ML20136G932: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-85-434, Monthly Operating Repts for Oct 1985]]
| number = ML20136G932
| issue date = 10/31/1985
| title = Monthly Operating Repts for Oct 1985
| author name = Grant N, Williams J
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
| docket = 05000000, 05000250, 05000251, 05000335, 05000389
| license number =
| contact person =
| document report number = L-85-434, NUDOCS 8601080666
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 18
}}
 
=Text=
{{#Wiki_filter:-          AVER AGE DAILY VNIT POWER LEVEL DOCKET NO. 50-260 UNIT Turkey Point 3 DATE  11/14/85 COMPLETED BY N.W. Grant TELEPHONE  (305)S52-3675 October,1985 MONTH DAY    AVER AGE DAILY POWER LEVEL (MWe Net) 10/ 1/85            681 10/ 2/85          681 10/ 3/85          676 10/ 4/85          676 10/ 5/85          676 10/ 6/85          676 10/ 7/85          670 10/ 8/85          630 10/ 9/85          682 10/10/85          682 10/11/85          631 10/12/85            335 10/13/85            671 10/14/85          676 10/15/85          328 10/16/85          -23 10/17/85          364 10/18/85          629 10/19/85          358 10/20/85          616 10/21/85            34 10/22/85            -1g 20/23/85              -3 10/24/85              -3 10/25/85              -3 10/26/85              _3 10/27/85            _3 10/28/85            _3 10/29/85            _3 10/30/85            -3 10/31/85            _3
(    8601080666    851030                                    Q PDR  ADOCK 05000250 R                PDR                                  I lN l )
 
OPERATING DATA REPORT DOCKET NO          50 - 250 DATE                11/ 7/85 COMPLETED BY    N. W. GRANT OPERATING STATUS TELEPHONE      305/552/3675
: 1. UNIT NAME: TURKEY POINT        UNIT 3
: 2. REPORTING PERIOD: OCTOBER 1985
: 3. LICENSED THERMAL POWER (MWT): ______________
4.
2200 NAMEPLATE RATING (GROSS MWE): ______________            760
: 5. DESIGN ELECTRICAL RATING (NET MWE): ________
6.
693 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___          700 JT . MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____          666 8.
IF CHANGES SINCE          OCCUS IN LAST REPORT,    CAPACITY GIVE      RATINGS (ITEMS NUMBER 3 THROUGH 7)
REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED,__________________________________________________________
IF ANY (NET MWE) ________________________
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY      -YTD-  CUMULATIVE
: 11. HOURS IN REPORT PERIOD: _________________                  745        7296        113145.6
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____                451.0      4183.6      77856.4
: 13. REACTOR RESERVE SHUTDOWN HOURS __________
14.
0.0        0.0        844.4 HOURS GENERATOR ON-LINE _________________              447.6      4032.0      77211.1
: 15. UNIT RESERVE. SHUTDOWN HOURS _____________                      0          0        121.8
: 16. GROSS THERMAL ENERGY GENERATED (MWH)          ____      906410      8547139    159676650
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)                _ 289540      2T86980      51042675
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                    272373      2627000      48324206
  ~19.
UNIT SERVICE FACTOR _____________________    ___        60.1        55.3          68.2
: 20. UNIT AVAILABILITY FACTOR ________________                    60.1        55.3          68.3
: 21. CAPACITY FACTOR (USING MDC NET) _________                  54.9        54.1          65.7
: 22. CAPACITY FACTOR (USING DER NET) _________                    52.8        52.0          61.6
: 23. UNIT FORCED OUTAGE RATE _________________                    39.9        14.0          6.8
: 24. SHUTDOWNS SCHEDULED OVER.NEXT 6 MONTHS                :
: 25. IF SHUT-DOWN AT END OF REPORT PERICD, ESTIMATED DATE OF STARTUP: 11/ 6/85
 
1  of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS                    DOCKET NO. 50-389                                    -
UNIT NAME Turkey Pt. Unit #3 DATE 11 14 '15 REPORT MONill October, 1985                COtti,ETED BY Nu nrant TEL.EPHONE (30t)S57_3575 "i                                -
No        Date i
5E 3 ij 3
h Ei 255 Licensee Event 5%
g 'g k?                Cause & Corrective Attion to
                              $5        5                                              0 j di y    Report a      'n 0                          Prevent Recurrence b
15      851011    S        0.0      H          5                      EB        TRANSF  Power was reduced to below 50% to take a startup transformer out of service for switchyard modifications.
The unit was then returned to full power operation.
16      851015      F      42.6      G          3    250-8S-032        HA        RELAYX  Protective relays tripped the generator resulting in a turbine /
reactor trip. The most probable cause of the relay actuation was accidental jarring of the relays.
The unit was taken to hot shutdown due to an AFW pump being out of service for maintenance. Upon completion of the root cause evaluation, the unit returned to full power operation.
I                  2                                                    3                              4 i Forced        Reaum:                                                Method:                          Exhibit G - Instructions
  % Stheduled      A-lquipment Failure (Explain)                        1 Manual                        for Preparation of Data R. Maintenance or Test                                2 Manual Scram.                  Entry Sheets Ior Licensee C-Refueling                                          3 Automatic Scram.              Event Report (LERI Fde tNURLG-D-Regulatory Restrictmn                              %Other i Explam)                  016li I -Operator Trainmg & lxense I~sammation F- Administ rative                                                ,
5 G Operational I e ror (liplatn)                      c _ 4e e neve.,..cl              F stubit 1 - Same Source l9/77)              Il-Other iI splam)
 
2 of 2 UNIT SHUTDOWNS AND POWER REDUCTIONS                    DOCKET NO.      En_74n UNIT NAME _T_iJrkey Point Unit #3 DATE 11 14-85 REPORT MONIN ' 0ctober, 1985                  COMPLETED BY n u            r:,-a n t TELEPHONE @ }5523g5
                                                          . T                              -
g
                                          =_      ..      3                        -
              "        D'' e
                                ~.        Ie        E    gsy        Licensee      5 **,      g".                Cause a Correttive i      5?        4    2sE          Event        u7                                  Action to 53        E    j d5 j      Report a    iN G        }qL                  Prevent Resurrence 6
17        851018      S        0.0      H        5                      EB      TRANSF    Power was reduced to below 50% to take a startup transformer out of service for switchyard modifications.
The unit was then returned to full power operation.
18        851021      F    254.8        B        1                    HC        HTEXCH    Following a power reduction for secondary chemistry control, the unit was shutdown to replace a. condenser bo >t seal and to align reactor coolant pump motors. Following repairs, the unit returned to full power operation on November 6,1985.
I                    2                                                3                                  4 I Forced            Reasim:                                            Method:                            Exhibit G Instructiims
            % Scheduled        A Lympment Failure (Explain)                      1 -Manual                          for Preparation of Data R. Maintenance or Test                            2 Manual Scram.                    Entry Sheets for Licensee C-Refueling                                        3 Automatic Scram.
D Regulatory Restriction                                                              Event Rerort (LERI File int!RLG-
                                                                                  $0 her (Explain 1                  0161I I Operator Training & LAenw I samination F-Atlmimstrative                                  9,                              %
G Operatomal I esur il splamt                    g_      t o e c o ve.,..cf        I:sinbit 1 Same Simrce l's/ 77 )                Il Other il splami
 
==SUMMARY==
OF OPERATING EXPER.TEMCE DOCKET.NO.        50-250 UNIT        Turkey Point Unit #3 _
DATE        November 14, 1985 COMPLETED BY        N. W. Grant TELEPHONE        (305)SS2-3675 REPORT HONTH        Jctober,1985 See the " unit shutdowns and power reductions" report.
 
    .      AVERAGE DAlt.Y UNIT POWF.R LEVEL DOCKETNO. 50-251 UNIT Turkey Point 4 DATE 11/14/85 N.W. Grant COMPLETED BY TELEPHONE (305)552-36/5 MONTH  October.1985 DAY    AVER ACE DAILY POWER LEVEL (MWe Net) 10/ 1/85            679 10/ 2/85            668 10/ 3/85            671 10/ 4/85            671 10/ 5/85            671 10/ 6/85            668 10/ 7/85            672 10/ 8/65            676 10/ 9/85            680 10/10/85            677 10/11/85            592 10/12/85            340 10/13/85            666 10/14/85            662 10/15/85            668 10/16/85            670 10/17/85            674 10/18/85            633 10/19/85            367 10/20/85            679 10/21/85            680 10/22/85            680 10/23/85            680 10/24/85            684 10/25/85            683 10/26/85            684 10/27/85            682 10/28/85            678 10/29/85            674 10/30/85            673 10/31/85            676 l-
 
OPERATING DATA REPORT D CKET NO                50 - 251 DATE                    11/ 7/85 COMPLETED BY      N. W. GRANT TELEPHONE        305/552/3675 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT      UNIT 4
: 2. REPORTING PERIOD: OCTOBER 1985
: 3. LICENSED THERMAL POWER (MWT): ______________          2200
: 4. NAMEPLATE RATING (GROSS MWE): ______________            760
: 5. DESIGN ELECTRICAL RATING (NET MWE):      ________      693 6.
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): ___ 700 8.
MAXIMUM DEFENDABLE CAPACITY (NET MWE): _____ 666 IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REAGONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:                            ________________________
MONTHLY      -YTD-    CUMULATIVE
: 11. HOURS IN REPORT PERIOD: _________________                745        7296          106877.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____                745.0      6636.4          76354.7
: 13. REACTOR RESERVE SHUTDOWN HOURS __________                    0.0          0.0              166.6
: 14. HOURS GENERATOR ON-LINE _________________                  745.0      6587.2          73827.3
: 15. UNIT RESERVE SHUTDOWN HOURS _____________                      0            0                31.2
: 16. GROSS THERMAL ENERGY GENERATED (MWH)          ____      1582133    14133585      156263691
: 17. GROSS ELECTRICAL ENERGY GERERATED (MWH)              _. 508845      4546575        49738972
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)            ___    484462      4318829        47102110
: 19. UNIT SERVICE FACTOR _____________________                  100.0        90.3                69.1
: 20. UNIT AVAILABILITY FACTOR ________________                  100.0        90.3                69.1
: 21. CAPACITY FACTOR (USING MDC NET) _________                  97.6        88.9                67.8
: 22. CAPACITY FACTOR (USING DER NET) _________                  93.8        85.4                63.6
: 23. UNIT FORCED OUTAGE RATE _________________                      0        8.2                    6.3 24.. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
REFUELING 1/86, 11 TO 12_ WEEKS _________________________________________
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                    ________
p..
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                      DOCKET NO.        50-251          .
UNIT NAME Turkey Pt. Unit #4 DATE 11-14-85 REPORT MONnt October 1985                      COMPLETED BY M u nrant TELEPHONE Mn5}557_7c75
                                                                  .    %                              ~
                                                  =        .. 3 .:                                  s Nii            1)aic    1 -
5_5 2
3 Eb
                                                                  .c 's oc      Even'        =7        h  o
                                                                                                                                " A b**
Attion to
* iN 0          0
                                                  $I          ic  j di g        Report sr                                    Prevent Recurrence d
20        851011      S          0.0        H      5                        EB      TRANSF      Power was reduced to below 50% to take a startup transformer out of service for scritchyard modifications.
The unit was then returned to full power operation.
21        851018      S          0.0        H      5                        EB      TRANSF      Power was reduced to below 50% to take a startup transformar out of service for switchyard modifications The unit was then returned to full power operation.
I                      2                                                    3                                4 F Forced              Reason:                                              Method:                            Exhibit G - Instructitms 5
Scheduled        A-Lyuspment Failure (Explain)                        1 Manual                        for Preparation of Data R.Mairtenance or Test                                2 Manual Scram.                  Entry Sheets for Licensee C Refueling                                          3 Automatic Scram.                Event Report (LER) File (NUREG-D-Regulatory Pestriction                            @-Other (Explain)                01611 1.-Operator Training & 1.acense Fsamination F. Administrative                                              ,
5 G Operational I nor Ii xplam)                        s    g.o ao 44 eve ,. .d        Esinbit I Same Source t'8/ 77 )                  Il-Ot her I E xplain) 1
 
SUIG1ARY OF OPERATINC EXPER.TEMCE DOCKET NO.      50-251 UNIT      Turkey Point Unit #4 DATE      November 14, 1985 COMPLETED BY        N. W. Grant
                                  -TELEPHONE        (305)552-3675 REPORT MONTH        October,1985 See the " unit shutdowns and power reductions" report.
                                                                        =
I l
l u-                                                                            .
 
    .      AVER AGE DAILY UNIT POWER LEVEL DOCKETNO.      60-334 UNIT St. Lucie Unit 1 DATE 11/14/85 COMPLETED BY N.W. Grant TELEPHONE  (305)S52-3675 MONTH  October,1985 DAY    AVERAGE DAILY POWER LEVEL (MWe Net) 10/ 1/85          812 10/ 2/85          813 10/ 3/85          812 10/ 4/85          809 10/ 5/85          810 10/ 6/S5          805 10/ 7/35          802 10/ 8/85          802 10/ 9/85          794 10/10/85          792 10/11/85          792 10/12/85          790 10/13/85          785 10/14/85          775 10/15/85          766 10/16/85          762 10/17/85          757 10/18/85          750                                          3 10/19/85          732                                          '
10/20/85            -1                                          i 10/21/85            -6                                          l 10/22/85            -3 10/23/85            -3 10/24/85            -3 10/25/85            -3 10/26/85            -3 10/27/85            -3 10/28/85            -3 10/29/85            -3 10/30/85            -3 10/31/85            -3 l
l l
u
 
OPERATING DATA REPORT DOCKET NO                50 - 335 DATE                      11/ 7/85 COMPLETED BY N. W. GRANT TELEPHONE        305/552/3675 OPERATING STATUS                          "
: 1. UNIT NAME: ST. LUCIE              UNIT 1
: 2. REPORTING PERIOD: OCTOBER 1985
: 3. LICENSED THERMAL POWER (MWT): ______________                  2700
: 4. NAMEPLATE RATING (GROSS MWE): ______________                  850
: 5. DESIGN ELECTRICAL RATING (NET MWE): ________                  830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSSs MWE):              ___    872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET M4E) : _____                  827 8.
IF CHANGES OCCUS IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
                  ~
                                                      ~              ~
9.
P6U5R LEVEL
: 10. REASONS                ~f6~EEiUU~E55TRICTE6[~iF FOR RESTRICTIONS,  IF ANY:                    AUY~iU5T kEE5[_~~~(([_~~~~((_
MONTHLY      -YTD-    CUMULATIVE
: 11. HOURS IN REPORT PERIOD: _________________                        745        7296            77688.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL _____                        458.3      7005.3          56026.6
: 13. REACTOR. RESERVE SHUTDOWN HOURS __________                          0.0          0.0            205.3
: 14. HOURS GENERATOR ON-LINE _________________                          457.8      7001.8          55735.3
: 15. UNIT RESERVE SHUTDOWN HOURS ;____. ,______                              0            0              39.3
: 16. GROSS T8ERMAL ENERGY GENERATED (MWH)              ____        1214386      18656593        140794129
: 17. GROSS ELECTRICAL ENERGY-GERERATED (MWH)                  _      380220      6167990          46026645
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                ___        357920      5852546          43414894 i 19. UNIT SERVICE FACTOR _____________________                          61.4        96.0                71.7
: 20. UNIT AVAILABILITY FACTOR _________________                          61.4        96.0                71.8
: 21. CAPACITY FACTOR (USING MDC NET) _________                          58.1        97.2                70.2
: 22. CAPACITY FACTOR (USING DER NET) _________                          57.9        96.6                68.7
: 23. UNIT FORCED OUTAGE RATE _______,__________                            O            .1              4.2
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/22/85
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-33 r; UNIT N AME st- 1 incia finit #1 DATE 11-!A 95 REPORT MONTil nc+nhor    1485 TELEPHONE fanqiEq?_167; e.
                                                                -    E                            c N. ..      Date
                                      .      3E          3    j E5        Licensee      ,E*,      {".                Cause & Corrective i      3g          i  2s&          Event
{?                                Action to
                                      *      $:          5  j p, g      Report 8    mO        g{                  Prevent Recurrence 6
03        851020  S      286.2        C      1                    RC      FUELXX    Unit #1 was shutdown for refueling and scheduled maintenance.
I                  2                                                  3                              4 F. Forced          Reason:                                              Method:                        Exhibit G Instructisms N Scheduled        A-Equipment Failure (Explain)                        1 Manual                        for Preparation of Data B-Maintenance of Test                                2-Manual Scram.                Entry Sheets for Licensee C Refueling                                        3 Automatic Scram.              Event Report (LER) File (NUREG-D-Regulator) Restriction                          $0ther (Explain)                0161)
I.-Operator Training & Ucense Fxamination F Administrative                                              ,
5 G Operational I iror Iliplain t                    s . /.o ao Movc.,. .ct          E stubit I - Same Source 19/77)                Il-Os her iI:splain )
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.        50-335 UNIT      St. Lucie Unit #1 DATE      November 14, 1985
                            -COMPLETED BY          N. W. Grant TELEPHONE          (305) 552-3675 REPORT MONTH        nntnhor. 14R5 Unit #1 was shutdown .for refueling and scheduled maintenance.
In accordance with requirements of NUREG-0737 Item II.K.3.3, there were no challenges to PORV or safety valves during the report month.
 
    .      AYERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-389 tmlir St. I ncio Unit 2 DATE ll /14 / A6 COMPLETED BY  fl.J. Grant TELEPHONE (305)552-3676 October,1985 MONTH DAY    AVER AGE DAILY POWER LEVEL IMWe Net) 10/  1/85                840 10/  2/85                840 10/  3/85                812 10/  4/85                802 10/  5/85                850 10/  6/85                839 10/  7/85                797 10/  8/85                788 10/  9/85                849 10/10/85                  84g 10/11/85                  349 10/12/85                  848 10/13/85                  347 10/14/85                  g45 10/15/85                  345 10/16/85                  845 10/17/85                  846 10/18/85                g44 10/19/85                843 10/20/85                845 10/21/85                g47 10/22/85                849 10/23/85                g49 10/24/85                846 10/25/85                846 10/26/85                847 10/27/85                g47 10/28/85                g49 10/29/85                s47 10/30/85                547 10/31/85                845
 
OPERATING DATA REPORT DOCKET NO              50 - 389 DATE                  11/ 7/85 COMPLETED BY  'N. W.                GRANT OPERATING STATUS TELEPHONE      305/552/3675
: 1. UNIT NAME: ST. LUCIE            UNIT 2 i
: 2. REPORTING PERIOD: OCTOBER 1985
: 3. LICENSED THERMAL POWER (MWT):
4                                      ______________            2700 NAMEPLATE RATING (GROSS MWE): ______________                    850
: 5. DESIGN ELECTRICAL RATING (NET MWE):
: 6.                                                ________          830 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):                ___    882 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE): _____                  837 8.
IF CHANGES SINCE          OCCUS IN LAST REPORT,    CAPACITY GIVE      RATINGS (ITEMS NUMBER 3 THROUGH 7)
REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED,__________________________________________________________
IF ANY (NET MWE) ________________________
: 10. REASONS FOR RESTRICTIONS,_IF ANY:
MONTHLY      -YTD-  CUMULATIVE
: 11. HOURS IN REPORT PERIOD: _________________                        745        7296
: 12.                                                                                              19585.0 NUMBER OF HOURS REACTOR WAS CRITICAL _____                    745.0      6051'.6        16657.8 13.
: 14. REACTOR      RESERVE _ SHUTDOWN HOURS _________                    0.0        0.0                                        0.0
: 15. HOURS    GENERATOR  ON-LINE __________________              745.0      5990.3          16190.9
: 16. UNIT  RESERVE    SHUTDOWN  HOURS _____________                    0          0                                          0 GROSS THERMAL ENERGY GENERATED (MWH)                        1986668    15611074.
____                                    40969639
: 17. GROSS' ELECTRICAL ENERGY GERERATED (MWH)                  _      659510      5227050        13676750
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                            625794      4942540      12904952 19.
UNIT SERVICE FACTOR _____________________        ___          100.0        82.1                            82.7
: 20. UNIT AVAILABILITY FACTOR ________________                        100.0        82.1 i
: 21. CAPACITY FACTOR (USING MDC NET) _________                                                                      82.7            l R2 2.                                                                  100.4        82.4                    -82.4 CAPACITY FACTOR (USING DER NET) ______                        101.2        82.4
: 22.                                                                                                                81.3 UNIT FORCED OUTAGE RATE __________________          __              0      14.9                            11.2
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :
REFUELING, 2/86-7 WEEKS ___________________________________________
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
L
 
DOCKET NO.
                                                                                                                                                                  - 9                                                            '
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME St_Iticie tinit #2 DATE 11 la RR COMPLETED BY Mu nrant REPORT MOND{ Octab$M985                        TELEPHONE IanRiRR?_1474 jg        3      Eh    Licensee    ,E g        .                  Cause & Corrective 1)Jle Ni i .
i        3g          il 2s&        Event 37            .
Action to F        j=        5  jisg      Repor e    in U g                    Prevent Recurrence 6
Unit #2 had no shutdowns or significant power reductions.
3 i                                            2                                                3                                4 F Forced                                    Reason :                                          Method:                          Exhibit G -Instructions 5
St hed uled                            A Equipment Failure (Explain)                    1 Manual                          for Preparation of Data B Maintenance or Test                            2-Manual Scram.                  Entry Sheets for Licensee C Refueling                                      3 Automatic Scram.                Event Repori I LE R) File (NUREG-I) Regulatory Restriction                        3-Oiher (Explairi)                016I) 1 Operator Training & Ixense rsamination F Administrative                                M~ C'*"*" ""                    5 G Operational I sent (tiplain)                  4_    toao Mow.i. .et            Estubit I Same Source 19/77)                                          Il-Ot her ( E uplain )
 
==SUMMARY==
OF OPERATING EXPER.TENCE DOCKET .NO.        50-389 UNIT    St. Lucie Unit #2    -
DATE    November 14, 1985 COMPLETED BY          N. W. Grant TELEPHONE        (305) 552-3675 REPORT MONTH        nr+nhor  l anc; Unit #2 operated at essentially full power and had no unit shutdowns or significant power reductions.
In accordance with requirements of Technical Specificaton 6.9.1.6, there were no challenges to PORV or safety valves during the repor.t month.
i
 
g                                                                  P.O. BOX 029100 MI AMI, F L 33102 et
                                                                                                      ^^'
Whalva    Rhi        J'      ,
: k. -            -.
sueesrmW+ 5 FLORIDA POWER & LIGHT COMPANY November 14, 1985 L-85-434 Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555
 
==Dear Sir:==
 
Attached are the October 1985 Operating Status Reports and Operating Summary Reports for Turkey Point Units No. 3 and 4 and St. Lucie Units No. I and 2.
Very truly yours,
  / , YJ.W.WJi
        &<A W        s, Jr.
V    Group JV e President Nuclear Energy JWW/NWG: mis Attachment cc:  Dr. 3. Nelson Grace Harold F. Reis, Esquire PNS-LI-85-391/1 Y
l                                                                                              $6 ih
_ ..s _ _
t}}

Latest revision as of 23:53, 13 December 2021