ML20080P842: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 2: | Line 2: | ||
| number = ML20080P842 | | number = ML20080P842 | ||
| issue date = 10/03/1983 | | issue date = 10/03/1983 | ||
| title = Provides Quarterly Status Rept in Response to | | title = Provides Quarterly Status Rept in Response to . Schedule Unchanged.Fuel Load Scheduled for Apr 1984 W/ Commercial Operation Scheduled for Late 1984 or Early 1985 | ||
| author name = Schnell D | | author name = Schnell D | ||
| author affiliation = UNION ELECTRIC CO. | | author affiliation = UNION ELECTRIC CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = ULNRC-671, NUDOCS 8310120069 | | document report number = ULNRC-671, NUDOCS 8310120069 | ||
| title reference date = 05-27-1981 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| page count = 1 | | page count = 1 | ||
Revision as of 16:54, 26 September 2022
| ML20080P842 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 10/03/1983 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| ULNRC-671, NUDOCS 8310120069 | |
| Download: ML20080P842 (1) | |
Text
UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS:
October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20S55
Dear Mr. Denton:
ULNRC-671 DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 QUARTERLY PROGRESS UPDATE
Reference:
ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant. Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter.
Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985.
Sincerely, DS/ls cc: C. J. Dougherty E. K. Dille
\
8310120069 831003 0 PDR ADOCK 05000483 PDR 1
R
O
- PPat Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101
- 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC 20555 SUSQUDIANNA STEAM ELECIRIC STATICN FSAR SECTION 7.6 ER 100508 FILE 841-1 PIA-1836 Docket No. 50-388
Dear Mr. Schwencer:
In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows:
7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring.
7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2.
Table 7.6-5 - This table has been revised to include the APRM Upscale Thermal Trip.
1
- These revisions will be incorporated into the next amendment to the FSAR.
, Very truly s, b) u#
N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc: R. L. Perch NBC y 1
i i
l 8310120067 831006 PDR ADOCK 05000388 A PDR
.