BW240003, Regulatory Commitment Change Summary Report: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:w,,* Constellation., | {{#Wiki_filter:w,,* | ||
Constellation., | |||
February 09, 2024 BW240003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Constellation Energy Generation, LLC (CEG) | |||
Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 www.constellationenergy.com Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457, and 72-73 | |||
February 09, 2024 BW240003 | |||
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | |||
Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457, and 72-73 | |||
==Subject:== | ==Subject:== | ||
Regulatory Commitment Change Summary Report | Regulatory Commitment Change Summary Report The purpose of this report is to provide the Constellation Energy Generation, LLC (CEG) | ||
"Regulatory Commitment Change Summary Report" for Braidwood Station for commitment changes approved during the period from January 1, 2023 through December 31, 2023. | |||
The purpose of this report is to provide the Constellation Energy Generation, LLC (CEG) | |||
Commitment changes are processed in accordance with Nuclear Energy lnstitute's (NEI) 99-04, Revision 0, "Guidelines for Managing NRC Commitment Changes," dated July 1999 and associated implementing procedures. For the period from January 1, 2023 through December 31, 2023 there were no commitment changes processed in accordance with NEI 99-04, Revision O and associated implementing procedures requiring NRC notification. | Commitment changes are processed in accordance with Nuclear Energy lnstitute's (NEI) 99-04, Revision 0, "Guidelines for Managing NRC Commitment Changes," dated July 1999 and associated implementing procedures. For the period from January 1, 2023 through December 31, 2023 there were no commitment changes processed in accordance with NEI 99-04, Revision O and associated implementing procedures requiring NRC notification. | ||
Should you have any questions concerning this report, please contact Mr. Dane Brunswick, Regulatory Assurance Manager, at (815) 417-2800. | Should you have any questions concerning this report, please contact Mr. Dane Brunswick, Regulatory Assurance Manager, at (815) 417-2800. | ||
Respectfully, | |||
Respectfully, Gugle, Digitally signed by Gugle,Greg G Date: 2024.02.09 reg os,49,21 -06*00* | : Gugle, Digitally signed by Gugle,Greg G | ||
Gregory Gugle Site Vice President Braidwood Station | Date: 2024.02.09 reg os,49,21 -06*00* | ||
Gregory Gugle Site Vice President Braidwood Station cc: | |||
cc: NRC Regional Administrator, Region Ill NRR Project Manager - Braidwood Station NRC Senior Resident Inspector, Braidwood Station Illinois Emergency Management Agency - Division of Nuclear Safety}} | NRC Regional Administrator, Region Ill NRR Project Manager - Braidwood Station NRC Senior Resident Inspector, Braidwood Station Illinois Emergency Management Agency - Division of Nuclear Safety}} | ||
Latest revision as of 21:26, 24 November 2024
| ML24040A061 | |
| Person / Time | |
|---|---|
| Site: | Braidwood (NPF-072, NPF-077) |
| Issue date: | 02/09/2024 |
| From: | Gugle G Constellation Energy Generation |
| To: | Document Control Desk |
| References | |
| BW240003 | |
| Download: ML24040A061 (1) | |
Text
w,,*
Constellation.,
February 09, 2024 BW240003 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Units 1 and 2 Constellation Energy Generation, LLC (CEG)
Braidwood Station 35100 South Route 53, Suite 84 Braceville, IL 60407-9619 www.constellationenergy.com Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457, and 72-73
Subject:
Regulatory Commitment Change Summary Report The purpose of this report is to provide the Constellation Energy Generation, LLC (CEG)
"Regulatory Commitment Change Summary Report" for Braidwood Station for commitment changes approved during the period from January 1, 2023 through December 31, 2023.
Commitment changes are processed in accordance with Nuclear Energy lnstitute's (NEI) 99-04, Revision 0, "Guidelines for Managing NRC Commitment Changes," dated July 1999 and associated implementing procedures. For the period from January 1, 2023 through December 31, 2023 there were no commitment changes processed in accordance with NEI 99-04, Revision O and associated implementing procedures requiring NRC notification.
Should you have any questions concerning this report, please contact Mr. Dane Brunswick, Regulatory Assurance Manager, at (815) 417-2800.
Respectfully,
- Gugle, Digitally signed by Gugle,Greg G
Date: 2024.02.09 reg os,49,21 -06*00*
Gregory Gugle Site Vice President Braidwood Station cc:
NRC Regional Administrator, Region Ill NRR Project Manager - Braidwood Station NRC Senior Resident Inspector, Braidwood Station Illinois Emergency Management Agency - Division of Nuclear Safety