ML20155B586: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[JAFP-86-0296, Monthly Operating Rept for Mar 1986]]
| number = ML20155B586
| issue date = 03/31/1986
| title = Monthly Operating Rept for Mar 1986
| author name = Converse R, Cook J
| author affiliation = POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
| addressee name =
| addressee affiliation = NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
| docket = 05000333
| license number =
| contact person =
| document report number = JAFP-86-0296, JAFP-86-296, NUDOCS 8604160260
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 17
}}
 
=Text=
{{#Wiki_filter:. . . _          . . _ _ . _
JAMES A. FITZPATRICK NUCLFAR POWER PLANT OPERATING DATA REPORT
$                                                                                                    D00ET No. 50-333 UNIT NAME  FITZPATRICK DATE  APRIL 1986 00MPIRIED BY  JOHN COOK L~                                                                                                  TELEPHONE (315)342-3840 i
lj!      OPERATING STATUS i
[~      1.        UNIT NAME:      FITZPATRICK
=
: 2.        REPORTING PERIOD: 860301-860331
: 3.        LICENSED 'nERMAL POWER (MIT):                  2436
: 4.        NAMEPIATE RATING (GPOSS ME):                    883 g        5.        DESIGN ELECTRICAL RATING (NET ME):                    816
: 6.        MAXIMUM DEPENDABLE CAPACITY (GROSS ME):                  823 5 ,. 7.        MAXI 1'iM DEPENDABLE CAPACITY (tEr ME):                  796
[-      8.        IF CHANGES OCCUR IN CAPACITY RATINGS (nuS 3 - 7) SINCE LAST REPORT, GIVE REASONS:
n-l
: 9.        POWER LEVEL 10 MIIQI RESTRIUn.D, IF ANY (hTT ME):                        N0ht
!'s,    10.        REASONS E R RESTRICTIONS, IF ANY:
f-i
;- ~                                                                          1111S 50 NTH        YR-10-DATE    CUMUIATIVE R
l~      11.        HOURS IN REPUKuriG PERIOD:                                        744                2160        93601__
:      12.        NUMBER OF HOURS REACIOR WAS CRITICAL:                          415.8              1831.8        67247.4 i      13.        REACIOR RESERVE SHUfDOLE HOURS:                                      0                  0            0
!:      14.        HOURS GENERATOR ON-LINE:                                        332.2              1748.2        65274.3
[      15.        UNIT RESERVE SHUrDOLE HOURS:                                        0                  0            0
: 16.        GROSS THERMAL ENERGY GDERATED OMI):                            776856            4204416      139918090
:5  17.        GROSS ELECTRICAL DERGY GENERATED QWI):                        263050            1435820        48029030
      = 18.        IEr ELECIRICAL ENERGY GEtERATED @WI):                          254040            1386605        45951130
: 19.        UNIT SERVICE FACIOR:                                            44.7                80.9            69.7 r-      20.        UNIT AVAIIABILITY FACIOR:                                        44.7                80.9            69.7 L'      21.        UNIT CAPACITY FACIOR (USING MDC NET):                            42.9                80.6            63.5
: 22.        UNIT CAPACITY FACIOR (USING DER hTr):                            41.8                78.7            60.2 L      23.        UNIT FORCED OUTAGE RATE:                                            0                  0            12.9 L
['      24.        SHUrDOWNS SOEDULED ONER NEXT 6 l'ONDIS (TYPE, DATE AND DURATION OF EAOI):
5 b;      25.        IF SHUR DOWN AT DO OF REPORT PERIOD, ESTD4ATED DATE OF STARTUP:
y
[
la      26.        UNITS IN TEST STATUS (PRIOR 'IU C0tEERCIAL OPERATION):                          FDRECAST      AOIIEVED
[L INITIAL CRITICALITY 9                                                                INITIAL EIECTRICITY 7tEERCIAL OPERATION 8604160260 860331 PDR R          ADOCK 05000333 js K-PDR
 
(
JAMES A, FITZPATRICK NUCLEAR P(XER FIANT AVERAGE DAIIX UNIT POWER 1EVEL DOCKER No.      50-333 UNIT nmATRICK DATE  APRIL 1986 OWPIEIED BY JOHN COOK TELEPHONE (315)342-3840 FONIH  MARCH 1986 DAY  AVERAGE DAILY POWER LEVEL                          DAY AVERAGE DAILY POWER LEVEL 1            802                                        17              0 2            800                                        18              0 3            801                                        19              0 4            801                                        20              0 5            801            _ _ _
21              0 6            802                                        22              0 7            798                                        23              0 8            802                                        24              0 9            801                                        25              0 10            801                                        26              0 11            802                                        27              0 12            801                                        28              0 13            709                                        29              0 14            12                                        30              0 15              0                                        31            251 16              0 SUMtdARY: The FitzPatrick plant operated at near full thenml powr for the first 13 days of the reporting period. On 860314 the unit was taken out of service for maintenance.
l I
 
JAMES A. FITZPATRICK NUCEAR POWER PUNr LNIT SHIJIDOWNS AND POWER REDUCTIONS
                                                                                                                                                                                ~
DOCKER NO.      50-333 LNIT NAME 'TTTHWfRIT-DATE      APRIL 1986 REPORT M NIH    MARCH 1986-                                                                    00MPLEIED BY      JUm u m TEEPfDE (315)342-3840-D                                                                            C UH    R    MEIN 0D                      S                                  O RO    E    OF                          YC                                  MC                          CAUSE AND 00RRECrlVE ACTIO!
AU    A      SHUITING        LICENSEE    SO                                  PO                                      10 NO. DATE  TYPE    T R-  S    DOWN            EVENT        TD                                  0D                              PREVEITT RECURRENCE IS    O      THE              REPOKr      EE                                  NE O    N      REACIOR                      M                                  E N                                                                            N T
1    860314  S      411.8  B        1              N/A      N/A                                N/A          SHUIDOLW FOR CONIROL ROD DRIVE MAINTDIANCE 1                2                                                                                3                                        4 F: FORCED        REASON:                                                                          METHOD:                                      EXHIBIT G.- INSTRUCITONS S: SCHEDUIED    A. EQUIPMENT FAIUJRE (EXPIAIN)                                                    1-MANUAL                                    FOR PREPARATION OF DATA B. MAINIENANCE OF TEST                                                            2-MAhTAL SCRAM                              ENIRY SHEEIS FOR LICENSEE C. REFUELItc                                                                      3-AUIO'ATIC SCRAM                            EVENT REPORT (IIR) FIII D. REGUIATORY PESTRICTION                                                        4-0IHER (EXPIAIN)                            (IRREG-0161)
E. OPERATOR SAINING AtB LICENSE ETRIIN.UIai F. AIMINISTRATIVE G. OPERATIONAL ERROR (EXPIADi)
H. OTHER (EXPIARI)
 
NARRATIVE
 
==SUMMARY==
OF.0PERATING EXPERIENCE MARCH 1986 The FitzPatrick plant operated at near full thermal power for the first thirteen days of the reporting period.                                                    On March 14 the unit was taken out of service for control rod drive maintenance. Startup commenced on March 28 and the plant was back on line on March 31.
At the end of the reporting peroid the unit is operating at approximately 251 MWe.
s u  _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ __...__ _ __ __._________ _ ____________ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                                              _
 
NEW YORK POKER AUTHORITY                                              -
JAMES A, FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
                                                                                                                              ~
MARQI 1986 ACTION TAKEN    REPAIR WORK REQUEST NO. HOW            CAUSE OF          RESULTS OF          TO PRECLUDE      '"IME -
DATE SYSTEM  COMPONENT NO. DETECTED        MALFUNCTION          MALFUNCTION          RECURRENCE      HOURS 860311    00        036350      OPS          DRIFT              SENSORS READ HIGI  NONE, READHES E RE  16 D/W SENSORS                                                        ACCURATE 860319    00        _039082    I&C          P.M.                ENSURE SPAN LINKS  PERF0FFED IMP-TIS    30 FOX XMITR                                    TIGfr:ATTS 860312    02        041145      OPS          NO PROBLEM FDUND    COMPlJrER PT READS  ISP-78; READ RID      2 TE-107B2                                      IIM                RES. N O W P Fr 860317    02        039090      I&C          SIL-418            CHECK IIU YOLT      AIMUSTED IIM NULTAGE 10 INV 801A,B                                    CUT OFF, IRIP PT    SET PORTF 860318    03        039684      OPS          SWIIGI STICKS,      PUSH BUTION        REPAILED SWIIDI      3 RSPB 22-11                AGE /USE            SELECTS VERY HARD 860315    03        038927      OPS          DRIFT              IIM PRESSURE NJ2M AIUUSIED SETPOINr;    12 HCU 10-31                                    SOUNDED            IMP-3.5 860315    03        041681      OPS          BAD SWTIUI;        ROD SELECT SWrIGI  REPLACED SWIIDI      3 RSS 10-43                AGE /USE            NOT WOFXING 860318    03        041687      OPS          RELAY 00U.          ROD WIINDRWL HIJDCK REPIACED REIAY AND  18 ROD BIDCK                BURNED OUT          FOR NO RFASON      RESISIOR
 
                                                  .NEW YORR POWER AUTHORITY ~                                          -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
                                                                                                                      ~
MARCH 1986 ACTION TAKEN    REPAIR WORK REQUEST NO.      HOW            CAUSE OF            RESULTS OF          "'O PRECLUDE  TIME D/.TE SYSTEM    COMPONENT NO. DETECTED        MALFUNCTION.          MALFUNCTION        RECURRENCE    . HOURS 860321  03          041690        OPS          BAD TRANSISIOR,      REFUEL INIERIDCK  REPIACED BOIII    44 RSCS                      BAD PUSHBUTION      LETS XTRA SELECT i
860322  05          032769        I&C          MDD. M1-84-080      REPIACE S/D SCRAM  CQ4PIErED WORK IN  42 05A-K17A,B                                        RESET REIAYS      F0DIFICATION 1
8603?2  05          032869        I&C          FDD. M1-84-080      REPIACE BACK-UP    CCNPIEIED WORK IN  29 5A-K2]A,B                                        SCRAM REIAYS      MODIFICATION 860325  05          039469        OPS          NEW TRANSMITIER      CHECK 11E          CALIBRATED PER      6 PT-14 ABCD                    DATA                CALIBRATION        ISP-200A-D 860316  06          032788        I&C          PACKING OUT OF      Dtfu;nVE VALVES    AIUUSIED PACKHU      2 PT-53A,B                    ADJUSINENT 860316  06          038468        I&C          OUT OF ADJUSIMENT    IEAKS THRU PACKING ADJUSIED PACKING    1 LT-52A 860316  06          039087        I&C          SIL-418              CHECK IIM NOLTAGE  AIUUSTED SETPOIhT  10 INV-A,B                                          cur-OFF, TRIP PI 4
860319  06          030637        I&C          COVER REMNED:        WNCTIONAL TST      PERE RMED ISP-3-4, 10 L/PT-52,53                    BURNr ODOR NOTICED  LT-52A/C Pt-53A    ISP-5-4
 
NEW YORK POWER AUTHORITY                                              -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE SUl&!ARY MARCH 1986 l                                                        ACTION TAKEN        REPAIR
                    ~ WORK REQUEST NO.
                                      !  HOW            CAUSE OF            RESULTS OF        TO PRECLUDE          TIFT DATE    SYSTEM    COMPONENT NO. DETECTED        MALFUNCTION          MALFUNCTION      RECURRENCE          HOURS 860225    07          023174        I&C          DRIFT                RECORDERS OUT OF AIUUSTED                  2 PR-46A,B,D                                        PROC. TOLERANCE 860312    07          030493        OPS          EDUND OPERATING      READING IIM      'IDR TRACE;I/V PWr;      6 LPRM 44-45B                  NORMALLY                              ~1 ram 860312    07          039668        OPS          FOUND OPERATING      DEFECIOR FAILED  TDR TPACE;I/V PWr;        8 LPRM 36-21A                  NORMALLY            DOWNSCALE        Tun w 24 Hours 860313    07          030626        I&C          BAD HIGH VOLTAGE    INOP TRIP        REPIACED HI VOLTAGE      3 IRM-B                      POWER SUPPLY        FLUCIUATES      I%ER SUPPLY 860313    07          032861        I&C          BAD HIGH VOLTAGE    INOP TRIP        REPIACED HI VOLTAGE      6 IIbT-U-                    poler SUPPLY        FLUCIUATES      POWER SUPPLY 860313    07          039704        OPS          BAD SWITG ON        FAILED DOWNSCALE REPALCED SWITCH; IMP-7.6  6 LPRM 36-45A                  LPRM CARD 860319    07          032887        I&C          WFAR                HI VOLTAGE BNC  REPIACE 00NNECIOR        3 IRM-G                                            CONNECIOR BPIEEN 860323    07          041029        OPS          MDISTURE; DIRTY      DRIFTED FRm 5010 CLEANED 00tECIOR;        15 LPRM 44-37C                  CABIE CONNECIOR      58 TO 50        RAN TDR
 
s NEW YORK POWER AUTHORITY-                                              .
JAMES A.'FITZPATRICK NUCLEAR POWER PLANT.
MAINTENANCE
 
==SUMMARY==
                                                                                                                ~
MARCH 1986 ACTION TAKEN-      REPAIR WORK REQUEST NO. HOW            CAUSE OF            RESULTS OF        -TO. PRECLUDE        TIME DATE. SYSTEM  COMPONENT NO. DETECTED        MALFUNCTION          MALFUNCTION      . RECURRENCE        HOURS 860323 07          041788      OPS-        CABLE CONtECIOR      READ UPSCALE      CEANED CONNECIOR AND    16 LPRM 12-21A                DIRTY                DURING CRD        RAN TDR MAINIENANCE 860324  07        041791      OPS          }0ISTURE IN          FAIED UPSCAE      DRIED AND USED NEW HEAT  2 LPRM 20-21A                WNNECIOR                              SIRINK 860325  07        041774      OPS          }OISIURE DURING      "A,C,D" DAMAGED  CLEANED, APPLIED NEW    8 LPRM 20-37                CRD REPIACEMENT      UHILE BfNING      HEAT SHRINK 860325  07        041780      OPS          BAD CABLE            READS UPSCAE      REPAIRED CABLE          16 LPRM 38-27A                CONNECIOR                              CONNECIOR 860326  07        030633      I&C          PREPARATION FOR      REMNE TIP TUBING: RESIORED AFIFR CRD      78 TI N                      MAINTENANCE        - TIE OFF CABE      WORK CCEPLEIED 860327  07        041857      OPS          BAD OP-AMP CARD      LPRM IS DRIFFING  REPUCED OP-AMP CARD    16 LPRM 20-21A 860304  10        030610      I&C          TEST GAUGE USED      NEEDS            RECALIBRATED            7 FT-103                  WAS OUT OF CAL      RECALIBRATION 860305  10        036847      OPS          NO PROBLEM FOUND  ' VALVE CONIROLER  N/A                      5 PCV-69B                                      AIR LEAK
 
NEW YORK POWER AUTHORITY                                          -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
PARCH 1986 ACTION TAKEN  REPAIR WORK REQUEST NO. HOW            CAUSE OF          RESULTS OF          TO PRECLUDE  TIME DATE  SYSTEM  COMPONENT NO. DETECTED        MALFUNCTION          MALFUNCTION          RECURRENCE    HOURS 860327  10        032891      I&C          FAILED              SWIICH FAILED      REPIACED SWrIG    22 PS-120B                  DIAPHRAW            DURING ISP-6        (M1-86-033) 860313  11        030552      OPS          BAD lETER          READS UPSCALE;      REPIACE MEIER;    4 LI-46                                      NEEDS CALIBRATION  ISP-82 860318  13        039089      I&C          SIL-418            IN/HIGH VOLTAGE    AIUUST IN VOLTAGE  6 INV-152                                      CUIDFF AND TRIP    CUIDFF;SETPOINT 860318  17        032731      I&C          AGE /WFAR          BAIL GR&NEIS        REPAILED GRafETS  4 RM-251-ABCD                                    NEED REPIACItK; 860227  17        039844      OPS          GAIN ON FDNITOR    RECORDER READING    REDUCED GAIN ON    4 BR-433                  100 HIGH            ERRATIC            FDNITOR 860321  20        032863      I&C          BAD AMPS R-18 AND  INTEGRAIOR RUNS    REPIACED AFTS,    20 FQ-530                  C-1, SLIDERIRE      C0YrINUOUSIX        SLIDEWIRE 860316 23          032700      I&C          P.M.                ATTS INTERPOSING    REPIACED REIAYS    4 A-K129/130                                    REIAYS 860317 23          038423      OPS          VIBRATION          NEEDLE BROKEN ON    RESET IEEDLE,      7 PI-123A                                      PRESSURF GAUGE      CALIBRATED I                                                                                  I
 
NEW YORK POWER AUTHORITY                                            -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE
 
==SUMMARY==
 
MARCH 1986 ACTION TAKEN    REPAIR WORK REQUEST NO. HOW            CAUSE OF            RESULTS OF        TO PRECLUDE      TIME DATE  SYSTEM  COMPONENT NO. DETECTED        MALFUNCTION            MALFUNCTION        RECURRENCE      HOURS 860317  23        039088      I&C          SIL-418              CHECK IN VOLTAGE  AIUUSTED SETPOINT    6 INV-79                                        cur-OFF, TRIP Pr 860326  23        032894      I&C          TRANSMITTER OUT      XMIR AND TU      CALIBRATED PER        6 PT-68D                  OF CALIBRATION        INDICATE PRESSURE ISP-225B AT S/D 860228  2~;        037987      OPS          BAD CH0PPER          ERRATIC Drau;1vK  REPIACED BAD CH0PPER 160 RM-104B                                        RESPONSE 860310  27        034930      OPS          NORMAL WEAR          FLOR 00NTROL      REPAIRED CALIBRATED  240 D/W AIR W N                                      VALVES NEED      CONTAIMENT AIR REPAIR            ENITOR 860315  29        036196      JTS          E.Q. UPGRADE          N/A              INSTALLED AND        16 PS-201/2AB                                                        CALIBRATED 860316  29        039850      OPS          STRIPPED              SWITCH 1RNGS UP  REPIACED SWIICH ARM; 17 AOV-80B                  SWITCH ARM                              ISP-65-1 860316  29        041083      OPS          N/A                  WILL NOT PICK UP  PERFORMED ISP-65-1    9 LS-7                                          AT FULL OPEN      SATISFACIORY 860320  71        030741'    OPS          DRIFT                AMEIER FEADING    AIUUSTED ZERO        10 INV-3A                                        IN
 
NEW YORK POWER AUTHORITY                                                            -
JAMES A. FITZPATRICK NUCLEAR POWER PLANT MAINTENANCE SU) DIARY MARCH 1986 ACTION TAKEN                  REPAIR WORK REQUEST NO. HOW              CAUSE OF            RESULTS OF          TO PRECLUDE                    TIME D/6TE SYSTUI    COMPONENT NO. DETECTED        MALFUNCTION          MALFUNCTION        RECURRENCE                    HOURS 860314  76            038619      OPS          DRIFT                GAUGE NEEDS        CALIBPATED CAUGE                    4
                      'IK-10                                        CALIBRATION 860321  76            041708    OPS          BAD POWER            FIRE PROTECTION    CHANGED POWER                      8 FPP                  SUPPLIES              PANEL IUr WRKING  SUPPLIES 860315 93              030615    I&C          N&TE OUT OF          "C" SWIICHES      RE-CALIBRATED PER                  8 PS-5/13/14                CALIBRATION          NEED              IMP-93.1 RE-CALIBRTION 860315 93            030634      I&C          M&TE OUT OF          "A" SWrICHES      RE-CALIBRATED PER                  8 PS-5/13/14                CALIBRATION          NEED              IMP-93.1 RE-CALIBRATION 860319 93            033113      OPS          FDD F1-84-041        VERIFY / CALIBRATE CALIBRATED                          5 REL\YS                                        TIME DEAY REIAYS 860323 93            030777      JMD          " PUSH 'ID TEST"      ENGINE FAULT AUSM AJDUST BUTION AND CAL;              3 EDG-C                    BUTION IUr RESET      ON DIESEL C        IMP-93.2 860317 02-3          032739      I&C          AGE / WEAR            ISOIATION VALVE    REPIACED VALVE                36 N                                              LEAIG C            MANIFOID 860319 02-3          030638      I&C          AS FOUND/LEFT        FUNCTIONAL TEST    PERFDRMED ISP-201B&C                3 LT-101B,C                VOLTAGE > .10VDC      REQUIRED
 
                                            ~
NEW1 YORK POUER AUTHORITY-                                        -
                                                                                                                    ;i,; , ''
JAMES A. FITZPATRICK NUCLEAR ~ POWER PLANT MAINTENANCE
 
==SUMMARY==
 
MARCH 1986 ACTION TAKEN      REPAIR
                  ' WORK REQUEST NO. HOW              CAUSE.GE          RESULTS OF-        .TO PRECLUDE      TIME-DATE  SYSTDI -    COMPONENT NO. DETECTED        MALFUNCTION          MALFUNCTION        RECURRENCE    . HOURS, 860319  02-3          032724      I&C          P.M.                REPUCE IDOSE    PERFORMED IMP-TIS    90 ROLTTRRIT                                      TXMIT LEADS:ATTS 860321  02-3          038572      OPS-          TRANSMEITER IDW    INDICATES IDW,  All1USTED TRANSMITTER 10 LI-86                    OUT OF SPEC        NO RESPONST      02-3 LT-61 LFREL CHANGE
 
NEW YORK POWER AUIHORITY JAMES A. FITZPA'IRICK NUCLEAR POWER PIANT SAFEIY REIATED ELECIRICAL & MECHANICAL MAINTENANCE StPHARY                                                                .
MARCH 1986 foTAIR WORK RMUEST f                                                                                                                                        TIME DATE              SYSTEM                CCNP0FENT                      HOW DtThcrtu                      CAUSE OF MALFUNCTION                      ACTION TAKEN 'IO PRECLUDE RECURRENCE HOURS 3/21              16                  41784                            IIRT                              Ioose packing.                            Adjusted handwheel packing.            3 X
  -____--______________'A                    ____________________________________-________________-_-_-__----____--_-_-_-__---_-_----_-__---__________
3/21              10                  41754                            OPS                              Bonnet Gasket Imak.                        Replaced gasket.                      180 A0V-68A 3/19              34                  30770                            OPS                              Seat Imaks.                                Replaced valves.                        61 JVS-14A &
15A 3/22              16                  33112                            OPS                              Irose Bolt,                                Retorqued bolt.                          3 X-200B 3/23              71                  S0761                            Inspection                      Damaged Arc Chute.                        Replaced arc chute.                      5 11516 3/23              03                  27068                            OPS                              Wom Seals.                                Replaced CRD mechanism.                50 50-35 3/23              03                  27069                            OPS                              Worn Seals.                                Replaced CRD mechanism.                60 50-27 3/23              03                  39045                            OPS                              Worn Seals.                                Replaced CRD mechanism.                55 50-19
__________-_______________-__________-_------_-_ -__---_________________________-------__-__--_____-_______--____======-_____.
3/23              03                  25469                            OPS                              Wom Seals.                                Replaced CRD mechanism.                50 42_11 3/23              03                  40969                            OPS                              Worn Seals.                                Replaced CRD mechanism.                60 26-03 3/23              03                  41489                            OPS                              Worn Seals.                                Replaced CRD mechanism.                60 18-23
____-_________________--_ ..________________-----_-_-_---_-________-_-________________===_-______. _-__ -----______-_----___ .
3/23              03                  41482                            OPS                              Worn Seals.                                Replaced CRD meclunism.                50 06-35
 
e NER YORK POWER AUIHORITY JAMES A. FITZPATRICK NUCUAR POWER PIANT SAFELY REIATED ELFLTRICAL & MECHANICAL MAINTENANCE SlM1ARY                                              .
MARCH 1986 REPAIR WDRK REQUEST #                                                                                                                    TIME DATE              SYSTEM                CWPONENT                      HOW DETECTED                      CAUSE OF MALFUNCTION      ACTION TAKEN TO PRECLUDE RECURRENCE HOURS 3/23              03                  41482                            OPS                              Wom Seals.                Replaced CRD mechanism.                60 10-39 3/23              03                  41490                            OPS                              Wom Seals.                Replaced CRD mechanism.                50 14-35 3/23              03                  25470                            OPS                              Worn Seals.              Replaced CRD mechanism.                50 26-51 3/23              03                  25470                            OPS                              Wom Seals.                Replaced CRD mechanism.                60 34-31 3/23              03                  41491                            OPS                              Wom Seals.                Replaced CRD mechanism.                50 w
w_JJ 3/23              03                  40970                            OPS                              Wom Seals.                Replaced CRD mechanism.                50 26-31 3/23              03                  27066                            OPS                              Wom Seals.                Replaced CRD mechanism-                60 34-43                                                                                                                  s 3/23              03                  40395                            OPS                              Wom Seals.                Replaced CRD mechanism._              50 30-35 3/23              03                  27067                            OPS                              Wom Seals.                Replaced CRD mechanism.                50 30-39 3/23              03                  40357                            OPS                              Failed Reed Switches. Replaced PI Probe.                      6 46-11 3/23              03                  39502                            OPS                              Failed Reed Switches. Replaced PI Probe.                      5 34-35 3/23              03                  40358                            OPS                              Failed Reed Switches. Replaced PI Probe.                      5 14-19
 
NEW YORK POWER AUIHORITY JAMES A. FITZPATRICK NUCEAR POWER PIANT SARTY REIATED ELECIRICAL & MECHANICAL MAINIENANCE SIMRRY                                                                                                                    .
MARCH 1986 nrEAIR WORK REQUEST #                                                                                                                                                                            TDE DATE              SYSTEM                C@20NENT                      HOR DETECTED                      CAUSE OF MAIRJNCTION                              ACTION TAKEN 10' PRECLUDE RFLURRENCE H0t.RS 3/23              03                  38906                            OPS                              Failed Reed Switches.                              Replaced PI Probe.                                                      2 42-07 3/23              03                  38925                            OPS                              Failed Reed Switches.                              Replaced PI Probe.                                                      2 06-31 3/23              03                  38944                            OPS                              Failed Reed Switches.                              Replaced PI Probe.                                                      2 30-07 3/24              71                  30772                            OPS                              Failed Card A-3.                                  Replaced A-3 card.                                                      4 INV-3B
_________________________________________________________________________________________________________________________=
3/24              03                  30773                            OPS                              Failed Reed Switches.                              Replaced PI Probe.                                                      5 50-19 3/26              10                  38594                            OPS                              Seat Imak.                                        Replaced valve.                                                        30 RHR-712 3/26              29                  41753                            OPS                              Pressure Seal Imak.                                Replaced pressure seal.                                                80 t0V-74 3/26              33                  39035                            OPS                              Worn Packing.                                      Replaced packing.                                                      12 F0V-16 3/26              13                  35188                            OPS                              Worn Packing.                                      Replaced packing.                                                      8 RCIC_697
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -    === ______.
3/18              02-2                38965                            OPS                              Wom Packing.                                      Replaced packing.                                                      8 F0V-54B 3/30              23                  21220                            OPS                              Stuck overspeed trip                              Remnved burr from trip weight.                                        24 TU-1                                                              device.
3/27              12                  37043                            OPS                              Worn Packing. .                                    Replaced packing.                                                      6 bOV-15
_________________________________________== =-- ====________________________==-- ____________________________________________.
 
NER YORK POWER AUINORITY JAMES A. FITZPATRICK NUCLEAR POWER PLANT                                                .
SAFELY REIAIED ELECIRICAL & MECHANICAL MAINIENANCE SlfNARY'                                              :.
MARCH 1986 REPATR WORK REQUEST f                                                                                                                    TINE DATE              SYSTEM                C(NPONENT                      HOR Duuntu                        CAUSE OF MALFLNCTION      ACTION TAKEN 'IO PRECIUDE RECURRENCE HOURS 3/23              13                  37611                            OPS-                              Worn Packing.            Replaced packing.                        3 POV-131 3/23              23                  27888                            OPS                              Worn Packing.            Replaced packing.                      10 HPI_898 3/26              20                  30781                            OPS                              Gear Limit Switch        Adjusted gear limit switch.              I 1%V-82                                                            out of adjustment.
3/24              03                  41715                            OPS                              Failed position          Replaced PI probe.                      43 50-19                                                              indication.
3/15              34                  41768                            OPS                              Failed SOV.              Replaced SOV.                            16 SOV-Illa 3/23              03                  41709                            OPS                              Failed PI Probe.          Replaced PI probe.                      14 30-35
 
J: me) A. FitzP; trick Nucle:r Power Plant PO Bos 41 Lycoming. New York 13093 315 342.3840 Radford J. Converse
#> NewYorkPower
(# Authority April 10, 1986 JAFP 86- 0296 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION:            DOCUMENT CONTROL DESK
 
==REFERENCE:==
DOCKET NO. 50-333
 
==Dear Sir:==
 
Enclosed please find the J. A. FitzPatrick Operating Status Report for. the month of March, 1986.            Refueling information remains the same as previously submitted.
If there are any questions concerning this report, please contact John Cook at (315) 342-3840, Ext. 439.
  /        aaan RADFORD J. CONVERSE RESIDENT MANAGER RJC:J    :mac Enclosures cc:  Distribution rE2M ljg}}

Latest revision as of 22:50, 9 December 2021