ML20138C190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[PLA-2543, Monthly Operating Repts for Sept 1985]]
| number = ML20138C190
| issue date = 09/30/1985
| title = Monthly Operating Repts for Sept 1985
| author name = Hirt J, Keiser H
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = Beebe M
| addressee affiliation = NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
| docket = 05000387, 05000388
| license number =
| contact person =
| document report number = PLA-2543, NUDOCS 8512120494
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 9
}}
 
=Text=
{{#Wiki_filter:.1,...
[                               AVERAGE DAILY UNIT POWER LEVEL s
LM j  E\      ~%
3                                                        DOCKET NO. 50-387 UNIT -One
(                          C                                                                  DATI -October 4,1985 gg 3Y                                                                COMPLETED 8Y          J.A. Hirt TELEPHONE      (717)S42-3917 MONT1g S nte-ber. 1985 DAY          AVERAGE DAILY POWER LEVEL                      DAY      AVER AGE DAILY POWER LEVEL (MWe Net)                                                1MWe-Net s I                    1035                                37                        1035 2                    1014                                l3                        1033 3                      1016                              39                          1029      -
4                      Int?                              20                          1025 3                    1014                                                          1026 21 6                      1014                              2:                          1075 7                      630                              23                          1028    _
S                      750                              ,4                          1027 9                      971                                                          1037 23 10                      1016                              26                          1035 11                      1014                              :7                          1032 1941                                                          1037 12                                                        :s 13                      '041                              29                          1035 14                      104I                              30                          1034 15                      1036                              3;                            -
16                      1037 INSTRUCTIONS On this format,lut she average dady unit power levelin MWe Net for each day in the reputting inonth. Compute to the nearest whole nwgawatt.
19177) 0512120494 050730 l'DH    ADOCK 05000307 H                      PDH                                                                      '),,
l  l
 
                                                                                                                              %g MMM 4%
                                                                                                        .ag c.,-                                                                      >@
w                                                                            y ye                                                                                                                          .
y
                                                                                                                                                                                                      . . . _ .. _ ,                                                  a L7                                                                                                                nr. ;                                  OPERATING DATA REPORT C                                              DOCKET No. 50-387 DQ                                                                                                                                    4                                                      DATE October 4, 1985 J,A. Hirt RfC 6N                                                                                                                                  COMPLETED BY TELEPHONE (717)S42-3917 OPERATING STATUS Unit i Susquehanna Steam Elect ric Stat ion                                  N"'"
: 1. Unit Name:
: 2. Reporting Penod:
September. 1985
: 3. Licensed Themul Power tMht):                                                                                                                                    3293
: 4. Nameplate Rating (Gross Mbel:                                                                                                                                  1152
: 5. Design Electrical Rating (Net MWeI:                                                                                                                                1065
: 6. Masimum Dependable Capacity (Gross Mhel:                                                                                                                                  1068
: 7. Masimum Dependable Capacity (Net Mhel:                                                                                                                                    1032
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reawnv None
: 9. Power Lesel To hhich Restricted,if Any INet MWel:                                                                                                                                None
: 10. Reasons For Restnetions,if Any:                                                                                                                                      None This Month      Yr to.Date        Cumulatne
: 11. Hours in Reportmg renod                                                                                                                                                                  720            6.551            20.304
: 12. Number Of Houri Reactor was Critical                                                                                                                                                    720            3,6I2.5          14.005.2
: 13. Reactor Resene Shutdown Hour,                                                                                                                                                              0              41.8              513 2
: 14. Hours Generator On.Lin,                                                                                                                                                                  720            3,532.5          13.679.4
: 15. Unit Resene Shutdown Hours                                                                                                                                                                  0                0                  0
: 16. Grou Thermal Energy Generated iMWHI                                                                                                                                              2.321.530    .19,856.409        41.485.197 17 Grou Electrical Energy Generated (MhHI                                                                                                                                                750,191    ._3,513.429        13.503.959
: 18. Net Electncal Energy Cencrated tMhH)                                                                                                                                                723,373      3.345,738        12,926,308
: 19. Umt Sernce Factor                                                                                                                                                                        100                51.9              67.4
: 20. Unit Asadability Factor 100                53.9              67.4
: 21. Unit Capacity Factor (Using MDC Neti                                                                                                                                                        97.4 __
49.5                61.7
: 22. Unit Capacity Factor IUsing DER Net)                                                                                                                                                        94.3            48                  59,8 0                1.5              11,0
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Oser Nest 6 Months iType. Date,and Duration of Ea(ni hefueling outaqe1 February 15, 1986; 84 day.
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:                                                                                                                                  O
: 26. Units in Test Status IPrior to Commercial Operationt                                                                                                                                                  forecast          Acinesed INITIAL CRITICALITY                                                                    l INITIAL ELEC TRICITY C0\lMERCl AL OPER A flON l
t,",,    I l
 
              +pANN45                                                                                                                                            -
w
                      ;  ')[Eb, 'i -
:-/        7                                                                                                                              '
* M:            5
              * '              U "' R                                                                                      DOCKET NO.        50-387 UNIT SHUTDOWNS AND POWER REDUCTIONS One                  .-
g          3 UNIT NAME October 4,   1985 g@ ,                                                                                                                    DATE
(
COMPLETED BY        J.A. Hirt.
                        ##pc 5 E                                            REPORT MONTil Sep t ernbe r , 1985 (717)S42-3917 TELEPHONE                                    !
E                              c
                                          ,      {?g        ;    - E ~4
                                                                  }gE        Licensee      E-t,      $ *,                Cause & Corrective h                  Date            i                  (  2            Event        p          {'!                      Action to
                                                  $E          5    j ;75 c    Repori e    mV g'                  Prevent Recurrence d
4                850907              5      0          F      5        N/A        ZZ      ZZZZZZ    Control Rod Sequence Exchange.
                                                                          =            3                                4 1                                2 F: For sed                        Reason:                                            Methext:                          Exhibit G-Instructions 5 Scheduled                      A-Equiprnent Failure (Expbin)                      1-Manual                          for Preparation of Data B-Maintenance of Test                              2-Manual Saam-                    Entry Sheets for Licensee C-Refueling                                        3-Automatic Scram.                Esent Repint tLERI File (NUREG.
D-Replatory Restrictitm                            4-Continuation                    0161)
E4)perator Traming & Ucense Esamination              from previcus month F-Adnunistratne                                                                  5 G4)pe.ational Error (E xplain t 5-Reduction                      Exhibit I - Same Source 08/77)                              II O her( E splain)                                9-Other
 
                                                .                                    a UNIT 1                !
SUSQUEHANNA STEAM ELECTRIC STATION Docket No. 50-387 Date        October 4,1985 Completed by J.A. Hirt Telephone    (717)S42-3917 i
Cha llenges to Main Steam Safety Relief Valves None.
Changes to the Offsite Dose Calculatlon Manual None.                                                        '
Major Changes to Radloactive Waste Treatment Systems None, m__._________.___.__.___.__..__.__.________________
 
[
  .                                        AVERAGE DAILY UNIT POWER LEVEL
          ,/
F~Q          \%
3                                                      DOCKET NO.      50-388 LM            ~4                                                                        UNIT    Two C                                                                DATE October 4, 1985
(+                    9 ggg gY                                                                COMPLETED BY          J.A. Hirt TELEPHONE        (717)S42-3917 MO N        September, 1985 DAY        AVERAGE DAILY POWER LEVEL                        DAY      AVERAGE DAILY POWER LEVEL (MWe Net)                                                (Mwe Net I                    1042                                37                  1044 2                    1034                                is                  1042 3                    1033                                g,                  1037          .
4                    1027                                20                    1034 g                    1027                                21 1035 6                    1028                                ;;                    1034 7                    1029                                23                    1035 8                    1029                                24                    1037 9                    1033                                23                    1047 10                    1034                                26                    1043 l3                    1048                                                      1041 37
::                    1050                                  3                  1045 l3                      1051                                29                    1042 34                      746                                                      1042 30 15                      875                                3 16                      10k2 INSTRUCTIONS On this format.hst the avenge dady urut power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole messwatt.
14177) 1 l
 
y
            ~ hc ~~ ~g&
y Q            -:+            7 Z            . . . . _ - -    3 t7      .        rr J                      OPERATING DATA REPORT
* N              %
YD                          O                                                          DOCKET NO.      50-388 O                  D                                                                      DATE October 4, 1985 J.A. Hirt NIC fN                                                                  COMPLETED BY TELEPHONE 1717)S42-3917 OPERATING STATUS Unit 2                              b " '"
: 1. Unit Name: Susauehanna Steam Elect ric Station
: 2. Reporting Period:      Spetember. 1985
: 3. Licensed Thennal Power iMhti: 3293 1152
: 4. Nameplate Rating (Gross Mhel:
: 5. Design Electrical Rating (Net MWei: 1065
: 6. Masimum Dependable Capacity (Gross Mhel:
1068
: 7. Masimum Dependable Capacity 4 Net Mwe):      1032
: 8. If Changes Occur in Capacity Ratings (ltems Number 3 Through 71 Since Last Report. Gise Reasons:
None
: 9. Power Lesel To which Restricted.lf Any tNet MWei.      None
: 10. Reasons For Restrictions. lf Any:    N ne This Month            ir. to Date            Cumulatne
: 11. Hours in Reportmg Period                                720                    5.543      ,
5,543
: 12. Number Of Hours Reactor was Critical                    720                    5.063,8                5.063.8
: 13. Reactor Rewne Shutdown Hours                                0                      432 1                  432.7
: 14. Hours Generator On.Line                                  720                    4.961.5      ___      4.961.5
: 15. Urut Rewne Shutdown Hour,                                  0                          0                      0
: 16. Gross Thermal Energy Generated IMWH)            2.331.711            ._].5 .6 % . 5 0 7          15.695.507
: 17. Gross Electrical Energy Generated IMhH1            762,634              5,120.668                5.120.668
: 18. Net Electrical Energy Generated (MhH)
                                                            /36,4/4          J ,937.413                  4.937.413
: 19. Umt Semce Factor                                          100                        89 5                    89 5
: 20. Unit Availability Factor 100        __
89.5                    89 5
: 21. Unit Capacity Factor IUsing MDC Net)                      99.1                      86.3                    86.3
: 22. Unit Capacity Factor 10$mg DER Neti                        96.0                      83.6                    83.6
: 23. Unit Forced Outage Rate                                    0                        10.5                  10 5
: 24. Shutdowns Scheduled Over Nest 6 MonthsiType.Date,and Duration of Ea(lo None 25, if Shut Down At End Of Report Period.Eirimated Date of Startup:      N
: 26. Umts in Test Status (Prior to Commercial Operationt'                        forecast                Tchiesed INiilA L CRITICAlliY INITI AL ELEC TRICl!Y COM\lERCI % L OPER A TION                                      __
gyl*
* l
 
r1 Si)gNN 4j                                                                                                                              ,
        , - '((k..$j t
                  . y                                                                                                                    .
9                i
                                                                                                                                                        'l LN        it                            UNIT SHUH) OWNS AND POWER REDUCTIONS                  DOCKETNO. 50-388                          ,
g      R                                                                                  UNIT NAME Two M                                                                                          DATE October 4, 1985 C # LE          Y
              %3C S                                      REPORT MONiil September. 1985                  gt                hh)    2-3917 E                                .
w.
                                  .5 E        3      Eh      Litensee    E*,          *
                                                                                          .              Cause & Corrective N.            Ibte        {
H 3g 5
(  jgE          Event    g7 mO p                      Actitm to f              jg        Report *r                g'                Prevent Recurrence 6
14        850914        S              0  F    5          N/A      ZZ        ZZZZZZ  Control Rod Sequence Exchange.
I                    2                                                3                              4 F- Finced              Reasim:                                        Method:                          Exhibit G - Instructiims S. ScheduleJ          A Equipment Failure (Emplain)                  1. Manual                        for Preparation of Data B-Maintenance of Test                          2 Manual Scram.                  Entry Sheets for Licensee C-Refocling                                    3-Automate Scram.                Esen: ReporI (LE RI Fi8e (NUREG-D-Regulatory Restriction                        4 Continuation                  0161)
EOperator Training & license Examinatio"          from previous month F-Adrrunistratise                                                            5 Goperational Error iEsplain)                    5-Reduction                      Eshibit I - Same Source (9/77)                    IIOther (Esplain t                              9-Other
 
UNIT 2 SUSQUEHANNA STEAM ELECTRIC STATION Docket No. 50-388 Date          October 4, 1985 Completed By  J.A. Hirt Telephone    (717)S42-3917 Challenges to Main Steam Safety Relief Valves None Changes to the Offsite Dose Calculation Manual i
i          None Major Changes to Radioactive Waste Treatment Systems None 1
1
.f                                                                  l l
'I l
J
 
F
                            .PPat Pennsylvania Power &' Light Company Two North Ninth Street
* Allentown, PA 18101
* 215 I 77G5151 i
Harold W. Keiser Vice President-Nuclear Operations 215/770-7502 OCT 141985 Director, Data Automation &
Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS ER 100450                        FILE 841                                    Docket Nos. 50-387/NPF-14 PLA-2543                                                                                        50-388/NPF-22
 
==Dear Mr. Beebe:==
 
TheSeptember1985monthlyoperatingreportsforSusquehAnnaSESUnits1and2 are attached, y  s Very truly yours,
                              )                                                                        [
H. W. Keiser                                                                              _,
i Vice President-Nuclear Operations                      y            .,
                                                                                                ~
                                                    )
Attachment                                                    ,
I cc:  Dr. Thomas E. Murley                              >
Regional Administrator-Region I                                      i        '
                                                                                                                ,      T<  ,
U.S. Nuclear Regulatory Commission                                                    %
631 Park Avenue                                        ,
King of Prussia, PA 19406 Director                                            q Office of Inspecti,oh and Enforcement U.S. Nuclear Regulatory Commission                            7 Washington, D.C.        20555 Attn: bocument Control Desk (12 copies)
Mr.R.H.Jbcobs-NRC    ,                    fs        j    ,;
bp. M.'J. Campapsone - NRC                                  '
p
                                                        ,        ',7 3                                            a t            ,
                                                                                                              .}}

Latest revision as of 04:07, 13 December 2021