{{#Wiki_filter:October 3, 2022
{{#Wiki_filter:October 3, 2022
Mr. Brad Kapellas, Site Vice President
Mr. Brad Kapellas, Site Vice President
Entergy Operations, Inc.
Entergy Operations, Inc.
Line 23: Line 24:
P.O. Box 756
P.O. Box 756
Port Gibson, MS 39150
Port Gibson, MS 39150
SUBJECT:         GRAND GULF NUCLEAR STATION - NOTIFICATION OF COMMERCIAL
 
                GRADE DEDICATION INSPECTION 05000416/2023011 AND REQUEST FOR
SUBJECT:     GRAND GULF NUCLEAR STATION - NOTIFICATION OF COMMERCIAL
                INFORMATION
              GRADE DEDICATION INSPECTION 05000416/2023011 AND REQUEST FOR
              INFORMATION
 
Dear Mr. Kapellas:
Dear Mr. Kapellas:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct the commercial grade dedication baseline inspection at Grand Gulf Nuclear Station,
will conduct the commercial grade dedication baseline inspection at Grand Gulf Nuclear Station,
beginning on January 30, 2023. The inspection team will be composed of personnel from the
beginning on January 30, 2023. The inspection team will be composed of personnel from the
NRC Region IV office. The inspection will be conducted in accordance with NRC inspection
NRC Region IV office. The inspection will be conducted in accordance with NRC inspection
procedure (IP) 71111.21N.03, Commercial Grade Dedication, dated June 28, 2022.
procedure (IP) 71111.21N.03, Commercial Grade Dedication, dated June 28, 2022.
The inspection will evaluate the implementation of Grand Gulf Nuclear Station process for
The inspection will evaluate the implementation of Grand Gulf Nuclear Station process for
dedicating commercial-grade items, as required in applicable portions of Appendix B to Title 10
dedicating commercial-grade items, as required in applicable portions of Appendix B to Title 10
of the Code of Federal Regulations (10 CFR) Part 50 (Appendix B), to ensure reasonable
of the Code of Federal Regulations (10 CFR) Part 50 (Appendix B), to ensure reasonable
assurance is provided that these items will perform their intended safety function. Additionally,
assurance is provided that these items will perform their intended safety function. Additionally,
this inspection will evaluate implementation of Grand Gulf Nuclear Stations procurement
this inspection will evaluate implementation of Grand Gulf Nuclear Stations procurement
process for safety-related components, as required in Appendix B.
process for safety-related components, as required in Appendix B.
The inspection will include an onsite information gathering visit by the team lead and two weeks
The inspection will include an onsite information gathering visit by the team lead and two weeks
of onsite inspection by the team. The schedule for the inspection is as follows:
of onsite inspection by the team. The schedule for the inspection is as follows:
      Onsite Information Gathering Visit: December 5 - 8, 2022
 
      Onsite Inspection Weeks: January 30 - February 3, 2023, and February 13 - 17, 2023
    Onsite Information Gathering Visit: December 5 - 8, 2022
    Onsite Inspection Weeks: January 30 - February 3, 2023, and February 13 - 17, 2023
 
The purpose of the information gathering visit is to meet with members of your staff to become
The purpose of the information gathering visit is to meet with members of your staff to become
familiar with the process for dedicating commercial-grade items and the process for procuring
familiar with the process for dedicating commercial-grade items and the process for procuring
safety-related components at Grand Gulf Nuclear Station. This visit may include a tour of onsite
safety-related components at Grand Gulf Nuclear Station. This visit may include a tour of onsite
commercial-grade item dedication facilities, receipt inspection facilities, storage facilities, and
commercial-grade item dedication facilities, receipt inspection facilities, storage facilities, and
installed plant components associated with potential inspection samples. The team lead will
installed plant components associated with potential inspection samples. The team lead will
also discuss inspection support administrative details such as office space size and location,
also discuss inspection support administrative details such as office space size and location,
specific documents to be made available, arrangements for reactor site access, and the
specific documents to be made available, arrangements for reactor site access, and the
availability of knowledgeable plant staff and licensing organization personnel to serve as points
availability of knowledgeable plant staff and licensing organization personnel to serve as points
of contact during the inspection. Finally, the team lead will review an initial set of documents,
of contact during the inspection. Finally, the team lead will review an initial set of documents,
which are requested in Enclosure 1, to select potential inspection samples.
which are requested in Enclosure 1, to select potential inspection samples.
B. Kapellas
B. Kapellas
The team lead will contact Mr. T. R. Jones of your Regulatory Assurance organization with a
2The team lead will contact Mr. T. R. Jones of your Regulatory Assurance organization with a  
final list of inspection samples. For the selected samples, the team will review an additional set
final list of inspection samples. For the selected samples, the team will review an additional set  
of documents, which are requested in Enclosure 2, during the in-office preparation week and
of documents, which are requested in Enclosure 2, during the in-office preparation week and  
throughout the conduct of the inspection. Also, personnel who are knowledgeable about
throughout the conduct of the inspection. Also, personnel who are knowledgeable about  
dedicating commercial-grade items, procuring safety-related components, and performing
dedicating commercial-grade items, procuring safety-related components, and performing  
receipt inspection and storage activities should be available during the inspection. Additional
receipt inspection and storage activities should be available during the inspection. Additional  
information requests, interviews with your staff, and/or walkdowns of facilities or installed plant
information requests, interviews with your staff, and/or walkdowns of facilities or installed plant  
components will be made by the team throughout the inspection to complete their review of the
components will be made by the team throughout the inspection to complete their review of the  
inspection samples. Finally, it is important that all documentation provided to the team is up-to-
inspection samples. Finally, it is important that all documentation provided to the team is up-to-
date and complete to minimize the number of additional documents requested during the
date and complete to minimize the number of additional documents requested during the  
preparation and/or the onsite portions of the inspection.
preparation and/or the onsite portions of the inspection.
If there are any questions about the inspection or the requested materials, please contact the
If there are any questions about the inspection or the requested materials, please contact the  
team lead, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.
team lead, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.
Additional contact information for the inspection team is found in Enclosure 3.
Additional contact information for the inspection team is found in Enclosure 3.
PAPERWORK REDUCTION ACT STATEMENT
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
This letter contains mandatory information collections that are subject to the Paperwork  
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)  
approved these information collections (approval number 3150-0011). Send comments
approved these information collections (approval number 3150-0011). Send comments  
regarding this information collection to the Information Services Branch, Office of the Chief
regarding this information collection to the Information Services Branch, Office of the Chief  
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC  
20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of
20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of  
Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and  
Budget, Washington, DC 20503.
Budget, Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request  
for information or an information collection requirement unless the requesting document
for information or an information collection requirement unless the requesting document  
displays a currently valid OMB control number.
displays a currently valid OMB control number.
This letter, its enclosure, and your response (if any) will be made available for public inspection
This letter, its enclosure, and your response (if any) will be made available for public inspection  
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document  
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public  
Inspections, Exemptions, Requests for Withholding.
Inspections, Exemptions, Requests for Withholding.
                                              Sincerely,
Sincerely,
                                                                      Signed by Gaddy, Vincent
Vincent G. Gaddy, Chief
                                                                      on 10/03/22
Engineering Branch 1
                                              Vincent G. Gaddy, Chief
Division of Operating Reactor Safety
                                              Engineering Branch 1
Signed by Gaddy, Vincent
                                              Division of Operating Reactor Safety
on 10/03/22
                                                  2


B. Kapellas
B. Kapellas
Docket No. 05000416
 
License No. NPF-29
 
Docket No. 05000416
License No. NPF-29
 
Enclosures:
Enclosures:
    1. Documents Requested for Information Gathering Visit
  1. Documents Requested for Information Gathering Visit
    2. Documents Requested for Inspection
  2. Documents Requested for Inspection
    3. Inspection Team Contact Information
  3. Inspection Team Contact Information
cc w/ encl: Distribution via LISTSERV
 
                                            3
cc w/ encl: Distribution via LISTSERV
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


                                            3


  ML22271A857
  ML22271A857
                                X     Non-Sensitive                     X     Publicly Available
                        X   Non-Sensitive                 X   Publicly Available
  X    SUNSI Review
  X    SUNSI Review
                                      Sensitive                               Non-Publicly Available
                            Sensitive                       Non-Publicly Available
  OFFICE DORS: EB1                 DORS: EB1
 
  NAME     WSifre                 VGsddy
  OFFICE DORS: EB1         DORS: EB1
  DATE     9/28/2022             10//2022
 
                                       
  NAME   WSifre             VGsddy
                                                Enclosure 1
  DATE   9/28/2022         10//2022
                        Documents Requested for Information Gathering Visit
 
 
 
                             
                                          Enclosure 1
 
                    Documents Requested for Information Gathering Visit
 
 
The documents and information requested below should generally be made available to the
The documents and information requested below should generally be made available to the
inspection team for the team's use both on-site and off-site during the information gathering
inspection team for the team's use both on-site and off-site during the information gathering
visit. Electronic format is the preferred media. If electronic media is made available via an
visit. Electronic format is the preferred media. If electronic media is made available via an
internet based remote document management system, then the remote document access must
internet based remote document management system, then the remote document access must
allow inspectors to download, save, and print the documents in the NRC's regional office.
allow inspectors to download, save, and print the documents in the NRC's regional office.
Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of
Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of
the inspection, the documents in the team's possession will not be retained.
the inspection, the documents in the team's possession will not be retained.
This document request is based on typical documents that a generic plant might have. As such,
 
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below.
titles listed below. We also request that the information provided be sorted by the list below.
 
Documents requested by November 28, 2022:
Documents requested by November 28, 2022:
    1.      Licensing basis documents such as the updated final safety analysis report and
              technical specifications.
    2.      Procedures for dedicating commercial-grade items and for procurement of safety-
              related components.
    3.      List of items commercial-grade items, with brief description of application, that have
              been dedicated for safety-related applications. These items may be dedicated by
              Grand Gulf Nuclear Station, dedicated by a vendor (or other licensee), and procured
              by Grand Gulf Nuclear Station. Please note whether the item has been installed in
              the plant. The list should encompass the past six years of dedication activities.
    4.      List of components procured as safety-related, with brief description of application, if
              not included above. Please note whether the item has been installed in the plant.
              The list should encompass the past six years of procurement activities.
    5.      List of corrective action program documents, with brief description of application,
              related to commercial-grade items, procurement, storage, and/or items that failed
              after completing the dedication process. The list should encompass the past six
              years of these activities.
    6.      List of systems, system numbers/designators, and corresponding names.
    7.      List of site contacts that will be associated with the inspection.
                                                                                            Enclosure


                                            Enclosure 2
  1.        Licensing basis documents such as the updated final safety analysis report and
                                Documents Requested for Inspection
          technical specifications.
 
  2.        Procedures for dedicating commercial-grade items and for procurement of safety-
          related components.
 
  3.        List of items commercial-grade items, with brief description of application, that have
          been dedicated for safety-related applications.  These items may be dedicated by
          Grand Gulf Nuclear Station, dedicated by a vendor (or other licensee), and procured
          by Grand Gulf Nuclear Station.  Please note whether the item has been installed in
          the plant.  The list should encompass the past six years of dedication activities.
 
  4.        List of components procured as safety-related, with brief description of application, if
          not included above.  Please note whether the item has been installed in the plant.
          The list should encompass the past six years of procurement activities.
 
  5.        List of corrective action program documents, with brief description of application,
          related to commercial-grade items, procurement, storage, and/or items that failed
          after completing the dedication process.  The list should encompass the past six
          years of these activities.
 
  6.        List of systems, system numbers/designators, and corresponding names.
 
  7.        List of site contacts that will be associated with the inspection.
 
 
 
 
 
 
 
 
 
                                                                                      Enclosure
                                          Enclosure 2
 
                            Documents Requested for Inspection
 
 
For the samples identified by the team lead, the documents and information requested below
For the samples identified by the team lead, the documents and information requested below
should generally be made available to the inspection team for the team's use both on-site and
should generally be made available to the inspection team for the team's use both on-site and
off-site during the inspection. Electronic format is the preferred media. If electronic media is
off-site during the inspection. Electronic format is the preferred media. If electronic media is
made available via an internet based remote document management system, then the remote
made available via an internet based remote document management system, then the remote
document access must allow inspectors to download, save, and print the documents in the
document access must allow inspectors to download, save, and print the documents in the
NRC's regional office. Electronic media on compact disc or paper records (hard copy) are
NRC's regional office. Electronic media on compact disc or paper records (hard copy) are
acceptable. At the end of the inspection, the documents in the team's possession will not be
acceptable. At the end of the inspection, the documents in the team's possession will not be
retained.
retained.
This document request is based on typical documents that a generic plant might have. As such,
This document request is based on typical documents that a generic plant might have. As such,
this document request is not meant to imply that any specific plant is required to have all of the
this document request is not meant to imply that any specific plant is required to have all of the
listed documents. In addition, your plant specific document titles may vary from the document
listed documents. In addition, your plant specific document titles may vary from the document
titles listed below. We also request that the information provided be sorted by the list below for
titles listed below. We also request that the information provided be sorted by the list below for
each sample.
each sample.
Documents requested by January 23, 2023:
Documents requested by January 23, 2023:
    1.      Purchase requisition and purchase orders.
    2.      Other pertinent vendor/licensee correspondence.
    3.      Original and updated design specifications.
    4.      Catalog specifications.
    5.      Procurement basis evaluation such as like-for-like, equivalency, plant design change
              packages, drawing and specification updates.
    6.      10 CFR 50.59 documentation, if required.
    7.      Material receiving reports, packing lists/invoices, and other shipping documents.
    8.      Receipt inspection reports and any related test reports.
    9.      Other documents to trace the item from the time it was dedicated to the time it was
              installed, tested, and accepted.
    10.      Certificates of conformance/compliance/quality.
    11.      Vendor test and inspection reports.
    12.      Third-party or sub vendor test and inspection reports.
    13.      Shelf-life information.
    14.      Vendor dedication/partial dedication information.
                                                    2


15. Design/material/process change history information.
  1.        Purchase requisition and purchase orders.
16. Completed commercial-grade dedication document including safety classification,
 
    identification of safety functions/application requirements, identification of critical
  2.        Other pertinent vendor/licensee correspondence.
    characteristics, identification of verification methods and acceptance criteria for the
 
    critical characteristics, evaluation of credible failure modes, if applicable, and
  3.        Original and updated design specifications.
    identification of the suppliers quality assurance program that meets 10 CFR Part 50,
 
    Appendix B.
  4.        Catalog specifications.
17. Any deviation from design, material, and performance characteristics relevant to the
 
    safety function (nonconformance dispositions).
  5.        Procurement basis evaluation such as like-for-like, equivalency, plant design change
18. Documents showing objective evidence such as special test and inspection
          packages, drawing and specification updates.
    procedures and results, commercial-grade survey reports -item, design, material,
 
    and specific performance characteristic (relevant to safety function), and source
  6.        10 CFR 50.59 documentation, if required.
    inspection reports.
 
19. Completed post-installation test procedure and results.
  7.        Material receiving reports, packing lists/invoices, and other shipping documents.
20. Completed stock or material issue forms and installation work orders or reports.
 
21. Historical performance information.
  8.        Receipt inspection reports and any related test reports.
                                            3
 
  9.        Other documents to trace the item from the time it was dedicated to the time it was
          installed, tested, and accepted.
 
  10.      Certificates of conformance/compliance/quality.
 
  11.      Vendor test and inspection reports.
 
  12.      Third-party or sub vendor test and inspection reports.
 
  13.      Shelf-life information.
 
  14.      Vendor dedication/partial dedication information.
 
                                                2
15.     Design/material/process change history information.
 
16.     Completed commercial-grade dedication document including safety classification,
      identification of safety functions/application requirements, identification of critical
      characteristics, identification of verification methods and acceptance criteria for the
      critical characteristics, evaluation of credible failure modes, if applicable, and
      identification of the suppliers quality assurance program that meets 10 CFR Part 50,
      Appendix B.
 
17.     Any deviation from design, material, and performance characteristics relevant to the
      safety function (nonconformance dispositions).
 
18.     Documents showing objective evidence such as special test and inspection
      procedures and results, commercial-grade survey reports -item, design, material,
      and specific performance characteristic (relevant to safety function), and source
      inspection reports.
 
19.     Completed post-installation test procedure and results.
 
20.     Completed stock or material issue forms and installation work orders or reports.
 
21.     Historical performance information.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                            3
                                    Enclosure 3
 
                        Inspection Team Contact Information
 
 
Wayne Sifre                Dustin Reinert              Fabian Thomas
Senior Reactor Inspector    Reactor Inspector            Reactor Inspector
817-200-1193                817-200-1534                817-200-1126
Wayne.Sifre@nrc.gov        Dustin.Reinert@nrc.gov      Fabian.Thomas@nrc.gov
 


                                      Enclosure 3
                          Inspection Team Contact Information
Wayne Sifre                  Dustin Reinert              Fabian Thomas
Senior Reactor Inspector    Reactor Inspector            Reactor Inspector
817-200-1193                817-200-1534                817-200-1126
Wayne.Sifre@nrc.gov          Dustin.Reinert@nrc.gov      Fabian.Thomas@nrc.gov
Mailing Address:
Mailing Address:
  U.S. NRC, Region IV
  U.S. NRC, Region IV
  Attn: Wayne Sifre
  Attn: Wayne Sifre
  1600 East Lamar Blvd.
  1600 East Lamar Blvd.
  Arlington, TX 76011-4511
  Arlington, TX 76011-4511
                                            4
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                          4
}}
}}

Revision as of 03:36, 16 November 2024

Notification of Commercial Grade Dedication Inspection (05000416/2023011) and Request for Information
ML22271A857
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/03/2022
From: Vincent Gaddy
NRC/RGN-IV/DORS/EB1
To: Kapellas B
Entergy Operations
Sifre W
References
IR 2023011
Download: ML22271A857 (8)


See also: IR 05000416/2023011

Text

October 3, 2022

Mr. Brad Kapellas, Site Vice President

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF COMMERCIAL

GRADE DEDICATION INSPECTION 05000416/2023011 AND REQUEST FOR

INFORMATION

Dear Mr. Kapellas:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff

will conduct the commercial grade dedication baseline inspection at Grand Gulf Nuclear Station,

beginning on January 30, 2023. The inspection team will be composed of personnel from the

NRC Region IV office. The inspection will be conducted in accordance with NRC inspection

procedure (IP) 71111.21N.03, Commercial Grade Dedication, dated June 28, 2022.

The inspection will evaluate the implementation of Grand Gulf Nuclear Station process for

dedicating commercial-grade items, as required in applicable portions of Appendix B to Title 10

of the Code of Federal Regulations (10 CFR) Part 50 (Appendix B), to ensure reasonable

assurance is provided that these items will perform their intended safety function. Additionally,

this inspection will evaluate implementation of Grand Gulf Nuclear Stations procurement

process for safety-related components, as required in Appendix B.

The inspection will include an onsite information gathering visit by the team lead and two weeks

of onsite inspection by the team. The schedule for the inspection is as follows:

Onsite Information Gathering Visit: December 5 - 8, 2022

Onsite Inspection Weeks: January 30 - February 3, 2023, and February 13 - 17, 2023

The purpose of the information gathering visit is to meet with members of your staff to become

familiar with the process for dedicating commercial-grade items and the process for procuring

safety-related components at Grand Gulf Nuclear Station. This visit may include a tour of onsite

commercial-grade item dedication facilities, receipt inspection facilities, storage facilities, and

installed plant components associated with potential inspection samples. The team lead will

also discuss inspection support administrative details such as office space size and location,

specific documents to be made available, arrangements for reactor site access, and the

availability of knowledgeable plant staff and licensing organization personnel to serve as points

of contact during the inspection. Finally, the team lead will review an initial set of documents,

which are requested in Enclosure 1, to select potential inspection samples.

B. Kapellas

2The team lead will contact Mr. T. R. Jones of your Regulatory Assurance organization with a

final list of inspection samples. For the selected samples, the team will review an additional set

of documents, which are requested in Enclosure 2, during the in-office preparation week and

throughout the conduct of the inspection. Also, personnel who are knowledgeable about

dedicating commercial-grade items, procuring safety-related components, and performing

receipt inspection and storage activities should be available during the inspection. Additional

information requests, interviews with your staff, and/or walkdowns of facilities or installed plant

components will be made by the team throughout the inspection to complete their review of the

inspection samples. Finally, it is important that all documentation provided to the team is up-to-

date and complete to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

If there are any questions about the inspection or the requested materials, please contact the

team lead, Wayne Sifre, by telephone at 817-200-1193 or by e-mail at Wayne.Sifre@nrc.gov.

Additional contact information for the inspection team is found in Enclosure 3.

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Vincent G. Gaddy, Chief

Engineering Branch 1

Division of Operating Reactor Safety

Signed by Gaddy, Vincent

on 10/03/22

B. Kapellas

Docket No. 05000416

License No. NPF-29

Enclosures:

1. Documents Requested for Information Gathering Visit

2. Documents Requested for Inspection

3. Inspection Team Contact Information

cc w/ encl: Distribution via LISTSERV

3

ML22271A857

X Non-Sensitive X Publicly Available

X SUNSI Review

Sensitive Non-Publicly Available

OFFICE DORS: EB1 DORS: EB1

NAME WSifre VGsddy

DATE 9/28/2022 10//2022

Enclosure 1

Documents Requested for Information Gathering Visit

The documents and information requested below should generally be made available to the

inspection team for the team's use both on-site and off-site during the information gathering

visit. Electronic format is the preferred media. If electronic media is made available via an

internet based remote document management system, then the remote document access must

allow inspectors to download, save, and print the documents in the NRC's regional office.

Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of

the inspection, the documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all of the

listed documents. In addition, your plant specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below.

Documents requested by November 28, 2022:

1. Licensing basis documents such as the updated final safety analysis report and

technical specifications.

2. Procedures for dedicating commercial-grade items and for procurement of safety-

related components.

3. List of items commercial-grade items, with brief description of application, that have

been dedicated for safety-related applications. These items may be dedicated by

Grand Gulf Nuclear Station, dedicated by a vendor (or other licensee), and procured

by Grand Gulf Nuclear Station. Please note whether the item has been installed in

the plant. The list should encompass the past six years of dedication activities.

4. List of components procured as safety-related, with brief description of application, if

not included above. Please note whether the item has been installed in the plant.

The list should encompass the past six years of procurement activities.

5. List of corrective action program documents, with brief description of application,

related to commercial-grade items, procurement, storage, and/or items that failed

after completing the dedication process. The list should encompass the past six

years of these activities.

6. List of systems, system numbers/designators, and corresponding names.

7. List of site contacts that will be associated with the inspection.

Enclosure

Enclosure 2

Documents Requested for Inspection

For the samples identified by the team lead, the documents and information requested below

should generally be made available to the inspection team for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media. If electronic media is

made available via an internet based remote document management system, then the remote

document access must allow inspectors to download, save, and print the documents in the

NRC's regional office. Electronic media on compact disc or paper records (hard copy) are

acceptable. At the end of the inspection, the documents in the team's possession will not be

retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all of the

listed documents. In addition, your plant specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below for

each sample.

Documents requested by January 23, 2023:

1. Purchase requisition and purchase orders.

2. Other pertinent vendor/licensee correspondence.

3. Original and updated design specifications.

4. Catalog specifications.

5. Procurement basis evaluation such as like-for-like, equivalency, plant design change

packages, drawing and specification updates.

6. 10 CFR 50.59 documentation, if required.

7. Material receiving reports, packing lists/invoices, and other shipping documents.

8. Receipt inspection reports and any related test reports.

9. Other documents to trace the item from the time it was dedicated to the time it was

installed, tested, and accepted.

10. Certificates of conformance/compliance/quality.

11. Vendor test and inspection reports.

12. Third-party or sub vendor test and inspection reports.

13. Shelf-life information.

14. Vendor dedication/partial dedication information.

2

15. Design/material/process change history information.

16. Completed commercial-grade dedication document including safety classification,

identification of safety functions/application requirements, identification of critical

characteristics, identification of verification methods and acceptance criteria for the

critical characteristics, evaluation of credible failure modes, if applicable, and

identification of the suppliers quality assurance program that meets 10 CFR Part 50,

Appendix B.

17. Any deviation from design, material, and performance characteristics relevant to the

safety function (nonconformance dispositions).

18. Documents showing objective evidence such as special test and inspection

procedures and results, commercial-grade survey reports -item, design, material,

and specific performance characteristic (relevant to safety function), and source

inspection reports.

19. Completed post-installation test procedure and results.

20. Completed stock or material issue forms and installation work orders or reports.

21. Historical performance information.

3

Enclosure 3

Inspection Team Contact Information

Wayne Sifre Dustin Reinert Fabian Thomas

Senior Reactor Inspector Reactor Inspector Reactor Inspector

817-200-1193 817-200-1534 817-200-1126

Wayne.Sifre@nrc.gov Dustin.Reinert@nrc.gov Fabian.Thomas@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Wayne Sifre

1600 East Lamar Blvd.

Arlington, TX 76011-4511

4