{{#Wiki_filter:4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-21-015                                                                                10 CFR 50.55a February 10, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. 50-454 and 50-455 Braidwood Station, Units 1 and 2 Renewed Facility Operating License No. NPF-72 and NPF - 77 NRC Docket Nos. STN 50-456 and STN 50-457
 
==Subject:==
Response to Request for Additional Information Related to Relief Request for Braidwood I4R-11 and Byron I4R-18
 
==References:==
: 1. Letter from D. Murray (Exelon Generation Company, LLC) to U.S. NRC, "Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements," dated July 24, 2020.
: 2. Email from J. Wiebe (U.S. Nuclear Regulatory Commission) to P. A.
Henderson (Exelon Generation Company, LLC), "RAIs Regarding Relief Request for Braidwood I4R-11 and Byron I4R-18," dated December 30, 2020.
By application dated July 24, 2020 (Reference 1), Exelon Generation Company, LLC (EGC) requested NRC approval of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, concerning containment unbonded post-tensioning system inservice inspection requirements. These requests are associated with the fourth Inservice Inspection (ISI) interval for Braidwood Station and Byron Station.
In an NRC email dated December 30, 2020 (Reference 2), the NRC determined that additional information is needed to complete its review. The attachments to this letter provide the requested information. As discussed during the clarification call held with the NRC on January 12, 2021, the response to the request for additional information (RAI) is requested within 30 days of the clarification call.
 
February 10, 2021 U.S. Nuclear Regulatory Commission Page 2 There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Phillip A. Henderson at (630) 657-4727.
Respectfully, Dwi Murray Sr. Manager - Licensing Exelon Generation Company, LLC Attachments:
: 1. Response to Request for Additional Information
: 2. Revised Pages from Containment Post-Tensioning System Inservice Inspection Technical Report, Revision 1 cc:    NRC Regional Administrator, Region III NRC Senior Resident Inspector - Braidwood Station NRC Senior Resident Inspector - Byron Station
 
ATTACHMENT 1 Response to Request for Additional Information
 
ATTACHMENT 1 Response to Request for Additional Information By application dated July 24, 2020 (Reference 1), Exelon Generation Company, LLC (EGC) requested NRC approval of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, concerning containment unbonded post-tensioning system inservice inspection requirements (ADAMS Accession No. ML20206L135).
By email dated December 30, 2020 (Reference 2), the NRC determined that additional information is needed to complete its review. This attachment provides the requested information.
 
==References:==
: 1)      Letter from D. Murray (Exelon Generation Company, LLC) to U.S. NRC, "Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements," dated July 24, 2020
: 2)      Email from J. Wiebe (U.S. Nuclear Regulatory Commission) to P. A. Henderson (Exelon Generation Company, LLC), "RAIs Regarding Relief Request for Braidwood I4R-11 and Byron I4R-18," dated December 30, 2020.
NRC RAI 55 The request for relief for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements in Accordance with 10 CFR 50.55a(z)(1), Section 4, Reason for Request, states "ASME Section XI, Subsection IWL requires periodic visual examination and physical testing of Containment Building concrete as well as physical testing of post-tensioning systems."
The staff finds that ASME Section XI, Subsection IWL does not require periodic physical testing of Containment Building concrete. Describe what kind of physical testing of concrete is required and whether it has been performed. If yes, where are the test results documented.
EGC Response to NRC RAI 55 EGC agrees that ASME Section XI, Subsection IWL does not require periodic physical testing of the Containment Building concrete. The statement contained in Reference 1 cover letter and Section 4, Reason for Request, describing the required inspections of the Containment Building concrete and post-tensioning systems is revised as follows:
"ASME Section XI, Subsection IWL requires periodic visual examination and physical testing of the post-tensioning system, as well as, periodic visual examination of the Containment Building concrete."
NRC RAI 57 PART B - CONTAINMENT DESCRIPTION, ISI PROGRAM, and
 
==SUMMARY==
of PROPOSED PROGRAM CHANGES, Containment ISI Program Summary Description, states "Also, limited scope visual examinations that addressed Unit 2 water intrusion issues were performed at Byron in 1987 and 1988. Limited scope visual examinations that addressed Unit 1 and Unit 2 Page 1 of 18
 
ATTACHMENT 1 Response to Request for Additional Information water intrusion issues were performed at Braidwood in June - August 1987 and October -
November 1990."
Describe how the water intruded into the containment buildings and the results of these limited scope visual examinations activities.
EGC Response to NRC RAI 57 (a) Water did not enter into the containment buildings. Specifically, water did not pass through the liner and into the containment; it permeated through concrete (concrete is moderately porous) and entered the rolled seam (not watertight) tendon ducts.
(b) Limited scope examinations to assess the extent of water intrusion were performed following the completion of the regularly scheduled examinations and, for purposes of the technical report, are considered to be an extension of the latter (extension of the regularly scheduled exams). Therefore, the results of the limited scope exams are included with the results of the regularly scheduled exams.
Water intrusion is documented on Byron (report Part D) Table 13 and Braidwood (report Part E)
Table 14.
As stated in the 4.1 subsections of both report Parts D and E, corrosion found on Byron and Braidwood enclosed anchorage components was not active. It was concluded to have existed at the time of construction and, therefore, unrelated to the observed water intrusion in tendon ducts.
NRC RAI 58 The licensee states the following:
: 1.      "Byron and Braidwood have completed nine and eight, respectively, pre-stressing system surveillances on each unit. These were based on Regulatory Guide 1.35 or 10CFR50.55a / ASME Section XI Subsection IWL,"
: 2.      "the Regulatory Guide 1.35 requires "Examination sample size - six dome, five vertical, and ten hoop tendons,"
: 3.      "Regulatory Guide 1.35 was withdrawn in August 2015 following the incorporation, by reference, of ASME Section XI, Subsection IWL into NRC Regulation 10CFR50.55a," and
: 4.      "the examination intervals and wire testing addressed in the 1973 original issue of Regulatory Guide 1.35 are now, 45 years later, still incorporated effectively unchanged into the current edition of ASME Section XI, Subsection IWL."
Based on the above, provide responses to the following questions #58;
: 1.      Byron Unit 1, the sample sizes for dome tendons are five for years 1 and 5, and three for years 10, 20, and 30 (see Byron Table 7), for vertical tendons are six for years 1 and 5, and three for years 10, 20, and 30 (see Table 5), and for hoop tendons are ten for year 1, eight for year 5, and four for years 10, 20, and 30 (see Page 2 of 18
 
ATTACHMENT 1 Response to Request for Additional Information Byron Table 3). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
: 2.      Byron Unit 2, the sample sizes for dome tendons are five for years 1 (see Byron Table 8), three for years 10, 20, and 30 (see Byron Table 8), for vertical tendons are eight for year 1, six for year 5, and four for years 15, 25, and 35 (see Byron Table 6),
and for hoop tendons are twelves for year 1, ten for year 5, and five for years 15, 25, and 35 (see Byron Table 4). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
: 3.      Braidwood Unit 1, the sample sizes for dome tendons are four for years 1, seven for years 5, three for years 10 and 20, and four for year 30 (see Braidwood Table 7), for vertical tendons are six for years 1 and 5, and three for years 10, four for year 20, and three for year 30 (see Braidwood Table 5), and for hoop tendons are nine for year 1, eight for year 5, and four for years 10, five for year 20, and four for year 30 (see Braidwood Table 3). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
: 4.      Braidwood Unit 2, the sample sizes for dome tendons are five for years 1 and 5, and three for years 15 and 25 (see Braidwood Table 8), for vertical tendons are six for years 1 and 5, and three for year 10, four for year 20, and three for year 30 (see Braidwood Table 5), and for hoop tendons are nine for year 1, eight for year 5, and four for year 10, five for year 20, and four for year 30 (see Braidwood Table 3). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
: 5.      There are ten numerical values listed in Table 3 for Unit 1 year 1 hoop tendon forces, but only seven forces are plotted in figure 1. There are 8 numerical values listed in Table 3 for Unit 1 year 5 for hoop tendon forces, but only four are plotted in figure
: 1. Provide an explanation for the discrepancy.
EGC Response to NRC RAI 58 (a) With respect to sub-questions 1 through 4, Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, Technical Specifications governed tendon sample sizes until compliance with ASME Section XI, Subsection IWL was required in accordance with 10 CFR 50.55a (61 FR 41303) after September 9, 1996, starting with the 20th year examinations at Byron Unit 1 and the 15th year examinations at Braidwood Unit 2 (Reference the Technical Report, Part B, Section 2).
Starting with the 20th year examinations at Byron Unit 1 and 15th year examinations at Braidwood Unit 2, tendon sample sizes were required in accordance with IWL-2421 and Table IWL-2521-1 for a sample size of 2%, with a minimum of 3 and maximum of 5 tendons of each type requiring examination. Starting with the 30th year examinations at Byron Unit 1 and Braidwood Unit 1, the sampling requirements were modified in accordance with Table IWL-2521-2 for a sample size of 2%, with a minimum of 3 and maximum of 5 tendons of each type requiring examination. Starting with the 30th year examinations at Byron Unit 1 and Braidwood Unit 1, the sampling requirements were modified in accordance with Table IWL-2521-2 to address tendons affected by repair/replacement activities, where temporary openings were repaired following steam generator replacements. These activities resulted in the removal and replacement of 38 vertical and 32 hoop tendons in each of these units to facilitate cutting the Page 3 of 18
 
ATTACHMENT 1 Response to Request for Additional Information containment cylinder wall opening needed for exchanging the steam generators. With this confirmation, revision to pages 46 and 131 of the technical report are provided as corrections to typographical errors regarding vertical tendon population in Attachment 2. The revisions are delineated with revision bars.
A review of the tendons selected for examination in accordance with ASME Section XI, Subsection IWL has determined that the required sample sizes met, or exceeded the sample sizes required by Subsection IWL, as shown in the following Tables 1 and 2.
Page 4 of 18
 
ATTACHMENT 1 Response to Request for Additional Information Table 1 Byron Station, Units 1 and 2 Tendon Sample Sizes Required by ASME Section XI, Subsection IWL Except as noted below, the required minimum sample sizes for each examination are as follows (as required by Table IWL-2521-1, based on a 2% sample size):
* 4 Verticals (Based on 162 Vertical Tendons)
* 3 Domes (Based on 120 Dome Tendons)
* 5 Hoops (Based on 201 Hoop Tendons)
Tendons Selected for Examination Unit 1 20th Year                Unit 2                Unit 1                Unit 2 Tendon Group                              (2004)          25th year (2009)      30th Year (2014)      35th Year (2019)
Unit 1 Verticals not Affected      V47, V88,                                  V82, V88, V121(5) by Steam Generator                  V110(2)
Replacement (SGR)
Unit 1 Verticals Affected by        V15(1), V162(1)                            V15(1), (3)2, SGR                                                                            V160(1), (3)
Unit 1 Hoops not Affected by        H55BA, H24CB,          Unit 2 Physical    H42AC, H45BA,            Unit 2 Physical SGR                                H58AC, H6BA(2)        Inspection Year    H57CB, H58AC(4)          Inspection Year Unit 1 Hoops Affected by            H37BA(1),                                  H30CB(1), (3),
SGR                                H38CB(1)                                  H38BA(1), (3)
Unit 1 Dome                        D124, D307,                                D124, D138, D219                                      D312 Unit 2 Vertical                                          V290, V232,                                  V208, V290, V295, V306                                  V315, V356 Unit 2 Hoop                          Unit 1 Physical    H60ED, H55DF,          Unit 1 Physical      H8DF, H48DF, Inspection Year      H21DF, H12ED,          Inspection Year      H29ED, H60ED, H65EF                                        H27FE Unit 2 Dome                                              D636, D619,                                  D407, D531, D510                                        D636 Notes:
(1)  These tendons were excluded from those shown in Part D, Tables 3 and 5 of the Technical Report because these tendons were affected by repair/replacement activity associated with Steam Generator replacement repairs and are not representative of tendons that have been in service since commercial operation of the plant.
(2)  The required sample size during this examination was satisfied by examination of the tendons identified here, as well as the additional tendons affected by SGR.
(3)  Starting with the Unit 1 30th year examinations, the sample size for tendons affected by repair/replacement activities is determined by Table IWL-2521-2.
(4)  The number of hoop tendons required to be examined during this inspection is based on 2% of the hoop tendons not affected by SGR. The revised population of unaffected tendons allowed a sample size of 4 to be selected.
(5)  The number of vertical tendons required to be examined during this inspection is based on 2% of the vertical tendons not affected by SGR. The revised population of unaffected tendons allowed a sample size of 3 to be selected.
Page 5 of 18
 
ATTACHMENT 1 Response to Request for Additional Information Table 2 Braidwood Station, Units 1 and 2 Tendon Sample Sizes Required by ASME Section XI, Subsection IWL Except as noted below, the required minimum sample sizes for each examination are as follows (as required by Table IWL-2521-1, based on a 2% sample size):
* 4 Verticals (Based on 162 Vertical Tendons)
* 3 Domes (Based on 120 Dome Tendons)
* 5 Hoops (Based on 201 Hoop Tendons)
Tendons Selected for Examination Unit 2 15th Year                Unit 1                Unit 2                Unit 1 Tendon Group                              (2001)          20th Year (2006)      25th Year (2011)      30th Year (2016)
Unit 1 Verticals not Affected                              V30, V50, V95,                              V30, V76, V112(3) by SGR                                                          V133 Unit 1 Verticals Affected by                              None inspected(2)                            V16(1),(5), V143(1),
(5)
SGR Unit 2 Physical                            Unit 2 Physical Unit 1 Hoops not Affected by        Inspection Year      H35AC, H59AC,        Inspection Year        H16CB, H21BA, SGR                                                        H53CB, H67CB,                              H50BA, H67AC(4)
H50BA Unit 1 Hoops Affected by                                  None inspected                                H42CB(1), (5),
SGR                                                                                                      H44BA(1), (5)
Unit 1 Dome                                                  D102, D115,                                  D132, D219, D219                                    D332, D137 Unit 2 Vertical                        V232, V308,                                V203, V308, V333, V357,                                  V243, V342 V236, V249 Unit 1 Physical                              Unit 1 Physical Unit 2 Hoop                          H22DF, H36ED,                              H57DF, H16ED, Inspection Year                              Inspection Year H45DF, H56FE,                              H24ED, H46FE, H57DF, H4ED                                    H62FE Unit 2 Dome                            D438, D537,                                D436, D504, D622                                        D622 Notes:
(1) These tendons were excluded from those shown in Part E, Tables 3 and 5 of the Technical Report because these tendons were affected by repair/replacement activity associated with Steam Generator replacement repairs and are not representative of tendons that have been in service since commercial operation of the plant.
(2) In 2006, there were no specific requirements for examination of tendons affected by repair/replacement activities in the ASME Code, Section XI Code of record in use at that time. Note that the requirements now found in Table IWL-2521-2 were incorporated into the 2002 Addenda of the ASME Code, Section XI.
(3) The number of vertical tendons required to be examined during this inspection is based on 2% of the vertical tendons not affected by SGR. The revised population of unaffected tendons allowed a sample size of 3 to be selected.
(4) The number of hoop tendons required to be examined during this inspection is based on 2% of the hoop tendons not affected by SGR. The revised population of unaffected tendons allowed a sample size of 4 to be selected.
(5) Starting with the Unit 1 30th year examinations, the sample size for tendons affected by repair/replacement activities is determined by Table IWL-2521-2.
Page 6 of 18
 
ATTACHMENT 1 Response to Request for Additional Information (b) With respect to sub-question 5, all points on Table 3 for Unit 1 year 1 hoop tendon forces and Unit 1 year 5 for hoop tendon forces are plotted in Figure 1.
Since the data points were close in values, as a result, they were superimposed on each other such that they cannot be distinguished on the plots. Specifically, three of the lift-off forces measured during the 1st year examination, as listed on Part D (Byron) Table 3, are 1,310, 1,310 and 1,311 kips and have a spread of only 1 kip. The three symbols plotted for these are effectively superimposed and cannot be distinguished from one another on the plot (Figure 1).
Two of the measured forces are 1,257 and 1,258 kips and have a spread of 1 kip. Again, the symbols for these are effectively superimposed and cannot be distinguished from one another on the plot (Figure 1).
Three of the forces measured during the 5th year are 1,206, 1,207 and 1,209 kips and have a spread of 3 kips. The three symbols are partially superimposed but close inspection shows that these do overlap. The same is true for the closely spaced values of 1,216 and 1,218 kips (2 kip spread) as well as the closely spaced values of 1,226 and 1,228 kip (also a 2 kip spread).
It is to be noted that the trend line and LCL computations use all of the data listed in Table 3.
Notes provided in Figure 1 provided in this letter describes the plotted numerical values listed in Table 3 for Unit 1 year 1 and 5 for hoop tendon forces. Therefore, there is no discrepancy between the numerical values listed in Table 3 and Figure 1.
NRC RAI 59 The licensee developed and proposed formulas indicating that the pre-stressing forces in the cylinder both in the hoop and vertical directions and in the dome of the containments have been decreasing gradually with time. The formulas predict that the pre-stressing forces will remain above the required minimum magnitudes for the next ten years. This is the main argument used by the licensee to extend the ASME Code's five year surveillance intervals to ten years. However, the prestressing forces in the following figures do not match the licensee's formula predicted. The prestressing forces in the following figures have been decreased or increased or flattened at different time intervals, sometimes sharply and other times gradually, with no predictable trends (increase or decrease or flat) and magnitudes from time to time. Therefore, the use of the formulas to predict the future prestressing lost in the containment as the justification for extending the ASME Code's five-year surveillance intervals to ten-year intervals may not be valid.
Figure 1 - Byron Unit 1 Hoop Tendon Force Trend & LCL / 1 - 30 Year Surveillance Results indicate that the prestressing force is decreased from year 1 to year 5 and decreased more to year 10, but then is reversed to increase from year 10 to year 29 and is decreased again to year 30.
Figure 8 - Byron Unit 1 Vertical Tendon Force Trend & LCL / 5 - 30 Year Surveillance Results indicate that the prestressing force is increased from year 5 to year 10 and then flattened to year 20 and then decreased from year 20 to year 30.
Figure 10 - Byron Unit 2 Vertical Tendon Force Trend & LCL / 1 - 35 Year Surveillance Results indicate that the prestressing force is decreased sharply from year 1 to year 5 and then flattened to year 15 and then another sharply decreased to year 25 and then slightly increased to year 35.
Page 7 of 18
 
ATTACHMENT 1 Response to Request for Additional Information Figure 13 - Byron Unit 1 Dome Tendon Force Trend & LCL / 1 - 30 Year Surveillance Results indicate that the prestressing force is decreased sharply from year 1 to year 5 and then increased from year 5 to year 10 and then decreased to year 20 and then increased slightly to year 30.
Figure 16 - Braidwood Unit 2 Dome Tendon Force Trend & LCL / 1 - 35 Year Surveillance Results indicates that the prestressing force is reduced from year 1 to year 5 and is increased from year 5 upward through years 15 and 25.
Figure 17 - Byron Unit 2 Dome Tendon Force Trend & LCL / 5 - 35 Year Surveillance Results indicates that the prestressing force is increased from year 5 to year 15 and then decreased from year 15 to year 25 and 35.
Provide an explanation for such irregular phenomena of prestressing loss or gain with time in containments. Also provide additional justification why it is acceptable to extend the surveillance intervals from the ASME Code's five year surveillance intervals to the proposed ten year intervals.
EGC Response to NRC RAI 59 There is no formula, as such, used in developing the Byron and Braidwood prestressing force trends. The log-linear function used to generate statistically meaningful force trends is a pre-stressed concrete technology standard based on the results of laboratory tests, performed over many years, on concrete design mix specimens and specimens of tendon wire representing different heats of steel. These tests have consistently shown that the following parameters vary essentially linearly with the logarithm of time, with possible flattening of the characteristic over a time span measured in decades.
Concrete shrinkage strain when specimens are maintained at fixed temperature and humidity.
Concrete creep strain when specimens are maintained under a fixed load at a fixed temperature and sealed to eliminate moisture loss and attendant shrinkage.
Steel stress when relaxation test specimens are maintained at a fixed elongation and fixed temperature.
These log-linear characteristics1 are used during containment design to predict pre-stressing force loss with time. The pre-stressing system is then designed to ensure that the level force will meet the design specification requirements at the end of plant life (initially specified as 40 years). Designs are generally based on the conservative postulates that temperature, humidity and loading conditions are such as to maximize expected concrete shrinkage / creep strains and pre-stressing steel stress loss.
The same log-linear characteristic is used in post-tensioning ISI reports to trend tendon group mean force through the subsequent examination. And, it is used in the technical reports 1
Flattening of the log-linear characteristic, as is often observed in plots of surveillance data acquired over a several decade time span, results in a conservative design, i.e., one with lower than forecast loss of pre-stressing force.
Page 8 of 18
 
ATTACHMENT 1 Response to Request for Additional Information supporting the TMI-1, Vogtle 1 & 2, and Millstone 2 relief requests, all of which were approved by the NRC (ML19226A023, ML19182A077, and ML20287A471).
In addition, use of the log-linear characteristic to forecast tendon forces is addressed in USNRC Regulatory Guide 1.35.1, Figure 2.
If all tendons were tensioned simultaneously and subsequently maintained under steady and uniform environmental conditions, then forces measured during a surveillance would plot on the trend line; i.e., the force measured for each tendon2 would represent the mean.
As tendons are tensioned in a prescribed sequence over a period of several months and as field conditions differ from controlled laboratory conditions, forces in individual tendons do deviate from the mean. Several major causes of these deviations are listed below.
Strain induced in the concrete and, consequently, in the tensioned tendons due to subsequent tensioning of remaining tendons.
Shrinkage strain accrued subsequent to tensioning of a given tendon.
Creep strain accrued subsequent to tensioning of a given tendon.
Minor variations in initial seating force.
Age of the concrete at the time of tensioning a given tendon. For example, an upper hoop tendon will experience more early creep strain than a lower hoop tendon since upper-level cylinder concrete is placed well after lower-level concrete and, therefore, will experience more creep strain under the same load applied at the same time.
Spatial and temporal variation in environmental factors, principally temperature and humidity, that affect shrinkage, creep and relaxation rates. For example, tendons tensioned during the heat of the summer will experience somewhat more early loss due to creep and relaxation than those tensioned during the cooler months.
In addition, there may be deviations from surveillance to surveillance resulting from changes in the methods3 used to measure tendon force as well as deviations, generally negligible, due to random measurement error.
These deviations from the mean appear as scatter on the force vs log time plots in the technical report. Scatter exhibited on the Byron and Braidwood plots is similar to that seen on plots of tendon forces measured at other plants. Three such plots are attached; one for Byron (Figure 1), one for Braidwood (Figure 7) and one figure from a technical report supporting the relief 2
Containment geometry will, in fact, result in some deviation from the mean. E.g., the lowest hoop tendons will experience a relatively little loss in force due to concrete creep since radial movement of the lower wall is restrained by the base mat.
3 Methods used to measure tendon force have evolved over time. Early methods include shim prying (generally yields a small under estimate of force) and shim sounding (generally yields an over estimate).
A possibly somewhat later method, feeler gage pull out, usually yields a small over estimate. The most recent and most accurate method, force / displacement plotting, is seldom used.
Page 9 of 18
 
ATTACHMENT 1 Response to Request for Additional Information request submitted by Millstone Unit 2 (ML19352B898). It is to be noted that all measured forces plotted on these figures lie above the minimum required level for group (hoop, dome vertical) mean force.
The forces in individual tendons are shown on the common tendon4 plots in the technical report (e.g., Byron Figures 3, 6, 9, 12, 15 and 18) to follow a log-linear trend with reasonably little scatter. This provides confirmation that the mean pre-stressing force trend is also essentially log-linear.
Since the use of a log-linear force trend is justified by common tendon data, it is only necessary to account in an acceptable statistical manner for the scatter of data about a linear trend line.
This is done by using the linear regression methods developed in statistical theory and presented in statistics texts (e.g., the Miller and Freund text cited as Byron Reference 8.15 and Braidwood Reference 8.8). The statistically expected, or most probable, force trend is represented by a linear function, F(t) = a - b
* Log (t), with coefficients a and b computed by the method of least squares and using all available surveillance lift-off force data.
Since the data set size is still small relative to the number of tendons in a group (e.g., 37 or fewer sample tendons vs 201 hoop tendons) it is likely that the true trend of the group mean will differ from that computed for the relatively small sample. While the actual true trend can only be determined by measuring the force in every tendon during each surveillance, a high probability lower limit on the true mean force at any point in time can be computed for any specified probability level. The technical report uses a probability level of 95%. The 95% level was selected to be consistent with that used to set an upper limit on containment leakage rates computed during tests prescribed by Appendix J to 10CFR50. The computed (also using the methods developed in the Miller and Freund text) lower limit is termed the 95% lower confidence limit5 or 95% LCL. The difference between the trend line and LCL values is a function of both the number of data points and the degree of scatter.
The LCL is represented by the red font dashed curves on the tendon force plots.
Since individual surveillance samples are small (3 to 12 tendons) relative to the tendon group population, the average force computed for a given sample is not a meaningful proxy for the group (hoop, vertical, dome) mean. The sample could as easily include only tendons with forces above the group mean as those with forces below the mean. Therefore, a long-term trend cannot be based on the difference in the average forces computed for two consecutive surveillances. A long-term trend, and the associated LCL curve, must be constructed using all available data or, as discussed in the addendum at the end of this response, using a data set that excludes force measurements acquired during the earliest surveillances.
The scatter of measured forces observed on the Byron and Braidwood figures is characteristic of lift-off force data in general and is similar to that illustrated by the plots included in the technical reports supporting the TMI-1, Vogtle 1 & 2, and Millstone 2 Relief Requests, which were approved by the NRC.
4 A tendon (one in each group) included in consecutive surveillance samples.
5 The 95% LCL on true mean force can be defined by the statement below.
There is a 95% probability that the true mean force lies above the 95% LCL value.
Page 10 of 18
 
ATTACHMENT 1 Response to Request for Additional Information Finally, it is to be noted that all 95% LCL curves plotted using year 5 and forward measured lift-offs show positive margin above minimum required group mean force at year 100 (since the applicable SIT) which is well beyond the end of the expected 80-year limit on unit operating life.
Margins are tabulated in technical report Parts D (Byron) and E (Braidwood) Sub-sections 2.4.
The margins are listed, for reference, in the table below.
95% LCL Margin, kip, Above Minimum Required Group Mean Force Group \ Unit            Byron 1            Byron 2          Braidwood 1          Braidwood 2 Hoop                  45                18                  62                  76 Vertical              153                102                  52                  306 Dome                    56                64                  16                  188 Summary and Conclusions
: 1. The log-linear function used to forecast group mean tendon forces is not unique to the Byron/Braidwood Relief Requests technical report. It is based on the trends demonstrated by innumerable concrete creep, concrete shrinkage and pre-stressing steel relaxation tests performed over many decades.
The function is used in containment design and in post-tensioning system ISI reports to project group mean force out to the deadline for completion of the subsequent examination.
The same function is used in the technical reports supporting the TMI-1, Vogtle 1 & 2, and Millstone 2 Relief Requests, all of which were approved by the NRC.
And, Regulatory Guide 1.35.1, Figure 2 uses a log-linear function to represent tendon force loss over time.
: 2. The scatter exhibited on the Figures 1, 7, and Millstone Unit 2 as well as the remaining plots in the technical report is the result of numerous effects that are not all quantified. It is expected, is typical of that evident on the plots in ISI reports and is similar to that shown on the plots included in the technical reports supporting the TMI-1, Vogtle 1 & 2, and Millstone 2 Relief Requests.
As is normal in treating scattered data, confidence limits are computed to establish statistically meaningful bounds on the best (least squares) fit trend line values. The 95%
confidence level used in the technical report is based on the 95% level used to set a limit on containment leakage rates computed for tests performed under Appendix J to 10CFR50.
: 3. The 95% LCL curves computed using surveillance year 5 and forward measured lift-offs show positive margin above minimum required group mean force at year 100 (since the applicable SIT) for all Byron and Braidwood tendon groups.
: 4. Finally, it is concluded that the data and analyses (Figures 1, 8, 10, 13, 16, 17 referred to in NRC RAI 59) in the technical report remain valid and, with the clarifications provided in this response, fully support the extension of the Byron and Braidwood containment ISI interval from 5 to 10 years with no compromise to nuclear safety. The ongoing structural integrity and ability of each containment to fulfill the intended safety function will continue to be Page 11 of 18
 
ATTACHMENT 1 Response to Request for Additional Information demonstrated by periodic examinations. The examination interval will be changed to reflect the excellent past performance of the containment structures as demonstrated by the many surveillances completed to date.
Addendum - Observed Flattening Typically, concrete creep and shrinkage tests are conducted over a period of 6 months. Tendon wire (or strand) relaxation tests are conducted over a period of 1,000 hours (~42 days). The results of these tests almost always follow a log-linear trend with relatively little scatter.
Tendon force measurements acquired over much longer terms of up to 40 years show that the log-linear postulate is conservative in that it forecasts greater than actual loss of force. This flattening trend is sometimes visually evident on long term plots that exhibit minimal scatter. It can be demonstrated statistically by comparing the slopes lines fitted to all surveillance data with those of lines fitted to data acquired during the year 10 (or, in some cases, year 5) and subsequent surveillances. The latter almost always have a flatter (less negative) slope and greater LCL as is illustrated by the following table which lists forecast hoop, vertical and dome group mean forces and LCLs for each of the 4 units (Byron 1 & 2 and Braidwood 1 & 2) at T =
100 years (time since the unit pre-operational structural integrity test). Mean force and LCL values are computed using data acquired during all surveillances as well as that acquired during the 5th year and subsequent surveillances.
Group Mean, kip, at 100 Years                Group LCL, kip, at 100 Years Tendon Plant    Unit                    For Data From        For Data From        For Data From        For Data From Group Year 1              Year 5                Year 1                Year 5 1                          1,156                1,181                1,136                  1,155 Hoop 2                          1,128                1,148                1,104                  1,128 1                          1,218                1,249                1,194                  1,213 Byron              Vertical 2                          1,180                1,194                1,157                  1,162 1                          1,199                1,223                1,165                  1,166 Dome 2                          1,199                1,207                1,174                  1,174 1                          1,220                1,256                1,162                  1,172 Hoop 2                          1,224                1,254                1,184                  1,186 1                          1,200a              1,166a                1,166a                1,112a Braidwood              Vertical 2                          1,380                1,418                1,344                  1,366 1                          1,169                1,174                1,133                  1,126 Dome 2                          1,303                1,351                1,268                  1,298 Note: Computed group mean and LCL are significantly impacted by one questionable tendon force recorded during the 5th year surveillance.
Forces and LCLs computed for the truncated data sets are, with 3 exceptions as shown in the highlighted cells, equal to (Byron Unit 2 dome tendon group LCL) or greater than, those computed using all surveillance data. This adds further support to the observation that the mean pre-stressing force tends to decrease more slowly as the logarithm of time increases.
Page 12 of 18
 
ATTACHMENT 1 Response to Request for Additional Information It is to be noted that all group LCL values listed above (and, consequently, all group means) exceed the minimum pre-stressing levels specified for the respective groups.
Page 13 of 18
 
ATTACHMENT 1 Response to Request for Additional Information Figure 1  Byron Unit 1 Hoop Tendon Force Trend & LCL / 1  30 Year Surveillance Results 1,400 Note A 1,350 Hoop Tendon Mean Force Trend Line FH (kip) = 1,271.5  58.0
* Log10 (T) 1,300 LiftOff Force Data Point (Typ)
F, Tendon Force, kip 1,250 Note B 1,200                      95% LCL on Mean Force Note D Note E Note C 1,150 1,100 Minimum Required Mean Hoop Tendon Force FMinH = 1,110 kip 1,050 1,000 0                                    1                                    10                                      100 T, Time Since SIT, Years (Logarithmic Scale)
Note A - Overlapping / superimposed symbols represent 3 plotted forces; 1,310, 1,310 & 1,311 kips as listed in Table 3 Note B - Overlapping symbols represent 2 plotted forces; 1,257 & 1,258 kips as listed in Table 3 Note C - Overlapping symbols represent 3 plotted forces; 1,206, 1,207 & 1,209 kips as listed in Table 3 Note D - Overlapping symbols represent 2 plotted forces; 1,216 & 1,218 kips as listed in Table 3 Note E - Overlapping symbols represent 2 plotted forces; 1,226 & 1,228 kips as listed in Table 3 Page 14 of 18
 
ATTACHMENT 1 Response to Request for Additional Information Figure 7  Braidwood Unit 1 Vertical Tendon Force Trend & LCL / 1  30 Year Surveillance Results 1,400 Vertical Tendon Mean Force Trend Line FV (kip) = 1,264.1  32.2
* Log10 (T)                                          LiftOff Force 1,350 Data Point (Typ) 1,300 1,250 F, Tendon Force, kip 1,200 95% LCL on Mean Force 1,150 1,100                                                  Minimum Required Mean Vertical Tendon Force FMinV = 1,060 kip 1,050 1,000 0                              1                                    10                                        100 T, Time Since SIT, Years (Logarithmic Scale)
Page 15 of 18
 
ATTACHMENT 1 Response to Request for Additional Information Millstone Unit 2 Figure  Dome Tendon Force Trend & LCL / 15  40 Year Surveillance Results 1,700 1,650 Mean Dome Tendon Force Trend Line FD (kip) = 1,625.4  112.04
* Log10 (T)
LiftOff Force 1,600                                                                                Data Point (Typ) 1,550 F, Tendon Force, kip 1,500 1,450 1,400 Minimum Required Mean Dome Tendon Force 1,350 FMinD (kip) = 1,308 95% LCL on Mean Force 1,300 1,250 10                                                                                                            100 T, Time Since SIT, Years (Logarithmic Scale)
Page 16 of 18
 
ATTACHMENT 1 Response to Request for Additional Information NRC RAI 60 PART C - BACKGROUND OF CURRENT ISI REQUIREMENTS AND BASIS FOR PROPOSED ALTERNATIVES, Basis for Proposed Alternatives / Relief from 10CFR50.55a and IWL Requirements, Section 4.2 System Hardware Condition History, states two conditions, "A number of wires were severely corroded and found to be no longer effective as pre-stressing elements," and "A unique combination of steel chemistry and high hardness led to the failure of anchor heads in both units of a two-unit plant. Several failures have occurred at random times over the past four decades."
Were any one of the conditions identified during the containment in-service inspection (CISI) activities? Have any of these conditions occurred at the Byron or Braidwood plant? If yes, describe in detail how the condition was identified and resolved.
EGC Response to NRC RAI 60 These conditions have not been found at Byron or Braidwood. Technical report Part C Subsection 4.2 stated that the extensive wire corrosion (initially observed during a regularly scheduled IWL examination) and anchor head failure (initially found during an Appendix J pre-ILRT visual examination) conditions are each unique to a single plant site in question. Additionally, anchor heads with the specific composition and heat treatment concluded to have led to the observed failures are unique to the site in question.
NRC RAI 61 Surveillance records indicate that some tendons in Byron and Braidwood have exceeded the free water limit of 0.2 liters as the licensee stated. For examples, Byron, Unit 1, had 0.5 liters of free water for tendon H27BA at Buttress A during the July 1986 surveillance, Unit 2 had 7.7 liters of free water for tendon H7FE at Buttress E, 6.6 liters of free water for tendon H2FF at Buttress F, and 6.1 liters of free water for tendon H3FE at Buttress E during the September 2019 surveillance. Braidwood, Unit 1, had 3.2 liters of free water for tendon H1AC at buttress C, and Unit 2, had 17.2 liters of free water for tendon H5FE at buttress F, during the July 1986 surveillance. Although all sample analyses have shown the free water to be alkaline or neutral with pH of 7 or greater and, therefore, noncorrosive, there is no guarantee that condition will always be the case in the future. The significant amount of free water found during the most recent September 2019 surveillance for Byron Unit 2 should be a concern. The licensee proposed a program to alleviate that concern of extending the surveillance interval from five years to ten years.
Page 69 of the Byron/Braidwood Technical Report states "Also, an augmented surveillance program of limited intermediate examinations to monitor free water19 conditions, as well as the condition of the dome coatings and dome drainage, will be initiated." Footnote 19 states "It has been reasonably assumed that water intruding into the lower hoop tendon ductwork is ground water. The validity of this assumption will be checked by a water chemist or other qualified professional. It is expected that this evaluation will be based on the quantitative analysis of a water sample collected at a tendon anchorage (see the following paragraphs) and a ground water sample collected at a location as specified by the chemist."
Provide an explanation of the augmented surveillance program to monitor the free water conditions, as well as the condition of the dome coatings and dome drainage. Footnote 19 states "this evaluation will be based on the quantitative analysis of a water sample collected at a Page 17 of 18
 
ATTACHMENT 1 Response to Request for Additional Information tendon anchorage (see the following paragraphs)." However, there are no paragraphs in the text because that is the end of the chapter. Provide the missing text as stated.
EGC Response to NRC RAI 61 Byron and Braidwood stations monitoring plan of tendon free water, dome coatings and dome drainage conditions are as follows:
ASME Section XI, Subsections IWL-2421 and IWL-2525 prescribe the requirements to monitor free water conditions. Monitoring of dome coatings and dome drainage exceed ASME Section XI, Subsection IWL scope requirements.
Implementation of tendon free water monitoring and grease sampling augmented inspection programs are in accordance with license renewal (LR) commitments described in Byron and Braidwood Stations Updated Final Safety Analysis Report (UFSAR) Supplement (License Renewal), Appendix F, Section A.2.1.30, "ASME Section XI, Subsection IWL," (ML18355A506). These augmented inspection programs were developed based on Byron and Braidwood historical containment structural conditions and the programs surpass the prescriptive ASME Section XI, Subsection IWL requirements to monitor and address free water conditions for tendons.
Monitoring of dome coatings and dome drainage will be performed during the performance of the baseline and follow up surveillances for free water conditions.
Based on the data gathered during these surveillances, a graduated monitoring plan will be developed for free water, dome coatings and dome drainage conditions.
In addition, the subsequent paragraphs referenced in footnote 19 were intended to be the main text paragraphs following the point where the footnote is cited. The reference to subsequent paragraphs is unclear since the footnote itself has no additional paragraphs. Therefore, revision to pages 69 and 150 of the technical report is provided in Attachment 2 as clarification. The revisions are delineated with revision bars.
Page 18 of 18
 
ATTACHMENT 2 Revised Pages from Containment Post-Tensioning System Inservice Inspection Technical Report, Revision 1
 
Byron/Braidwood Technical Report Part D (Byron) - Page 46 of 204 Revision 1 Updated 02/02/21 38 Vertical tendons - V1 through V18 and V143 through V162 32 Hoop tendons - H29BA through H44BA and H29CB through H44CB ASME Section XI, Subsection IWL paragraph IWL-2521.2 specifies that a separate sample of these tendons be examined during surveillances subsequent to the completion of re-tensioning. The forces in the SGR tendons have been altered by re-tensioning and are, therefore, addressed separately when evaluating trends and LCLs.
Samples of SGR tendons were examined during the 20th and 30th year surveillances in 2004 and 2014, respectively. The lift-off forces measured during each surveillance are shown below.
SGR Hoop Tendon Lift-Off Force Hoop Tendons              Vertical Tendons Surveillance  T, Time Since                        FM ,
FM, Measured Year          SIT, Years      Tendon /      Measured    Tendon /
Force /
Average        Force /    Average Lossb, kip Lossb, kip H37BA        1,316 / 99    V15        1,290 / 127 20            20.8          H38CB        1,322 / 96    V162        1,376 / 55 Average        1,319 / 98  Average      1,333 / 91 H30CB        1,332 / 61    V152        1,318 / 118 a
30            30.9          H38BA        1.320 / 81    V160a        1,367 / 52 Average        1,326 / 71  Average      1,342 / 85 Note a: Tendon de-tensioned for test wire removal and re-tensioned.
Note b: Loss is re-tensioning seating force, as documented in Reference 8.16, less FM.
The samples, two tendons in each group during each surveillance, are small which precludes formulating definitive conclusions regarding rate of loss in the SGR tendon population. Nonetheless, on the basis of the limited data available, it is reasonable to postulate that mean force in the hoop and vertical SGR tendons is relatively stable. This is expected since concrete creep and shrinkage strains are largely accounted for at year 20 (more than 20 years after the completion of pre-stressing operations) and tendon relaxation recovery between de-tensioning and re-tensioning is relatively limited.
 
Byron/Braidwood Technical Report Part D (Byron) - Page 69 of 204 Revision 1 Updated 02/02/21 will be initiated. Anchorages included in the program are those where water in excess of 0.2 liters was collected during one or both of the two most recent surveillances.
The augmented program will include detailed requirements for the following:
Base frequency of augmented surveillance and criteria for more frequent examinations at anchorages with accelerating water intrusion and / or developing corrosion.
Scope of surveillance examination / testing (free water collection / pH testing, CPM collection / testing, visual observation of corrosion, need for more extensive examination and other as applicable).
Chemical analysis, by a water chemist or other qualified professional, of both lower hoop and vertical tendon free water samples, as well as analysis of ground water, to establish whether or not ground water is the source of free water collected at the ends of these tendons.
Criteria for reducing the frequency of, or ending, augmented surveillance at specific anchorages.
Frequency and scope of dome coating / drainage examinations.
Examination and testing results will be evaluated by the Responsible Engineer who will determine if more extensive examinations and / or corrective action is needed.
In addition to the above, a one-time sample of Unit 1 below grade tendons (those in rings 1 through 7) will be added to the random sample designated for the 45th year surveillance.
Condition of these tendons and anchorage areas will be evaluated by the RE who will specify further examinations and / or corrective action as deemed necessary.
 
Byron/Braidwood Technical Report Part E (Braidwood) - Page 131 of 204 Revision 1 Updated 02/02/21 All of the above margins, which range from a minimum of 16 kip to 358 kip, are positive at T = 100 years. This provides a strong measure of assurance that mean pre-stressing forces provided by the hoop, vertical and dome tendon groups will remain above the minimum required levels well past the presumed 80 year maximum unit operating lifetime.
The above margin summary fully supports the proposed extension of the Byron post-tensioning system examination interval from five years to ten years with tendon force measurements (ASME Section XI Table IWL-2500-1, Examination Category L-B, Item L2.10) alternating between Unit 1 and Unit 2 as shown in Part E sub-section 1.1 above.
2.5    Steam Generator Replacement (SGR) Tendons The 1998 Unit 1 steam generator replacement project (Unit 2 generators have not been replaced) required cutting an opening in the containment cylinder wall. This, in turn, required de-tensioning and subsequent re-tensioning of the following tendons.
38 Vertical tendons - V1 through V18 and V143 through V162 32 Hoop tendons - H29BA through H44BA and H29CB through H44CB ASME Section XI, Subsection IWL paragraph IWL-2521.2 specifies that a separate sample of these tendons be examined during surveillances subsequent to the completion of re-tensioning. The forces in the SGR tendons have been altered by re-tensioning and are, therefore, addressed separately when evaluating trends and LCLs.
Samples of SGR tendons were examined during the 15th and 30th year surveillances in 2001 and 2016, respectively. The lift-off forces measured during each surveillance are shown below.
SGR Hoop Tendon Lift-Off Force Hoop Tendons                Vertical Tendons Surveillance    T, Time Since                        FM ,
FM, Measured Year          SIT, Years      Tendon /      Measured      Tendon /
Force /
Average        Force /      Average Lossb, kip Lossb, kip 15              15.0          H40CB        1,227 / 201      V160        1,323 / 90 a
H44BA        1,270 / 113      V16        1,328 / 96 30              30.5          H42CBa        1,287 / 120      V143        1,304 / 81 Average      1,278 / 116    Average      1,316 / 88 Note a: Tendon de-tensioned for test wire removal and re-tensioned.
Note b: Loss is re-tensioning seating force, as documented in Reference 8.2, less FM.
 
Byron/Braidwood Technical Report Part E (Braidwood) - Page 150 of 204 Revision 1 Updated 02/02/21 needed, a corrective action (e.g., end cap gasket replacement and duct refilling / top-off) plan will be prepared by, and implemented in accordance with the requirements of, the RE.
7.2    Enhanced Examination of Domes and Tendons Subject to Water Intrusion An augmented surveillance program of limited intermediate examinations to monitor free water conditions, as well as the condition of the dome coatings and dome drainage, will be initiated. Anchorages included in the program are those where water in excess of 0.2 liters was collected during one or both of the two most recent surveillances.
The augmented program will include detailed requirements for the following:
Base frequency of augmented surveillance and criteria for more frequent examinations at anchorages with accelerating water intrusion and / or developing corrosion.
Scope of surveillance examination / testing (free water collection / pH testing, CPM collection / testing, visual observation of corrosion, need for more extensive examination and other as applicable).
Chemical analysis, by a water chemist or other qualified professional, of both lower hoop and vertical tendon free water samples, as well as analysis of ground water, to establish whether or not ground water is the source of free water collected at the ends of these tendons.
Criteria for reducing the frequency of, or ending, augmented surveillance at specific anchorages.
Frequency and scope of dome coating / drainage examinations.
Examination and testing results will be evaluated by the Responsible Engineer who will determine if more extensive examinations and / or corrective action is needed.
Also, as noted in 3.1, Level E corrosion was found on the wires extracted from below grade tendons H2CB, H2DF and H1BA. At least one wire will be extracted from each of these tendons during the 40th year surveillance. Extracted wires will be examined for damage and corrosion. If Level D (4) or greater corrosion, or any active corrosion, is found, the condition will be evaluated by the Responsible Engineer who will specify further actions as deemed necessary.
Tensile tests will be performed on specimens cut from any wire that has Level D (4) or greater corrosion. The test specimens will include the most highly corroded segments}}

Revision as of 18:53, 20 January 2022

Response to Request for Additional Information Related to Relief Request for Braidwood I4R-11 and Byron I4R-18
ML21041A519
Person / Time
Site: Byron, Braidwood  
Issue date: 02/10/2021
From: Demetrius Murray
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-21-015
Download: ML21041A519 (26)


Text

4300 Winfield Road Warrenville, IL 60555 630 657 2000 Office RS-21-015 10 CFR 50.55a February 10, 2021 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. 50-454 and 50-455 Braidwood Station, Units 1 and 2 Renewed Facility Operating License No. NPF-72 and NPF - 77 NRC Docket Nos. STN 50-456 and STN 50-457

Subject:

Response to Request for Additional Information Related to Relief Request for Braidwood I4R-11 and Byron I4R-18

References:

1. Letter from D. Murray (Exelon Generation Company, LLC) to U.S. NRC, "Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements," dated July 24, 2020.
2. Email from J. Wiebe (U.S. Nuclear Regulatory Commission) to P. A.

Henderson (Exelon Generation Company, LLC), "RAIs Regarding Relief Request for Braidwood I4R-11 and Byron I4R-18," dated December 30, 2020.

By application dated July 24, 2020 (Reference 1), Exelon Generation Company, LLC (EGC) requested NRC approval of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, concerning containment unbonded post-tensioning system inservice inspection requirements. These requests are associated with the fourth Inservice Inspection (ISI) interval for Braidwood Station and Byron Station.

In an NRC email dated December 30, 2020 (Reference 2), the NRC determined that additional information is needed to complete its review. The attachments to this letter provide the requested information. As discussed during the clarification call held with the NRC on January 12, 2021, the response to the request for additional information (RAI) is requested within 30 days of the clarification call.

February 10, 2021 U.S. Nuclear Regulatory Commission Page 2 There are no regulatory commitments contained within this letter. Should you have any questions concerning this letter, please contact Mr. Phillip A. Henderson at (630) 657-4727.

Respectfully, Dwi Murray Sr. Manager - Licensing Exelon Generation Company, LLC Attachments:

1. Response to Request for Additional Information
2. Revised Pages from Containment Post-Tensioning System Inservice Inspection Technical Report, Revision 1 cc: NRC Regional Administrator, Region III NRC Senior Resident Inspector - Braidwood Station NRC Senior Resident Inspector - Byron Station

ATTACHMENT 1 Response to Request for Additional Information

ATTACHMENT 1 Response to Request for Additional Information By application dated July 24, 2020 (Reference 1), Exelon Generation Company, LLC (EGC) requested NRC approval of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, concerning containment unbonded post-tensioning system inservice inspection requirements (ADAMS Accession No. ML20206L135).

By email dated December 30, 2020 (Reference 2), the NRC determined that additional information is needed to complete its review. This attachment provides the requested information.

References:

1) Letter from D. Murray (Exelon Generation Company, LLC) to U.S. NRC, "Submittal of Relief Request I4R-11 for Braidwood Station, Units 1 and 2, and Relief Request I4R-18 for Byron Station, Units 1 and 2, Concerning Containment Unbonded Post-Tensioning System Inservice Inspection Requirements," dated July 24, 2020
2) Email from J. Wiebe (U.S. Nuclear Regulatory Commission) to P. A. Henderson (Exelon Generation Company, LLC), "RAIs Regarding Relief Request for Braidwood I4R-11 and Byron I4R-18," dated December 30, 2020.

NRC RAI 55 The request for relief for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements in Accordance with 10 CFR 50.55a(z)(1), Section 4, Reason for Request, states "ASME Section XI, Subsection IWL requires periodic visual examination and physical testing of Containment Building concrete as well as physical testing of post-tensioning systems."

The staff finds that ASME Section XI, Subsection IWL does not require periodic physical testing of Containment Building concrete. Describe what kind of physical testing of concrete is required and whether it has been performed. If yes, where are the test results documented.

EGC Response to NRC RAI 55 EGC agrees that ASME Section XI, Subsection IWL does not require periodic physical testing of the Containment Building concrete. The statement contained in Reference 1 cover letter and Section 4, Reason for Request, describing the required inspections of the Containment Building concrete and post-tensioning systems is revised as follows:

"ASME Section XI, Subsection IWL requires periodic visual examination and physical testing of the post-tensioning system, as well as, periodic visual examination of the Containment Building concrete."

NRC RAI 57 PART B - CONTAINMENT DESCRIPTION, ISI PROGRAM, and

SUMMARY

of PROPOSED PROGRAM CHANGES, Containment ISI Program Summary Description, states "Also, limited scope visual examinations that addressed Unit 2 water intrusion issues were performed at Byron in 1987 and 1988. Limited scope visual examinations that addressed Unit 1 and Unit 2 Page 1 of 18

ATTACHMENT 1 Response to Request for Additional Information water intrusion issues were performed at Braidwood in June - August 1987 and October -

November 1990."

Describe how the water intruded into the containment buildings and the results of these limited scope visual examinations activities.

EGC Response to NRC RAI 57 (a) Water did not enter into the containment buildings. Specifically, water did not pass through the liner and into the containment; it permeated through concrete (concrete is moderately porous) and entered the rolled seam (not watertight) tendon ducts.

(b) Limited scope examinations to assess the extent of water intrusion were performed following the completion of the regularly scheduled examinations and, for purposes of the technical report, are considered to be an extension of the latter (extension of the regularly scheduled exams). Therefore, the results of the limited scope exams are included with the results of the regularly scheduled exams.

Water intrusion is documented on Byron (report Part D) Table 13 and Braidwood (report Part E)

Table 14.

As stated in the 4.1 subsections of both report Parts D and E, corrosion found on Byron and Braidwood enclosed anchorage components was not active. It was concluded to have existed at the time of construction and, therefore, unrelated to the observed water intrusion in tendon ducts.

NRC RAI 58 The licensee states the following:

1. "Byron and Braidwood have completed nine and eight, respectively, pre-stressing system surveillances on each unit. These were based on Regulatory Guide 1.35 or 10CFR50.55a / ASME Section XI Subsection IWL,"
2. "the Regulatory Guide 1.35 requires "Examination sample size - six dome, five vertical, and ten hoop tendons,"
3. "Regulatory Guide 1.35 was withdrawn in August 2015 following the incorporation, by reference, of ASME Section XI, Subsection IWL into NRC Regulation 10CFR50.55a," and
4. "the examination intervals and wire testing addressed in the 1973 original issue of Regulatory Guide 1.35 are now, 45 years later, still incorporated effectively unchanged into the current edition of ASME Section XI, Subsection IWL."

Based on the above, provide responses to the following questions #58;

1. Byron Unit 1, the sample sizes for dome tendons are five for years 1 and 5, and three for years 10, 20, and 30 (see Byron Table 7), for vertical tendons are six for years 1 and 5, and three for years 10, 20, and 30 (see Table 5), and for hoop tendons are ten for year 1, eight for year 5, and four for years 10, 20, and 30 (see Page 2 of 18

ATTACHMENT 1 Response to Request for Additional Information Byron Table 3). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.

2. Byron Unit 2, the sample sizes for dome tendons are five for years 1 (see Byron Table 8), three for years 10, 20, and 30 (see Byron Table 8), for vertical tendons are eight for year 1, six for year 5, and four for years 15, 25, and 35 (see Byron Table 6),

and for hoop tendons are twelves for year 1, ten for year 5, and five for years 15, 25, and 35 (see Byron Table 4). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.

3. Braidwood Unit 1, the sample sizes for dome tendons are four for years 1, seven for years 5, three for years 10 and 20, and four for year 30 (see Braidwood Table 7), for vertical tendons are six for years 1 and 5, and three for years 10, four for year 20, and three for year 30 (see Braidwood Table 5), and for hoop tendons are nine for year 1, eight for year 5, and four for years 10, five for year 20, and four for year 30 (see Braidwood Table 3). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
4. Braidwood Unit 2, the sample sizes for dome tendons are five for years 1 and 5, and three for years 15 and 25 (see Braidwood Table 8), for vertical tendons are six for years 1 and 5, and three for year 10, four for year 20, and three for year 30 (see Braidwood Table 5), and for hoop tendons are nine for year 1, eight for year 5, and four for year 10, five for year 20, and four for year 30 (see Braidwood Table 3). Provide an explanation for those sample sizes that are less than that of the current edition of ASME Section XI, Subsection IWL.
5. There are ten numerical values listed in Table 3 for Unit 1 year 1 hoop tendon forces, but only seven forces are plotted in figure 1. There are 8 numerical values listed in Table 3 for Unit 1 year 5 for hoop tendon forces, but only four are plotted in figure
1. Provide an explanation for the discrepancy.

EGC Response to NRC RAI 58 (a) With respect to sub-questions 1 through 4, Byron Station, Units 1 and 2, and Braidwood Station, Units 1 and 2, Technical Specifications governed tendon sample sizes until compliance with ASME Section XI, Subsection IWL was required in accordance with 10 CFR 50.55a (61 FR 41303) after September 9, 1996, starting with the 20th year examinations at Byron Unit 1 and the 15th year examinations at Braidwood Unit 2 (Reference the Technical Report, Part B, Section 2).

Starting with the 20th year examinations at Byron Unit 1 and 15th year examinations at Braidwood Unit 2, tendon sample sizes were required in accordance with IWL-2421 and Table IWL-2521-1 for a sample size of 2%, with a minimum of 3 and maximum of 5 tendons of each type requiring examination. Starting with the 30th year examinations at Byron Unit 1 and Braidwood Unit 1, the sampling requirements were modified in accordance with Table IWL-2521-2 for a sample size of 2%, with a minimum of 3 and maximum of 5 tendons of each type requiring examination. Starting with the 30th year examinations at Byron Unit 1 and Braidwood Unit 1, the sampling requirements were modified in accordance with Table IWL-2521-2 to address tendons affected by repair/replacement activities, where temporary openings were repaired following steam generator replacements. These activities resulted in the removal and replacement of 38 vertical and 32 hoop tendons in each of these units to facilitate cutting the Page 3 of 18

ATTACHMENT 1 Response to Request for Additional Information containment cylinder wall opening needed for exchanging the steam generators. With this confirmation, revision to pages 46 and 131 of the technical report are provided as corrections to typographical errors regarding vertical tendon population in Attachment 2. The revisions are delineated with revision bars.

A review of the tendons selected for examination in accordance with ASME Section XI, Subsection IWL has determined that the required sample sizes met, or exceeded the sample sizes required by Subsection IWL, as shown in the following Tables 1 and 2.

Page 4 of 18

ATTACHMENT 1 Response to Request for Additional Information Table 1 Byron Station, Units 1 and 2 Tendon Sample Sizes Required by ASME Section XI, Subsection IWL Except as noted below, the required minimum sample sizes for each examination are as follows (as required by Table IWL-2521-1, based on a 2% sample size):

  • 4 Verticals (Based on 162 Vertical Tendons)
  • 3 Domes (Based on 120 Dome Tendons)
  • 5 Hoops (Based on 201 Hoop Tendons)

Tendons Selected for Examination Unit 1 20th Year Unit 2 Unit 1 Unit 2 Tendon Group (2004) 25th year (2009) 30th Year (2014) 35th Year (2019)

Unit 1 Verticals not Affected V47, V88, V82, V88, V121(5) by Steam Generator V110(2)

Replacement (SGR)

Unit 1 Verticals Affected by V15(1), V162(1) V15(1), (3)2, SGR V160(1), (3)

Unit 1 Hoops not Affected by H55BA, H24CB, Unit 2 Physical H42AC, H45BA, Unit 2 Physical SGR H58AC, H6BA(2) Inspection Year H57CB, H58AC(4) Inspection Year Unit 1 Hoops Affected by H37BA(1), H30CB(1), (3),

SGR H38CB(1) H38BA(1), (3)

Unit 1 Dome D124, D307, D124, D138, D219 D312 Unit 2 Vertical V290, V232, V208, V290, V295, V306 V315, V356 Unit 2 Hoop Unit 1 Physical H60ED, H55DF, Unit 1 Physical H8DF, H48DF, Inspection Year H21DF, H12ED, Inspection Year H29ED, H60ED, H65EF H27FE Unit 2 Dome D636, D619, D407, D531, D510 D636 Notes:

(1) These tendons were excluded from those shown in Part D, Tables 3 and 5 of the Technical Report because these tendons were affected by repair/replacement activity associated with Steam Generator replacement repairs and are not representative of tendons that have been in service since commercial operation of the plant.

(2) The required sample size during this examination was satisfied by examination of the tendons identified here, as well as the additional tendons affected by SGR.

(3) Starting with the Unit 1 30th year examinations, the sample size for tendons affected by repair/replacement activities is determined by Table IWL-2521-2.

(4) The number of hoop tendons required to be examined during this inspection is based on 2% of the hoop tendons not affected by SGR. The revised population of unaffected tendons allowed a sample size of 4 to be selected.

(5) The number of vertical tendons required to be examined during this inspection is based on 2% of the vertical tendons not affected by SGR. The revised population of unaffected tendons allowed a sample size of 3 to be selected.

Page 5 of 18

ATTACHMENT 1 Response to Request for Additional Information Table 2 Braidwood Station, Units 1 and 2 Tendon Sample Sizes Required by ASME Section XI, Subsection IWL Except as noted below, the required minimum sample sizes for each examination are as follows (as required by Table IWL-2521-1, based on a 2% sample size):

  • 4 Verticals (Based on 162 Vertical Tendons)
  • 3 Domes (Based on 120 Dome Tendons)
  • 5 Hoops (Based on 201 Hoop Tendons)

Tendons Selected for Examination Unit 2 15th Year Unit 1 Unit 2 Unit 1 Tendon Group (2001) 20th Year (2006) 25th Year (2011) 30th Year (2016)

Unit 1 Verticals not Affected V30, V50, V95, V30, V76, V112(3) by SGR V133 Unit 1 Verticals Affected by None inspected(2) V16(1),(5), V143(1),

(5)

SGR Unit 2 Physical Unit 2 Physical Unit 1 Hoops not Affected by Inspection Year H35AC, H59AC, Inspection Year H16CB, H21BA, SGR H53CB, H67CB, H50BA, H67AC(4)

H50BA Unit 1 Hoops Affected by None inspected H42CB(1), (5),

SGR H44BA(1), (5)

Unit 1 Dome D102, D115, D132, D219, D219 D332, D137 Unit 2 Vertical V232, V308, V203, V308, V333, V357, V243, V342 V236, V249 Unit 1 Physical Unit 1 Physical Unit 2 Hoop H22DF, H36ED, H57DF, H16ED, Inspection Year Inspection Year H45DF, H56FE, H24ED, H46FE, H57DF, H4ED H62FE Unit 2 Dome D438, D537, D436, D504, D622 D622 Notes:

(1) These tendons were excluded from those shown in Part E, Tables 3 and 5 of the Technical Report because these tendons were affected by repair/replacement activity associated with Steam Generator replacement repairs and are not representative of tendons that have been in service since commercial operation of the plant.

(2) In 2006, there were no specific requirements for examination of tendons affected by repair/replacement activities in the ASME Code,Section XI Code of record in use at that time. Note that the requirements now found in Table IWL-2521-2 were incorporated into the 2002 Addenda of the ASME Code,Section XI.

(3) The number of vertical tendons required to be examined during this inspection is based on 2% of the vertical tendons not affected by SGR. The revised population of unaffected tendons allowed a sample size of 3 to be selected.

(4) The number of hoop tendons required to be examined during this inspection is based on 2% of the hoop tendons not affected by SGR. The revised population of unaffected tendons allowed a sample size of 4 to be selected.

(5) Starting with the Unit 1 30th year examinations, the sample size for tendons affected by repair/replacement activities is determined by Table IWL-2521-2.

Page 6 of 18

ATTACHMENT 1 Response to Request for Additional Information (b) With respect to sub-question 5, all points on Table 3 for Unit 1 year 1 hoop tendon forces and Unit 1 year 5 for hoop tendon forces are plotted in Figure 1.

Since the data points were close in values, as a result, they were superimposed on each other such that they cannot be distinguished on the plots. Specifically, three of the lift-off forces measured during the 1st year examination, as listed on Part D (Byron) Table 3, are 1,310, 1,310 and 1,311 kips and have a spread of only 1 kip. The three symbols plotted for these are effectively superimposed and cannot be distinguished from one another on the plot (Figure 1).

Two of the measured forces are 1,257 and 1,258 kips and have a spread of 1 kip. Again, the symbols for these are effectively superimposed and cannot be distinguished from one another on the plot (Figure 1).

Three of the forces measured during the 5th year are 1,206, 1,207 and 1,209 kips and have a spread of 3 kips. The three symbols are partially superimposed but close inspection shows that these do overlap. The same is true for the closely spaced values of 1,216 and 1,218 kips (2 kip spread) as well as the closely spaced values of 1,226 and 1,228 kip (also a 2 kip spread).

It is to be noted that the trend line and LCL computations use all of the data listed in Table 3.

Notes provided in Figure 1 provided in this letter describes the plotted numerical values listed in Table 3 for Unit 1 year 1 and 5 for hoop tendon forces. Therefore, there is no discrepancy between the numerical values listed in Table 3 and Figure 1.

NRC RAI 59 The licensee developed and proposed formulas indicating that the pre-stressing forces in the cylinder both in the hoop and vertical directions and in the dome of the containments have been decreasing gradually with time. The formulas predict that the pre-stressing forces will remain above the required minimum magnitudes for the next ten years. This is the main argument used by the licensee to extend the ASME Code's five year surveillance intervals to ten years. However, the prestressing forces in the following figures do not match the licensee's formula predicted. The prestressing forces in the following figures have been decreased or increased or flattened at different time intervals, sometimes sharply and other times gradually, with no predictable trends (increase or decrease or flat) and magnitudes from time to time. Therefore, the use of the formulas to predict the future prestressing lost in the containment as the justification for extending the ASME Code's five-year surveillance intervals to ten-year intervals may not be valid.

Figure 1 - Byron Unit 1 Hoop Tendon Force Trend & LCL / 1 - 30 Year Surveillance Results indicate that the prestressing force is decreased from year 1 to year 5 and decreased more to year 10, but then is reversed to increase from year 10 to year 29 and is decreased again to year 30.

Figure 8 - Byron Unit 1 Vertical Tendon Force Trend & LCL / 5 - 30 Year Surveillance Results indicate that the prestressing force is increased from year 5 to year 10 and then flattened to year 20 and then decreased from year 20 to year 30.

Figure 10 - Byron Unit 2 Vertical Tendon Force Trend & LCL / 1 - 35 Year Surveillance Results indicate that the prestressing force is decreased sharply from year 1 to year 5 and then flattened to year 15 and then another sharply decreased to year 25 and then slightly increased to year 35.

Page 7 of 18

ATTACHMENT 1 Response to Request for Additional Information Figure 13 - Byron Unit 1 Dome Tendon Force Trend & LCL / 1 - 30 Year Surveillance Results indicate that the prestressing force is decreased sharply from year 1 to year 5 and then increased from year 5 to year 10 and then decreased to year 20 and then increased slightly to year 30.

Figure 16 - Braidwood Unit 2 Dome Tendon Force Trend & LCL / 1 - 35 Year Surveillance Results indicates that the prestressing force is reduced from year 1 to year 5 and is increased from year 5 upward through years 15 and 25.

Figure 17 - Byron Unit 2 Dome Tendon Force Trend & LCL / 5 - 35 Year Surveillance Results indicates that the prestressing force is increased from year 5 to year 15 and then decreased from year 15 to year 25 and 35.

Provide an explanation for such irregular phenomena of prestressing loss or gain with time in containments. Also provide additional justification why it is acceptable to extend the surveillance intervals from the ASME Code's five year surveillance intervals to the proposed ten year intervals.

EGC Response to NRC RAI 59 There is no formula, as such, used in developing the Byron and Braidwood prestressing force trends. The log-linear function used to generate statistically meaningful force trends is a pre-stressed concrete technology standard based on the results of laboratory tests, performed over many years, on concrete design mix specimens and specimens of tendon wire representing different heats of steel. These tests have consistently shown that the following parameters vary essentially linearly with the logarithm of time, with possible flattening of the characteristic over a time span measured in decades.

Concrete shrinkage strain when specimens are maintained at fixed temperature and humidity.

Concrete creep strain when specimens are maintained under a fixed load at a fixed temperature and sealed to eliminate moisture loss and attendant shrinkage.

Steel stress when relaxation test specimens are maintained at a fixed elongation and fixed temperature.

These log-linear characteristics1 are used during containment design to predict pre-stressing force loss with time. The pre-stressing system is then designed to ensure that the level force will meet the design specification requirements at the end of plant life (initially specified as 40 years). Designs are generally based on the conservative postulates that temperature, humidity and loading conditions are such as to maximize expected concrete shrinkage / creep strains and pre-stressing steel stress loss.

The same log-linear characteristic is used in post-tensioning ISI reports to trend tendon group mean force through the subsequent examination. And, it is used in the technical reports 1

Flattening of the log-linear characteristic, as is often observed in plots of surveillance data acquired over a several decade time span, results in a conservative design, i.e., one with lower than forecast loss of pre-stressing force.

Page 8 of 18

ATTACHMENT 1 Response to Request for Additional Information supporting the TMI-1, Vogtle 1 & 2, and Millstone 2 relief requests, all of which were approved by the NRC (ML19226A023, ML19182A077, and ML20287A471).

In addition, use of the log-linear characteristic to forecast tendon forces is addressed in USNRC Regulatory Guide 1.35.1, Figure 2.

If all tendons were tensioned simultaneously and subsequently maintained under steady and uniform environmental conditions, then forces measured during a surveillance would plot on the trend line; i.e., the force measured for each tendon2 would represent the mean.

As tendons are tensioned in a prescribed sequence over a period of several months and as field conditions differ from controlled laboratory conditions, forces in individual tendons do deviate from the mean. Several major causes of these deviations are listed below.

Strain induced in the concrete and, consequently, in the tensioned tendons due to subsequent tensioning of remaining tendons.

Shrinkage strain accrued subsequent to tensioning of a given tendon.

Creep strain accrued subsequent to tensioning of a given tendon.

Minor variations in initial seating force.

Age of the concrete at the time of tensioning a given tendon. For example, an upper hoop tendon will experience more early creep strain than a lower hoop tendon since upper-level cylinder concrete is placed well after lower-level concrete and, therefore, will experience more creep strain under the same load applied at the same time.

Spatial and temporal variation in environmental factors, principally temperature and humidity, that affect shrinkage, creep and relaxation rates. For example, tendons tensioned during the heat of the summer will experience somewhat more early loss due to creep and relaxation than those tensioned during the cooler months.

In addition, there may be deviations from surveillance to surveillance resulting from changes in the methods3 used to measure tendon force as well as deviations, generally negligible, due to random measurement error.

These deviations from the mean appear as scatter on the force vs log time plots in the technical report. Scatter exhibited on the Byron and Braidwood plots is similar to that seen on plots of tendon forces measured at other plants. Three such plots are attached; one for Byron (Figure 1), one for Braidwood (Figure 7) and one figure from a technical report supporting the relief 2

Containment geometry will, in fact, result in some deviation from the mean. E.g., the lowest hoop tendons will experience a relatively little loss in force due to concrete creep since radial movement of the lower wall is restrained by the base mat.

3 Methods used to measure tendon force have evolved over time. Early methods include shim prying (generally yields a small under estimate of force) and shim sounding (generally yields an over estimate).

A possibly somewhat later method, feeler gage pull out, usually yields a small over estimate. The most recent and most accurate method, force / displacement plotting, is seldom used.

Page 9 of 18

ATTACHMENT 1 Response to Request for Additional Information request submitted by Millstone Unit 2 (ML19352B898). It is to be noted that all measured forces plotted on these figures lie above the minimum required level for group (hoop, dome vertical) mean force.

The forces in individual tendons are shown on the common tendon4 plots in the technical report (e.g., Byron Figures 3, 6, 9, 12, 15 and 18) to follow a log-linear trend with reasonably little scatter. This provides confirmation that the mean pre-stressing force trend is also essentially log-linear.

Since the use of a log-linear force trend is justified by common tendon data, it is only necessary to account in an acceptable statistical manner for the scatter of data about a linear trend line.

This is done by using the linear regression methods developed in statistical theory and presented in statistics texts (e.g., the Miller and Freund text cited as Byron Reference 8.15 and Braidwood Reference 8.8). The statistically expected, or most probable, force trend is represented by a linear function, F(t) = a - b

  • Log (t), with coefficients a and b computed by the method of least squares and using all available surveillance lift-off force data.

Since the data set size is still small relative to the number of tendons in a group (e.g., 37 or fewer sample tendons vs 201 hoop tendons) it is likely that the true trend of the group mean will differ from that computed for the relatively small sample. While the actual true trend can only be determined by measuring the force in every tendon during each surveillance, a high probability lower limit on the true mean force at any point in time can be computed for any specified probability level. The technical report uses a probability level of 95%. The 95% level was selected to be consistent with that used to set an upper limit on containment leakage rates computed during tests prescribed by Appendix J to 10CFR50. The computed (also using the methods developed in the Miller and Freund text) lower limit is termed the 95% lower confidence limit5 or 95% LCL. The difference between the trend line and LCL values is a function of both the number of data points and the degree of scatter.

The LCL is represented by the red font dashed curves on the tendon force plots.

Since individual surveillance samples are small (3 to 12 tendons) relative to the tendon group population, the average force computed for a given sample is not a meaningful proxy for the group (hoop, vertical, dome) mean. The sample could as easily include only tendons with forces above the group mean as those with forces below the mean. Therefore, a long-term trend cannot be based on the difference in the average forces computed for two consecutive surveillances. A long-term trend, and the associated LCL curve, must be constructed using all available data or, as discussed in the addendum at the end of this response, using a data set that excludes force measurements acquired during the earliest surveillances.

The scatter of measured forces observed on the Byron and Braidwood figures is characteristic of lift-off force data in general and is similar to that illustrated by the plots included in the technical reports supporting the TMI-1, Vogtle 1 & 2, and Millstone 2 Relief Requests, which were approved by the NRC.

4 A tendon (one in each group) included in consecutive surveillance samples.

5 The 95% LCL on true mean force can be defined by the statement below.

There is a 95% probability that the true mean force lies above the 95% LCL value.

Page 10 of 18

ATTACHMENT 1 Response to Request for Additional Information Finally, it is to be noted that all 95% LCL curves plotted using year 5 and forward measured lift-offs show positive margin above minimum required group mean force at year 100 (since the applicable SIT) which is well beyond the end of the expected 80-year limit on unit operating life.

Margins are tabulated in technical report Parts D (Byron) and E (Braidwood) Sub-sections 2.4.

The margins are listed, for reference, in the table below.

95% LCL Margin, kip, Above Minimum Required Group Mean Force Group \ Unit Byron 1 Byron 2 Braidwood 1 Braidwood 2 Hoop 45 18 62 76 Vertical 153 102 52 306 Dome 56 64 16 188 Summary and Conclusions

1. The log-linear function used to forecast group mean tendon forces is not unique to the Byron/Braidwood Relief Requests technical report. It is based on the trends demonstrated by innumerable concrete creep, concrete shrinkage and pre-stressing steel relaxation tests performed over many decades.

The function is used in containment design and in post-tensioning system ISI reports to project group mean force out to the deadline for completion of the subsequent examination.

The same function is used in the technical reports supporting the TMI-1, Vogtle 1 & 2, and Millstone 2 Relief Requests, all of which were approved by the NRC.

And, Regulatory Guide 1.35.1, Figure 2 uses a log-linear function to represent tendon force loss over time.

2. The scatter exhibited on the Figures 1, 7, and Millstone Unit 2 as well as the remaining plots in the technical report is the result of numerous effects that are not all quantified. It is expected, is typical of that evident on the plots in ISI reports and is similar to that shown on the plots included in the technical reports supporting the TMI-1, Vogtle 1 & 2, and Millstone 2 Relief Requests.

As is normal in treating scattered data, confidence limits are computed to establish statistically meaningful bounds on the best (least squares) fit trend line values. The 95%

confidence level used in the technical report is based on the 95% level used to set a limit on containment leakage rates computed for tests performed under Appendix J to 10CFR50.

3. The 95% LCL curves computed using surveillance year 5 and forward measured lift-offs show positive margin above minimum required group mean force at year 100 (since the applicable SIT) for all Byron and Braidwood tendon groups.
4. Finally, it is concluded that the data and analyses (Figures 1, 8, 10, 13, 16, 17 referred to in NRC RAI 59) in the technical report remain valid and, with the clarifications provided in this response, fully support the extension of the Byron and Braidwood containment ISI interval from 5 to 10 years with no compromise to nuclear safety. The ongoing structural integrity and ability of each containment to fulfill the intended safety function will continue to be Page 11 of 18

ATTACHMENT 1 Response to Request for Additional Information demonstrated by periodic examinations. The examination interval will be changed to reflect the excellent past performance of the containment structures as demonstrated by the many surveillances completed to date.

Addendum - Observed Flattening Typically, concrete creep and shrinkage tests are conducted over a period of 6 months. Tendon wire (or strand) relaxation tests are conducted over a period of 1,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> (~42 days). The results of these tests almost always follow a log-linear trend with relatively little scatter.

Tendon force measurements acquired over much longer terms of up to 40 years show that the log-linear postulate is conservative in that it forecasts greater than actual loss of force. This flattening trend is sometimes visually evident on long term plots that exhibit minimal scatter. It can be demonstrated statistically by comparing the slopes lines fitted to all surveillance data with those of lines fitted to data acquired during the year 10 (or, in some cases, year 5) and subsequent surveillances. The latter almost always have a flatter (less negative) slope and greater LCL as is illustrated by the following table which lists forecast hoop, vertical and dome group mean forces and LCLs for each of the 4 units (Byron 1 & 2 and Braidwood 1 & 2) at T =

100 years (time since the unit pre-operational structural integrity test). Mean force and LCL values are computed using data acquired during all surveillances as well as that acquired during the 5th year and subsequent surveillances.

Group Mean, kip, at 100 Years Group LCL, kip, at 100 Years Tendon Plant Unit For Data From For Data From For Data From For Data From Group Year 1 Year 5 Year 1 Year 5 1 1,156 1,181 1,136 1,155 Hoop 2 1,128 1,148 1,104 1,128 1 1,218 1,249 1,194 1,213 Byron Vertical 2 1,180 1,194 1,157 1,162 1 1,199 1,223 1,165 1,166 Dome 2 1,199 1,207 1,174 1,174 1 1,220 1,256 1,162 1,172 Hoop 2 1,224 1,254 1,184 1,186 1 1,200a 1,166a 1,166a 1,112a Braidwood Vertical 2 1,380 1,418 1,344 1,366 1 1,169 1,174 1,133 1,126 Dome 2 1,303 1,351 1,268 1,298 Note: Computed group mean and LCL are significantly impacted by one questionable tendon force recorded during the 5th year surveillance.

Forces and LCLs computed for the truncated data sets are, with 3 exceptions as shown in the highlighted cells, equal to (Byron Unit 2 dome tendon group LCL) or greater than, those computed using all surveillance data. This adds further support to the observation that the mean pre-stressing force tends to decrease more slowly as the logarithm of time increases.

Page 12 of 18

ATTACHMENT 1 Response to Request for Additional Information It is to be noted that all group LCL values listed above (and, consequently, all group means) exceed the minimum pre-stressing levels specified for the respective groups.

Page 13 of 18

ATTACHMENT 1 Response to Request for Additional Information Figure 1 Byron Unit 1 Hoop Tendon Force Trend & LCL / 1 30 Year Surveillance Results 1,400 Note A 1,350 Hoop Tendon Mean Force Trend Line FH (kip) = 1,271.5 58.0

  • Log10 (T) 1,300 LiftOff Force Data Point (Typ)

F, Tendon Force, kip 1,250 Note B 1,200 95% LCL on Mean Force Note D Note E Note C 1,150 1,100 Minimum Required Mean Hoop Tendon Force FMinH = 1,110 kip 1,050 1,000 0 1 10 100 T, Time Since SIT, Years (Logarithmic Scale)

Note A - Overlapping / superimposed symbols represent 3 plotted forces; 1,310, 1,310 & 1,311 kips as listed in Table 3 Note B - Overlapping symbols represent 2 plotted forces; 1,257 & 1,258 kips as listed in Table 3 Note C - Overlapping symbols represent 3 plotted forces; 1,206, 1,207 & 1,209 kips as listed in Table 3 Note D - Overlapping symbols represent 2 plotted forces; 1,216 & 1,218 kips as listed in Table 3 Note E - Overlapping symbols represent 2 plotted forces; 1,226 & 1,228 kips as listed in Table 3 Page 14 of 18

ATTACHMENT 1 Response to Request for Additional Information Figure 7 Braidwood Unit 1 Vertical Tendon Force Trend & LCL / 1 30 Year Surveillance Results 1,400 Vertical Tendon Mean Force Trend Line FV (kip) = 1,264.1 32.2

  • Log10 (T) LiftOff Force 1,350 Data Point (Typ) 1,300 1,250 F, Tendon Force, kip 1,200 95% LCL on Mean Force 1,150 1,100 Minimum Required Mean Vertical Tendon Force FMinV = 1,060 kip 1,050 1,000 0 1 10 100 T, Time Since SIT, Years (Logarithmic Scale)

Page 15 of 18

ATTACHMENT 1 Response to Request for Additional Information Millstone Unit 2 Figure Dome Tendon Force Trend & LCL / 15 40 Year Surveillance Results 1,700 1,650 Mean Dome Tendon Force Trend Line FD (kip) = 1,625.4 112.04

  • Log10 (T)

LiftOff Force 1,600 Data Point (Typ) 1,550 F, Tendon Force, kip 1,500 1,450 1,400 Minimum Required Mean Dome Tendon Force 1,350 FMinD (kip) = 1,308 95% LCL on Mean Force 1,300 1,250 10 100 T, Time Since SIT, Years (Logarithmic Scale)

Page 16 of 18

ATTACHMENT 1 Response to Request for Additional Information NRC RAI 60 PART C - BACKGROUND OF CURRENT ISI REQUIREMENTS AND BASIS FOR PROPOSED ALTERNATIVES, Basis for Proposed Alternatives / Relief from 10CFR50.55a and IWL Requirements, Section 4.2 System Hardware Condition History, states two conditions, "A number of wires were severely corroded and found to be no longer effective as pre-stressing elements," and "A unique combination of steel chemistry and high hardness led to the failure of anchor heads in both units of a two-unit plant. Several failures have occurred at random times over the past four decades."

Were any one of the conditions identified during the containment in-service inspection (CISI) activities? Have any of these conditions occurred at the Byron or Braidwood plant? If yes, describe in detail how the condition was identified and resolved.

EGC Response to NRC RAI 60 These conditions have not been found at Byron or Braidwood. Technical report Part C Subsection 4.2 stated that the extensive wire corrosion (initially observed during a regularly scheduled IWL examination) and anchor head failure (initially found during an Appendix J pre-ILRT visual examination) conditions are each unique to a single plant site in question. Additionally, anchor heads with the specific composition and heat treatment concluded to have led to the observed failures are unique to the site in question.

NRC RAI 61 Surveillance records indicate that some tendons in Byron and Braidwood have exceeded the free water limit of 0.2 liters as the licensee stated. For examples, Byron, Unit 1, had 0.5 liters of free water for tendon H27BA at Buttress A during the July 1986 surveillance, Unit 2 had 7.7 liters of free water for tendon H7FE at Buttress E, 6.6 liters of free water for tendon H2FF at Buttress F, and 6.1 liters of free water for tendon H3FE at Buttress E during the September 2019 surveillance. Braidwood, Unit 1, had 3.2 liters of free water for tendon H1AC at buttress C, and Unit 2, had 17.2 liters of free water for tendon H5FE at buttress F, during the July 1986 surveillance. Although all sample analyses have shown the free water to be alkaline or neutral with pH of 7 or greater and, therefore, noncorrosive, there is no guarantee that condition will always be the case in the future. The significant amount of free water found during the most recent September 2019 surveillance for Byron Unit 2 should be a concern. The licensee proposed a program to alleviate that concern of extending the surveillance interval from five years to ten years.

Page 69 of the Byron/Braidwood Technical Report states "Also, an augmented surveillance program of limited intermediate examinations to monitor free water19 conditions, as well as the condition of the dome coatings and dome drainage, will be initiated." Footnote 19 states "It has been reasonably assumed that water intruding into the lower hoop tendon ductwork is ground water. The validity of this assumption will be checked by a water chemist or other qualified professional. It is expected that this evaluation will be based on the quantitative analysis of a water sample collected at a tendon anchorage (see the following paragraphs) and a ground water sample collected at a location as specified by the chemist."

Provide an explanation of the augmented surveillance program to monitor the free water conditions, as well as the condition of the dome coatings and dome drainage. Footnote 19 states "this evaluation will be based on the quantitative analysis of a water sample collected at a Page 17 of 18

ATTACHMENT 1 Response to Request for Additional Information tendon anchorage (see the following paragraphs)." However, there are no paragraphs in the text because that is the end of the chapter. Provide the missing text as stated.

EGC Response to NRC RAI 61 Byron and Braidwood stations monitoring plan of tendon free water, dome coatings and dome drainage conditions are as follows:

ASME Section XI, Subsections IWL-2421 and IWL-2525 prescribe the requirements to monitor free water conditions. Monitoring of dome coatings and dome drainage exceed ASME Section XI, Subsection IWL scope requirements.

Implementation of tendon free water monitoring and grease sampling augmented inspection programs are in accordance with license renewal (LR) commitments described in Byron and Braidwood Stations Updated Final Safety Analysis Report (UFSAR) Supplement (License Renewal), Appendix F, Section A.2.1.30, "ASME Section XI, Subsection IWL," (ML18355A506). These augmented inspection programs were developed based on Byron and Braidwood historical containment structural conditions and the programs surpass the prescriptive ASME Section XI, Subsection IWL requirements to monitor and address free water conditions for tendons.

Monitoring of dome coatings and dome drainage will be performed during the performance of the baseline and follow up surveillances for free water conditions.

Based on the data gathered during these surveillances, a graduated monitoring plan will be developed for free water, dome coatings and dome drainage conditions.

In addition, the subsequent paragraphs referenced in footnote 19 were intended to be the main text paragraphs following the point where the footnote is cited. The reference to subsequent paragraphs is unclear since the footnote itself has no additional paragraphs. Therefore, revision to pages 69 and 150 of the technical report is provided in Attachment 2 as clarification. The revisions are delineated with revision bars.

Page 18 of 18

ATTACHMENT 2 Revised Pages from Containment Post-Tensioning System Inservice Inspection Technical Report, Revision 1

Byron/Braidwood Technical Report Part D (Byron) - Page 46 of 204 Revision 1 Updated 02/02/21 38 Vertical tendons - V1 through V18 and V143 through V162 32 Hoop tendons - H29BA through H44BA and H29CB through H44CB ASME Section XI, Subsection IWL paragraph IWL-2521.2 specifies that a separate sample of these tendons be examined during surveillances subsequent to the completion of re-tensioning. The forces in the SGR tendons have been altered by re-tensioning and are, therefore, addressed separately when evaluating trends and LCLs.

Samples of SGR tendons were examined during the 20th and 30th year surveillances in 2004 and 2014, respectively. The lift-off forces measured during each surveillance are shown below.

SGR Hoop Tendon Lift-Off Force Hoop Tendons Vertical Tendons Surveillance T, Time Since FM ,

FM, Measured Year SIT, Years Tendon / Measured Tendon /

Force /

Average Force / Average Lossb, kip Lossb, kip H37BA 1,316 / 99 V15 1,290 / 127 20 20.8 H38CB 1,322 / 96 V162 1,376 / 55 Average 1,319 / 98 Average 1,333 / 91 H30CB 1,332 / 61 V152 1,318 / 118 a

30 30.9 H38BA 1.320 / 81 V160a 1,367 / 52 Average 1,326 / 71 Average 1,342 / 85 Note a: Tendon de-tensioned for test wire removal and re-tensioned.

Note b: Loss is re-tensioning seating force, as documented in Reference 8.16, less FM.

The samples, two tendons in each group during each surveillance, are small which precludes formulating definitive conclusions regarding rate of loss in the SGR tendon population. Nonetheless, on the basis of the limited data available, it is reasonable to postulate that mean force in the hoop and vertical SGR tendons is relatively stable. This is expected since concrete creep and shrinkage strains are largely accounted for at year 20 (more than 20 years after the completion of pre-stressing operations) and tendon relaxation recovery between de-tensioning and re-tensioning is relatively limited.

Byron/Braidwood Technical Report Part D (Byron) - Page 69 of 204 Revision 1 Updated 02/02/21 will be initiated. Anchorages included in the program are those where water in excess of 0.2 liters was collected during one or both of the two most recent surveillances.

The augmented program will include detailed requirements for the following:

Base frequency of augmented surveillance and criteria for more frequent examinations at anchorages with accelerating water intrusion and / or developing corrosion.

Scope of surveillance examination / testing (free water collection / pH testing, CPM collection / testing, visual observation of corrosion, need for more extensive examination and other as applicable).

Chemical analysis, by a water chemist or other qualified professional, of both lower hoop and vertical tendon free water samples, as well as analysis of ground water, to establish whether or not ground water is the source of free water collected at the ends of these tendons.

Criteria for reducing the frequency of, or ending, augmented surveillance at specific anchorages.

Frequency and scope of dome coating / drainage examinations.

Examination and testing results will be evaluated by the Responsible Engineer who will determine if more extensive examinations and / or corrective action is needed.

In addition to the above, a one-time sample of Unit 1 below grade tendons (those in rings 1 through 7) will be added to the random sample designated for the 45th year surveillance.

Condition of these tendons and anchorage areas will be evaluated by the RE who will specify further examinations and / or corrective action as deemed necessary.

Byron/Braidwood Technical Report Part E (Braidwood) - Page 131 of 204 Revision 1 Updated 02/02/21 All of the above margins, which range from a minimum of 16 kip to 358 kip, are positive at T = 100 years. This provides a strong measure of assurance that mean pre-stressing forces provided by the hoop, vertical and dome tendon groups will remain above the minimum required levels well past the presumed 80 year maximum unit operating lifetime.

The above margin summary fully supports the proposed extension of the Byron post-tensioning system examination interval from five years to ten years with tendon force measurements (ASME Section XI Table IWL-2500-1, Examination Category L-B, Item L2.10) alternating between Unit 1 and Unit 2 as shown in Part E sub-section 1.1 above.

2.5 Steam Generator Replacement (SGR) Tendons The 1998 Unit 1 steam generator replacement project (Unit 2 generators have not been replaced) required cutting an opening in the containment cylinder wall. This, in turn, required de-tensioning and subsequent re-tensioning of the following tendons.

38 Vertical tendons - V1 through V18 and V143 through V162 32 Hoop tendons - H29BA through H44BA and H29CB through H44CB ASME Section XI, Subsection IWL paragraph IWL-2521.2 specifies that a separate sample of these tendons be examined during surveillances subsequent to the completion of re-tensioning. The forces in the SGR tendons have been altered by re-tensioning and are, therefore, addressed separately when evaluating trends and LCLs.

Samples of SGR tendons were examined during the 15th and 30th year surveillances in 2001 and 2016, respectively. The lift-off forces measured during each surveillance are shown below.

SGR Hoop Tendon Lift-Off Force Hoop Tendons Vertical Tendons Surveillance T, Time Since FM ,

FM, Measured Year SIT, Years Tendon / Measured Tendon /

Force /

Average Force / Average Lossb, kip Lossb, kip 15 15.0 H40CB 1,227 / 201 V160 1,323 / 90 a

H44BA 1,270 / 113 V16 1,328 / 96 30 30.5 H42CBa 1,287 / 120 V143 1,304 / 81 Average 1,278 / 116 Average 1,316 / 88 Note a: Tendon de-tensioned for test wire removal and re-tensioned.

Note b: Loss is re-tensioning seating force, as documented in Reference 8.2, less FM.

Byron/Braidwood Technical Report Part E (Braidwood) - Page 150 of 204 Revision 1 Updated 02/02/21 needed, a corrective action (e.g., end cap gasket replacement and duct refilling / top-off) plan will be prepared by, and implemented in accordance with the requirements of, the RE.

7.2 Enhanced Examination of Domes and Tendons Subject to Water Intrusion An augmented surveillance program of limited intermediate examinations to monitor free water conditions, as well as the condition of the dome coatings and dome drainage, will be initiated. Anchorages included in the program are those where water in excess of 0.2 liters was collected during one or both of the two most recent surveillances.

The augmented program will include detailed requirements for the following:

Base frequency of augmented surveillance and criteria for more frequent examinations at anchorages with accelerating water intrusion and / or developing corrosion.

Scope of surveillance examination / testing (free water collection / pH testing, CPM collection / testing, visual observation of corrosion, need for more extensive examination and other as applicable).

Chemical analysis, by a water chemist or other qualified professional, of both lower hoop and vertical tendon free water samples, as well as analysis of ground water, to establish whether or not ground water is the source of free water collected at the ends of these tendons.

Criteria for reducing the frequency of, or ending, augmented surveillance at specific anchorages.

Frequency and scope of dome coating / drainage examinations.

Examination and testing results will be evaluated by the Responsible Engineer who will determine if more extensive examinations and / or corrective action is needed.

Also, as noted in 3.1, Level E corrosion was found on the wires extracted from below grade tendons H2CB, H2DF and H1BA. At least one wire will be extracted from each of these tendons during the 40th year surveillance. Extracted wires will be examined for damage and corrosion. If Level D (4) or greater corrosion, or any active corrosion, is found, the condition will be evaluated by the Responsible Engineer who will specify further actions as deemed necessary.

Tensile tests will be performed on specimens cut from any wire that has Level D (4) or greater corrosion. The test specimens will include the most highly corroded segments