                       . the FirstEnergy Nuclear Operating Company (the licensee) to withdraw its April 9,1997, application for an amendment to Facility Operating License No. NPF-58 for tne Perry Nuclear Power Plant, Unit 1, located in Lake County, Ohio. Notice of Consideration of issuance of this amendment was published in the FEDERAL REGISTER on May 21,1997 (62 FR 27794).
                       . the FirstEnergy Nuclear Operating Company (the licensee) to withdraw its April 9,1997, application for an amendment to Facility Operating License No. NPF-58 for tne Perry Nuclear Power Plant, Unit 1, located in Lake County, Ohio. Notice of Consideration of issuance of this amendment was published in the FEDERAL REGISTER on May 21,1997 (62 FR 27794).
The purpose of the licensee's amendment request was to revise the Technical Specifications to extend the existing surveillance interval for performing the Channel Functional Tests for the refueling equipment interlocks and for the one-rod-out interlock.
The purpose of the licensee's amendment request was to revise the Technical Specifications to extend the existing surveillance interval for performing the Channel Functional Tests for the refueling equipment interlocks and for the one-rod-out interlock.
Subsequently, by letter dated March 10,1999, the licensee informed the staff that the amendment was being withdrawn nd would be resubmitted in the future based on an approved
Subsequently, by {{letter dated|date=March 10, 1999|text=letter dated March 10,1999}}, the licensee informed the staff that the amendment was being withdrawn nd would be resubmitted in the future based on an approved
                       . Standard Te      ;ical Specification Change Traveler, Number TSTF-225. Thus, the amendment application is considered to be withdrawn by the licensee.
                       . Standard Te      ;ical Specification Change Traveler, Number TSTF-225. Thus, the amendment application is considered to be withdrawn by the licensee.
For further details with respect to this action, see the application for amendment dated  '
For further details with respect to this action, see the application for amendment dated  '
April 9,1997, and the licensee's withdrawal letter dated March 10,1999. These documents are available for public inspection at the Commission's Public Document Room, the Gelman i
April 9,1997, and the licensee's withdrawal {{letter dated|date=March 10, 1999|text=letter dated March 10,1999}}. These documents are available for public inspection at the Commission's Public Document Room, the Gelman i
9904130240 990405                                                                                      l l                  PDR      ADOCK 05000440                                                                                i P
9904130240 990405                                                                                      l l                  PDR      ADOCK 05000440                                                                                i P
PDR          .
PDR          .

Revision as of 20:34, 6 December 2021

Notice of Withdrawal of Application for Amend to FOL NPF-58 Re Revising TSs to Extend Existing Surveillance Interval for Performing Channel Functional Tests for Refueling Equipment Interlocks & for one-rod-out Interlock
ML20205K532
Person / Time
Site: Perry 
Issue date: 04/05/1999
From: Anthony Mendiola
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20205K525 List:
References
NUDOCS 9904130260
Download: ML20205K532 (2)


Text

, . _ _ _ _ . . _ _ ._ _ __ -- -

.n.

i 7590-01-P 1

, UNITED STATES NUCLEAR REGULATORY COMMISSION I

FIRSTENERGY NUCLEAR GPERATING COMPANY l i

DOCKET NO. 5,Q-fdQ NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted a request by

. the FirstEnergy Nuclear Operating Company (the licensee) to withdraw its April 9,1997, application for an amendment to Facility Operating License No. NPF-58 for tne Perry Nuclear Power Plant, Unit 1, located in Lake County, Ohio. Notice of Consideration of issuance of this amendment was published in the FEDERAL REGISTER on May 21,1997 (62 FR 27794).

The purpose of the licensee's amendment request was to revise the Technical Specifications to extend the existing surveillance interval for performing the Channel Functional Tests for the refueling equipment interlocks and for the one-rod-out interlock.

Subsequently, by letter dated March 10,1999, the licensee informed the staff that the amendment was being withdrawn nd would be resubmitted in the future based on an approved

. Standard Te ;ical Specification Change Traveler, Number TSTF-225. Thus, the amendment application is considered to be withdrawn by the licensee.

For further details with respect to this action, see the application for amendment dated '

April 9,1997, and the licensee's withdrawal letter dated March 10,1999. These documents are available for public inspection at the Commission's Public Document Room, the Gelman i

9904130240 990405 l l PDR ADOCK 05000440 i P

PDR .

l l

L.,

4 Building, 2120 L Street, NW., Washington, DC and at the local public document room located at the Perry Public Library, 3753 Main Street, Perry, OH 44081.

Dated at Rockville, Maryland, this 5th Day of April 1999.

FOR THE NUCLEAR REGULATORY COMMISSION

--/ v thony J. Mendiola, Chief, Section 2 Project Directorate lli Division of Licensing Project Management Office of Nuclear Reactor Regulation 1