------------------------
Separate Condition entry is allowed for each channel.
Separate Condition entry is allowed for each channel.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One feedwater and main turbine high water level trip channel inoperable.
A.1 Place channel in trip.
7 days B.
Two or more feedwater and main turbine high water level trip channels inoperable.
B.1 Restore feedwater and main turbine high water level trip capability.
2 hours C.
Required Action and associated Completion Time not met.
C.1
------------NOTE-----------
Only applicable if inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.
Remove affected feedwater pump(s) and main turbine valve(s) from service.
OR C.2 Reduce THERMAL POWER to < 24% RTP.
4 hours 4 hours


CONDITION REQUIRED ACTION COMPLETION TIME
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-28 Amendment No.
 
3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1
A. One feedwater and main A.1 Place channel in trip. 7 days turbine high water level trip channel inoperable.
: a.
 
Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
B. Two or more feedwater and B.1 Restore feedwater and 2 hours main turbine high water main turbine high water level trip channels level trip capability.
: 1.
inoperable.
Turbine Stop Valve (TSV) - Closure; and
 
: 2.
C. Required Action and C.1 ------------NOTE-----------
Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.
 
Remove affected 4 hours feedwater pump(s) and main turbine valve(s) from service.
 
OR
OR
 
: b.
C.2 Reduce THERMAL 4 hours POWER to < 24% RTP.
LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
 
APPLICABILITY:
HATCH UNIT 2 3.3-21 Amendment No.
7+(50$/32:(5 27.6% RTP.
EOC-RPT Instrumentation 3.3.4.1
ACTIONS  
 
3.3 INSTRUMENTATION
 
3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation
 
LCO 3.3.4.1 a. Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:
: 1. Turbine Stop Valve (TSV) - Closure; and
: 2. Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.
OR
: b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.
 
APPLICABILITY: 7+(50$/32:(5 27.6% RTP.
 
ACTIONS
 
-----------------------------------------------------------NOTE----------------------------------------------------------
-----------------------------------------------------------NOTE----------------------------------------------------------
Separate Condition entry is allowed for each channel.
Separate Condition entry is allowed for each channel.
 
CONDITION REQUIRED ACTION COMPLETION TIME A.
CONDITION REQUIRED ACTION COMPLETION TIME
One or more required channels inoperable.
 
A.1 Restore channel to OPERABLE status.
A. One or more required A.1 Restore channel to 72 hours channels inoperable. OPERABLE status.
OR A.2  
 
------------NOTE-----------
OR
 
A.2 ------------NOTE-----------
Not applicable if inoperable channel is the result of an inoperable breaker.
Not applicable if inoperable channel is the result of an inoperable breaker.
Place channel in trip.
72 hours 72 hours (continued)


Place channel in trip. 72 hours
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-29 Amendment No.
 
(continued)
 
HATCH UNIT 2 3.3-28 Amendment No.
EOC-RPT Instrumentation 3.3.4.1
 
ACTIONS (continued)
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
CONDITION REQUIRED ACTION COMPLETION TIME B.
 
One or more Functions with EOC-RPT trip capability not maintained.
B. One or more Functions with B.1 Restore EOC-RPT trip 2 hours EOC-RPT trip capability not capability.
AND MCPR limit for inoperable EOC-RPT not made applicable.
maintained.
B.1 Restore EOC-RPT trip capability.
OR AND B.2 Apply the MCPR limit 2 hours MCPR limit for inoperable for inoperable EOC-RPT not made EOC-RPT as specified applicable. in the COLR.
OR B.2 Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR.
 
2 hours 2 hours C.
C. Required Action and C.1 -----------NOTE------------
Required Action and associated Completion Time not met.
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.
C.1  
 
-----------NOTE------------
Remove the affected 4 hours recirculation pump from service.
Only applicable if inoperable channel is the result of an inoperable RPT breaker.
 
Remove the affected recirculation pump from service.
OR
OR C.2 Reduce THERMAL POWER to < 27.6%
 
C.2 Reduce THERMAL 4 hours POWER to < 27.6%
RTP.
RTP.
 
4 hours 4 hours SURVEILLANCE REQUIREMENTS  
SURVEILLANCE REQUIREMENTS
 
-----------------------------------------------------------NOTE----------------------------------------------------------
-----------------------------------------------------------NOTE----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains EOC-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Program (continued)


SURVEILLANCE FREQUENCY
EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-30 Amendment No.
 
SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program
 
(continued)
HATCH UNIT 2 3.3-29 Amendment No.
EOC-RPT Instrumentation 3.3.4.1
 
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
SURVEILLANCE FREQUENCY SR 3.3.4.1.2 Verify TSV - Closure and TCV Fast Closure, Trip Oil Pressure - Low Functions are not bypassed ZKHQ7+(50$/32:(5LV 27.6% RTP.
 
In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.3 Perform CHANNEL CALIBRATION. The Allowable Values shall be:
SR 3.3.4.1.2 Verify TSV - Closure and TCV Fast Closure, Trip In accordance with Oil Pressure - Low Functions are not bypassed the Surveillance ZKHQ7+(50$/32:(5LV 27.6% RTP. Frequency Control Program
TSV - &ORVXUH 10% closed; and TCV Fast Closure, Trip Oil Pressure - /RZ 600 psig.
 
In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation.
SR 3.3.4.1.3 Perform CHANNEL CALIBRATION. The In accordance with Allowable Values shall be: the Surveillance Frequency Control TSV - &ORVXUH  10% closed; and Program
In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.5  
 
---------------------------NOTE-------------------------------
TCV Fast Closure, Trip Oil Pressure - /RZ  600 psig.
 
SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST In accordance with including breaker actuation. the Surveillance Frequency Control Program
 
SR 3.3.4.1.5 ---------------------------NOTE-------------------------------
Breaker interruption time may be assumed from the most recent performance of SR 3.3.4.1.6.
Breaker interruption time may be assumed from the most recent performance of SR 3.3.4.1.6.
Verify the EOC-RPT SYSTEM RESPONSE TIME is within limits.
In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.6 Determine RPT breaker interruption time.
In accordance with the Surveillance Frequency Control Program


Verify the EOC-RPT SYSTEM RESPONSE TIME In accordance with is within limits. the Surveillance Frequency Control Program
ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 2 3.3-32 Amendment No.
 
SR 3.3.4.1.6 Determine RPT breaker interruption time. In accordance with the Surveillance Frequency Control Program
 
HATCH UNIT 2 3.3-30 Amendment No.
ATWS-RPT Instrumentation 3.3.4.2
 
ACTIONS (continued)
ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME
CONDITION REQUIRED ACTION COMPLETION TIME C.
 
Both Functions with ATWS-RPT trip capability not maintained.
C. Both Functions with C.1 Restore ATWS-RPT trip 1 hour ATWS-RPT trip capability capability for one not maintained. Function.
C.1 Restore ATWS-RPT trip capability for one Function.
 
1 hour D.
D. Required Action and D.1 -----------NOTE------------
Required Action and associated Completion Time not met.
associated Completion Only applicable if Time not met. inoperable channel is the result of an inoperable RPT breaker.
D.1  
 
-----------NOTE------------
Remove the affected 6 hours recirculation pump from service.
Only applicable if inoperable channel is the result of an inoperable RPT breaker.
 
Remove the affected recirculation pump from service.
OR
OR D.2 Be in MODE 2.
 
6 hours 6 hours SURVEILLANCE REQUIREMENTS  
D.2 Be in MODE 2. 6 hours
 
SURVEILLANCE REQUIREMENTS
 
-----------------------------------------------------------NOTE----------------------------------------------------------
-----------------------------------------------------------NOTE----------------------------------------------------------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains ATWS-RPT trip capability.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the associated Function maintains ATWS-RPT trip capability.
SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Program (continued)


SURVEILLANCE FREQUENCY
ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 2 3.3-33 Amendment No.
 
SR 3.3.4.2.1 Perform CHANNEL CHECK. In accordance with the Surveillance Frequency Control Program
 
(continued)
 
HATCH UNIT 2 3.3-32 Amendment No.
ATWS-RPT Instrumentation 3.3.4.2
 
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY
SURVEILLANCE FREQUENCY SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST.
 
In accordance with the Surveillance Frequency Control Program SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The Allowable Values shall be:
SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST. In accordance with the Surveillance Frequency Control Program
: a.
 
Reactor Vessel Water Level -
SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The In accordance with Allowable Values shall be: the Surveillance Frequency Control
ATWS-537/HYHO -73 inches; and
: a. Reactor Vessel Water Level - Program ATWS-537/HYHO  -73 inches; and
: b.
: b. Reactor Steam Dome Pressure -
Reactor Steam Dome Pressure -  
+LJK  1175 psig.
+LJK 1175 psig.
 
In accordance with the Surveillance Frequency Control Program SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation.
SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST In accordance with including breaker actuation. the Surveillance Frequency Control Program
In accordance with the Surveillance Frequency Control Program}}
 
HATCH UNIT 2 3.3-33 Amendment No.}}

Latest revision as of 18:43, 27 November 2024

Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227 & TSTF-297
ML22033A073
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/01/2022
From: Gayheart C
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-22-0062
Download: ML22033A073 (28)


Text

Cheryl A. Gayheart Regulatory Affairs Director 3535 Colonnade Parkway Birmingham, AL 35243 205 992 5316 cagayhea@southernco.com February 1, 2022 NL-22-0062 Docket Nos. 50-321 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation On December 13, 2021, pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested a license amendment to Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Renewed Facility Operating License DPR-57 and Unit 2 Renewed Facility Operating License NPF-5 (ADAMS Accession Number ML21347A385). The proposed amendment requested adoption of TSTF-227, Revision 0, involving clarification to the End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Technical Specifications (TS), and TSTF-297, Revision 1, involving enhancements to Feedwater and Main Turbine High Water Level Trip, EOC-RPT, and Anticipated Transient Without Scram (ATWS)-RPT TS.

Subsequent to the submittal, SNC identified the need for editorial corrections not affecting technical content as described in Enclosure 1 of this letter.

SNC requests the same approval and implementation schedule as requested in its original application. The conclusions of the No Significant Hazards Consideration Determination and Environmental Consideration contained in the original application have been reviewed and are unaffected by this supplement.

This letter contains no regulatory commitments.

If you should have any questions regarding this submittal, please contact Ryan Joyce at 205.992.6468.

U.S. Nuclear Regulatory Commission NL-22-0062 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1st day of February 2022.

Respectfully submitted, Cheryl A. Gayheart Regulatory Affairs Director Southern Nuclear Operating Company CAG/tle

Enclosure:

Editorial Corrections - Description, Corrections, and Assessment Attachments: 1. Revised Proposed Technical Specifications Changes (Mark-Up)

2. Revised Technical Specifications Pages cc:

Regional Administrator, Region II NRR Project Manager - Hatch Senior Resident Inspector - Hatch Director, Environmental Protection Division - State of Georgia RType: CHA02.004

Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation Enclosure Editorial Corrections - Description, Corrections, and Assessment

Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment E-1

=

Background===

On December 13, 2021, pursuant to 10 CFR 50.90, Southern Nuclear Operating Company (SNC) requested a license amendment to Edwin I. Hatch Nuclear Plant (HNP) Unit 1 Renewed Facility Operating License DPR-57 and Unit 2 Renewed Facility Operating License NPF-5 (ADAMS Accession Number ML21347A385). The proposed amendment requested adoption of TSTF-227, Revision 0, involving clarification to the End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Technical Specifications (TS), and TSTF-297, Revision 1, involving enhancements to Feedwater and Main Turbine High Water Level Trip, EOC-RPT, and Anticipated Transient Without Scram (ATWS)-RPT TS.

Subsequent to the submittal, SNC identified the need to editorially correct certain non-technical aspects of the request. The table below identifies provides a description of each issue as well as corrections to the original request and an assessment of each correction. Each correction has been assessed to be of an editorial nature and none impact the technical or regulatory basis for the Technical Specifications changes requested in the original submittal, dated December 13, 2021.

to this Enclosure provides the marked-up pages for HNP Units 1 and 2. provides revised (clean) TS pages. These pages have incorporated changes that address the editorial corrections described in the table below. Note that all HNP TS pages that were included in the original submittal are included in Attachments 1 and 2; this includes the pages corrected in this supplement as well as the pages that are unchanged by this supplement. All pages are included for clarity and convenience as this provides all marked-up and clean pages in a single submittal. Therefore, Attachments 1 and 2 of this Enclosure replace, in their entirety, Attachments 1 and 2, respectively, of the December 13, 2021, submittal.

Description Correction to Original Request Assessment The acronym EOC-RPT is spelled out as End of Cycle Reactor Pump Trip in two locations (first paragraph of the cover letter and page E7 of the Enclosure of the original request). It should appear as End of Cycle Recirculation Pump Trip in both locations.

Please consider End of Cycle Reactor Pump Trip to read End of Cycle Recirculation Pump Trip in the two locations identified.

It is noted the acronym is correctly spelled out in the majority of instances in the original amendment request.

This is a typographical correction.

Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment E-2 Description Correction to Original Request Assessment In the Enclosure of the original request, Section 4.1, Applicable Regulatory Requirements, 10 CFR 50.36(c)(2)(ii)(D), Criterion 4 is misquoted.

Please consider Section 4.1, 10 CFR 50.36, Technical specifications, Item (D), of the original request to read:

(D) Criterion 4. A structure, system, or component which operating experience or probabilistic risk assessment has shown to be significant to public health and safety.

As stated in the original request, TS 3.3.4.2, Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) Instrumentation, satisfies Criterion 4 of 10 CFR 50.36(c)(2)(ii).

Although incorrect regulation text was cited, the appropriate regulatory criterion was addressed in support of the regulatory analysis of the proposed changes to the TS.

Therefore, this editorial correction does not impact the technical or regulatory basis for the proposed changes to the HNP TS.

In the Enclosure of the original request, Section 4.1, Applicable Regulatory Requirements, a paragraph addressing the requirements of 10 CFR 50.62, Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants, erroneously cited 10 CFR 50.36(c)(5). The paragraph should cite 10 CFR 50.62(c)(5).

In Section 4.1, 10 CFR 50.62, Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants, please consider 10 CFR 50.36(c)(5) to read 10 CFR 50.62(c)(5) in both locations.

Although the incorrect regulation number was cited, the appropriate regulatory requirement was addressed in support of the regulatory analysis of the proposed changes to the TS. Therefore, this editorial correction does not impact the technical or regulatory basis for the proposed changes to the HNP TS.

Enclosure to NL-22-0062 Editorial Corrections - Description, Corrections, and Assessment E-3 Description Correction to Original Request Assessment In the Attachments of the original request, the markups and clean-typed pages for HNP Unit 1, TS 3.3.4.2, Note for Required Action D.1 did not match the TSTF-297 proposed wording. The TSTF-297 proposed wording, as well as the wording proposed in Section 2.3 of the Enclosure of the original request, read Only applicable if inoperable channel is the result of an inoperable RPT breaker. In the Attachments of the original request, the second instance of the word inoperable was inadvertently omitted from the Required Action D.1 Note. to this submittal provides the affected TS pages revised to correctly show the HNP TS 3.3.4.2, Required Action D.1 Note, i.e., the previously omitted word inoperable is included in the Note. For convenience, Attachments 1 and 2 contain all the TS pages included in the original request.

The HNP Unit 1, TS 3.3.4.2, Required Action D.1 Note is corrected to be consistent with the TSTF-297 proposed wording.

This is a typographical correction.

In the Attachments of the original request, the markups and clean-typed pages for HNP Unit 1 and Unit 2, TS 3.3.2.2 Note for Required Action C.1 did not match the wording proposed in Section 2.3 of the Enclosure of the original request. Specifically, the markups and clean-typed pages for TS 3.3.2.2 omitted the word an in the Note for Required Action C.1. to this submittal provides the affected TS pages revised to correctly show the HNP Unit 1 and Unit 2, TS 3.3.2.2 Note for Required Action C.1, i.e., the previously omitted word an is included in the Note. For convenience, Attachments 1 and 2 contain all the TS pages included in the original request.

The addition of the word an does not change the intent of the Note but is a grammatical improvement.

This is a typographical correction.

Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation Revised Proposed Changes (Mark-Up)

Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2 HATCH UNIT 1 3.3-21 Amendment No. 266 3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.

APPLICABILITY:

7+(50$/32:(5% RTP.

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One feedwater and main turbine high water level trip channel inoperable.

A.1 Place channel in trip.

7 days B.

Two or more feedwater and main turbine high water level trip channels inoperable.

B.1 Restore feedwater and main turbine high water level trip capability.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C.

Required Action and associated Completion Time not met.

C.1


NOTE-----------

Only applicable if inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.

Remove affected feedwater pump(s) and main turbine valve(s) from service.

OR C.2 Reduce THERMAL POWER to < 24% RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-28 Amendment No. 266 3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1

a.

Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1.

Turbine Stop Valve (TSV) - Closure; and

2.

Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.

OR

b.

LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.

APPLICABILITY:

THERMAL 32:(5573

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required channels inoperable.

A.1 Restore channel to OPERABLE status.

OR A.2


NOTE------------

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours (continued)

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-29 Amendment No. 266 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

One or more Functions with EOC-RPT trip capability not maintained.

AND MCPR limit for inoperable EOC-RPT not made applicable.

B.1 Restore EOC-RPT trip capability.

OR B.2 Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2 hours C.

Required Action and associated Completion Time not met.

C.1


NOTE------------

Only applicable if inoperable channel is the result of an inoperable RPT breaker.

Remove the associated affected recirculation pump from service.

OR C.2 Reduce THERMAL POWER to < 27.6%

RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Program (continued)

ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 1 3.3-32 Amendment No. 266 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Both Functions with ATWS-RPT trip capability not maintained.

C.1 Restore ATWS-RPT trip capability for one Function.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D.

Required Action and associated Completion Time not met.

D.1


NOTE------------

Only applicable if inoperable channel is the result of an inoperable RPT breaker.

Remove the associated affected recirculation pump from service.

OR D.2 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 6 hours SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program (continued)

Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2 HATCH UNIT 2 3.3-21 Amendment No. 210 3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.

APPLICABILITY:

7+(50$/32:(5 24% RTP.

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One feedwater and main turbine high water level trip channel inoperable.

A.1 Place channel in trip.

7 days B.

Two or more feedwater and main turbine high water level trip channels inoperable.

B.1 Restore feedwater and main turbine high water level trip capability.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C.

Required Action and associated Completion Time not met.

C.1


NOTE-----------

Only applicable if inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.

Remove affected feedwater pump(s) and main turbine valve(s) from service.

OR C.2 Reduce THERMAL POWER to < 24% RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-28 Amendment No. 210 3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1

a.

Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1.

Turbine Stop Valve (TSV) - Closure; and

2.

Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.

OR

b.

LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.

APPLICABILITY:

7+(50$/32:(5 27.6% RTP.

ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required channels inoperable.

A.1 Restore channel to OPERABLE status.

OR A.2


NOTE-----------

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours (continued)

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-29 Amendment No. 210 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

One or more Functions with EOC-RPT trip capability not maintained.

AND MCPR limit for inoperable EOC-RPT not made applicable.

B.1 Restore EOC-RPT trip capability.

OR B.2 Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2 hours C.

Required Action and associated Completion Time not met.

C.1


NOTE------------

Only applicable if inoperable channel is the result of an inoperable RPT breaker.

Remove the associated affected recirculation pump from service.

OR C.2 Reduce THERMAL POWER to < 27.6%

RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Program (continued)

ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 2 3.3-32 Amendment No. 210 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Both Functions with ATWS-RPT trip capability not maintained.

C.1 Restore ATWS-RPT trip capability for one Function.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D.

Required Action and associated Completion Time not met.

D.1


NOTE------------

Only applicable if inoperable channel is the result of an inoperable RPT breaker.

Remove the associated affected recirculation pump from service.

OR D.2 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 6 hours SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program (continued)

Edwin I. Hatch Nuclear Plant - Units 1 and 2 Supplement to License Amendment Request: Revise Technical Specifications to Adopt TSTF-227, Revision to EOC-RPT Pump Actions and TSTF-297, Enhancements to Required Actions for Feedwater and Main Turbine High Water Level Trip Instrumentation, EOC-RPT Instrumentation, and ATWS-RPT Instrumentation Revised Technical Specifications Pages

Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2 HATCH UNIT 1 3.3-21 Amendment No.

3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.

APPLICABILITY:

7+(50$/32:(5% RTP.

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One feedwater and main turbine high water level trip channel inoperable.

A.1 Place channel in trip.

7 days B.

Two or more feedwater and main turbine high water level trip channels inoperable.

B.1 Restore feedwater and main turbine high water level trip capability.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C.

Required Action and associated Completion Time not met.

C.1


NOTE-----------

Only applicable if inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.

Remove affected feedwater pump(s) and main turbine valve(s) from service.

OR C.2 Reduce THERMAL POWER to < 24% RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-28 Amendment No.

3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1

a.

Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1.

Turbine Stop Valve (TSV) - Closure; and

2.

Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.

OR

b.

LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.

APPLICABILITY:

7+(50$/32:(5573

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required channels inoperable.

A.1 Restore channel to OPERABLE status.

OR A.2


NOTE------------

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours (continued)

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-29 Amendment No.

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

One or more Functions with EOC-RPT trip capability not maintained.

AND MCPR limit for inoperable EOC-RPT not made applicable.

B.1 Restore EOC-RPT trip capability.

OR B.2 Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2 hours C.

Required Action and associated Completion Time not met.

C.1


NOTE------------

Only applicable if inoperable channel is the result of an inoperable RPT breaker.

Remove the affected recirculation pump from service.

OR C.2 Reduce THERMAL POWER to < 27.6%

RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Program (continued)

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 1 3.3-30 Amendment No.

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.4.1.2 Verify TSV - Closure and TCV Fast Closure, Trip Oil Pressure - Low Functions are not bypassed ZKHQ7+(50$/32:(5LV573

In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.3 Perform CHANNEL CALIBRATION. The Allowable Values shall be:

TSV - &ORVXUHFORVHGDQG TCV Fast Closure, Trip Oil Pressure - /RZSVLJ

In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.5


NOTE------------------------------

Breaker interruption time may be assumed from the most recent performance of SR 3.3.4.1.6.

Verify the EOC-RPT SYSTEM RESPONSE TIME is within limits.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.6 Determine RPT breaker interruption time.

In accordance with the Surveillance Frequency Control Program

ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 1 3.3-32 Amendment No.

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Both Functions with ATWS-RPT trip capability not maintained.

C.1 Restore ATWS-RPT trip capability for one Function.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D.

Required Action and associated Completion Time not met.

D.1


NOTE------------

Only applicable if inoperable channel is the result of an inoperable RPT breaker.

Remove the affected recirculation pump from service.

OR D.2 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 6 hours SURVEILLANCE REQUIREMENTS


NOTE------------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program (continued)

ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 1 3.3-33 Amendment No.

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The Allowable Values shall be:

a.

Reactor Vessel Water Level -

ATWS-537/HYHO-73 inches; and

b.

Reactor Steam Dome Pressure -

+LJKSVLJ

In accordance with the Surveillance Frequency Control Program SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation.

In accordance with the Surveillance Frequency Control Program

Feedwater and Main Turbine Trip High Water Level Instrumentation 3.3.2.2 HATCH UNIT 2 3.3-21 Amendment No.

3.3 INSTRUMENTATION 3.3.2.2 Feedwater and Main Turbine Trip High Water Level Instrumentation LCO 3.3.2.2 Three channels of feedwater and main turbine trip instrumentation shall be OPERABLE.

APPLICABILITY:

7+(50$/32:(5 24% RTP.

ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One feedwater and main turbine high water level trip channel inoperable.

A.1 Place channel in trip.

7 days B.

Two or more feedwater and main turbine high water level trip channels inoperable.

B.1 Restore feedwater and main turbine high water level trip capability.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C.

Required Action and associated Completion Time not met.

C.1


NOTE-----------

Only applicable if inoperable channel is the result of an inoperable feedwater pump valve or main turbine stop valve.

Remove affected feedwater pump(s) and main turbine valve(s) from service.

OR C.2 Reduce THERMAL POWER to < 24% RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-28 Amendment No.

3.3 INSTRUMENTATION 3.3.4.1 End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation LCO 3.3.4.1

a.

Two channels per trip system for each EOC-RPT instrumentation Function listed below shall be OPERABLE:

1.

Turbine Stop Valve (TSV) - Closure; and

2.

Turbine Control Valve (TCV) Fast Closure, Trip Oil Pressure - Low.

OR

b.

LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for inoperable EOC-RPT as specified in the COLR are made applicable.

APPLICABILITY:

7+(50$/32:(5 27.6% RTP.

ACTIONS


NOTE----------------------------------------------------------

Separate Condition entry is allowed for each channel.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required channels inoperable.

A.1 Restore channel to OPERABLE status.

OR A.2


NOTE-----------

Not applicable if inoperable channel is the result of an inoperable breaker.

Place channel in trip.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours (continued)

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-29 Amendment No.

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

One or more Functions with EOC-RPT trip capability not maintained.

AND MCPR limit for inoperable EOC-RPT not made applicable.

B.1 Restore EOC-RPT trip capability.

OR B.2 Apply the MCPR limit for inoperable EOC-RPT as specified in the COLR.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 2 hours C.

Required Action and associated Completion Time not met.

C.1


NOTE------------

Only applicable if inoperable channel is the result of an inoperable RPT breaker.

Remove the affected recirculation pump from service.

OR C.2 Reduce THERMAL POWER to < 27.6%

RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains EOC-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.1.1 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Program (continued)

EOC-RPT Instrumentation 3.3.4.1 HATCH UNIT 2 3.3-30 Amendment No.

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.4.1.2 Verify TSV - Closure and TCV Fast Closure, Trip Oil Pressure - Low Functions are not bypassed ZKHQ7+(50$/32:(5LV 27.6% RTP.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.3 Perform CHANNEL CALIBRATION. The Allowable Values shall be:

TSV - &ORVXUH 10% closed; and TCV Fast Closure, Trip Oil Pressure - /RZ 600 psig.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.4 Perform LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.5


NOTE-------------------------------

Breaker interruption time may be assumed from the most recent performance of SR 3.3.4.1.6.

Verify the EOC-RPT SYSTEM RESPONSE TIME is within limits.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.1.6 Determine RPT breaker interruption time.

In accordance with the Surveillance Frequency Control Program

ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 2 3.3-32 Amendment No.

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Both Functions with ATWS-RPT trip capability not maintained.

C.1 Restore ATWS-RPT trip capability for one Function.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> D.

Required Action and associated Completion Time not met.

D.1


NOTE------------

Only applicable if inoperable channel is the result of an inoperable RPT breaker.

Remove the affected recirculation pump from service.

OR D.2 Be in MODE 2.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 6 hours SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the associated Function maintains ATWS-RPT trip capability.

SURVEILLANCE FREQUENCY SR 3.3.4.2.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program (continued)

ATWS-RPT Instrumentation 3.3.4.2 HATCH UNIT 2 3.3-33 Amendment No.

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.4.2.2 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.2.3 Perform CHANNEL CALIBRATION. The Allowable Values shall be:

a.

Reactor Vessel Water Level -

ATWS-537/HYHO -73 inches; and

b.

Reactor Steam Dome Pressure -

+LJK 1175 psig.

In accordance with the Surveillance Frequency Control Program SR 3.3.4.2.4 Perform LOGIC SYSTEM FUNCTIONAL TEST including breaker actuation.

In accordance with the Surveillance Frequency Control Program