ENS 54771: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 10: | Line 10: | ||
| utype = B, B, B | | utype = B, B, B | ||
| cfr = 10 CFR 50.72(b)(3)(xiii) | | cfr = 10 CFR 50.72(b)(3)(xiii) | ||
| emergency class = | | emergency class = Non Emergency | ||
| notification date = 07/10/2020 08:17 | | notification date = 07/10/2020 08:17 | ||
| notification by = Jim Thomas | | notification by = Jim Thomas | ||
Line 17: | Line 17: | ||
| last update date = 07/10/2020 | | last update date = 07/10/2020 | ||
| title = Planned Common Emergency Operations Facility Maintenance | | title = Planned Common Emergency Operations Facility Maintenance | ||
| event text = At 0900 EDT hours on 7/10/2020 Duke Energy will undertake planned maintenance activities on the common Emergency Operations Facility (EOF) for Brunswick, Catawba, Harris, McGuire, Oconee, and Robinson nuclear sites. The work includes performance of upgrades to the emergency AC power system and requires the removal of both normal and emergency power to the facility. The work duration is approximately ten (10) days. | | event text = At 0900 EDT hours on 7/10/2020 Duke Energy will undertake planned maintenance activities on the common Emergency Operations Facility (EOF) for Brunswick, Catawba, Harris, McGuire, Oconee, and Robinson nuclear sites. The work includes performance of upgrades to the emergency AC power system and requires the removal of both normal and emergency power to the facility. The work duration is approximately ten (10) days. | ||
If a declared emergency were to occur at Oconee, the Alternate EOF would be set up in the Catawba Alternate Technical Support Center (TSC) location as described in implementing procedures. The Emergency Response Organization has been notified that the primary EOF will be unavailable during the upgrade project and to report to the alternate location, if activated. | If a declared emergency were to occur at Oconee, the Alternate EOF would be set up in the Catawba Alternate Technical Support Center (TSC) location as described in implementing procedures. The Emergency Response Organization has been notified that the primary EOF will be unavailable during the upgrade project and to report to the alternate location, if activated. | ||
This is an eight-hour, non-emergency notification for a loss of emergency assessment capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility. | This is an eight-hour, non-emergency notification for a loss of emergency assessment capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility. | ||
The NRC Resident Inspector has been notified. | The NRC Resident Inspector has been notified. | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200713en.html#en54771 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200713en.html#en54771 | ||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Latest revision as of 12:32, 15 January 2021
Where | |
---|---|
Oconee ![]() South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-4.72 h-0.197 days <br />-0.0281 weeks <br />-0.00647 months <br />) | |
Opened: | Jim Thomas 08:17 Jul 10, 2020 |
NRC Officer: | Brian Lin |
Last Updated: | Jul 10, 2020 |
54771 - NRC Website
| |