ML22270A237: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Form 5.1-1 Postexamination Check Sheet
{{#Wiki_filter:ES-5.1, Page 8 of 20 Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility:
 
Dates of Examination:
Postexamination Check Sheet
Activity Description Date Complete 1.
 
*Received postexamination package from facility licensee and verified complete. (ES-4.4) 2.
Facility: Dates of Examination:
*Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 3.
 
*Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
Activity Description Date Complete
(ES-3.6) 4.
: 1. *Received postexamination package from facility licensee and 08/22/2022 verified complete. (ES-4.4)
*Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 5.
: 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination N/A completed. (ES-4.4)
Completed licensing official review.
: 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed. N/A (ES-3.6)
6.
: 4. *Completed NRC chief examiner review of operating test and written 08/23/2022 examination grading. (ES-3.6 and ES-4.4)
Mailed licenses, preliminary results, and pass letters.
: 5. Completed licensing official review. 08/25/2022
7.
: 6. Mailed licenses, preliminary results, and pass letters. 08/25/2022
Notified facility licensee of results.
: 7. Notified facility licensee of results. 08/26/2022
8.
: 8. Issued the examination report (refer to Operator Licensing Manual 08/31/2022 Chapter (OLMC) 510, Operator Licensing Examination Reports).
Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
: 9. Returned reference material after final resolution of any informal N/A NRC staff reviews, hearing demands, or both.
9.
: 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and 09/26/2022 Management Directive 3.53, NRC Records and Document Management Program).
Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
: 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
* Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.
* Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.
 
08/22/2022 N/A N/A 08/25/2022 08/23/2022 08/25/2022 08/26/2022 08/31/2022 N/A 09/26/2022}}
ES-5.1, Page 8 of 20}}

Latest revision as of 16:39, 27 November 2024

Form 5.1-1 Post Exam Checklist
ML22270A237
Person / Time
Site: Prairie Island  
(DPR-042, DPR-060)
Issue date: 09/26/2022
From: Jim Nance
Division of Operating Reactors
To:
Xcel Energy
Nance J
Shared Package
ML21188A222 List:
References
Download: ML22270A237 (274)


Text

ES-5.1, Page 8 of 20 Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility:

Dates of Examination:

Activity Description Date Complete 1.

  • Received postexamination package from facility licensee and verified complete. (ES-4.4) 2.
  • Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4) 3.
  • Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.

(ES-3.6) 4.

  • Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 5.

Completed licensing official review.

6.

Mailed licenses, preliminary results, and pass letters.

7.

Notified facility licensee of results.

8.

Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).

9.

Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.

10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
  • Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.

08/22/2022 N/A N/A 08/25/2022 08/23/2022 08/25/2022 08/26/2022 08/31/2022 N/A 09/26/2022