ENS 56252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 22: Line 22:
The evaluation is expected to be completed by 01/27/2023. If there are questions, or addition information is required, please contact Chris Shaffer, Quality Assurance Manager, Flowserve Corporation, Ph: (434) 522-4136.  
The evaluation is expected to be completed by 01/27/2023. If there are questions, or addition information is required, please contact Chris Shaffer, Quality Assurance Manager, Flowserve Corporation, Ph: (434) 522-4136.  
Known affected plant: Waterford 3 Nuclear Generating Station
Known affected plant: Waterford 3 Nuclear Generating Station
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20221202en.html#en56252
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20221205en.html#en56252
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Revision as of 08:30, 5 December 2022

ENS 56252 +/-
Where
Flowserve
Lynchburg, Virginia (NRC Region 2)
Organization: Flowserve
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
Time - Person (Reporting Time:+1376.75 h57.365 days <br />8.195 weeks <br />1.886 months <br />)
Opened: Chris Shaffer
14:45 Dec 1, 2022
NRC Officer: Ernest West
Last Updated: Dec 1, 2022
56252 - NRC Website