ML20080P842: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 2: Line 2:
| number = ML20080P842
| number = ML20080P842
| issue date = 10/03/1983
| issue date = 10/03/1983
| title = Provides Quarterly Status Rept in Response to 810527 Ltr. Schedule Unchanged.Fuel Load Scheduled for Apr 1984 W/ Commercial Operation Scheduled for Late 1984 or Early 1985
| title = Provides Quarterly Status Rept in Response to . Schedule Unchanged.Fuel Load Scheduled for Apr 1984 W/ Commercial Operation Scheduled for Late 1984 or Early 1985
| author name = Schnell D
| author name = Schnell D
| author affiliation = UNION ELECTRIC CO.
| author affiliation = UNION ELECTRIC CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = ULNRC-671, NUDOCS 8310120069
| document report number = ULNRC-671, NUDOCS 8310120069
| title reference date = 05-27-1981
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1

Revision as of 16:54, 26 September 2022

Provides Quarterly Status Rept in Response to . Schedule Unchanged.Fuel Load Scheduled for Apr 1984 W/ Commercial Operation Scheduled for Late 1984 or Early 1985
ML20080P842
Person / Time
Site: Callaway 
Issue date: 10/03/1983
From: Schnell D
UNION ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
ULNRC-671, NUDOCS 8310120069
Download: ML20080P842 (1)


Text

UNION ELECTRIC COM PANY 1908 GRATIOT STREE T ST. Louts, MISSOURI MAILING ADDRESS:

October 3, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20S55

Dear Mr. Denton:

ULNRC-671 DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1 QUARTERLY PROGRESS UPDATE

Reference:

ULNRC-644 dated June 30, 1983 This is a quarterly follow-up response to your letter of May 27, 1981, regarding progress of our Callaway Plant. Our schedule remains unchanged since our last re-port, which was transmitted by the referenced letter.

Fuel load is scheduled for April, 1984 with commercial operation scheduled for late 1984 or early 1985.

Sincerely, DS/ls cc: C. J. Dougherty E. K. Dille

\

8310120069 831003 0 PDR ADOCK 05000483 PDR 1

R

O

- PPat Pennsylvania Power & Light Company Two North Ninth Street

  • Allentown, PA 18101
  • 215 1 770 5151 Norman W. Curtir Vice President-Engineering & Construction-Nuclear 215/770-7501 OCT 0 61983 Director of Nuclear Reactor Regulation Attention: Mr. A. Schwencer, Chief Licensing Bra:r,h No. 2 Division of Licensing U. S. Nuclear Regulatory Ccanission Washington, DC 20555 SUSQUDIANNA STEAM ELECIRIC STATICN FSAR SECTION 7.6 ER 100508 FILE 841-1 PIA-1836 Docket No. 50-388

Dear Mr. Schwencer:

In order to support obtaining an operating license for Susquehanna SES Unit 2, enclosed is a revised Section 7.6 of the Susquehanna SES FSAR. The revisions to this section are as follows:

7.6.la.4.3.8.1 - This section has been revised to show a clarification that a pressure indicator monitors the pressure between the inner and outer head seal ring.

7.6.lb.l.2.4.1 - This section has been revised to add a discussion on the additional non-Class IE tenperature sensors for Unit 2.

Table 7.6-5 - This table has been revised to include the APRM Upscale Thermal Trip.

1

These revisions will be incorporated into the next amendment to the FSAR.

, Very truly s, b) u#

N. E Curtis Vice President-Engineering & Construction-Nuclear Enclosure cc: R. L. Perch NBC y 1