ML20066C065: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20066C065 | | number = ML20066C065 | ||
| issue date = 01/03/1991 | | issue date = 01/03/1991 | ||
| title = Informs That Page 8 of Encl 2 to Util | | title = Informs That Page 8 of Encl 2 to Util Re Status of Open Items Contained in NRC SER on Performance Plan Should Be Revised to State That Evaluation Tracked by Nco 86-0326-163 & Completed on 900913 | ||
| author name = Wallace E | | author name = Wallace E | ||
| author affiliation = TENNESSEE VALLEY AUTHORITY | | author affiliation = TENNESSEE VALLEY AUTHORITY | ||
| Line 12: | Line 12: | ||
| case reference number = RTR-NUREG-1232 | | case reference number = RTR-NUREG-1232 | ||
| document report number = NUDOCS 9101090177 | | document report number = NUDOCS 9101090177 | ||
| title reference date = 10-26-1990 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | ||
| page count = 2 | | page count = 2 | ||
| Line 24: | Line 25: | ||
'JAN 03 B91 U.S. Nuclear Regulatory Commission ATTN: Docume'.st Control Desk Washington, D.C. 20555 Gentlemen: | 'JAN 03 B91 U.S. Nuclear Regulatory Commission ATTN: Docume'.st Control Desk Washington, D.C. 20555 Gentlemen: | ||
In the Matter of ) Docket Nos. 50-260 Tennessee Valley Authority ) | In the Matter of ) Docket Nos. 50-260 Tennessee Valley Authority ) | ||
BROWNS FERRY NLCLEAR PLANT (BFN) - NUREG-1232, SUPPLEMENT 1, SAFETY EVALUATION REPORT ON THE BROWNS FERRY NUCLEAR PERFORMANCE PLAN By letter dated October 26, 1990, TVA provided the status of the open items contained in the NRC's Safety Evaluation Report on the BFN Performance Plan, dated April 14, 1989, and its supplement, dated October 24, 1989. Page 8 of Enclosure 2 to that letter provided the status of completion of the evaluation of potential seismic-induced water spray effects of Class II systems on Class I systems. The status should be revised to state that this evaluation was tracked by NCO 86-0326-163 and completed on September 13, 1990. | BROWNS FERRY NLCLEAR PLANT (BFN) - NUREG-1232, SUPPLEMENT 1, SAFETY EVALUATION REPORT ON THE BROWNS FERRY NUCLEAR PERFORMANCE PLAN By {{letter dated|date=October 26, 1990|text=letter dated October 26, 1990}}, TVA provided the status of the open items contained in the NRC's Safety Evaluation Report on the BFN Performance Plan, dated April 14, 1989, and its supplement, dated October 24, 1989. Page 8 of Enclosure 2 to that letter provided the status of completion of the evaluation of potential seismic-induced water spray effects of Class II systems on Class I systems. The status should be revised to state that this evaluation was tracked by NCO 86-0326-163 and completed on September 13, 1990. | ||
There are no commitments contained in this letter. If you have any ouestions, please get in touch with Patrick P. Carier, Manager of Site Licensing, at (205) 729-3570. | There are no commitments contained in this letter. If you have any ouestions, please get in touch with Patrick P. Carier, Manager of Site Licensing, at (205) 729-3570. | ||
Very truly yours, TENNESSEE VALLEY AUTHORITY | Very truly yours, TENNESSEE VALLEY AUTHORITY | ||
Revision as of 15:54, 31 May 2023
| ML20066C065 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 01/03/1991 |
| From: | Wallace E TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RTR-NUREG-1232 NUDOCS 9101090177 | |
| Download: ML20066C065 (2) | |
Text
'
? !
(
5B Lookout Place
'JAN 03 B91 U.S. Nuclear Regulatory Commission ATTN: Docume'.st Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of ) Docket Nos. 50-260 Tennessee Valley Authority )
BROWNS FERRY NLCLEAR PLANT (BFN) - NUREG-1232, SUPPLEMENT 1, SAFETY EVALUATION REPORT ON THE BROWNS FERRY NUCLEAR PERFORMANCE PLAN By letter dated October 26, 1990, TVA provided the status of the open items contained in the NRC's Safety Evaluation Report on the BFN Performance Plan, dated April 14, 1989, and its supplement, dated October 24, 1989. Page 8 of Enclosure 2 to that letter provided the status of completion of the evaluation of potential seismic-induced water spray effects of Class II systems on Class I systems. The status should be revised to state that this evaluation was tracked by NCO 86-0326-163 and completed on September 13, 1990.
There are no commitments contained in this letter. If you have any ouestions, please get in touch with Patrick P. Carier, Manager of Site Licensing, at (205) 729-3570.
Very truly yours, TENNESSEE VALLEY AUTHORITY
/
/
/' (.//c < -
E. G. Wallace, Manager Nuclear Licensing and Regulatory Affairs j cc: See page 2 9101090ly 60 PDR ADO PDR P
g/
O '
An Equal Opportunity Employer /
a U.S. Nuclear Regulatory Comission: -
I jf % 4 t
ec: Ms. S. C. Black, Deputy Director Project Directorate-II-41 '
U.S. Nuclear Regulatory Comission One White Flint,-North :)
11555 Rockville Pike,' :I Rockville,' Maryland ~ 20852 :
NRC Resident Inspector . .
Browns Ferry: Nuclear Plant Route 12, Box 637 ,
Athens, Alabama 35609-2000 -
Mr. Thierry M. Ross, Project Manager U. S. Nuclear Regulatory- Comission One White Flint, North-11555 Rockville--Pike ~
Rockville, Maryland 20852 Mr. B. A. Wilson, Project. Chief U.S. - Nuclear Regulatory Comission -
-Region II 101 Marietta Street,'NW, Suite 2900 Atlanta, Georgia 30323 4
i r'
. . , _ . - . _ - - - _ _ , . . . . - - _ . . _ . _ . . - _ , - . -. , , , , , - . . - - . . . . . . . , - , _ ,