ENS 55821: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 9: Line 9:
| unit = 2
| unit = 2
| utype = GE-2, GE-5
| utype = GE-2, GE-5
| cfr = 10 CFR 50.72(b)(2)(iv)(A)
| cfr = 10 CFR 50.72(b)(2)(iv)(A), 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 04/05/2022 06:08
| notification date = 04/05/2022 06:08
Line 16: Line 16:
| event date = 04/05/2022 02:23 EDT
| event date = 04/05/2022 02:23 EDT
| last update date = 04/05/2022
| last update date = 04/05/2022
| title = SCRAM on LOW Level
| title = Scram on LOW Level
| event text = The following information was provided by the licensee via telephone and email:
| event text = The following information was provided by the licensee via telephone and email:
On 4/5/2022, at time 0223, during maintenance on Feedwater Level Control Valve 2FWS-LV10B, a Feedwater transient occurred resulting in an RPS Automatic Reactor Scram on Low Level (Level 3, 159.3 inches). Following the scram, reactor water level dropped below Level 2 (108.8 inches) resulting in a Group 2 Recirculation Sample System Isolation, Group 3 TIP [(Traversing Incore Probe)] Isolation Valve Isolation, Group 6 and 7 Reactor Water Cleanup Isolation and Group 9 Containment Purge Isolations.
On 4/5/2022, at time 0223, during maintenance on Feedwater Level Control Valve 2FWS-LV10B, a Feedwater transient occurred resulting in an RPS Automatic Reactor Scram on Low Level (Level 3, 159.3 inches). Following the scram, reactor water level dropped below Level 2 (108.8 inches) resulting in a Group 2 Recirculation Sample System Isolation, Group 3 TIP [(Traversing Incore Probe)] Isolation Valve Isolation, Group 6 and 7 Reactor Water Cleanup Isolation and Group 9 Containment Purge Isolations.

Latest revision as of 16:02, 4 January 2024

ENS 55821 +/-
Where
Nine Mile Point Constellation icon.png
New York (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(A), System Actuation - ECCS Discharge

10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-0.25 h-0.0104 days <br />-0.00149 weeks <br />-3.4245e-4 months <br />)
Opened: Roman Arnold
06:08 Apr 5, 2022
NRC Officer: Ossy Font
Last Updated: Apr 5, 2022
55821 - NRC Website
Loading map...