ML21116A179: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements)
{{#Wiki_filter:}}
Supporting                                                                                                Responses      Total Number of                                Burden per Total Annual Burden  Total Cost @
Statement            Rule Section                          Description                                        per    Number of Respondents                                Response          Hours          $279/Hour Section                                                                                                  Respondent Responses Early Site Permit application - general 50.33(a)-(d), (g), (j)        information                                                -              -            -      360.0                  -  $                -
Standard Design Certification application -
50.33(a)-(d), (j)              general information                                      1.0            0.3          0.3      450.0              148.5 $          41,432 Combined OL application - general 50.33(a)-(d), (g), (j)        information                                                -              -            -    2,700.0                  -  $                -
Standard Design Approval application -
50.33(a)-(d), (j)              general information                                      1.0            0.3          0.3      450.0              148.5 $          41,432 Manfacturing License application - general 50.33(a)-(d), (j)              information                                                -              -            -      450.0                  -  $                -
NPUF Construction Permit application -
50.33(a)-(d), (h), (j)        general information                                        -              -            -    2,700.0                  -  $                -
NPUF Operating License application -
50.33(a)-(d), (h), (j)        general information                                        -              -            -    2,700.0                  -  $                -
Nuclear Power Plant Construction Permit 50.33(a)-(d), (h)-(j)          application - general information                          -              -            -    2,700.0                  -  $                -
Nuclear Power Plant Operating License 50.33(a)-(d), (g)-(j)          application - technical information                        -              -            -    2,700.0                  -  $                -
Financial qualification information as 50.33(f)                      requested by the Commission                                -              -            -    3,580.0                  -  $                -
NPUF Construction Permit application -
50.34                          general information (PSAR)                                -              -            -    14,000.0                  -  $                -
NPUF Operating License application -
50.34                          technical information (FSAR)                              -              -            -    7,000.0                  -  $                -
Nuclear Power Plant Construction Permit 50.34                          application - general information (PSAR)                  -              -            -    90,000.0                  -  $                -
Nuclear Power Plant Operating License 50.34                          application - technical information (FSAR)                -              -            -    40,000.0                  -  $                -
Decommissioned plants submit program for managing and funding irradiated fuel following permanent cessation of 2      50.54(bb)                      operation of the reactor                                  -              -            -      250.0                  - $                -
50.59(c), 50.90, 50.91(a), (b) License Amendments                                      164.0            6.0      984.0      313.0          307,992.0 $        85,929,768 50.59(c), 50.90, 50.91(a), (b) License Amendments - Topical Reports                    15.0            1.0        15.0      400.0            6,000.0 $        1,674,000 50.74                          Notification within 30 days of a change in status of a licensed reactor operator or senior operator.                                        201.0            1.0      201.0        1.0              201.0 $          56,079 50.80(b)                      License Transfers                                        8.0            1.0          8.0      540.0            4,320.0 $        1,205,280 50.36,50.36A, 50.36B &
Appendix I                    Technical Specifications                                164.0            5.0      820.0      168.0          137,760.0 $        38,435,040 50.36,50.36A, 50.36B, 50.36C & Technical Specifications - Risk Informed Appendix I                    Completion Times (RICT) Program                          5.0            1.0          5.0      60.0              300.0 $          83,700 50.34(c) & (d) & 50.54(p) -
Burden covered under 10 CFR    Physical security and safeguards 73.67 approved by OMB under    contingency plans (operating power Clearance No. 3150-0151        reactors)                                                  -            1.0          -        29.0                  -  $                -
 
ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements)
Supporting                                                                                            Responses      Total Number of                                Burden per Total Annual Burden  Total Cost @
Statement            Rule Section                        Description                                        per    Number of Respondents                                Response          Hours          $279/Hour Section                                                                                              Respondent Responses 50.34(c) & (d) & 50.54(p) - Physical security and safeguards Burden covered under 10 CFR contingency plans 73.67 approved by OMB under (decommissioned/shutdown power Clearance No. 3150-0151    reactors)                                                  -              -            -        29.0                  -  $                -
50.34(c) & (d) & 50.54(p) - Physical security and safeguards Burden covered under 10 CFR contingency plans (nonpower reactors) 73.67 approved by OMB under Clearance No. 3150-0151                                                                -            1.0          -        29.0                  -  $                -
50.35(b)                    Periodic reports of the progress and                      -              -            -      100.0                  -  $                -
results of research and development programs designed to resolve safety questions 50.54(w)(3)                Annual report on the source of property                118.0            1.0      118.0          4.0              472.0 $          131,688 and damage insurance 10 CFR 50.54(w)(4)          Cleanup plan outlining the steps and costs                -              -            -    2,000.0                  -  $                -
needed to complete decontamination and cleanup following an accident 50.33(k)                    Contents of applications                                  1.0            1.0          1.0      200.0              200.0 $          55,800 3      50.75                      Decommissioning planning                                89.0            1.0        89.0          5.0              445.0 $          124,155 50.82                      Termination of license                                    5.0            1.0          5.0      680.0            3,400.0 $          948,600 50.71(b)& Appendix C        Annual financial reporting                              60.0            1.0        60.0          1.0              60.0 $          16,740 50.76                      Submission of financial qualifications information within 75 days prior to ceasing to be an electric utility                                  -              -            -        33.0                  - $                -
50.71(e)                    Updated FSAR (operating reactors)                        51.0            1.0        51.0      900.0          45,900.0 $        12,806,100 Updated FSAR (power reactors that have 50.71(e)                    ceased operating)                                        16.0            1.0        16.0      225.0            3,600.0 $        1,004,400 50.72 & 50.54(z)            Notification of Events                                  120.0            2.0      240.0        1.00              240.0 $          66,960 Daily testing of the ENS system by the 10 CFR Part 50, Appendix E, HOO, submission of voluntary reactor Paragraph E.9.d            status and grid information                              91.0        365.0    33,215.0        0.083            2,757.0 $          769,203 Appendix E, VI.1 Periodic  Quarterly testing of Emergency Response Testing                    Data System                                            120.0            4.0      480.0          2.0              960.0 $          267,840 HW/SW changes affecting ERDS DPLs 4
Appendix E, VI.3 a&b        and communication                                        9.0            1.0          9.0        4.0              36.0 $          10,044 Emergency Response Data System 50.72(a)                    reports                                                  7.0            1.0          7.0        4.0              28.0 $            7,812 50.70                      Team Inspections                                        51.0            1.0        51.0      160.0            8,160.0 $        2,276,640 Other Inspections (e.g. Resident, Supplemental, Special and Infrequently Performed, Temporary Instructions, and 50.70                      Reactive)                                                51.0            1.0        51.0        45.0            2,295.0 $          640,305 Submission of event report to submit a licensee event report for any event or condition that would have prevented RISC-1 and RISC-2 structures, systems, and components from performing a safety-50.69(g)                    significant function                                    10.0            1.0        10.0      600.0            6,000.0 $        1,674,000
 
ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements)
Supporting                                                                                                Responses      Total Number of                                Burden per Total Annual Burden  Total Cost @
Statement            Rule Section                            Description                                      per      Number of Respondents                                Response          Hours          $279/Hour Section                                                                                                  Respondent Responses 50.54(cc)                      Bankruptcy Notifications                                  -              -            -        1.0                  -  $                -
48 hour notification (Design and 50.55(e)                        Construction Deficiencies)                                2.0            1.0          2.0      10.0                20.0 $            5,580 30-day reports (Design and Construction 50.55(e)                        Deficiencies)                                            2.0            1.0          2.0      70.0              140.0 $          39,060 Quality Assurance reports (operating 50.55(f), Appendices A & B      reactors)                                                89.0            1.0        89.0      160.0          14,240.0 $        3,972,960 Quality Assurance reports (reactors under 50.55(f), Appendices A & B      construction)                                            2.0            1.0          2.0      160.0              320.0 $          89,280 Quality Assurance reports (Part 52 50.55(f), Appendices A & B      applicants)                                              2.0            1.0          2.0      667.0            1,334.0  $          372,186 50.55a(z)                      Alternatives submitted by COLs                            2.0            1.0        2.0      230.0              460.0 $          128,340 50.55a(z)                      Alternatives submitted by Power Reactors                  89.0            3.0      267.0        230.0          61,410.0  $      17,133,390 50.55a(z)                      Alternatives submitted for I&C                            0.0            0.0          -        230.0                -  $                -
50.55a(z)(1) and 50.55a(z)(2) - Request for Alternatives (Online portal)
Burden covered under 50.55a(z)(1) and 50.55a(z)(2),
approved by OMB under Clearance No. 3150-0244                                                                  89.0            2.4      218.0        230.0          50,140.0 $        13,989,060 50.55a(f)(5) and (g)(5)        Relief requests                                          89.0            2.0      178.0        230.0          40,940.0 $        11,422,260 50.55a                          Codes and Standards                                      89.0            2.0      178.0        58.0          10,324.0 $        2,880,396 5                                      Power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including 50.59(c) and d                  a summary of the evaluation of each                    118.0            1.0      118.0      380.0          44,840.0 $        12,510,360 Non-power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including 50.59(c) and d                  a summary of the evaluation of each                      31.0            1.0        31.0      120.0            3,720.0 $        1,037,880 Appendices G & H, 50.60        Fracture Toughness                                      22.0            1.0        22.0      102.0            2,244.0 $          626,076 50.61                          Pressurized Thermal Shock                                4.0            1.0          4.0      24.0                96.0 $          26,784 Unique purpose application for highly 50.64(c)(1) enriched uranium                                          2.0            1.0          2.0      10.0                20.0 $            5,580 Highly enriched uranium - updated 50.64(c)(2)(i) documentation                                            4.0            1.0          4.0      10.0                40.0 $          11,160 Highly enriched uranium - updated 50.64(c)(2)(ii) documentation                                            4.0            1.0          4.0      10.0                40.0 $          11,160 50.64(c)(2)(iii)                Highly enriched uranium, safety analyses                  3.0            1.0          3.0      333.3            1,000.0 $          279,000 50.66                          Thermal Annealing                                          -              -            -    6,400.0                  -
6      50.12                          Exemptions                                              30.0            1.0        30.0      360.0          10,800.0 $        3,013,200
 
ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements)
Supporting                                                                                                Responses      Total Number of                                Burden per Total Annual Burden  Total Cost @
Statement            Rule Section                          Description                                        per    Number of Respondents                                Response          Hours          $279/Hour Section                                                                                                  Respondent Responses Part 50 applicants provide plans for implementing rule requirements in 50.34(i)                        application                                              -              -            -      300.0                  -  $                -
50.44(c)                        Hydrogen Control Requirements                            -              -            -      203.0                  -  $                -
Annual report of changes to change 50.46(a)(3)(ii)                evaluation model                                      104.0            1.0      104.0        20.0            2,080.0          580,320.0 30-day report of significant change or error 50.46(a)(3)(ii)                to evaluation model                                    52.0            1.0        52.0        20.0            1,040.0          290,160.0 50.46, Appendix K              Realistic evaluation model submittal                    1.0            1.0          1.0    2,500.0            2,500.0          697,500.0 50.46, Appendix K              Modified evaluation model submittal                      0.6            1.0          0.6    1,750.0            1,050.0          292,950.0 Schedule for completing actions associated with 10 CFR 50 Appendix K 50.46, Appendix K              and 10 CFR 50.46(b)                                      1.6            1.0          1.6      16.0                25.6            7,142.4 Appendix K, 50.46              ECCS                                                                    2.0          -        40.0                  -                    -
Emergency plans (operating power 50.47, 50.54(q & t), Appendix E reactors)                                              57.0          25.0    1,425.0        81.0          115,425.0  $      32,203,575 Submission of proposed changes that 7
would reduce the effective of approved emergency plans (operating power 50.54(q)(4)                    reactors)                                              12.0            1.0        12.0        40.0              480.0 $          133,920 Participation Exercise - exercise scenario App. E.IV.F.2.a,b              submission                                              28.5            1.0        28.5        40.0            1,140.0 $          318,060 Emergency plans (operating non-power 50.47, 50.54(q & t), Appendix E reactors)                                              31.0          10.0      310.0        2.0              620.0 $          172,980 Emergency plans (power reactor sites 50.47, 50.54(q & t), Appendix E being decommissioned)                                  29.0          15.0      435.0        34.0          14,790.0  $        4,126,410 Emergency plans (non-power reactors being decommissioned and possession 50.47, 50.54(q & t), Appendix E only)                                                    4.0            5.0        20.0        1.0                20.0 $            5,580 50.47, 50.54(q & t), Appendix E Emergency Planning                                    116.0          18.0    2,088.0        60.0          125,280.0  $      34,953,120 Earthquake Engineering Criteria, DC Appendix S and 50.54(ff)        applicants                                              1.0            1.0          1.0  155,000.0          155,000.0  $      43,245,000 Earthquake Engineering Criteria, Appendix S and 50.54(ff)        Operating Reactors                                      5.0            1.0          5.0      900.0            4,500.0 $        1,255,500 Total                                                                                    164                      42,078                      1,197,502      $334,102,946
 
ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements)
Supporting                                                                                                                                  Total Annual Number of    Hours per Statement                Section                                      Description                                                          Burden    Annual Cost @ $279/hr Recordkeepers  Recordkeeper Section                                                                                                                                      Hours 50.33(a)-(d), (g), (j)            Early Site Permits (records)                                                -          13.0            -  $                    -
50.33(a)-(d), (j)                Standard Design Certification (records)                                  1.0          16.5          16.5  $                  4,587 50.33(a)-(d), (g), (j)            Combined OL (records)                                                      -          99.0            -  $                192,654 50.33(a)-(d), (j)                Standard Design Approval (records)                                        1.0          16.5          16.5  $                13,761 50.33(a)-(d), (j)                Manfacturing License (records)                                              -          16.5            -    $-
50.33(a)-(d), (h), (j)            NPUF Construction Permit (records)                                          -          99.0            -  $                192,654 50.33(a)-(d), (h), (j)            NPUF Operating License (records)                                            -          99.0            -  $                27,522 50.33(a)-(d), (h)-(j)            Nuclear Power Plant Construction Permit (records)                          -          99.0            -  $                137,610 2      50.33(a)-(d), (g)-(j)            Nuclear Power Plant Operating License (records)                            -          99.0            -  $                27,522 50.59(c), 50.90, 50.91(a), (b)    Records License Amendments                                              164.0          192.0      31,488.0  $              8,785,152 50.74 - Burden covered under 10 CFR 55.22 approved by OMB        Records of change in status of a licensed reactor operator under Clearance No. 3150-0024    or senior operator                                                        -              -            -  $                    -
50.80(b)                          License Transfers                                                        8.0          60.0        480.0  $                133,920 50.36,50.36A, 50.36B & Appendix I Technical Specifications (Operating power reactor)                        89.0        2080.0  185,120.0  $            51,648,480 50.36,50.36A, 50.36B & Appendix I Technical Specifications (operating NPUFs)                                31.0            80.0    2,480.0  $                691,920 50.36,50.36A, 50.36B & Appendix I Technical Specifications (shutdown power reactor)                        29.0          208.0      6,032.0  $              1,682,928 3      50.75                            Decommissioning planning                                                149.0          73.0      10,877.0  $              3,034,683 50.71(b)& Appendix C              Financial records                                                        60.0            0.1          6.0  $                  1,674 50.71(e)                          Records for updated FSAR (operating reactors)                            51.0          100.0      5,100.0  $              1,422,900 Records for updated FSAR (power reactors that have 50.71(e)                          ceased operating)                                                        16.0          25.0        400.0  $                111,600 50.72 & 50.54(z)                  Notification of Events                                                  120.0            0.8        96.0  $                26,784 Appendix E, VI.1 Periodic Testing Quarterly testing of Emergency Response Data System                    120.0            0.2        24.0  $                  6,696 4      Appendix E, VI.3 a&b              HW/SW changes affecting ERDS DPLs and communication                      9.0            1.2        10.8  $                  3,013 50.72(a)                          Emergency Data Response System                                            7.0            0.4          2.8  $                    781 Maintain processes to control the inspection, testing, and 50.69                            corrective actions for structures, systems, and components, other SSC records                                                        10.0          833.0      8,330.0  $              2,324,070 After approval of application, perform evaluations of the 50.69 (one-time implementation significance of SSC functions (implementation for the requirements) alternative requirements of 10 CFR 50.69 - voluntary)                    16.0          920.0      14,720.0  $              4,106,880
 
ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements)
Supporting                                                                                                                        Total Annual Number of    Hours per Statement                Section                                Description                                                          Burden    Annual Cost @ $279/hr Recordkeepers Recordkeeper Section                                                                                                                            Hours 50.54(hh)(1)              Procedures for aircraft threat                                          51.0          40.0    2,040.0  $                569,160 Retention of evaluations, 50.55(e)(9)(ii) (Design and 50.55(e)                  Construction Deficiencies)                                              25.0            2.0        50.0  $                13,950 Quality Assurance records (operating reactors, 4 reactors 50.55(f), Appendices A & B under construction, 1 ESP, 1 COL)                                      104.0      10,000.0  1,040,000.0  $            290,160,000 50.55(f), Appendices A & B Quality Assurance records (shutdown reactors)                          29.0      2,500.0    72,500.0  $            20,227,500 50.55a                    Records related to Codes and Standards                                104.0      2,310.0    240,240.0  $            67,026,960 Power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any 5                                changes, tests, and experiments, including a summary of 50.59(c) and (d)          the evaluation of each                                                118.0          100.0    11,800.0  $              3,292,200 Non-power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of 50.59(c) and (d)          the evaluation of each                                                  31.0          480.0    14,880.0  $              4,151,520 Appendices G & H, 50.60    Fracture Toughness                                                      22.0          11.0      242.0  $                67,518 50.61                      Pressurized Thermal Shock                                                4.0          216.0      864.0  $                241,056 50.65                      Maintenance program records for operating plants                        89.0        4,315.0  384,035.0  $            107,145,765 50.65                      Maintenance program records for shutdown plants                        29.0          128.0    3,712.0  $              1,035,648 6      50.12                      Exemptions                                                              30.0          40.0    1,200.0  $                334,800
 
ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements)
Supporting                                                                                                                              Total Annual Number of    Hours per Statement                  Section                                  Description                                                          Burden    Annual Cost @ $279/hr Recordkeepers  Recordkeeper Section                                                                                                                                  Hours 50.44(c)                        Hydrogen Control Requirements                                          89.0            1.0        89.0 $                  24,831 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Operating Power Reactors                114.0        1,090.0    124,260.0  $            34,668,540 Emergency Planning Records for Operating Non-Power 50.47, 50.54(q & t), Appendix E Reactors                                                                31.0          589.0    18,259.0  $              5,094,261 Emergency Planning Records for Power Reactor Sites 50.47, 50.54(q & t), Appendix E Being Decommissioned                                                    29.0          256.0      7,424.0  $              2,071,296 Emergency Planning Records for Non-Power Reactors 50.47, 50.54(q & t), Appendix E Being Decommissioned and Possession Only                                4.0            4.0        16.0  $                  4,464 One-time transition of records for fire protection to NFPA 50.48 (c)                      805                                                                        -              -            -  $                    -
50.48, Appendix R              Fire Protection plan records                                          118.0          84.0      9,912.0  $              2,765,448 50.49(a),(d),(f)                One-time environmental qualification (program establishment, qualification of equipment), annualized                  8.0          793.3      6,346.4  $              1,770,646 50.49(d),(f),(j) 7                                      Environmental Qualification                                            89.0        2,080.0    185,120.0  $            51,648,480 50.120(b)                      Training & Qualification Records for Operating Reactors                51.0          780.0    39,780.0  $            11,098,620 50.120(b)                      Training & Qualification Records for Applicants                            -        1,440.0            -  $                    -
One-time Licensees review rule requirements and update 50.155(a)(1)                    procedures, programs, or plans                                          17.0          315.0      5,355.0  $              1,494,045 Maintain documentation of changes in the implementation of requirements 50.155(f)                                                                                              51.0          100.0      5,100.0  $              1,422,900 Development and Ongoing Analyses & Maintenance of Appendix J                      Performance Based Leakage Testing Program                              164.0          60.0      9,840.0  $              2,745,360 Appendix S and 50.54(ff)        Earthquake Engineering Criteria, Operating Reactors                      5.0          100.0        500.0  $                139,500 Appendix S and 50.54(ff)        Earthquake Engineering Criteria, DC applicants                          1.0          100.0        100.0  $                27,900 Plant inspection and documentation of inspection following Appendix S IV(a)(3)            seismic event                                                            5.0          320.0      1,600.0  $                446,400 Total                                                                                                    164                2,450,464.0  $        683,679,456.00
 
ANNUAL 3rd PARTY DISCLOSURES (Recurring Information Collection Requirements)
Supporting                                                Responses        Total                  Total Annual Number of                                Burden per                Cost @
Statement                                                      per      Number of                  Burden                    (Notes)
Respondents                                Response                  $279/Hour Section  Section      Description                      Respondent    Responses                    Hours Submission to ASME of Owner's certificate, AIA 5      50.55a  agreement (III/NCA-3230)          2.0          1.0            2.0        100.0        200.0 $      55,800 TOTAL                                                                            2.0                    200.0 $      55,800
 
Total Burden and Responses Section 2                Total Burden and Responses Section 3 Hours              Responses                                          Hours            Responses Reporting                      457,342                    2,152  Reporting                            4,045                95 Recordkeeping                  225,633                      164  Recordkeeping                        10,877                149 TOTAL                          682,975                    2,316  TOTAL                                14,922                244 Item #13, Other Costs Section 2                              Item #13, Other Costs Section 3 Recordkeeping          $        25,181                            Recordkeeping                        $1,214 TOTAL                  $        25,181                            TOTAL                                $1,214 Item #14, Costs to the Federal Government, Section 2            Item #14, Costs to the Federal Government, Section 3 Hours              Cost @ $279/hr                                    Hours            Cost @ $279/hr Staff time                      101953 $            28,444,887  Staff time                            1526            $425,754 Total Burden and Responses Section 4 Hours              Responses                Total Burden and Responses Section 5 Reporting                        70,036                  34,190                            Hours            Responses Recordkeeping                    28,690                      120 Reporting                          231,328              1,128 TOTAL                            98,726                  34,310  Recordkeeping                    1,770,363                118 Third Party Disclosure                  200                  2 TOTAL                            2,001,891              1,248 Item #13, Other Costs Section 4 Recordkeeping                    $3,202 TOTAL                            $3,202                          Item #13, Other Costs Section 5 Recordkeeping                    $197,573 TOTAL                            $197,573 Item #14, Costs to the Federal Government, Section 4 Hours              Cost @ $279/hr Staff time                        41295            $11,521,305        Item #14, Costs to the Federal Government, Section 5 Hours            Cost @ $279/hr Staff time                          73,115      $20,399,085
 
Total Burden and Responses Section 6                                      Total Burden and Responses Section 7 Hours            Responses                                        Hours            Responses Reporting                      10,800                      30 Reporting                        423,951              4,484 Recordkeeping                    1,200                      30 Recordkeeping                    413,701                164 TOTAL                          12,000                      60 TOTAL                            837,652              4,648 Item #13, Other Costs Section 6                                Item #13, Other Costs Section 7 Recordkeeping                    $134                        Recordkeeping                    $46,169 TOTAL                            $134                        TOTAL                            $46,169 Item #14, Costs to the Federal Government, Section 6          Item #14, Costs to the Federal Government, Section 7 Hours            Cost @ $279/hr                                  Hours            Cost @ $279/hr Staff time                      2,250                $627,750 Staff time                        20,275          $5,656,725 HOURS            RESPONSES 2021                      3,648,166                42,244 Previous                  3,710,882                43,617 Delta                          -62,716              -1,373
 
Item #13, Other Costs Section Section                Costs 2                $25,181 3                  $1,214 4                  $3,202 5                $197,573 6                  $134 7                $46,169 Total                          $273,472 Item #14, Costs to the Federal Government, Section          Staff Time Hours      Cost @ $279/hr 2                101,953      $28,444,887 3                  1,526        $425,754 4                  41,295      $11,521,305 5                  73,115      $20,399,085 6                  2,250        $627,750 7                  20,275      $5,656,725 Total                            240,414      $67,075,506 Burden Hours Section          Reporting              Recordkeeping 3rd Party Total        Cost 2                457,342          225,633              682,975      $190,550,025 3                  4,045          10,877              14,922        $4,163,238 4                  70,036          28,690              98,726      $27,544,442 5                231,328        1,770,363    200    2,001,891      $558,527,589 6                  10,800            1,200              12,000        $3,348,000 7                423,951          413,701              837,652      $233,704,908 Total                          1,197,502        2,450,464    200    3,648,166    $1,017,838,202 Previous total                1,148,086        2,562,696    100  3,710,881.7      $975,961,887 Deltas                            49,416        -112,232    100      -62,716      -$17,497,792
 
Reponses Section          Reporting        Recordkeeping  3rd Party TOTAL 2            2,152            164                  2,316 3              95            149                    244 4          34,190            120                34,310 5            1,128            118          2      1,248 6              30              30                    60 7            4,484            164                  4,648 2021 TOTAL                42,078            164          2    42,244 Previous total            43,467            149          1    43,617 Deltas                    -1,389              15          1      -1,373}}

Revision as of 19:31, 17 January 2022

OMB-3150-0011 Final 2021 Collection Renewal, 10 CFR Part 50 Domestic Licensing of Production and Utilization Facilities - Burden Tables
ML21116A179
Person / Time
Issue date: 06/14/2021
From:
NRC/NRR/DRMA/RPSBII
To:
NRC/OCIO
Shared Package
ML21085A616 List:
References
NRC-2020-0204, OMB 3150-0011
Download: ML21116A179 (12)


Text