ENS 56625: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 28: | Line 28: | ||
(c) The DG3 train was started and functioned successfully. | (c) The DG3 train was started and functioned successfully. | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/ | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230719en.html#en56625 | ||
}}{{unit info | }}{{unit info | ||
| Unit = 2 | | Unit = 2 |
Latest revision as of 06:30, 19 July 2023
Where | |
---|---|
Columbia Generating Station Washington (NRC Region 4) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1467.57 h61.149 days <br />8.736 weeks <br />2.01 months <br />) | |
Opened: | Dan Sharpe 14:13 Jul 17, 2023 |
NRC Officer: | Adam Koziol |
Last Updated: | Jul 17, 2023 |
56625 - NRC Website
| |