RIS 2004-10, Withdrawn NRC Regulatory Issue Summary 2004-010: Preparation and Scheduling of Operator Licensing Examinations: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 50: Line 50:
===Attachments:===
===Attachments:===
NRC Form 536, "Operator Licensing Examination Data" List of Recently Issued NRC Regulatory Issue SummariesDistribution:ADAMS RIS FileADAMS ACCESSION NUMBER: ML041400040OFFICEIROB:DIPMTech EditorSC:IOHS:IROB:DIPMOES:IROB:DIPMPIMB:PMAS:NRRNAMEEBarnhill*PKleene*DCTrimble*CDPetrone*DMcCainDATE05/19/200405/18/200405/19/200405/19/200405/19/2004OFFICEOCIOOGC(A)SC:OES:IROB:DIPMC:IROB:DIPMNAMEBSheltonMItzkowitzCPJacksonWDBecknerDATE05/27/200406/07/200406/09/200406/14/2004OFFICIAL RECORD COPY Attachment 1 ______________________________________________________________________________________OL = Operating License CP = Construction PermitAttachment 2 LIST OF RECENTLY ISSUEDNRC REGULATORY ISSUE SUMMARIES_____________________________________________________________________________________Regulatory Issue Date of Summary N Subject IssuanceIssued to_____________________________________________________________________________________2004-09Status on Deferral of ActiveRegulation of Ground-water Protection At In Situ Leach Uranium Extraction Facilities06/07/2004All holders of materials licenses foruranium and thorium recovery facilities.2004-08Results of the License TerminationRule Analysis05/28/2004All holders of operating licensesfor nuclear power reactors, research and test reactors, as well as decommissioning sites.2004-07Release of Final Review Standard(RS)-002, "ProcessingApplications for Early Site Permits"05/19/2004All holders of operating licensesfor nuclear power reactors, all applicants for early site permits (ESPs), and all prospective vendors of nuclear power plants in the United States.2004-06Independent Survey of PowerReactor Licensees04/16/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2004-05Grid Reliability and the Impact onPlant Risk and the Operability of Offsite Power04/15/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname
NRC Form 536, "Operator Licensing Examination Data" List of Recently Issued NRC Regulatory Issue SummariesDistribution:ADAMS RIS FileADAMS ACCESSION NUMBER: ML041400040OFFICEIROB:DIPMTech EditorSC:IOHS:IROB:DIPMOES:IROB:DIPMPIMB:PMAS:NRRNAMEEBarnhill*PKleene*DCTrimble*CDPetrone*DMcCainDATE05/19/200405/18/200405/19/200405/19/200405/19/2004OFFICEOCIOOGC(A)SC:OES:IROB:DIPMC:IROB:DIPMNAMEBSheltonMItzkowitzCPJacksonWDBecknerDATE05/27/200406/07/200406/09/200406/14/2004OFFICIAL RECORD COPY Attachment 1 ______________________________________________________________________________________OL = Operating License CP = Construction PermitAttachment 2 LIST OF RECENTLY ISSUEDNRC REGULATORY ISSUE SUMMARIES_____________________________________________________________________________________Regulatory Issue Date of Summary N Subject IssuanceIssued to_____________________________________________________________________________________2004-09Status on Deferral of ActiveRegulation of Ground-water Protection At In Situ Leach Uranium Extraction Facilities06/07/2004All holders of materials licenses foruranium and thorium recovery facilities.2004-08Results of the License TerminationRule Analysis05/28/2004All holders of operating licensesfor nuclear power reactors, research and test reactors, as well as decommissioning sites.2004-07Release of Final Review Standard(RS)-002, "ProcessingApplications for Early Site Permits"05/19/2004All holders of operating licensesfor nuclear power reactors, all applicants for early site permits (ESPs), and all prospective vendors of nuclear power plants in the United States.2004-06Independent Survey of PowerReactor Licensees04/16/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2004-05Grid Reliability and the Impact onPlant Risk and the Operability of Offsite Power04/15/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname
}}
}}


{{RIS-Nav}}
{{RIS-Nav}}

Revision as of 07:00, 23 February 2018

Withdrawn NRC Regulatory Issue Summary 2004-010: Preparation and Scheduling of Operator Licensing Examinations
ML041400040
Person / Time
Issue date: 06/14/2004
Revision: 0
From: Beckner W D
NRC/NRR/DIPM/IROB
To:
References
OMB-3150-0131 RIS-04-010
Download: ML041400040 (8)


Withdrawn NRC Regulatory Issue Summary 2004-10, "Preparation and Scheduling of Operator Licensing Examinations," dated June 14, 2004, has been withdraw ADAMS Accession Number: ML041400040 See Federal Register notice 81 FR 31969, dated May 20, 2016 OMB Clearance No.: 3150-0131 June 14, 2004NRC REGULATORY ISSUE SUMMARY 2004-10PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS

ADDRESSEES

All holders of operating licenses for nuclear power reactors, except those who havepermanently ceased operations and have certified that fuel has been permanently removed from the reactor vesse

INTENT

The U.S. Nuclear Regulatory Commission (NRC) is issuing this regulatory issue summary (RIS)to inform addressees of the NRC staff's need for updated information on projected site-specific operator licensing examination schedules and the estimated numbers of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations (GFEs). This information will help the NRC to more effectively plan the use of its resource This RIS requires no action or written response on the part of addressee Any action on the part of addressees to collect and transmit the information noted herein is strictly voluntary.

BACKGROUND

On April 23, 1999, the NRC published a notice in the Federal Register (64 FR 19868) amending10 CFR Part 55, "Operators' Licenses," to allow nuclear power facility licensees to prepare, proctor, and grade the written examinations required by 10 CFR 55.41 and 55.43, provided certain conditions are satisfie The amendment also allows facility licensees to prepare the NRC-administered operating tests required by 10 CFR 55.4 Pursuant to 10 CFR 55.40(c),

facility licensees that elect not to prepare their own examinations and operating tests must request in writing that the NRC prepare the examination and the operating tests.Regulatory Information Summary (RIS) 2003-14, "Preparation and Scheduling of OperatorLicensing Examinations," issued August 27, 2003, requested that facility licensees submit proposed schedules of examinations that they intended to prepare and estimate the number of applicants to be tested in both site examinations and GFEs in calendar years (CYs) 2004 through 200 This RIS supersedes RIS 2003-14; the objective is to update examination schedules and applicant estimates for CYs 2005 through 2007 and add an estimate for CY 200

SUMMARY OF ISSUE

The NRC uses about twice the resources to prepare an examination as it does to review,approve, administer, and document a facility-prepared examinatio Furthermore, the total number of examinations administered by licensees fluctuates from year to yea Consequently, the NRC has found it helpful to request an annual update of power reactor facility licensees'initial operator licensing examination need The update should include an estimate of the number of applicants to be examined and whether the licensee or the NRC will prepare the exam. This information will help the NRC budget its resource The NRC regional offices will continue to coordinate specific examination dates with the training managers of affected facility licensees.The NRC requests that each licensee provide the following information on NRC Form 536,"Operator Licensing Examination Data" (Attachment 1): Proposed Examination Preparation Schedule Estimate the number of examinations you intend to prepare and estimate the number ofexaminations you will request the NRC to prepare during CYs 2005 through 200 For examinations that are prepared by facility licensees, the NRC will assume that each examination includes the required outline, the written examination, and the operating test, unless otherwise specified (joint NRC/licensee examination development is permitted and should be coordinated with the NRC regional office). Initial Operator License Examinations For each desired examination, estimate the number of applicants to be tested and enter the proposed primary and alternate dates of examinatio If you are requesting more than one examination per calendar year, split the applicable column or use additional forms, as necessary, to cover all the examinations through CY 2008. Proposed Generic Fundamentals Examination Schedule Estimate by examination month the number of applicants who plan to take the GFE in CYs 2005 and 200 As requested by the industry, the GFE will be administered 4 times a year starting in CY 200

VOLUNTARY RESPONSE

Addressees

that choose to submit the information identified in NRC Form 536 are asked to doso within 30 days of receiving this RI NRC Form 536 is available on the NRC Web site at http://www.nrc.gov/reading-rm/doc-collections/forms/. Your response should be directed to theU.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, and a copy of the response should be sent to the applicable regional office.

BACKFIT DISCUSSION

This RIS requires no action or written respons Any action on the part of addressees to collectand transmit operator licensing examination data in accordance with the guidance in this RIS is strictly voluntar Therefore, this is not a backfit under 10 CFR 50.109, and the staff did not perform a backfit analysi

FEDERAL REGISTER NOTIFICATION

A notice of opportunity for public comment on this RIS was not published in the FederalRegister because it pertains to an administrative aspect of the regulatory process and involvesthe voluntary submission of information by addressees.

PAPERWORK REDUCTION ACT STATEMENT

This RIS contains information collection requirements that are subject to the PaperworkReduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0131, which expires July 31, 200 The burden to the public for this voluntary information collection is estimated to average 1 hourper response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collectio Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. Public Protection NotificationThe NRC may not conduct or sponsor, and a person is not required to respond to, a request forinformation or an information collection requirement unless the requesting document displays a currently valid OMB control numbe If you have any questions about this matter, please contact one of the technical contacts listedbelow or the appropriate Office of Nuclear Reactor Regulation project manage /RA/ William D. Beckner, Chief Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor RegulationTechnical Contacts: David C. Trimble, NRRRichard J. Conte, RI 301-415-2942610-337-5183 E-mail: dct@nrc.govE-mail: rjc@nrc.gov Michael E. Ernstes, RIIRoger D. Lanksbury, RIII 404-562-4638630-829-9631 E-mail: mee@nrc.govE-mail: rdl@nrc.gov Anthony T. Gody, RIV 817-860-8159 E-mail: atg@nrc.gov

Attachments:

NRC Form 536, "Operator Licensing Examination Data" List of Recently Issued NRC Regulatory Issue Summaries If you have any questions about this matter, please contact one of the technical contacts listedbelow or the appropriate Office of Nuclear Reactor Regulation project manage /RA/William D. Beckner, Chief Reactor Operations Branch Division of Inspection Program Management Office of Nuclear Reactor RegulationTechnical Contacts: David C. Trimble, NRRRichard J. Conte, RI 301-415-2942610-337-5183 E-mail: dct@nrc.govE-mail: rjc@nrc.gov Michael E. Ernstes, RIIRoger D. Lanksbury, RIII 404-562-4638630-829-9631 E-mail: mee@nrc.govE-mail: rdl@nrc.gov Anthony T. Gody, RIV 817-860-8159 E-mail: atg@nrc.gov

Attachments:

NRC Form 536, "Operator Licensing Examination Data" List of Recently Issued NRC Regulatory Issue SummariesDistribution:ADAMS RIS FileADAMS ACCESSION NUMBER: ML041400040OFFICEIROB:DIPMTech EditorSC:IOHS:IROB:DIPMOES:IROB:DIPMPIMB:PMAS:NRRNAMEEBarnhill*PKleene*DCTrimble*CDPetrone*DMcCainDATE05/19/200405/18/200405/19/200405/19/200405/19/2004OFFICEOCIOOGC(A)SC:OES:IROB:DIPMC:IROB:DIPMNAMEBSheltonMItzkowitzCPJacksonWDBecknerDATE05/27/200406/07/200406/09/200406/14/2004OFFICIAL RECORD COPY Attachment 1 ______________________________________________________________________________________OL = Operating License CP = Construction PermitAttachment 2 LIST OF RECENTLY ISSUEDNRC REGULATORY ISSUE SUMMARIES_____________________________________________________________________________________Regulatory Issue Date of Summary N Subject IssuanceIssued to_____________________________________________________________________________________2004-09Status on Deferral of ActiveRegulation of Ground-water Protection At In Situ Leach Uranium Extraction Facilities06/07/2004All holders of materials licenses foruranium and thorium recovery facilities.2004-08Results of the License TerminationRule Analysis05/28/2004All holders of operating licensesfor nuclear power reactors, research and test reactors, as well as decommissioning sites.2004-07Release of Final Review Standard(RS)-002, "ProcessingApplications for Early Site Permits"05/19/2004All holders of operating licensesfor nuclear power reactors, all applicants for early site permits (ESPs), and all prospective vendors of nuclear power plants in the United States.2004-06Independent Survey of PowerReactor Licensees04/16/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.2004-05Grid Reliability and the Impact onPlant Risk and the Operability of Offsite Power04/15/2004All holders of operating licensesfor nuclear power reactors except those who have permanently ceased operations and have certified that fuel has been permanently removed from the reactor vessel.Note:NRC generic communications may be received in electronic format shortly after they areissued by subscribing to the NRC listserver as follows:To subscribe send an e-mail to <listproc@nrc.gov >, no subject, and the followingcommand in the message portion:subscribe gc-nrr firstname lastname