OMB-3150-0011 Final 2021 Collection Renewal, 10 CFR Part 50 Domestic Licensing of Production and Utilization Facilities - Burden Tables
ML21116A179
Person / Time
Issue date: 06/14/2021
From:
NRC/NRR/DRMA/RPSBII
To:
NRC/OCIO
Shared Package
ML21085A616 List:
References
NRC-2020-0204, OMB 3150-0011
Download: ML21116A179 (12)


Text

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour 50.33(a)-(d), (g), (j)

Early Site Permit application - general information

- - - 360.0 - $ -

50.33(a)-(d), (j)

Standard Design Certification application -

general information 1.0 0.3 0.3 450.0 148.5 $ 41,432 50.33(a)-(d), (g), (j)

Combined OL application - general information

- - - 2,700.0 - $ -

50.33(a)-(d), (j)

Standard Design Approval application -

general information 1.0 0.3 0.3 450.0 148.5 $ 41,432 50.33(a)-(d), (j)

Manfacturing License application - general information

- - - 450.0 - $ -

50.33(a)-(d), (h), (j)

NPUF Construction Permit application -

general information

- - - 2,700.0 - $ -

50.33(a)-(d), (h), (j)

NPUF Operating License application -

general information

- - - 2,700.0 - $ -

50.33(a)-(d), (h)-(j)

Nuclear Power Plant Construction Permit application - general information

- - - 2,700.0 - $ -

50.33(a)-(d), (g)-(j)

Nuclear Power Plant Operating License application - technical information

- - - 2,700.0 - $ -

50.33(f)

Financial qualification information as requested by the Commission

- - - 3,580.0 - $ -

50.34 NPUF Construction Permit application -

general information (PSAR)

- - - 14,000.0 - $ -

50.34 NPUF Operating License application -

technical information (FSAR)

- - - 7,000.0 - $ -

50.34 Nuclear Power Plant Construction Permit application - general information (PSAR)

- - - 90,000.0 - $ -

50.34 Nuclear Power Plant Operating License application - technical information (FSAR)

- - - 40,000.0 - $ -

50.54(bb)

Decommissioned plants submit program for managing and funding irradiated fuel following permanent cessation of operation of the reactor

- - - 250.0 - $ -

50.59(c), 50.90, 50.91(a), (b)

License Amendments 164.0 6.0 984.0 313.0 307,992.0 $ 85,929,768 50.59(c), 50.90, 50.91(a), (b)

License Amendments - Topical Reports 15.0 1.0 15.0 400.0 6,000.0 $ 1,674,000 50.74 Notification within 30 days of a change in status of a licensed reactor operator or senior operator.

201.0 1.0 201.0 1.0 201.0 $ 56,079 50.80(b)

License Transfers 8.0 1.0 8.0 540.0 4,320.0 $ 1,205,280 50.36,50.36A, 50.36B &

Appendix I Technical Specifications 164.0 5.0 820.0 168.0 137,760.0 $ 38,435,040 50.36,50.36A, 50.36B, 50.36C &

Appendix I Technical Specifications - Risk Informed Completion Times (RICT) Program 5.0 1.0 5.0 60.0 300.0 $ 83,700 50.34(c) & (d) & 50.54(p) -

Burden covered under 10 CFR 73.67 approved by OMB under Clearance No. 3150-0151 Physical security and safeguards contingency plans (operating power reactors)

- 1.0 - 29.0 - $ -

ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 2

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 50.34(c) & (d) & 50.54(p) -

Burden covered under 10 CFR 73.67 approved by OMB under Clearance No. 3150-0151 Physical security and safeguards contingency plans (decommissioned/shutdown power reactors)

- - - 29.0 - $ -

50.34(c) & (d) & 50.54(p) -

Burden covered under 10 CFR 73.67 approved by OMB under Clearance No. 3150-0151 Physical security and safeguards contingency plans (nonpower reactors)

- 1.0 - 29.0 - $ -

50.35(b)

Periodic reports of the progress and results of research and development programs designed to resolve safety questions

- - - 100.0 - $ -

50.54(w)(3)

Annual report on the source of property and damage insurance 118.0 1.0 118.0 4.0 472.0 $ 131,688 10 CFR 50.54(w)(4)

Cleanup plan outlining the steps and costs needed to complete decontamination and cleanup following an accident

- - - 2,000.0 - $ -

50.33(k)

Contents of applications 1.0 1.0 1.0 200.0 200.0 $ 55,800 50.75 Decommissioning planning 89.0 1.0 89.0 5.0 445.0 $ 124,155 50.82 Termination of license 5.0 1.0 5.0 680.0 3,400.0 $ 948,600 50.71(b)& Appendix C Annual financial reporting 60.0 1.0 60.0 1.0 60.0 $ 16,740 50.76 Submission of financial qualifications information within 75 days prior to ceasing to be an electric utility

- - - 33.0 - $ -

50.71(e)

Updated FSAR (operating reactors) 51.0 1.0 51.0 900.0 45,900.0 $ 12,806,100 50.71(e)

Updated FSAR (power reactors that have ceased operating) 16.0 1.0 16.0 225.0 3,600.0 $ 1,004,400 50.72 & 50.54(z)

Notification of Events 120.0 2.0 240.0 1.00 240.0 $ 66,960 10 CFR Part 50, Appendix E, Paragraph E.9.d Daily testing of the ENS system by the HOO, submission of voluntary reactor status and grid information 91.0 365.0 33,215.0 0.083 2,757.0 $ 769,203 Appendix E, VI.1 Periodic Testing Quarterly testing of Emergency Response Data System 120.0 4.0 480.0 2.0 960.0 $ 267,840 Appendix E, VI.3 a&b HW/SW changes affecting ERDS DPLs and communication 9.0 1.0 9.0 4.0 36.0 $ 10,044 50.72(a)

Emergency Response Data System reports 7.0 1.0 7.0 4.0 28.0 $ 7,812 50.70 Team Inspections 51.0 1.0 51.0 160.0 8,160.0 $ 2,276,640 50.70 Other Inspections (e.g. Resident, Supplemental, Special and Infrequently Performed, Temporary Instructions, and Reactive) 51.0 1.0 51.0 45.0 2,295.0 $ 640,305 50.69(g)

Submission of event report to submit a licensee event report for any event or condition that would have prevented RISC-1 and RISC-2 structures, systems, and components from performing a safety-significant function 10.0 1.0 10.0 600.0 6,000.0 $ 1,674,000 4

3

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 50.54(cc)

Bankruptcy Notifications

- - - 1.0 - $ -

50.55(e) 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> notification (Design and Construction Deficiencies) 2.0 1.0 2.0 10.0 20.0 $ 5,580 50.55(e) 30-day reports (Design and Construction Deficiencies) 2.0 1.0 2.0 70.0 140.0 $ 39,060 50.55(f), Appendices A & B Quality Assurance reports (operating reactors) 89.0 1.0 89.0 160.0 14,240.0 $ 3,972,960 50.55(f), Appendices A & B Quality Assurance reports (reactors under construction) 2.0 1.0 2.0 160.0 320.0 $ 89,280 50.55(f), Appendices A & B Quality Assurance reports (Part 52 applicants) 2.0 1.0 2.0 667.0 1,334.0 $ 372,186 50.55a(z)

Alternatives submitted by COLs 2.0 1.0 2.0 230.0 460.0 $ 128,340 50.55a(z)

Alternatives submitted by Power Reactors 89.0 3.0 267.0 230.0 61,410.0 $ 17,133,390 50.55a(z)

Alternatives submitted for I&C 0.0 0.0 -

230.0 - $ -

50.55a(z)(1) and 50.55a(z)(2) -

Burden covered under 50.55a(z)(1) and 50.55a(z)(2),

approved by OMB under Clearance No. 3150-0244 Request for Alternatives (Online portal) 89.0 2.4 218.0 230.0 50,140.0 $ 13,989,060 50.55a(f)(5) and (g)(5)

Relief requests 89.0 2.0 178.0 230.0 40,940.0 $ 11,422,260 50.55a Codes and Standards 89.0 2.0 178.0 58.0 10,324.0 $ 2,880,396 50.59(c) and d Power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 118.0 1.0 118.0 380.0 44,840.0 $ 12,510,360 50.59(c) and d Non-power reactors - Reports changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 31.0 1.0 31.0 120.0 3,720.0 $ 1,037,880 Appendices G & H, 50.60 Fracture Toughness 22.0 1.0 22.0 102.0 2,244.0 $ 626,076 50.61 Pressurized Thermal Shock 4.0 1.0 4.0 24.0 96.0 $ 26,784 50.64(c)(1)

Unique purpose application for highly enriched uranium 2.0 1.0 2.0 10.0 20.0 $ 5,580 50.64(c)(2)(i)

Highly enriched uranium - updated documentation 4.0 1.0 4.0 10.0 40.0 $ 11,160 50.64(c)(2)(ii)

Highly enriched uranium - updated documentation 4.0 1.0 4.0 10.0 40.0 $ 11,160 50.64(c)(2)(iii)

Highly enriched uranium, safety analyses 3.0 1.0 3.0 333.3 1,000.0 $ 279,000 50.66 Thermal Annealing

- - - 6,400.0 -

6 50.12 Exemptions 30.0 1.0 30.0 360.0 10,800.0 $ 3,013,200 5

Supporting Statement Section Rule Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Total Cost @

$279/Hour ANNUAL REPORTING REQUIREMENTS (Recurring Information Collection Requirements) 50.34(i)

Part 50 applicants provide plans for implementing rule requirements in application

- - - 300.0 - $ -

50.44(c)

Hydrogen Control Requirements

- - - 203.0 - $ -

50.46(a)(3)(ii)

Annual report of changes to change evaluation model 104.0 1.0 104.0 20.0 2,080.0 580,320.0 50.46(a)(3)(ii) 30-day report of significant change or error to evaluation model 52.0 1.0 52.0 20.0 1,040.0 290,160.0 50.46, Appendix K Realistic evaluation model submittal 1.0 1.0 1.0 2,500.0 2,500.0 697,500.0 50.46, Appendix K Modified evaluation model submittal 0.6 1.0 0.6 1,750.0 1,050.0 292,950.0 50.46, Appendix K Schedule for completing actions associated with 10 CFR 50 Appendix K and 10 CFR 50.46(b) 1.6 1.0 1.6 16.0 25.6 7,142.4 Appendix K, 50.46 ECCS 2.0 - 40.0 - -

50.47, 50.54(q & t), Appendix E Emergency plans (operating power reactors) 57.0 25.0 1,425.0 81.0 115,425.0 $ 32,203,575 50.54(q)(4)

Submission of proposed changes that would reduce the effective of approved emergency plans (operating power reactors) 12.0 1.0 12.0 40.0 480.0 $ 133,920 App. E.IV.F.2.a,b Participation Exercise - exercise scenario submission 28.5 1.0 28.5 40.0 1,140.0 $ 318,060 50.47, 50.54(q & t), Appendix E Emergency plans (operating non-power reactors) 31.0 10.0 310.0 2.0 620.0 $ 172,980 50.47, 50.54(q & t), Appendix E Emergency plans (power reactor sites being decommissioned) 29.0 15.0 435.0 34.0 14,790.0 $ 4,126,410 50.47, 50.54(q & t), Appendix E Emergency plans (non-power reactors being decommissioned and possession only) 4.0 5.0 20.0 1.0 20.0 $ 5,580 50.47, 50.54(q & t), Appendix E Emergency Planning 116.0 18.0 2,088.0 60.0 125,280.0 $ 34,953,120 Appendix S and 50.54(ff)

Earthquake Engineering Criteria, DC applicants 1.0 1.0 1.0 155,000.0 155,000.0 $ 43,245,000 Appendix S and 50.54(ff)

Earthquake Engineering Criteria, Operating Reactors 5.0 1.0 5.0 900.0 4,500.0 $ 1,255,500 Total 164 42,078 1,197,502

$334,102,946 7

Supporting Statement Section Section Description Number of Recordkeepers Hours per Recordkeeper Total Annual Burden Hours Annual Cost @ $279/hr 50.33(a)-(d), (g), (j)

Early Site Permits (records)

- 13.0 - $ -

50.33(a)-(d), (j)

Standard Design Certification (records) 1.0 16.5 16.5 $ 4,587 50.33(a)-(d), (g), (j)

Combined OL (records)

- 99.0 - $ 192,654 50.33(a)-(d), (j)

Standard Design Approval (records) 1.0 16.5 16.5 $ 13,761 50.33(a)-(d), (j)

Manfacturing License (records)

- 16.5 - $-

50.33(a)-(d), (h), (j)

NPUF Construction Permit (records)

- 99.0 - $ 192,654 50.33(a)-(d), (h), (j)

NPUF Operating License (records)

- 99.0 - $ 27,522 50.33(a)-(d), (h)-(j)

Nuclear Power Plant Construction Permit (records)

- 99.0 - $ 137,610 50.33(a)-(d), (g)-(j)

Nuclear Power Plant Operating License (records)

- 99.0 - $ 27,522 50.59(c), 50.90, 50.91(a), (b)

Records License Amendments 164.0 192.0 31,488.0 $ 8,785,152 50.74 - Burden covered under 10 CFR 55.22 approved by OMB under Clearance No. 3150-0024 Records of change in status of a licensed reactor operator or senior operator 50.80(b)

License Transfers 8.0 60.0 480.0 $ 133,920 50.36,50.36A, 50.36B & Appendix I Technical Specifications (Operating power reactor) 89.0 2080.0 185,120.0 $ 51,648,480 50.36,50.36A, 50.36B & Appendix I Technical Specifications (operating NPUFs) 31.0 80.0 2,480.0 $ 691,920 50.36,50.36A, 50.36B & Appendix I Technical Specifications (shutdown power reactor) 29.0 208.0 6,032.0 $ 1,682,928 3

50.75 Decommissioning planning 149.0 73.0 10,877.0 $ 3,034,683 50.71(b)& Appendix C Financial records 60.0 0.1 6.0 $ 1,674 50.71(e)

Records for updated FSAR (operating reactors) 51.0 100.0 5,100.0 $ 1,422,900 50.71(e)

Records for updated FSAR (power reactors that have ceased operating) 16.0 25.0 400.0 $ 111,600 50.72 & 50.54(z)

Notification of Events 120.0 0.8 96.0 $ 26,784 Appendix E, VI.1 Periodic Testing Quarterly testing of Emergency Response Data System 120.0 0.2 24.0 $ 6,696 Appendix E, VI.3 a&b HW/SW changes affecting ERDS DPLs and communication 9.0 1.2 10.8 $ 3,013 50.72(a)

Emergency Data Response System 7.0 0.4 2.8 $ 781 50.69 Maintain processes to control the inspection, testing, and corrective actions for structures, systems, and components, other SSC records 10.0 833.0 8,330.0 $ 2,324,070 50.69 (one-time implementation requirements)

After approval of application, perform evaluations of the significance of SSC functions (implementation for the alternative requirements of 10 CFR 50.69 - voluntary) 16.0 920.0 14,720.0 $ 4,106,880 ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements) 4 2

Supporting Statement Section Section Description Number of Recordkeepers Hours per Recordkeeper Total Annual Burden Hours Annual Cost @ $279/hr ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements) 50.54(hh)(1)

Procedures for aircraft threat 51.0 40.0 2,040.0 $ 569,160 50.55(e)

Retention of evaluations, 50.55(e)(9)(ii) (Design and Construction Deficiencies) 25.0 2.0 50.0 $ 13,950 50.55(f), Appendices A & B Quality Assurance records (operating reactors, 4 reactors under construction, 1 ESP, 1 COL) 104.0 10,000.0 1,040,000.0 $ 290,160,000 50.55(f), Appendices A & B Quality Assurance records (shutdown reactors) 29.0 2,500.0 72,500.0 $ 20,227,500 50.55a Records related to Codes and Standards 104.0 2,310.0 240,240.0 $ 67,026,960 50.59(c) and (d)

Power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 118.0 100.0 11,800.0 $ 3,292,200 50.59(c) and (d)

Non-power reactors - Records of changes in the facility, of changes in procedures, and of tests and experiments and to submit a report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each 31.0 480.0 14,880.0 $ 4,151,520 Appendices G & H, 50.60 Fracture Toughness 22.0 11.0 242.0

$ 67,518 50.61 Pressurized Thermal Shock 4.0 216.0 864.0 $ 241,056 50.65 Maintenance program records for operating plants 89.0 4,315.0 384,035.0 $ 107,145,765 50.65 Maintenance program records for shutdown plants 29.0 128.0 3,712.0 $ 1,035,648 6

50.12 Exemptions 30.0 40.0 1,200.0 $ 334,800 5

Supporting Statement Section Section Description Number of Recordkeepers Hours per Recordkeeper Total Annual Burden Hours Annual Cost @ $279/hr ANNUAL RECORDKEEPING REQUIREMENTS (Recurring Information Collection Requirements) 50.44(c)

Hydrogen Control Requirements 89.0 1.0 89.0 $ 24,831 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Operating Power Reactors 114.0 1,090.0 124,260.0 $ 34,668,540 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Operating Non-Power Reactors 31.0 589.0 18,259.0 $ 5,094,261 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Power Reactor Sites Being Decommissioned 29.0 256.0 7,424.0 $ 2,071,296 50.47, 50.54(q & t), Appendix E Emergency Planning Records for Non-Power Reactors Being Decommissioned and Possession Only 4.0 4.0 16.0 $ 4,464 50.48 (c)

One-time transition of records for fire protection to NFPA 805 50.48, Appendix R Fire Protection plan records 118.0 84.0 9,912.0 $ 2,765,448 50.49(a),(d),(f)

One-time environmental qualification (program establishment, qualification of equipment), annualized 8.0 793.3 6,346.4 $ 1,770,646 50.49(d),(f),(j)

Environmental Qualification 89.0 2,080.0 185,120.0 $ 51,648,480 50.120(b)

Training & Qualification Records for Operating Reactors 51.0 780.0 39,780.0 $ 11,098,620 50.120(b)

Training & Qualification Records for Applicants

- 1,440.0 - $ -

50.155(a)(1)

One-time Licensees review rule requirements and update procedures, programs, or plans 17.0 315.0 5,355.0 $ 1,494,045 50.155(f)

Maintain documentation of changes in the implementation of requirements 51.0 100.0 5,100.0 $ 1,422,900 Appendix J Development and Ongoing Analyses & Maintenance of Performance Based Leakage Testing Program 164.0 60.0 9,840.0 $ 2,745,360 Appendix S and 50.54(ff)

Earthquake Engineering Criteria, Operating Reactors 5.0 100.0 500.0 $ 139,500 Appendix S and 50.54(ff)

Earthquake Engineering Criteria, DC applicants 1.0 100.0 100.0 $ 27,900 Appendix S IV(a)(3)

Plant inspection and documentation of inspection following seismic event 5.0 320.0 1,600.0 $ 446,400 Total 164 2,450,464.0 $ 683,679,456.00 7

Supporting Statement Section Section Description Number of Respondents Responses per Respondent Total Number of Responses Burden per

Response

Total Annual Burden Hours Cost @

$279/Hour (Notes) 5 50.55a Submission to ASME of Owner's certificate, AIA agreement (III/NCA-3230) 2.0 1.0 2.0 100.0 200.0 $ 55,800 TOTAL 2.0 200.0 $ 55,800 ANNUAL 3rd PARTY DISCLOSURES (Recurring Information Collection Requirements)

Total Burden and Responses Section 3 Hours Responses Hours Responses Reporting 457,342 2,152 Reporting 4,045 95 Recordkeeping 225,633 164 Recordkeeping 10,877 149 TOTAL 682,975 2,316 TOTAL 14,922 244 Item #13, Other Costs Section 3 Recordkeeping 25,181 Recordkeeping

$1,214 TOTAL 25,181 TOTAL

$1,214 Hours Cost @ $279/hr Hours Cost @ $279/hr Staff time 101953 28,444,887 Staff time 1526

$425,754 Hours Responses Total Burden and Responses Section 5 Reporting 70,036 34,190 Hours Responses Recordkeeping 28,690 120 Reporting 231,328 1,128 TOTAL 98,726 34,310 Recordkeeping 1,770,363 118 Third Party Disclosure 200 2

TOTAL 2,001,891 1,248 Item #13, Other Costs Section 4 Recordkeeping

$3,202 TOTAL

$3,202 Item #13, Other Costs Section 5 Recordkeeping

$197,573 TOTAL

$197,573 Item #14, Costs to the Federal Government, Section 4 Hours Cost @ $279/hr Staff time 41295

$11,521,305 Hours Cost @ $279/hr Staff time 73,115

$20,399,085 Total Burden and Responses Section 4 Total Burden and Responses Section 2 Item #13, Other Costs Section 2 Item #14, Costs to the Federal Government, Section 2 Item #14, Costs to the Federal Government, Section 3 Item #14, Costs to the Federal Government, Section 5

Total Burden and Responses Section 6 Hours Responses Hours Responses Reporting 10,800 30 Reporting 423,951 4,484 Recordkeeping 1,200 30 Recordkeeping 413,701 164 TOTAL 12,000 60 TOTAL 837,652 4,648 Item #13, Other Costs Section 6 Item #13, Other Costs Section 7 Recordkeeping

$134 Recordkeeping

$46,169 TOTAL

$134 TOTAL

$46,169 Item #14, Costs to the Federal Government, Section 6 Item #14, Costs to the Federal Government, Section 7 Hours Cost @ $279/hr Hours Cost @ $279/hr Staff time 2,250

$627,750 Staff time 20,275

$5,656,725 HOURS RESPONSES 2021 3,648,166 42,244 Previous 3,710,882 43,617 Delta

-62,716

-1,373 Total Burden and Responses Section 7

Section Costs 2

$25,181 3

$1,214 4

$3,202 5

$197,573 6

$134 7

$46,169 Total

$273,472 Section Staff Time Hours Cost @ $279/hr 2

101,953

$28,444,887 3

1,526

$425,754 4

41,295

$11,521,305 5

73,115

$20,399,085 6

2,250

$627,750 7

20,275

$5,656,725 Total 240,414

$67,075,506 Section Reporting Recordkeeping 3rd Party Total Cost 2

457,342 225,633 682,975

$190,550,025 3

4,045 10,877 14,922

$4,163,238 4

70,036 28,690 98,726

$27,544,442 5

231,328 1,770,363 200 2,001,891

$558,527,589 6

10,800 1,200 12,000

$3,348,000 7

423,951 413,701 837,652

$233,704,908 Total 1,197,502 2,450,464 200 3,648,166

$1,017,838,202 Previous total 1,148,086 2,562,696 100 3,710,881.7

$975,961,887 Deltas 49,416

-112,232 100

-62,716

-$17,497,792 Item #13, Other Costs Section Item #14, Costs to the Federal Government, Burden Hours

Section Reporting Recordkeeping 3rd Party TOTAL 2

2,152 164 2,316 3

95 149 244 4

34,190 120 34,310 5

1,128 118 2

1,248 6

30 30 60 7

4,484 164 4,648 2021 TOTAL 42,078 164 2

42,244 Previous total 43,467 149 1

43,617 Deltas

-1,389 15 1

-1,373 Reponses