ENS 57194: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 23: | Line 23: | ||
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance: | ||
A normal shutdown is expected to be completed by 0900 EDT. There are no radiological releases. Unit 1 was not affected. There is no estimate for the time of the repairs. | A normal shutdown is expected to be completed by 0900 EDT. There are no radiological releases. Unit 1 was not affected. There is no estimate for the time of the repairs. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240701en.html#en57194 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 2 | | Unit = 2 |
Latest revision as of 06:20, 1 July 2024
Where | |
---|---|
Cook Michigan (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-1.48 h-0.0617 days <br />-0.00881 weeks <br />-0.00203 months <br />) | |
Opened: | Ted Dey 04:30 Jun 27, 2024 |
NRC Officer: | Natalie Starfish |
Last Updated: | Jun 28, 2024 |
57194 - NRC Website
| |