ML20054G452: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[GO2-82-521, Forwards Wc Bibb Resume Per FSAR Chapter 13 Requirements]]
| number = ML20054G452
| issue date = 06/10/1982
| title = Forwards Wc Bibb Resume Per FSAR Chapter 13 Requirements
| author name = Bouchey G
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name = Schwencer A
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000397
| license number =
| contact person =
| document report number = GO2-82-521, NUDOCS 8206210567
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
}}
 
=Text=
{{#Wiki_filter:,
s
* W$shington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 June 10, 1982 G02-82-521 SS-L-02-CDT-82-073 Docket No. 50-397 Mr. A. Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Comission Washington, D.C. 20555
 
==Dear Mr. Schwencer:==
 
==Subject:==
NUCLEAR PROJECT N0. 2 RESUME OF W.C. BIBB, DIRECTOR OF POWER GENERATION Per a request by Messrs. R. Auluck and F. Allenspach of your staff, attached are sixty (60) copies of W.C. Bibb's resume. This request was made to satisfy WNP-2 FSAR Chapter 13 requirements.
Very truly yours, W
G. D. Bouchey Deputy Director, Safety and Security CDT/jca Attachment cc:  F Allenspach - NRC R Auluck      - NRC WS Chin        - BPA R Feil        - NRC Site 0 01 8206210'567 820610 PDR ADOCK 05000
 
., t ,,
a J                          j              WNP-2 William C. Bibb Director Power Generation Responsible for directing plant operations at the Supply System's Hanford Generating Project, Packwood Lake Hydroelectric Project and at Nuclear Plants 1, 2 and 3. Also responsible for the Startup and Test Program at WNP-2 and the Generation Services and Plant Training Divisions.                                                      ,
Edycational Background                    Professional Level Experience San Jose State College                    28 years in the comercial nuclear power Major: Electronics Engineering      i  field, including research and develop-1 ment, factory, plant construction, plant Certification:                        I  testing and plant operation. Fifteen i years of significant management experience Professional Engineer, Nuclear      i California, #1153                l General Electric Company l      Foreman (1954-1956)
Reactor Operators License            l      Quality Control Inspector-Factory for VBWR-Vallecitos                    l        Nuclear Plant Components (1956-1958) l      Engineering Assistant-Managed R&D Senior Reactor Operators License      l        Test Facility for Nuclear Plant Humboldt Bay Nuclear Plant          l        Components (1958-1961)
Oyster Creek Nuclear Plant          l      Engineer-Dresden Unit I (1961-1962) l      Startup Engineer-Humboldt Bay-including Senior Certification                  I        Commercial Operation (1962-1963)
KRB Nuclear Plant-Germany          i      Startup Engineer-SENN Nuclear Power SENN Nuclear Plant-Italy            l        Plant-including Commercial Operation
                                                ]         (1963-1964) l      Engineer-Big Rock Point Mods (1964-1965) l      Startup Engineer-KRB Nuclear Plant-l        Construction Completion to Commercial I        Operation (1965-1967) l      Operations Supervisor and Assistant l        Site Manager-0yster Creek Nuclear l        Power Plant (1967-1970) l      Senior Engineer-Browns Ferry Plants I        (1970-1972) l      Site Manager-Cooper Nuclear Station I        (1972-1974) l    Central Region Nuclear Service Manager-l      Managed Engineering Services for l      Operating Nuclear Plants (1974-1976)
I l
l    (Continued-Page Two) l I
a
 
O
,, ' William C. Bibb    *
                          ~
                            . WNP-2 Director        .
Power Generation Page Two Professional Level Experience l Washington Public Power Supply System g
Program Leader, Projects (1976-1977) l Manager, Startup l
(1977-1978)
Project Manager, WNP-1/4 (1978-1979)
Project Manager, WNP-2 l      (1979-1981) g g
Deputy Program Director, Startup g
                                        & Operations (1981-1982)
Director, Power Generation
                                  ;      (1982-Present) l l
1 1
I I
l 1
l 1
I i
l l
l l
l 1
1 I
I I
l l
l 1
1 I
l l
l i
l}}

Latest revision as of 12:12, 14 November 2023