FEB 2 71989 In Reply Refer To: | FEB 2 71989 In Reply Refer To: | ||
Docket: 50-298 Nebraska Public Power District ATTN: George A. Trevors Division Manager - Nuclear Support P.O. Box 499 Columbus, NE 68602-0499 Gentlemen: | Docket: 50-298 Nebraska Public Power District ATTN: George A. Trevors Division Manager - Nuclear Support P.O. Box 499 Columbus, NE 68602-0499 Gentlemen: | ||
.This acknowledges the receipt of your letter dated December 28, 1988, by which you transmitted Revision Number 23 to the Cooper Nuclear Station Safeguards Plan. | .This acknowledges the receipt of your {{letter dated|date=December 28, 1988|text=letter dated December 28, 1988}}, by which you transmitted Revision Number 23 to the Cooper Nuclear Station Safeguards Plan. | ||
We find the changes in the subject letter and the attachments thereto to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are acceptable for inclusion into the plan. | We find the changes in the subject letter and the attachments thereto to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are acceptable for inclusion into the plan. | ||
The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure. | The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure. | ||
Revision as of 13:01, 20 March 2021
| ML20235T758 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 02/27/1989 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 8903080462 | |
| Download: ML20235T758 (2) | |
Text
. _ _
FEB 2 71989 In Reply Refer To:
Docket: 50-298 Nebraska Public Power District ATTN: George A. Trevors Division Manager - Nuclear Support P.O. Box 499 Columbus, NE 68602-0499 Gentlemen:
.This acknowledges the receipt of your letter dated December 28, 1988, by which you transmitted Revision Number 23 to the Cooper Nuclear Station Safeguards Plan.
We find the changes in the subject letter and the attachments thereto to be consistent with the provisions of 10 CFR 50.54(p). Accordingly, they are acceptable for inclusion into the plan.
The enclosures to your letter contain Safeguards Information of a type specified in 10 CFR 73.21 and are being withheld from public disclosure.
Sincerely, Original Signed By.
A. B. Beacli L. J. Callan, Director Division of Reactor Projects CC:
Cooper Nuclear Station ATTN: Guy Horn, Division Manager of Nuclear Operations P.O. Box 98 Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director i
RI P. RPB C:SE :RPB C:RPB C: S D: P4 Ea nest / sir JEve ett BMurray C le Callan
}/I'1/89 1./f /89 l}l / /89 994 89 Z/28/89 CASEWORK NUMBER 50-298/20-XA 89030so462 890227 '
hDR ADOCK 050 9 g)
4
. , = . .
Nebraska Public Power District bec w/non safeguards portion of licensee's letter:
l DMB(RG01) bec distributed by RIV w/ letter from-licensee:
R. D. Martin, RA DRP R. L. Bangart, DRSS Branch Chief, RPB Security Inspector Section Chief, SEPS:RPB Section Chief DRP/C Resident Inspector j, P. A. Starcher, RSGB/NRR RITS Coordinator '
SD.54(p) Book SEPS:RPB Security File Physical Security File RIV File l R. E. Hall, DRSS Project Engineer, DRP/C j DRS MIS 1 P. O' Conner, NRR Project Manager j
I l
1 l
I 1
. > =.
Nebraska Public Power District bec w/non safeguards portion of licensee's letter:
DMB (RG01) bec distributed by RIV w/ letter from licensee:
R. D. Martin, RA DRP R. L. Bangart, DRSS Branch Chief, RPB Security Inspector Section Chief, SEPS:RPB Section Chief DRP/C Resident Inspector P. A. Starcher, RSGB/NRR RITS Coordinator 50.54(p) Book SEPS:RPB Security File Physical Security File RIV File R. E. Hall, DRSS Project Engineer, DRP/C DRS MIS P. O' Conner, NRR Project Manager
r- - - _ . . _
3 ..
4 p .c j COOPER NUCLEAR STATION
, Nebraska Public Power District "
"" " * "A"E##"N!% %""^>',"^ "'"
w 2 CNSS882294 December 28,.1988 ATTACHMENT CONTAINS SAFEGUARD INFORMATION U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Q
Subject:
Cooper Nuclear Station Safeguards Plan; Report of Change - Revision Twenty-three Docket No. 50-298/DPR-46 .
M/0 /I
//
References:
(1) Letter, G.A. Trevors, NPPD, to USNRC,
~% d Yill dated August 26, 1988.
(2) Letter, L.J. Callan, USNRC, to G.A. Trevors, NPPD, dated December 9, 1988.
Gentlemen:
Reference one provided Revision 23 to the Cooper Nuclear Station Safeguards Plan under the provis uns of 10 CFR 50.54(p). Reference two accepted these changes with six exceptic ns. Five of these exceptions have been corrected by reverting to the previous plan statements and as such are being q withdraun. The sixth change refers to a statement that was removed from page I-8-1 in Volume 1. This statement has now been included in Revision 23 but with. additional clarification to insure consistency with other plan statemants. The District has concluded that the enclosed modifications to Revision 23 do not decrease the safeguards effectiveness of the plan.
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited. Therefore, we request the material, with the exception of the cover letter, be withheld from public disclosure.
Sincerely,
. c r b Division Manager Nuclear Support 1 GAT:GRH:bjs 1
Enclosures:
(Controlled Copies 1-4) ec: U.S. Nuclear Regulatory Commission Regional Office - Region IV (Controlled Copies 5 and 6)
NRC Resident Inspector g [0dOSU A Cooper Nuclear Station (w/o enclosures) $ g ggest!ON .
.-a ux ==
n m<,e
&$ _ _ _ _ _ _ _ _ _ _ _ _ _