ML23150A189: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:EIP-ZZ-00245 ADDENDUM H | {{#Wiki_filter:EIP-ZZ- 00245 ADDENDUM H | ||
SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA | |||
==5.0 | ADMINISTRATIVE CORRECTION Revision 004 | ||
Page 1of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA | |||
TABLE OF CONTENTS Section Page Number | |||
1.0 PURPOSE........................................................................................................................................... 3 | |||
2.0 SCOPE................................................................................................................................................ 3 | |||
3.0 RESPONSIBILITIES........................................................................................................................ 3 | |||
4.0 PROCEDURE INSTRUCTIONS..................................................................................................... 3 | |||
==5.0 REFERENCES== | |||
................................................................................................................................... 3 5.1. Implementing........................................................................................................................... 3 5.2. Developmental......................................................................................................................... 3 | |||
6.0 RECORDS.......................................................................................................................................... 4 | |||
7.0 DEFINITIONS................................................................................................................................... 4 | |||
8.0 | |||
==SUMMARY== | ==SUMMARY== | ||
OF CHANGES ............................................................................................................. 4 SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA ........................................................................................................................... 5 Page | OF CHANGES............................................................................................................. 4 | ||
SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA........................................................................................................................... 5 | |||
Page 2of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA | |||
1.0 PURPOSE | |||
Provide guidance in the performance of the Security Coordinator position for Radiological Emergency Response Plan (RERP) events. | |||
2.0 SCOPE | |||
This procedure covers the Security Coordinator position. Other positions are covered in separate procedures. | |||
3.0 RESPONSIBILITIES | |||
Security Coordinator responsibilities are covered in the body of the main procedure,E IP -ZZ-00240, Technical Support Center Operations. | |||
4.0 PROCEDURE INSTRUCTIONS | |||
Security Coordinator procedural instructions are covered in the body of the main procedure, EIP-ZZ-00245, Alternate TSC/OSA Assembly Area Operations. | |||
==5.0 REFERENCES== | |||
5.1. Implementing | |||
5.1.1. EIP-ZZ-SK0001, Response to Security Events | |||
5.1.2. EIP-ZZ-00230, Accountability | |||
5.1.3. EIP-ZZ-00240, Technical Support Center Operations | |||
5.1.4. EIP-ZZ-00245, Alternate TSC/OSA Assembly Area Operations | |||
5.1.5. ODP-ZZ- 00001, Operations Department - Code of Conduct | |||
5.1.6. SDP-PI-RERP0, RERP | |||
5.2. Developmental | |||
5.2.1. Callaway Plant RERP | |||
EIP-ZZ-00245 ADDENDUM H Rev. 004 | Page 3of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 6.0 RECORDS | ||
This addendum becomes a record of the event and should be given to the Administrative Coordinator or Emergency Preparedness staff following the event. | |||
7.0 DEFINITIONS | |||
None | |||
8.0 | |||
==SUMMARY== | ==SUMMARY== | ||
OF CHANGES | OF CHANGES | ||
EIP-ZZ-00245 ADDENDUM H Rev. 004 SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA Sheet 1 of 4 Date: _____________ | Page(s) Section or Description Step Number Changes below generated by CR202302749 | ||
INITIATION NOTE Some items in this section are shared with other groups and may have already been completed. | |||
: 1. Initial entrance to the Alternate TSC/OSA Assembly Area: | 3 New 5.1.6 Added Reference to SDP-PI-RERP0, RERP | ||
: a. | |||
: b. | 5 Initiation Changed reference for performing sweep of OCA/EAB to SDP-PI-Step 5 RERP0, RERP. | ||
6 Operations Changed reference for performing sweep of OCA/EAB to SDP-PI-Step 9 RERP0, RERP. | |||
Page 4of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA Sheet 1 of 4 Date: _____________ Time: ___________ | |||
INITIATION | |||
NOTE | |||
Some items in this section are shared with other groups and may have already been completed. | |||
: 1. Initial entrance to the Alternate TSC /OSA Assembly Area: | |||
: a. SIGN IN on Facility Sign-in board. | |||
: b. CLIP ON Security Coordinator badge retrieved from the S ecurity Coordinator Packet. | |||
: 2. INITIATE Log sheet. | : 2. INITIATE Log sheet. | ||
: 3. Personnel Assessment: | : 3. Personnel Assessment: | ||
| Line 54: | Line 121: | ||
* CALL IN extra personnel as required. | * CALL IN extra personnel as required. | ||
: 4. STATION security officers at the Emergency Response Facilities entrances to log personnel ingress and egress. | : 4. STATION security officers at the Emergency Response Facilities entrances to log personnel ingress and egress. | ||
: 5. IF possible, ENSURE patrol(s) initiate a sweep of OCA/EAB at the ALERT classification per SDP-PI-RERP0, RERP. (Unbadged personnel are to evacuate the site unless authorized by EC or Security Coordinator.) | : 5. IF possible, ENSURE patrol(s) initiate a sweep of OCA/EAB at the ALERT classification per SDP - | ||
: 6. CONTACT Health Physics Coordinator (Radiation Protection Tech Support on back shift, ext. 66052 or (573)676-6052): | PI-RERP0, RERP. (Unbadged personnel are to evacuate the site unless authorized by EC or Security Coordinator.) | ||
: a. | : 6. CONTACT Health Physics Coordinator (Radiation Protection Tech Support on back shift,ext. 66052 or (573)676-6052): | ||
: a. REQUEST the following information: | |||
* Is there a Release Above Normal Operating Limits In Progress? YES / NO | * Is there a Release Above Normal Operating Limits In Progress? YES / NO | ||
* What is wind direction? From:________ TO: ________ | * What is wind direction? From:________ TO: ________ | ||
* What are the affected sectors? ________, ________, ________, ________ | * What are the affected sectors? ________, ________, ________, ________ | ||
: b. | : b. ENSURE SSS and OCA sweeps are briefed on this information. | ||
: 7. IF there is a release above normal operating limits in progress: | : 7. IF there is a release above normal operating limits in progress: | ||
* CONTACT SEMA. Normal hours (573) 751-2748, off-hours (573) 751-1000 (Troop F) and REQUEST activation of Hearnes Reception and Care Center. | * CONTACT SEMA. Normal hours (573) 751-2748, off-hours (573) 751-1000(Troop F) and REQUEST activation of Hearnes Reception and Care Center. | ||
* REFER to Operations Section | * REFER to Operations Section Step9. | ||
: 8. DISCUSS any additional support or supplies required with the Admin Coordinator. | : 8. DISCUSS any additional support or supplies required with the Admin Coordinator. | ||
EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area (Cont'd.) | -END OF SECTION- | ||
Sheet 2 of 4 OPERATIONS Steps in this Section should be frequently reviewed. | |||
NOTE If accident scenario carries past design basis accidents, SAMG and Emergency Coordinators Supplemental Guide are available as references. | Page 5of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area (Cont'd.) | ||
Sheet 2 of 4 | |||
OPERATIONS Steps in this Section should be frequently reviewed. | |||
NOTE | |||
If accident scenario carries past design basis accidents, SAMG and Emergency Coordinators Supplemental Guide are available as references. | |||
If a release above normal operating limits has occurred or is likely to occur, a radiological brief is required. | If a release above normal operating limits has occurred or is likely to occur, a radiological brief is required. | ||
: 1. | : 1. PERFORM the following: | ||
: a. | : a. CONDUCT normal and emergency security activities in accordance with the Security Plan. | ||
: b. | : b. IF the Security Plan can NOT be followed, OBTAIN authorization from EC to deviate (refer to ODP -ZZ- 00001, Operations Department - Code of Conduct ), in accordance with 10CFR50.54(x)(y) and INFORM ENS Communicator (1 hour NRC notification). | ||
: 2. | : 2. IF this is a Security related emergency, REFER to EIP -ZZ-SK0001, Response to Security Events. | ||
: 3. | : 3. ASSIST EC in Evacuation and Accountability per EIP -ZZ-00230, Accountability. | ||
: 4. | : 4. IF personnel are dispatched by you to another facility, INITIATE a follow up call in 15-20 minutes to ensure they arrive safely. | ||
: 5. | : 5. In the case of a release above normal operating limits. CONTACT HP Coordinator to determine the affected areas. IF Security is to be pulled back from their posts, CONSIDER requirements in Step1, Operations (above). | ||
: 6. | : 6. ENSURE Security Force has appropriate dosimetry by discussion with HPC. | ||
: 7. | : 7. COORDINATE plant access control. | ||
: 8. | : 8. CONTACT local law enforcement to coordinate traffic control (i.e. for evacuation routes). | ||
: 9. | : 9. IF possible, IF Site Evacuation is announced, ENSURE Patrol(s) initiate sweep of OCA/EAB per SDP-PI-RERP0, RERP, to ensure all personnel have left areas in question. | ||
NOTE Announcements are located in EIP-ZZ-00230, Attachment 3. | |||
: 10. | NOTE | ||
Announcements are located in EIP-ZZ-00230, Attachment 3. | |||
: 10. COORDINATE with HPC to determine which site evacuation announcement is to be used. | |||
EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area (Cont'd.) | Page 6of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area (Cont'd.) | ||
Sheet 3 of 4 NOTE Accountability is required within 30 minutes of declaring accountability | Sheet 3 of 4 | ||
NOTE | |||
Accountability is required within 30 minutes of declaring accountability | |||
: 11. COORDINATE personnel evacuation and accountability. | : 11. COORDINATE personnel evacuation and accountability. | ||
: 12. COORDINATE any off-site law enforcement agency involvement. | : 12. COORDINATE any off-site law enforcement agency involvement. | ||
-END OF SECTION- | |||
TURNOVER | |||
: 1. BRIEF incoming Security Coordinator of Plant, Facility and Security activities, transfer Security Coordinator badge, and review logs. | : 1. BRIEF incoming Security Coordinator of Plant, Facility and Security activities, transfer Security Coordinator badge, and review logs. | ||
: 2. INFORM Emergency Coordinator of turnover. | : 2. INFORM Emergency Coordinator of turnover. | ||
: 3. RECORD time turnover complete. _________________ | : 3. RECORD time turnover complete. _________________ | ||
: 4. LOG turnover. | : 4. LOG turnover. | ||
: 5. INITIATE new checklist using copy of this procedure (EIP-ZZ-00245 Addendum H, Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area). | : 5. INITIATE new checklist using copy of this procedure (EIP-ZZ- 00245 Addendum H,Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area). | ||
EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator's Checklist Sheet 4 of 4 EVENT CLOSEOUT/RECOVERY | -END OF SECTION- | ||
Page 7of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator's Checklist Sheet 4 of 4 | |||
EVENT CLOSEOUT/RECOVERY | |||
: 1. Until directed otherwise by the EC or Recovery Manager, CONTINUE Security activities. | : 1. Until directed otherwise by the EC or Recovery Manager, CONTINUE Security activities. | ||
-END OF SECTION- | |||
TERMINATION and SHUTDOWN | |||
: 1. WHEN directed, ASSIST with deactivation. | : 1. WHEN directed, ASSIST with deactivation. | ||
: 2. ENSURE security equipment is deactivated and/or stored. | : 2. ENSURE security equipment is deactivated and/or stored. | ||
: 3. CLIP Security Coordinator badge to Security Coordinator packet. | : 3. CLIP Security Coordinator badge to Security Coordinator packet. | ||
: 4. COLLECT documents and GIVE to Administrative Coordinator or Emergency Preparedness Staff. | : 4. COLLECT documents and GIVE to Administrative Coordinator or Emergency Preparedness Staff. | ||
-END OF SECTION- | |||
Page 8of 8 INFORMATION USE}} | |||
Revision as of 14:08, 14 November 2024
| ML23150A189 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 05/18/2023 |
| From: | Ameren Missouri |
| To: | Office of Nuclear Reactor Regulation, Document Control Desk |
| Shared Package | |
| ML23150A188 | List: |
| References | |
| EIP-ZZ-00245 Addendum H, Rev 4 | |
| Download: ML23150A189 (1) | |
Text
EIP-ZZ- 00245 ADDENDUM H
SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA
ADMINISTRATIVE CORRECTION Revision 004
Page 1of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA
TABLE OF CONTENTS Section Page Number
1.0 PURPOSE........................................................................................................................................... 3
2.0 SCOPE................................................................................................................................................ 3
3.0 RESPONSIBILITIES........................................................................................................................ 3
4.0 PROCEDURE INSTRUCTIONS..................................................................................................... 3
5.0 REFERENCES
................................................................................................................................... 3 5.1. Implementing........................................................................................................................... 3 5.2. Developmental......................................................................................................................... 3
6.0 RECORDS.......................................................................................................................................... 4
7.0 DEFINITIONS................................................................................................................................... 4
8.0
SUMMARY
OF CHANGES............................................................................................................. 4
SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA........................................................................................................................... 5
Page 2of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA
1.0 PURPOSE
Provide guidance in the performance of the Security Coordinator position for Radiological Emergency Response Plan (RERP) events.
2.0 SCOPE
This procedure covers the Security Coordinator position. Other positions are covered in separate procedures.
3.0 RESPONSIBILITIES
Security Coordinator responsibilities are covered in the body of the main procedure,E IP -ZZ-00240, Technical Support Center Operations.
4.0 PROCEDURE INSTRUCTIONS
Security Coordinator procedural instructions are covered in the body of the main procedure, EIP-ZZ-00245, Alternate TSC/OSA Assembly Area Operations.
5.0 REFERENCES
5.1. Implementing
5.1.1. EIP-ZZ-SK0001, Response to Security Events
5.1.2. EIP-ZZ-00230, Accountability
5.1.3. EIP-ZZ-00240, Technical Support Center Operations
5.1.4. EIP-ZZ-00245, Alternate TSC/OSA Assembly Area Operations
5.1.5. ODP-ZZ- 00001, Operations Department - Code of Conduct
5.1.6. SDP-PI-RERP0, RERP
5.2. Developmental
5.2.1. Callaway Plant RERP
Page 3of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 6.0 RECORDS
This addendum becomes a record of the event and should be given to the Administrative Coordinator or Emergency Preparedness staff following the event.
7.0 DEFINITIONS
None
8.0
SUMMARY
OF CHANGES
Page(s) Section or Description Step Number Changes below generated by CR202302749
3 New 5.1.6 Added Reference to SDP-PI-RERP0, RERP
5 Initiation Changed reference for performing sweep of OCA/EAB to SDP-PI-Step 5 RERP0, RERP.
6 Operations Changed reference for performing sweep of OCA/EAB to SDP-PI-Step 9 RERP0, RERP.
Page 4of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 SECURITY COORDINATOR CHECKLIST FOR THE ALTERNATE TSC/OSA ASSEMBLY AREA Sheet 1 of 4 Date: _____________ Time: ___________
INITIATION
NOTE
Some items in this section are shared with other groups and may have already been completed.
- 1. Initial entrance to the Alternate TSC /OSA Assembly Area:
- a. SIGN IN on Facility Sign-in board.
- b. CLIP ON Security Coordinator badge retrieved from the S ecurity Coordinator Packet.
- 2. INITIATE Log sheet.
- 3. Personnel Assessment:
- CONTACT Shift Security Supervisor and OBTAIN number and names of security personnel available for assignment.
- CALL IN extra personnel as required.
- 4. STATION security officers at the Emergency Response Facilities entrances to log personnel ingress and egress.
- 5. IF possible, ENSURE patrol(s) initiate a sweep of OCA/EAB at the ALERT classification per SDP -
PI-RERP0, RERP. (Unbadged personnel are to evacuate the site unless authorized by EC or Security Coordinator.)
- 6. CONTACT Health Physics Coordinator (Radiation Protection Tech Support on back shift,ext. 66052 or (573)676-6052):
- a. REQUEST the following information:
- Is there a Release Above Normal Operating Limits In Progress? YES / NO
- What is wind direction? From:________ TO: ________
- What are the affected sectors? ________, ________, ________, ________
- 7. IF there is a release above normal operating limits in progress:
- CONTACT SEMA. Normal hours (573) 751-2748, off-hours (573) 751-1000(Troop F) and REQUEST activation of Hearnes Reception and Care Center.
- REFER to Operations Section Step9.
- 8. DISCUSS any additional support or supplies required with the Admin Coordinator.
-END OF SECTION-
Page 5of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area (Cont'd.)
Sheet 2 of 4
OPERATIONS Steps in this Section should be frequently reviewed.
NOTE
If accident scenario carries past design basis accidents, SAMG and Emergency Coordinators Supplemental Guide are available as references.
If a release above normal operating limits has occurred or is likely to occur, a radiological brief is required.
- 1. PERFORM the following:
- a. CONDUCT normal and emergency security activities in accordance with the Security Plan.
- b. IF the Security Plan can NOT be followed, OBTAIN authorization from EC to deviate (refer to ODP -ZZ- 00001, Operations Department - Code of Conduct ), in accordance with 10CFR50.54(x)(y) and INFORM ENS Communicator (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> NRC notification).
- 2. IF this is a Security related emergency, REFER to EIP -ZZ-SK0001, Response to Security Events.
- 3. ASSIST EC in Evacuation and Accountability per EIP -ZZ-00230, Accountability.
- 4. IF personnel are dispatched by you to another facility, INITIATE a follow up call in 15-20 minutes to ensure they arrive safely.
- 5. In the case of a release above normal operating limits. CONTACT HP Coordinator to determine the affected areas. IF Security is to be pulled back from their posts, CONSIDER requirements in Step1, Operations (above).
- 6. ENSURE Security Force has appropriate dosimetry by discussion with HPC.
- 7. COORDINATE plant access control.
- 8. CONTACT local law enforcement to coordinate traffic control (i.e. for evacuation routes).
- 9. IF possible, IF Site Evacuation is announced, ENSURE Patrol(s) initiate sweep of OCA/EAB per SDP-PI-RERP0, RERP, to ensure all personnel have left areas in question.
NOTE
Announcements are located in EIP-ZZ-00230, Attachment 3.
- 10. COORDINATE with HPC to determine which site evacuation announcement is to be used.
Page 6of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area (Cont'd.)
Sheet 3 of 4
NOTE
Accountability is required within 30 minutes of declaring accountability
- 11. COORDINATE personnel evacuation and accountability.
- 12. COORDINATE any off-site law enforcement agency involvement.
-END OF SECTION-
TURNOVER
- 1. BRIEF incoming Security Coordinator of Plant, Facility and Security activities, transfer Security Coordinator badge, and review logs.
- 2. INFORM Emergency Coordinator of turnover.
- 3. RECORD time turnover complete. _________________
- 4. LOG turnover.
- 5. INITIATE new checklist using copy of this procedure (EIP-ZZ- 00245 Addendum H,Security Coordinator Checklist for the Alternate TSC/OSA Assembly Area).
-END OF SECTION-
Page 7of 8 INFORMATION USE EIP-ZZ-00245 ADDENDUM H Rev. 004 Security Coordinator's Checklist Sheet 4 of 4
EVENT CLOSEOUT/RECOVERY
- 1. Until directed otherwise by the EC or Recovery Manager, CONTINUE Security activities.
-END OF SECTION-
TERMINATION and SHUTDOWN
- 1. WHEN directed, ASSIST with deactivation.
- 2. ENSURE security equipment is deactivated and/or stored.
- 3. CLIP Security Coordinator badge to Security Coordinator packet.
- 4. COLLECT documents and GIVE to Administrative Coordinator or Emergency Preparedness Staff.
-END OF SECTION-
Page 8of 8 INFORMATION USE