ML20134B547: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[JAFP-85-0651, Monthly Operating Rept for Jul 1985]]
| number = ML20134B547
| issue date = 07/31/1985
| title = Monthly Operating Rept for Jul 1985
| author name = Cook J, Glovier H
| author affiliation = POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
| addressee name =
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| docket = 05000333
| license number =
| contact person =
| document report number = JAFP-85-0651, JAFP-85-651, NUDOCS 8508150664
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 9
}}
 
=Text=
{{#Wiki_filter:*
OPERATING DATA REPORT DOCKET NO. 50-333 DATE Aug 1985 COMPLETED i;Y  J. Cook TELEPHONE    (315)342-3840  __
OPERATING STATUS
: 1. Unit Name: James A. FitzPatrick                  : Notes                                    :
: 2.      Reporting Period:    850701 - 850731              :                                          :
: 3.      Licensed Thermal Power (MWt): 2436                :                                          -
: 4.      Nameplate Rating (Cross MWe): 883                :                                          :
: 5.      Design Electrical Rating (Net MWe): 821          :                                          :
: 6.      Maximum Dependable Capacity (Gross MWe): 831      :                                          :
: 7. Maximum Dependable Capacity (Net MWe): lfl0
: 8.      If Changes occur in Capacity Ratings (Items 3 Through 7) Since I.ast Report,Give Reasons:
NONE
: 9. Power Level To Which Restricted, If Any (Net MWe): NONE
: 10.      Reasons For Restrictions, If Any:
This Month      Yr.-to-Date      Cumulative
: 11.      Hours in Reporting Period                              744            5087            87768
: 12.      Number Of Hours Reactor Was Critical                  703.5          z439.9          bzu)3.9
: 13.      Reactor Reserve Shutdown Hours                          0              0              U 14      Hours Generator On-Line                              664.3          zzu9./          OUza/
: 15.      Unit Reserve Shutdown Hours                            0              U              U
: 16.      Gross Thermal Energy Generated (MWH)              1585056          3UdVJzu        izsuloz/4
: 17.      Gross Electrical Energy Generated (MWH)            530300            1/09960        4369Uzbu
: 18.      Net Electrical Energy Generated (MWH)              512795            1653055        42051060
: 19.      Unit Service Factor                                  91.9%          45.0%          68.6%
: 20.      Unit Availability Factor                              91.9%          45.0%          68.6%
: 21.      Unit Capacity Factor (Psing MDC Net)                  85.1%          40.1%          62.1%
: 22.      Unit Capacity Factor (Using DER Net)                  83.9%          39.6%          58.4%
: 23.      Unit Forced Outage Rate                                8%              10%            13.4%
: 24.      Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):
WONE
: 25.      If Shut Down At End Of Report Period, Estinated Date of Startup:
: 26.      linits In Test Status (Prior to Commercial Operation):                    Forecast      Achieved INITIAL CRITICALITY INITIAI. ELECTRICITY COMMERCIAL OPERATION 8508150664 850731 DR  ADOCK 050        3                                                      t{ g[
l\
L
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-333 UNIT  FITZPATRICK DATE  AUGUST 1985 COMPLETED BY  J. COOK TELEPHONE  (315) 342-3840 MONTH JULY 1985 DAY AVERAGE DAILY POWER LEVEL                DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                      (MWe-Net) 1            798                            17              796 2            702                            18              796 3            701                            19            483 4            776                          20                17 5            793                          21              518 6            793                          22              625 7            792                          23              757 8              794                          24              789 9              796                          25              788 10              796                          26              700 11              795                          27                0 12              794                          28              414 13              793                          29              652 14              794                          30              746 15              793                          31              746 16              793
 
==SUMMARY==
: The FitzPatrick plant operated at near full thermal power j
for this reporting period with one inadvertent shutdown while transferring electrical loads and a unit trip during
          'x
          ~
turbine control valve testing.
 
  /
UNIT SilUTDOWNS AND F0WER REDUCTIONS                    DOCKET E0. 50-333 f'                                                                                                UNIT NAME FITZPATRICK DATE pyggg7 7995 REPORT MONTH JULY 1985                        COMPLETED BY J. COOK TELEPHONE (315) 342-3840 N                              P z          Noo 8G      z  OUd          LICENSEE      di      $%                    CAUSE & CORRECTIVE NO.      DATE    $    "$      @  $$#          EVENT        $$      $$                        ACTION TO
                    $        $    d  5! $ s      REPORT #      $"      $"                    PREVENT RECURRENCE ov      e  ymg                                o 6    850624  F    34.6    A      3          85.018      AD                REACTOR SCRAM ON HIGH FLUX DUE TO FAULTY INPUT DIODE IN RECIRC SCOOP TUBE POSITIONER CIRCUITRY. REPLACED THE DEMODULATOR BOARD AND RETURNED TO SERVICE.
7    850719  F    29.7    G      3                                        REACTOR SCRAM ON LOW VACUUM DUE TO OPERATOR ERROR WHILE TRANSFERRING ELECTRICAL LOADS.
8    850726  F    30.0    G      3                                        REACTOR SCRAM DURING TURBINE CONTROL VALVE TESTING DUE TO IMPROPER OPERATOR ACTION.
l 1                2                                            3                            4 F: Forced          Reason:                                      Method:                      Exhibit G. Instructions S: Scheduled      A-Equipment Failure (Explain)                1-Manual                    for Peparation of Data E-Maintenance of Test                        2-Manual Scram              Entry Sheets for Licensee C-Refueling                                  3-Automatic Scram            Event Report (LER) File NUREG D-Regulatory Restriction                      4-Other(Explain)            0161 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other(Explain)
 
NARRATIVE
 
==SUMMARY==
OF OPERATING EXPERIENCE JULY 1985 The FitzPatrick plant operated at near full thermal power for the first eighteen days of the reporting period. On July 19 the unit tripped on low condenser vacuum which was caused by personnel error during electrical load transfers. The plant returned to service on July 20. On July 26 the unit again tripped due to improper operator action during Turbine control valve testing. The plant returned to service on July 28.
At the end of the reporting period the FitzPatrick plant is operating at approximately 783 mw, .
'N
 
NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MATNTENANCE
 
==SUMMARY==
 
JULY 1985 ACTION TAKEN        REPAIR WORK REOUEST NO.      HOW          CAUSE OF              RESULTS OF          10 PRECLUDE        TIME DATE    SYSTEM  COMPONENT NO. DETECTED      MALFUNCTION            MALFUNCTION        RErURRENCE          HOURS 850708      07      033594            OPS      POSSIBLE BAD          Y NOT = 0 WHEN      WILL NOT BE FIXED-        16 NM-131-2B                  SOLDER CONNECTION      DET. OUT OF CORE    OBSOLETE 850717      07      034791            OPS      LAGGING SWITCH ON      TIP STOPS DURING    LOWERED CORE TOP,        40 TIP-C                    VEED. RT. CNTR.        WITHDRAWAL          BOTTOM BY ONE 850724      07      034781            OPS                            APRM COUNT          ADJ. TO INOP FROM          3 APRM-F                                            CIRCUIT NEEDS        12 to 11 LPRM ADJST.
850709      11      034763            OPS      TRANSMIT. SENS.        SLC TANK XMIT/IND  BLEW OUT LINE WITH AIR,    8 LT-45                    LINE/ZERO ADJUST      READS HIGH          ADJ. ZERO 850711      12      034810            OPS      DEFECT SWITCH,        GIVES SPURIOUS      THIGHTENED                18 TS-139C                    LOOSE THERMOCOUPLE    ISOLAT. OF RWCU    THERMOCOUPLE, FIXED SWITCH 850701      13      034819            OPS      COVENOR VALVE          TRIPPED TWICE ON    ADJ. VALVE STROKE          32 P-1                      ADJUSTED WRONG        OVERSPEED          AND LINKAGE 850708      16      034823            OPS      UNKNOWN                BULK VALUE IS        REPROGRAMMED THE          8 TM-131                                            INCORRECT          COMPUTER 850719      16-1      028577            OPS      DRIFT                  DOESN'T INDICATE    REPLACED BATTERY,        40 PR-200                                            CORRECT PRESSURE    PERFORMED CALIBRATION
 
7 NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
JULY 1985 ACTION TAKEN          REPAIR WORK REOUEST NO. HOW'        CAUSE OF              RESULTS OF          TO PRECLUDE            TIME DATE SYSTEM  COMPONENT NO. DETECTED      MALFUNCTION          MALFUNCTION        RECURRENCE            HOURS 850722    17      040215          OPS      DETECTOR              MON. READS HI ON    CLEANED DETECTOR            16 RIS-458A                  CONTAMINATION          PANEL HV-12 850724    17      034717          OPS      DEFECTIVE              DOWNSCALE ALARM    ORDERED NEW GROMMETS        24 RM-251B                  MOUNTING              COMES IN AND OUT GROMMETS 850710    20      034870          OPS      LOOSE CARRIAGE        WILL NOT GO TO      ADJUSTED CARRIAGE            4 FR-52B                    ASSEMBLY              ZERO                ASSEMBLY 850718  20      034851          OPS      POSSIBLE LINEUP        MOVES SLOWLY WITH  ISOLATION TRANS.,            6 RQX-530                  PROBLEM, AIR LEAK      20A0V95 SHUT        VER. FT STOP LEAKAGE 850717  27      040800          OPS      BURNED OUT            PART., SOURCE      REPLACED LAMPS, ADJUSTE )    4 RM-101A                  LAMPS                  DRIVE WOULDN'T      CAMS DRIVE CIRC.
850702  27      039521          OPS      METER CAN'T            PANEL WOULDN'T      HAD METER CALIBRATED          3 PCA-101                  PROVIDE ENOUGH        CALIBRATE IN        ADJUSTED ZERO ADJUST.                ISP 30-1 850701  76      034718          OPS      DOOR MAGNET OUT        INDICATES OPEN      REPOSITIONED THE MAGNET      18 272-15                    0F POSITION            AT FPP WHEN NOT 850708  76      034680          OPS      LINE NOISE            CIR. #1 FAILURE    CHECKED LINES WITH            4 MPX-4                                          WON'T CLEAR        0-SCOPE
 
NEW YORK POWER AUTHORITY - JAMES A. FITZPATRICK HUCLEAR POWER PLANT MAINTENANCE SU1 DIARY JULY 1985 ACTION TAKEN      REPAIR WORK REOUEST NO.        HOW      CAUSE OF              RESULTS OF        TO PRECLUDE        TIME DATE SYSTEM  COMPONENT No.        DETECTED    MALFUNCTION            MALFUNCTION      RECURRENCE        HOURS 850718    76      034865              OPS    SWITCH OUT OF          COMPR. WON'T TURN CALIBRATED SWITCH        6 0-11                      CALIBRATION            OFF AT SET POINT 850718    76      040154              OPC    POWER SUPPLY          LINE 1,2 FAILED  REPLACED POWER SUPPLY    4 MPX-3                      AND TRANSMITTER        GENERATOR SYSTEM  AND TRANSMITTER FAILED
 
NEW YORK F0WER AUI110RITY JAMES A. FITZPATRICK hTCLFAR POWER PIAhT
* SAFEIY REIATED ELECIRICAL & MFEFANICAL PAIhTENANCE SlWARY                                ,
JULY 1985 REPAIR-kORK REQUEST #                                                                                  TIME DATE                      SYST&1  CTPONENT      110R DETECTED    CAUSE OF MAIJUNCTION    ACTION TAKEN 'IO PRFfLUDE RECURRENCE HOURS 6/25                    03    22725          OPS              Seat Icakage            Repaired valve seat                      3 HCU 10-23 6/27                    01-125 34700          OPS              kbrn Fan Belts          Replaced tan belts                      6 FN 1A 7/2                      03    37215          OPS              Broken Hand Kheel        Replaced hand wheel                      2 CRD 75 7/3                      71    33764          GPS              Indicator Light          Eeplaced bulb                            2 IBC-2                            Burned Out 7/3                      76    34686          OPS              Alarm Light Bumed        Replaced bulb                            2 SD-349                          Out 7/3                      76    34735          OPS              Alarm Light Bumed        Replaced bulb                            2 SD-336                          Out 7/4                      93    34841          OPS              Cmpressor Unloader      Replaced unloader                        5 AC-2B 7/11                    07    36827          OPS              Dead Spot in Switch      Cleaned switch                          2 SW-7A-S2 7/17                    70    34818          OPS              Seal Irak                Replaced mechanical seal                40 P-9A 7/18                    27    34675          OPS              Limit Switch Out of      Adjusted limit switch                    3      ,
VB-2                            Adjustment 7/19                    46    285/1          OPS              Breaker Failed to        Shindi X relay housing replaced        21 P-2A                            Close                    trip paddle 7/24                    03    40159          OPS              Solenoid Failure        Replaced solenoids                      8 CRD 34-15
 
A    PO. Etw 41 Lv com.ng. New %k 130'33 315 342 3340
  #5 NewYorkPower 1sf Authority August 7, 1985 JAFP 85-0651 Director, Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:          DOCUMENT CONTROL DESK
 
==REFERENCE:==
DOCKET NO. 50-333
 
==Dear Sir:==
 
Enclosed please find the J. A. FitzPatrick Operating Status Report for the month of July, 1985.                              Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.
IAROLD A. GLOVIER HAG        :mac Enclosures cc: Distribution 6''
                                                                                                        \\
                                -.__.- __. - . - .-.-- -                              - -      -      - -}}

Latest revision as of 19:22, 14 December 2021