ENS 54917: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 10: | Line 10: | ||
| utype = GE-4, GE-4 | | utype = GE-4, GE-4 | ||
| cfr = 10 CFR 50.72(b)(3)(xiii) | | cfr = 10 CFR 50.72(b)(3)(xiii) | ||
| emergency class = | | emergency class = Non Emergency | ||
| notification date = 09/28/2020 05:02 | | notification date = 09/28/2020 05:02 | ||
| notification by = Robert Raucci | | notification by = Robert Raucci | ||
Line 16: | Line 16: | ||
| event date = 09/28/2020 05:00 EDT | | event date = 09/28/2020 05:00 EDT | ||
| last update date = 10/09/2020 | | last update date = 10/09/2020 | ||
| title = | | title = <Td Align="Left" Scope="Row"> | ||
| event text = EN Revision Imported Date : 10/12/2020 | |||
LOSS OF TECHNICAL SUPPORT CENTER VENTILATION SYSTEM DUE TO PLANNED MAINTENANCE: | |||
This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the planned maintenance affects the functionality of an emergency response facility. Planned maintenance activities are being performed on 09/28/20 to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) HVAC. The work includes replacement of supply fan and roof-top unit. Work is scheduled to complete on 10/11/20. | This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the planned maintenance affects the functionality of an emergency response facility. Planned maintenance activities are being performed on 09/28/20 to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) HVAC. The work includes replacement of supply fan and roof-top unit. Work is scheduled to complete on 10/11/20. | ||
If an emergency is declared requiring PBAPS TSC activation during this period, the PBAPS TSC will be staffed and activated using existing Emergency Preparedness (EP) procedures. If the PBAPS TS becomes uninhabitable due to radiological, or other conditions, the TSC Station Emergency Director will relocate the TSC staff to an alternate location in accordance with EP procedures. The Emergency Response Organization team has been notified of the maintenance and the possible need to relocate during an emergency. | If an emergency is declared requiring PBAPS TSC activation during this period, the PBAPS TSC will be staffed and activated using existing Emergency Preparedness (EP) procedures. If the PBAPS TS becomes uninhabitable due to radiological, or other conditions, the TSC Station Emergency Director will relocate the TSC staff to an alternate location in accordance with EP procedures. The Emergency Response Organization team has been notified of the maintenance and the possible need to relocate during an emergency. | ||
The NRC Resident Inspector will be notified by the licensee. | The NRC Resident Inspector will be notified by the licensee. | ||
* * * UPDATE ON 10/9/20 AT 1234 EDT FROM BRIAN BAILEY TO ANDREW WAUGH * * * | * * * UPDATE ON 10/9/20 AT 1234 EDT FROM BRIAN BAILEY TO ANDREW WAUGH * * * | ||
An eight-hour, non-emergency notification for a loss of Emergency Assessment Capability was made on 9/28/20 under Event Notification 54917 for planned maintenance activities to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) ventilation system. This event was reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the planned maintenance affected the functionality of an emergency response facility. | An eight-hour, non-emergency notification for a loss of Emergency Assessment Capability was made on 9/28/20 under Event Notification 54917 for planned maintenance activities to the Peach Bottom Atomic Power Station (PBAPS) Technical Support Center (TSC) ventilation system. This event was reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the planned maintenance affected the functionality of an emergency response facility. | ||
This update to EN 54917 is to notify applicable stakeholders that, following satisfactory completion of the planned supply fan and roof-top unit replacement work, the PBAPS TSC ventilation system has been returned to service with no remaining work or outstanding deficiencies related to this work. | This update to EN 54917 is to notify applicable stakeholders that, following satisfactory completion of the planned supply fan and roof-top unit replacement work, the PBAPS TSC ventilation system has been returned to service with no remaining work or outstanding deficiencies related to this work. | ||
The licensee has notified the NRC Resident Inspector. Notified R1DO (Lally). | The licensee has notified the NRC Resident Inspector. Notified R1DO (Lally). | ||
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201012en.html#en54917 | | URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20201012en.html#en54917 | ||
}} | }} | ||
{{ENS-Nav}}[[Category:Power Reactor]] | {{ENS-Nav}}[[Category:Power Reactor]] |
Latest revision as of 11:16, 15 January 2021
Where | |
---|---|
Peach Bottom Pennsylvania (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+-3.97 h-0.165 days <br />-0.0236 weeks <br />-0.00544 months <br />) | |
Opened: | Robert Raucci 05:02 Sep 28, 2020 |
NRC Officer: | Thomas Herrity |
Last Updated: | Oct 9, 2020 |
54917 - NRC Website
| |