ML20151Y738: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 22: Line 22:


Three Mile Island Nuclear Station Unit 1 (TMI-1)
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Confiration of Item in Preventative Maintemnce Program for Reactor Trip Breakers GL 83-28, Item 4.2.1 By letter dated December 12, 1985, the NRC issued a safety evaluation report on the GPUN response to item 4.2.1 (Preventative Maintenance Program for Reactor Trip Breakers) and item 4.2.2 (Maintenance and Trending) of Generic Letter 83-28. The response to item 4.2.2 was found acceptable. For item 4.2.1, confiration of the inclusion of the measurement of the undervoltage trip device roller rivet-armture clearance in the energized position was requested.
Operating License No. DPR-50 Docket No. 50-289 Confiration of Item in Preventative Maintemnce Program for Reactor Trip Breakers GL 83-28, Item 4.2.1 By {{letter dated|date=December 12, 1985|text=letter dated December 12, 1985}}, the NRC issued a safety evaluation report on the GPUN response to item 4.2.1 (Preventative Maintenance Program for Reactor Trip Breakers) and item 4.2.2 (Maintenance and Trending) of Generic Letter 83-28. The response to item 4.2.2 was found acceptable. For item 4.2.1, confiration of the inclusion of the measurement of the undervoltage trip device roller rivet-armture clearance in the energized position was requested.
TMI-l Preventative Maintenance Procedure E-36, Rev.13 (Electrical) Control Rod Drive Trip Breaker Check, Step 6.5, requires the clearance between the rivet and the armture of the undervoltage trip device to be measured.
TMI-l Preventative Maintenance Procedure E-36, Rev.13 (Electrical) Control Rod Drive Trip Breaker Check, Step 6.5, requires the clearance between the rivet and the armture of the undervoltage trip device to be measured.
Measurements are mde with a feeler gauge. The clearance is to be relatively constant for all armture positions which includes the energized position. A range is specified and the as-found and as-lef t clearance is recorded on a data sheet.
Measurements are mde with a feeler gauge. The clearance is to be relatively constant for all armture positions which includes the energized position. A range is specified and the as-found and as-lef t clearance is recorded on a data sheet.

Revision as of 19:43, 10 December 2021

Provides Confirmation of Inclusion of Measurement of Undervoltage Trip Device Roller rivet-armature Clearance in Energized Position,Per 851212 Request Re Util Response to Generic Ltr 83-28,Item 4.2.1
ML20151Y738
Person / Time
Site: Crane 
Issue date: 02/10/1986
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
5211-86-2012, GL-83-28, NUDOCS 8602130118
Download: ML20151Y738 (1)


Text

I GPU Nuclear Corporation g g{ Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:

February 10, 1986 5211-86-2012 Office of Nuclear Reactor Regulation Attn: J. F. Stolz, Director PWR Projects Directorate No. 6 U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stolz:

Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Confiration of Item in Preventative Maintemnce Program for Reactor Trip Breakers GL 83-28, Item 4.2.1 By letter dated December 12, 1985, the NRC issued a safety evaluation report on the GPUN response to item 4.2.1 (Preventative Maintenance Program for Reactor Trip Breakers) and item 4.2.2 (Maintenance and Trending) of Generic Letter 83-28. The response to item 4.2.2 was found acceptable. For item 4.2.1, confiration of the inclusion of the measurement of the undervoltage trip device roller rivet-armture clearance in the energized position was requested.

TMI-l Preventative Maintenance Procedure E-36, Rev.13 (Electrical) Control Rod Drive Trip Breaker Check, Step 6.5, requires the clearance between the rivet and the armture of the undervoltage trip device to be measured.

Measurements are mde with a feeler gauge. The clearance is to be relatively constant for all armture positions which includes the energized position. A range is specified and the as-found and as-lef t clearance is recorded on a data sheet.

Sincerely, fjd*.

%21}{,gggy$g@g9 , g 7,p g , g e o u oaiy>

PDR gay P

H. D. ukill ron .. yco ,

birector, TMI-l A

HDH/SM0/spb:0472A f ,e6'S

,g cc: J. Thom R. Conte GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation