ENS 55821: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 9: | Line 9: | ||
| unit = 2 | | unit = 2 | ||
| utype = GE-2, GE-5 | | utype = GE-2, GE-5 | ||
| cfr = 10 CFR 50.72(b)(2)(iv)(A) | | cfr = 10 CFR 50.72(b)(2)(iv)(A), 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A) | ||
| emergency class = Non Emergency | | emergency class = Non Emergency | ||
| notification date = 04/05/2022 06:08 | | notification date = 04/05/2022 06:08 | ||
Line 16: | Line 16: | ||
| event date = 04/05/2022 02:23 EDT | | event date = 04/05/2022 02:23 EDT | ||
| last update date = 04/05/2022 | | last update date = 04/05/2022 | ||
| title = | | title = Scram on LOW Level | ||
| event text = The following information was provided by the licensee via telephone and email: | | event text = The following information was provided by the licensee via telephone and email: | ||
On 4/5/2022, at time 0223, during maintenance on Feedwater Level Control Valve 2FWS-LV10B, a Feedwater transient occurred resulting in an RPS Automatic Reactor Scram on Low Level (Level 3, 159.3 inches). Following the scram, reactor water level dropped below Level 2 (108.8 inches) resulting in a Group 2 Recirculation Sample System Isolation, Group 3 TIP [(Traversing Incore Probe)] Isolation Valve Isolation, Group 6 and 7 Reactor Water Cleanup Isolation and Group 9 Containment Purge Isolations. | On 4/5/2022, at time 0223, during maintenance on Feedwater Level Control Valve 2FWS-LV10B, a Feedwater transient occurred resulting in an RPS Automatic Reactor Scram on Low Level (Level 3, 159.3 inches). Following the scram, reactor water level dropped below Level 2 (108.8 inches) resulting in a Group 2 Recirculation Sample System Isolation, Group 3 TIP [(Traversing Incore Probe)] Isolation Valve Isolation, Group 6 and 7 Reactor Water Cleanup Isolation and Group 9 Containment Purge Isolations. |
Latest revision as of 16:02, 4 January 2024
Where | |
---|---|
Nine Mile Point ![]() New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-0.25 h-0.0104 days <br />-0.00149 weeks <br />-3.4245e-4 months <br />) | |
Opened: | Roman Arnold 06:08 Apr 5, 2022 |
NRC Officer: | Ossy Font |
Last Updated: | Apr 5, 2022 |
55821 - NRC Website
| |