ENS 56059: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:
| NRC officer = Bethany Cecere
| NRC officer = Bethany Cecere
| event date = 08/19/2022 23:42 CDT
| event date = 08/19/2022 23:42 CDT
| last update date = 10/14/2022
| last update date = 10/17/2022
| title = Technical Specification Required Shutdown
| title = Technical Specification Required Shutdown
| event text = The following information was provided by the licensee via fax or email:
| event text = The following information was provided by the licensee via fax or email:
Line 28: Line 28:
Following the shutdown, GGNS completed walkdowns and determined that the condition affected only one ADS valve.  As a result, the shutdown to satisfy the required actions of TS LCO 3.5.1 Condition G.1 was not required.
Following the shutdown, GGNS completed walkdowns and determined that the condition affected only one ADS valve.  As a result, the shutdown to satisfy the required actions of TS LCO 3.5.1 Condition G.1 was not required.
The NRC Resident Inspector has been notified of the retraction.
The NRC Resident Inspector has been notified of the retraction.
R4DO (Kellar) was notified
R4DO (Kellar) was notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20221017en.html#en56059
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2022/20221018en.html#en56059
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 07:30, 18 October 2022

ENS 56059 +/- *RETRACTED*
Where
Grand Gulf Entergy icon.png
Mississippi (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-2.52 h-0.105 days <br />-0.015 weeks <br />-0.00345 months <br />)
Opened: Paul Lyne
02:11 Aug 20, 2022
NRC Officer: Bethany Cecere
Last Updated: Oct 17, 2022
56059 - NRC Website
Loading map...