ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements)

Supporting Responses Total Number of Burden per Total Annual Burden Total Cost @

Statement Rule Section Description per Number of Respondents Response Hours $279/Hour Section Respondent Responses Early Site Permit application - general 50.33(a)-(d), (g), (j) information - - - 360.0 - $ -

Standard Design Certification application -

50.33(a)-(d), (j) general information 1.0 0.3 0.3 450.0 148.5 $ 41,432 Combined OL application - general 50.33(a)-(d), (g), (j) information - - - 2,700.0 - $ -

Standard Design Approval application -

50.33(a)-(d), (j) general information 1.0 0.3 0.3 450.0 148.5 $ 41,432 Manfacturing License application - general 50.33(a)-(d), (j) information - - - 450.0 - $ -

NPUF Construction Permit application -

50.33(a)-(d), (h), (j) general information - - - 2,700.0 - $ -

NPUF Operating License application -

50.33(a)-(d), (h), (j) general information - - - 2,700.0 - $ -

Nuclear Power Plant Construction Permit 50.33(a)-(d), (h)-(j) application - general information - - - 2,700.0 - $ -

Nuclear Power Plant Operating License 50.33(a)-(d), (g)-(j) application - technical information - - - 2,700.0 - $ -

Financial qualification information as 50.33(f) requested by the Commission - - - 3,580.0 - $ -

NPUF Construction Permit application -

50.34 general information (PSAR) - - - 14,000.0 - $ -

NPUF Operating License application -

50.34 technical information (FSAR) - - - 7,000.0 - $ -

Nuclear Power Plant Construction Permit 50.34 application - general information (PSAR) - - - 90,000.0 - $ -

Nuclear Power Plant Operating License 50.34 application - technical information (FSAR) - - - 40,000.0 - $ -

Decommissioned plants submit program for managing and funding irradiated fuel following permanent cessation of 2 50.54(bb) operation of the reactor - - - 250.0 - $ -

50.59(c), 50.90, 50.91(a), (b) License Amendments 164.0 6.0 984.0 313.0 307,992.0 $ 85,929,768 50.59(c), 50.90, 50.91(a), (b) License Amendments - Topical Reports 15.0 1.0 15.0 400.0 6,000.0 $ 1,674,000 50.74 Notification within 30 days of a change in status of a licensed reactor operator or senior operator. 201.0 1.0 201.0 1.0 201.0 $ 56,079 50.80(b) License Transfers 8.0 1.0 8.0 540.0 4,320.0 $ 1,205,280 50.36,50.36A, 50.36B &

Appendix I Technical Specifications 164.0 5.0 820.0 168.0 137,760.0 $ 38,435,040 50.36,50.36A, 50.36B, 50.36C & Technical Specifications - Risk Informed Appendix I Completion Times (RICT) Program 5.0 1.0 5.0 60.0 300.0 $ 83,700 50.34(c) & (d) & 50.54(p) -

Burden covered under 10 CFR Physical security and safeguards 73.67 approved by OMB under contingency plans (operating power Clearance No. 3150-0151 reactors) - 1.0 - 29.0 - $ -

ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements)

Supporting Responses Total Number of Burden per Total Annual Burden Total Cost @

Statement Rule Section Description per Number of Respondents Response Hours $279/Hour Section Respondent Responses 50.34(c) & (d) & 50.54(p) - Physical security and safeguards Burden covered under 10 CFR contingency plans 73.67 approved by OMB under (decommissioned/shutdown power Clearance No. 3150-0151 reactors) - - - 29.0 - $ -

50.34(c) & (d) & 50.54(p) - Physical security and safeguards Burden covered under 10 CFR contingency plans (nonpower reactors) 73.67 approved by OMB under Clearance No. 3150-0151 - 1.0 - 29.0 - $ -

50.35(b) Periodic reports of the progress and - - - 100.0 - $ -

results of research and development programs designed to resolve safety questions 50.54(w)(3) Annual report on the source of property 118.0 1.0 118.0 4.0 472.0 $ 131,688 and damage insurance 10 CFR 50.54(w)(4) Cleanup plan outlining the steps and costs - - - 2,000.0 - $ -

needed to complete decontamination and cleanup following an accident 50.33(k) Contents of applications 1.0 1.0 1.0 200.0 200.0 $ 55,800 3 50.75 Decommissioning planning 89.0 1.0 89.0 5.0 445.0 $ 124,155 50.82 Termination of license 5.0 1.0 5.0 680.0 3,400.0 $ 948,600 50.71(b)& Appendix C Annual financial reporting 60.0 1.0 60.0 1.0 60.0 $ 16,740 50.76 Submission of financial qualifications information within 75 days prior to ceasing to be an electric utility - - - 33.0 - $ -

50.71(e) Updated FSAR (operating reactors) 51.0 1.0 51.0 900.0 45,900.0 $ 12,806,100 Updated FSAR (power reactors that have 50.71(e) ceased operating) 16.0 1.0 16.0 225.0 3,600.0 $ 1,004,400 50.72 & 50.54(z) Notification of Events 120.0 2.0 240.0 1.00 240.0 $ 66,960 Daily testing of the ENS system by the 10 CFR Part 50, Appendix E, HOO, submission of voluntary reactor Paragraph E.9.d status and grid information 91.0 365.0 33,215.0 0.083 2,757.0 $ 769,203 Appendix E, VI.1 Periodic Quarterly testing of Emergency Response Testing Data System 120.0 4.0 480.0 2.0 960.0 $ 267,840 HW/SW changes affecting ERDS DPLs 4

Appendix E, VI.3 a&b and communication 9.0 1.0 9.0 4.0 36.0 $ 10,044 Emergency Response Data System 50.72(a) reports 7.0 1.0 7.0 4.0 28.0 $ 7,812 50.70 Team Inspections 51.0 1.0 51.0 160.0 8,160.0 $ 2,276,640 Other Inspections (e.g. Resident, Supplemental, Special and Infrequently Performed, Temporary Instructions, and 50.70 Reactive) 51.0 1.0 51.0 45.0 2,295.0 $ 640,305 Submission of event report to submit a licensee event report for any event or condition that would have prevented RISC-1 and RISC-2 structures, systems, and components from performing a safety-50.69(g) significant function 10.0 1.0 10.0 600.0 6,000.0 $ 1,674,000

ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements)

Supporting Responses Total Number of Burden per Total Annual Burden Total Cost @

Statement Rule Section Description per Number of Respondents Response Hours $279/Hour Section Respondent Responses 50.54(cc) Bankruptcy Notifications - - - 1.0 - $ -

48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> notification (Design and 50.55(e) Construction Deficiencies) 2.0 1.0 2.0 10.0 20.0 $ 5,580 30-day reports (Design and Construction 50.55(e) Deficiencies) 2.0 1.0 2.0 70.0 140.0 $ 39,060 Quality Assurance reports (operating 50.55(f), Appendices A & B reactors) 89.0 1.0 89.0 160.0 14,240.0 $ 3,972,960 Quality Assurance reports (reactors under 50.55(f), Appendices A & B construction) 2.0 1.0 2.0 160.0 320.0 $ 89,280 Quality Assurance reports (Part 52 50.55(f), Appendices A & B applicants) 2.0 1.0 2.0 667.0 1,334.0 $ 372,186 50.55a(z) Alternatives submitted by COLs 2.0 1.0 2.0 230.0 460.0 $ 128,340 50.55a(z) Alternatives submitted by Power Reactors 89.0 3.0 267.0 230.0 61,410.0 $ 17,133,390 50.55a(z) Alternatives submitted for I&C 0.0 0.0 - 230.0 - $ -

50.55a(z)(1) and 50.55a(z)(2) - Request for Alternatives (Online portal)

Burden covered under 50.55a(z)(1) and 50.55a(z)(2),

approved by OMB under Clearance No. 3150-0244 89.0 2.4 218.0 230.0 50,140.0 $ 13,989,060 50.55a(f)(5) and (g)(5) Relief requests 89.0 2.0 178.0 230.0 40,940.0 $ 11,422,260 50.55a Codes and Standards 89.0 2.0 178.0 58.0 10,324.0 $ 2,880,396 5 Power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including 50.59(c) and d a summary of the evaluation of each 118.0 1.0 118.0 380.0 44,840.0 $ 12,510,360 Non-power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including 50.59(c) and d a summary of the evaluation of each 31.0 1.0 31.0 120.0 3,720.0 $ 1,037,880 Appendices G & H, 50.60 Fracture Toughness 22.0 1.0 22.0 102.0 2,244.0 $ 626,076 50.61 Pressurized Thermal Shock 4.0 1.0 4.0 24.0 96.0 $ 26,784 Unique purpose application for highly 50.64(c)(1) enriched uranium 2.0 1.0 2.0 10.0 20.0 $ 5,580 Highly enriched uranium - updated 50.64(c)(2)(i) documentation 4.0 1.0 4.0 10.0 40.0 $ 11,160 Highly enriched uranium - updated 50.64(c)(2)(ii) documentation 4.0 1.0 4.0 10.0 40.0 $ 11,160 50.64(c)(2)(iii) Highly enriched uranium, safety analyses 3.0 1.0 3.0 333.3 1,000.0 $ 279,000 50.66 Thermal Annealing - - - 6,400.0 -

6 50.12 Exemptions 30.0 1.0 30.0 360.0 10,800.0 $ 3,013,200

ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements)

Supporting Responses Total Number of Burden per Total Annual Burden Total Cost @

Statement Rule Section Description per Number of Respondents Response Hours $279/Hour Section Respondent Responses Part 50 applicants provide plans for implementing rule requirements in 50.34(i) application - - - 300.0 - $ -

50.44(c) Hydrogen Control Requirements - - - 203.0 - $ -

Annual report of changes to change 50.46(a)(3)(ii) evaluation model 104.0 1.0 104.0 20.0 2,080.0 580,320.0 30-day report of significant change or error 50.46(a)(3)(ii) to evaluation model 52.0 1.0 52.0 20.0 1,040.0 290,160.0 50.46, Appendix K Realistic evaluation model submittal 1.0 1.0 1.0 2,500.0 2,500.0 697,500.0 50.46, Appendix K Modified evaluation model submittal 0.6 1.0 0.6 1,750.0 1,050.0 292,950.0 Schedule for completing actions associated with 10 CFR 50 Appendix K 50.46, Appendix K and 10 CFR 50.46(b) 1.6 1.0 1.6 16.0 25.6 7,142.4 Appendix K, 50.46 ECCS 2.0 - 40.0 - -

Emergency plans (operating power 50.47, 50.54(q & t), Appendix E reactors) 57.0 25.0 1,425.0 81.0 115,425.0 $ 32,203,575 Submission of proposed changes that 7

would reduce the effective of approved emergency plans (operating power 50.54(q)(4) reactors) 12.0 1.0 12.0 40.0 480.0 $ 133,920 Participation Exercise - exercise scenario App. E.IV.F.2.a,b submission 28.5 1.0 28.5 40.0 1,140.0 $ 318,060 Emergency plans (operating non-power 50.47, 50.54(q & t), Appendix E reactors) 31.0 10.0 310.0 2.0 620.0 $ 172,980 Emergency plans (power reactor sites 50.47, 50.54(q & t), Appendix E being decommissioned) 29.0 15.0 435.0 34.0 14,790.0 $ 4,126,410 Emergency plans (non-power reactors being decommissioned and possession 50.47, 50.54(q & t), Appendix E only) 4.0 5.0 20.0 1.0 20.0 $ 5,580 50.47, 50.54(q & t), Appendix E Emergency Planning 116.0 18.0 2,088.0 60.0 125,280.0 $ 34,953,120 Earthquake Engineering Criteria, DC Appendix S and 50.54(ff) applicants 1.0 1.0 1.0 155,000.0 155,000.0 $ 43,245,000 Earthquake Engineering Criteria, Appendix S and 50.54(ff) Operating Reactors 5.0 1.0 5.0 900.0 4,500.0 $ 1,255,500 Total 164 42,078 1,197,502 $334,102,946

ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements)

Supporting Total Annual Number of Hours per Statement Section Description Burden Annual Cost @ $279/hr Recordkeepers Recordkeeper Section Hours 50.33(a)-(d), (g), (j) Early Site Permits (records) - 13.0 - $ -

50.33(a)-(d), (j) Standard Design Certification (records) 1.0 16.5 16.5 $ 4,587 50.33(a)-(d), (g), (j) Combined OL (records) - 99.0 - $ 192,654 50.33(a)-(d), (j) Standard Design Approval (records) 1.0 16.5 16.5 $ 13,761 50.33(a)-(d), (j) Manfacturing License (records) - 16.5 - $-

50.33(a)-(d), (h), (j) NPUF Construction Permit (records) - 99.0 - $ 192,654 50.33(a)-(d), (h), (j) NPUF Operating License (records) - 99.0 - $ 27,522 50.33(a)-(d), (h)-(j) Nuclear Power Plant Construction Permit (records) - 99.0 - $ 137,610 2 50.33(a)-(d), (g)-(j) Nuclear Power Plant Operating License (records) - 99.0 - $ 27,522 50.59(c), 50.90, 50.91(a), (b) Records License Amendments 164.0 192.0 31,488.0 $ 8,785,152 50.74 - Burden covered under 10 CFR 55.22 approved by OMB Records of change in status of a licensed reactor operator under Clearance No. 3150-0024 or senior operator - - - $ -

50.80(b) License Transfers 8.0 60.0 480.0 $ 133,920 50.36,50.36A, 50.36B & Appendix I Technical Specifications (Operating power reactor) 89.0 2080.0 185,120.0 $ 51,648,480 50.36,50.36A, 50.36B & Appendix I Technical Specifications (operating NPUFs) 31.0 80.0 2,480.0 $ 691,920 50.36,50.36A, 50.36B & Appendix I Technical Specifications (shutdown power reactor) 29.0 208.0 6,032.0 $ 1,682,928 3 50.75 Decommissioning planning 149.0 73.0 10,877.0 $ 3,034,683 50.71(b)& Appendix C Financial records 60.0 0.1 6.0 $ 1,674 50.71(e) Records for updated FSAR (operating reactors) 51.0 100.0 5,100.0 $ 1,422,900 Records for updated FSAR (power reactors that have 50.71(e) ceased operating) 16.0 25.0 400.0 $ 111,600 50.72 & 50.54(z) Notification of Events 120.0 0.8 96.0 $ 26,784 Appendix E, VI.1 Periodic Testing Quarterly testing of Emergency Response Data System 120.0 0.2 24.0 $ 6,696 4 Appendix E, VI.3 a&b HW/SW changes affecting ERDS DPLs and communication 9.0 1.2 10.8 $ 3,013 50.72(a) Emergency Data Response System 7.0 0.4 2.8 $ 781 Maintain processes to control the inspection, testing, and 50.69 corrective actions for structures, systems, and components, other SSC records 10.0 833.0 8,330.0 $ 2,324,070 After approval of application, perform evaluations of the 50.69 (one-time implementation significance of SSC functions (implementation for the requirements) alternative requirements of 10 CFR 50.69 - voluntary) 16.0 920.0 14,720.0 $ 4,106,880

ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements)

Supporting Total Annual Number of Hours per Statement Section Description Burden Annual Cost @ $279/hr Recordkeepers Recordkeeper Section Hours 50.54(hh)(1) Procedures for aircraft threat 51.0 40.0 2,040.0 $ 569,160 Retention of evaluations, 50.55(e)(9)(ii) (Design and 50.55(e) Construction Deficiencies) 25.0 2.0 50.0 $ 13,950 Quality Assurance records (operating reactors, 4 reactors 50.55(f), Appendices A & B under construction, 1 ESP, 1 COL) 104.0 10,000.0 1,040,000.0 $ 290,160,000 50.55(f), Appendices A & B Quality Assurance records (shutdown reactors) 29.0 2,500.0 72,500.0 $ 20,227,500 50.55a Records related to Codes and Standards 104.0 2,310.0 240,240.0 $ 67,026,960 Power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any 5 changes, tests, and experiments, including a summary of 50.59(c) and (d) the evaluation of each 118.0 100.0 11,800.0 $ 3,292,200 Non-power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of 50.59(c) and (d) the evaluation of each 31.0 480.0 14,880.0 $ 4,151,520 Appendices G & H, 50.60 Fracture Toughness 22.0 11.0 242.0 $ 67,518 50.61 Pressurized Thermal Shock 4.0 216.0 864.0 $ 241,056 50.65 Maintenance program records for operating plants 89.0 4,315.0 384,035.0 $ 107,145,765 50.65 Maintenance program records for shutdown plants 29.0 128.0 3,712.0 $ 1,035,648 6 50.12 Exemptions 30.0 40.0 1,200.0 $ 334,800

ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements)

Supporting Total Annual Number of Hours per Statement Section Description Burden Annual Cost @ $279/hr Recordkeepers Recordkeeper Section Hours 50.44(c) Hydrogen Control Requirements 89.0 1.0 89.0 $ 24,831 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Operating Power Reactors 114.0 1,090.0 124,260.0 $ 34,668,540 Emergency Planning Records for Operating Non-Power 50.47, 50.54(q & t), Appendix E Reactors 31.0 589.0 18,259.0 $ 5,094,261 Emergency Planning Records for Power Reactor Sites 50.47, 50.54(q & t), Appendix E Being Decommissioned 29.0 256.0 7,424.0 $ 2,071,296 Emergency Planning Records for Non-Power Reactors 50.47, 50.54(q & t), Appendix E Being Decommissioned and Possession Only 4.0 4.0 16.0 $ 4,464 One-time transition of records for fire protection to NFPA 50.48 (c) 805 - - - $ -

50.48, Appendix R Fire Protection plan records 118.0 84.0 9,912.0 $ 2,765,448 50.49(a),(d),(f) One-time environmental qualification (program establishment, qualification of equipment), annualized 8.0 793.3 6,346.4 $ 1,770,646 50.49(d),(f),(j) 7 Environmental Qualification 89.0 2,080.0 185,120.0 $ 51,648,480 50.120(b) Training & Qualification Records for Operating Reactors 51.0 780.0 39,780.0 $ 11,098,620 50.120(b) Training & Qualification Records for Applicants - 1,440.0 - $ -

One-time Licensees review rule requirements and update 50.155(a)(1) procedures, programs, or plans 17.0 315.0 5,355.0 $ 1,494,045 Maintain documentation of changes in the implementation of requirements 50.155(f) 51.0 100.0 5,100.0 $ 1,422,900 Development and Ongoing Analyses & Maintenance of Appendix J Performance Based Leakage Testing Program 164.0 60.0 9,840.0 $ 2,745,360 Appendix S and 50.54(ff) Earthquake Engineering Criteria, Operating Reactors 5.0 100.0 500.0 $ 139,500 Appendix S and 50.54(ff) Earthquake Engineering Criteria, DC applicants 1.0 100.0 100.0 $ 27,900 Plant inspection and documentation of inspection following Appendix S IV(a)(3) seismic event 5.0 320.0 1,600.0 $ 446,400 Total 164 2,450,464.0 $ 683,679,456.00

ANNUAL 3rd PARTY DISCLOSURES (Recurring Information Collection Requirements)

Supporting Responses Total Total Annual Number of Burden per Cost @

Statement per Number of Burden (Notes)

Respondents Response $279/Hour Section Section Description Respondent Responses Hours Submission to ASME of Owner's certificate, AIA 5 50.55a agreement (III/NCA-3230) 2.0 1.0 2.0 100.0 200.0 $ 55,800 TOTAL 2.0 200.0 $ 55,800

Total Burden and Responses Section 2 Total Burden and Responses Section 3 Hours Responses Hours Responses Reporting 457,342 2,152 Reporting 4,045 95 Recordkeeping 225,633 164 Recordkeeping 10,877 149 TOTAL 682,975 2,316 TOTAL 14,922 244 Item #13, Other Costs Section 2 Item #13, Other Costs Section 3 Recordkeeping $ 25,181 Recordkeeping $1,214 TOTAL $ 25,181 TOTAL $1,214 Item #14, Costs to the Federal Government, Section 2 Item #14, Costs to the Federal Government, Section 3 Hours Cost @ $279/hr Hours Cost @ $279/hr Staff time 101953 $ 28,444,887 Staff time 1526 $425,754 Total Burden and Responses Section 4 Hours Responses Total Burden and Responses Section 5 Reporting 70,036 34,190 Hours Responses Recordkeeping 28,690 120 Reporting 231,328 1,128 TOTAL 98,726 34,310 Recordkeeping 1,770,363 118 Third Party Disclosure 200 2 TOTAL 2,001,891 1,248 Item #13, Other Costs Section 4 Recordkeeping $3,202 TOTAL $3,202 Item #13, Other Costs Section 5 Recordkeeping $197,573 TOTAL $197,573 Item #14, Costs to the Federal Government, Section 4 Hours Cost @ $279/hr Staff time 41295 $11,521,305 Item #14, Costs to the Federal Government, Section 5 Hours Cost @ $279/hr Staff time 73,115 $20,399,085

Total Burden and Responses Section 6 Total Burden and Responses Section 7 Hours Responses Hours Responses Reporting 10,800 30 Reporting 423,951 4,484 Recordkeeping 1,200 30 Recordkeeping 413,701 164 TOTAL 12,000 60 TOTAL 837,652 4,648 Item #13, Other Costs Section 6 Item #13, Other Costs Section 7 Recordkeeping $134 Recordkeeping $46,169 TOTAL $134 TOTAL $46,169 Item #14, Costs to the Federal Government, Section 6 Item #14, Costs to the Federal Government, Section 7 Hours Cost @ $279/hr Hours Cost @ $279/hr Staff time 2,250 $627,750 Staff time 20,275 $5,656,725 HOURS RESPONSES 2021 3,648,166 42,244 Previous 3,710,882 43,617 Delta -62,716 -1,373

Item #13, Other Costs Section Section Costs 2 $25,181 3 $1,214 4 $3,202 5 $197,573 6 $134 7 $46,169 Total $273,472 Item #14, Costs to the Federal Government, Section Staff Time Hours Cost @ $279/hr 2 101,953 $28,444,887 3 1,526 $425,754 4 41,295 $11,521,305 5 73,115 $20,399,085 6 2,250 $627,750 7 20,275 $5,656,725 Total 240,414 $67,075,506 Burden Hours Section Reporting Recordkeeping 3rd Party Total Cost 2 457,342 225,633 682,975 $190,550,025 3 4,045 10,877 14,922 $4,163,238 4 70,036 28,690 98,726 $27,544,442 5 231,328 1,770,363 200 2,001,891 $558,527,589 6 10,800 1,200 12,000 $3,348,000 7 423,951 413,701 837,652 $233,704,908 Total 1,197,502 2,450,464 200 3,648,166 $1,017,838,202 Previous total 1,148,086 2,562,696 100 3,710,881.7 $975,961,887 Deltas 49,416 -112,232 100 -62,716 -$17,497,792

Reponses Section Reporting Recordkeeping 3rd Party TOTAL 2 2,152 164 2,316 3 95 149 244 4 34,190 120 34,310 5 1,128 118 2 1,248 6 30 30 60 7 4,484 164 4,648 2021 TOTAL 42,078 164 2 42,244 Previous total 43,467 149 1 43,617 Deltas -1,389 15 1 -1,373