ENS 56810: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 22: Line 22:
This 8-hour non-emergency report is being made based upon requirements of 10CFR50.72(b)(3)(v)(A) which states: "Licensee shall notify the NRC of any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to: (A) Shut down the reactor and maintain it in a safe shutdown condition."  
This 8-hour non-emergency report is being made based upon requirements of 10CFR50.72(b)(3)(v)(A) which states: "Licensee shall notify the NRC of any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to: (A) Shut down the reactor and maintain it in a safe shutdown condition."  
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20231023en.html#en56810
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20231024en.html#en56810
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 07:30, 24 October 2023

ENS 56810 +/-
Where
Nine Mile Point Constellation icon.png
New York (NRC Region 1)
Reporting
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor
Time - Person (Reporting Time:+-23.08 h-0.962 days <br />-0.137 weeks <br />-0.0316 months <br />)
Opened: Conor Henrie
01:43 Oct 22, 2023
NRC Officer: John Russell
Last Updated: Oct 22, 2023
56810 - NRC Website
Loading map...