ENS 57245: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 24: | Line 24: | ||
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | ||
Both Fike Corporation and Paragon Energy Solutions have been informed of the HPCI inner rupture disc not meeting technical requirements. Known potentially affected plants include Browns Ferry Units 1, 2, and 3. | Both Fike Corporation and Paragon Energy Solutions have been informed of the HPCI inner rupture disc not meeting technical requirements. Known potentially affected plants include Browns Ferry Units 1, 2, and 3. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240728en.html#en57245 | ||
}} | }} | ||
{{ENS-Nav}} | {{ENS-Nav}} |
Revision as of 06:20, 28 July 2024
Where | |
---|---|
Browns Ferry Decatur, Alabama (NRC Region 2) | |
Organization: | Browns Ferry |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+50.8 h2.117 days <br />0.302 weeks <br />0.0696 months <br />) | |
Opened: | Mark Moebes 20:48 Jul 25, 2024 |
NRC Officer: | Ernest West |
Last Updated: | Jul 25, 2024 |
57245 - NRC Website
| |