ML20135D830: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML20135D830 | | number = ML20135D830 | ||
| issue date = 12/05/1996 | | issue date = 12/05/1996 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in Insp Repts 50-369/96-08 & 50-370/96-08.Corrective Actions:Initiated Procedure Change That Requires Reverification of Preheater Operation at End of Test | ||
| author name = Mcmeekin T | | author name = Mcmeekin T | ||
| author affiliation = DUKE POWER CO. | | author affiliation = DUKE POWER CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 9612100177 | | document report number = NUDOCS 9612100177 | ||
| title reference date = 11-15-1996 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | ||
| page count = 3 | | page count = 3 | ||
Revision as of 06:18, 14 December 2021
| ML20135D830 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 12/05/1996 |
| From: | Mcmeekin T DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9612100177 | |
| Download: ML20135D830 (3) | |
Text
.
," l Duke hver Company T. C hkhfEra McGuve Nuclear Generation Department Vice hesident 127(1)Magen ferryRoad(htG0lW) (704)S754800 Huntenville, NC280784985 (704)8154809 Fax l DUKEPOWER December 5,1996 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 NRC Inspection Report No. 50-369,370/96-08 Violation 50-369,370/96-08-02 Reply to a Notice of Violation Gentlemen:
Enclosed is a response to a Notice of Violation dated November 15,1996 concoming an inadequate containment annulus surveillance procedure.
Should there be any questions concoming this response, contact Randy Cross at (704) 875-4179.
Very Truly Yours, T.ftMV/
C. McMeekin Attachment I
\
9612100177 961205 \
PDR ADOCK 05000369 -
{'0 )
G PDR 090147 1
~m -.m., 1
_ . . _ - . _ . - _ . _ . . . _ . _ . . _ . . _ - _ . - _ . _ . - . _ - - . . ~ . . . . - , . - . - . - - . . , - - - - . - - -
l
]
. 1 i
l
' I U. S. Nuclear Regulatory Commission !
December 5,1996 i
!t xc: (w/ attachment) j l
Mr. S. D. Ebneter l Regional Administrator, Region 11 (
U. S. Nuclear Regulatory Commission 101 Marietta St., NW, Suite 2900 l Atlanta, Georgia 30323 !
- Mr. Victor Nerses i U. S. Nuclear Regulatory Commission ' !
Office of Nuclear Reactor Regulation j One White Flint North, Mail Stop 9H3 -
Washington, D. C. 20555
\
Mr. Scott Shaeffer .,
Senior Resident inspector ,
McGuire Nuclear Station i i
t l
l i
i l
l l
t l
I l
l
McGuire Nuclear Station Reply to a Notice of Violation Violation 50-369.370/96-08-02 Technical Specification 6.8.1 requires, in part, that written procedures shall be established, implemented, and maintained covering the activities referenced in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
Regulatory Guide 1.33, Revision 2, Appendix A, section 8.b addresses procedures for surveillance testing required by Technical Specifications.
Contrary to the above, McGuire Periodic Test procedure, Annulus Ventilation System Train B Operability Test, PT/1/A/4450/03B, was not adequate. Specifically, on September 29,1996, it was identified that PT/l/A/4450/038 did not contain adequate instructions to ensure that the containment system annulus ventilation system preheaters remained energized for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> during surveillance testing.
This is a Severity Level IV violation (Supplement 1).
Reolv to Violation 50-369.370/96-08-02
- 1. Reason for the violation:
The reason for the violation is a lack of attention to detail in preparing test procedure PT/1/A/4450/03B. The procedure documented that the preheaters were working when the test was 1 started, however, the procedure did not include a step to reverify preheater operation at the end of I the test.
l
- 2. .Qsn.94g;tyng that have been taken and the results achieved: i Since Train B of the annulus ventilation system was being tested at the time the procedure inadequacy was discovered, a procedure change was immediately initiated to require reverification of preheater operation at the end of the test.
No similar events have occurred since implementation of this corrective action.
- 3. Corrective steos that will be taken to avoid further violations:
No additional corrective actions are planned.
- 4. Date when full comoliance will be achieved:
McGuire Nuclear Station is now in full compliance.
.