05000416/FIN-2008002-05: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{finding | {{finding | ||
| title = Failure | | title = Failure to Evaluate Cracks in Standby Service Water Pump House Structure | ||
| docket = 05000416 | | docket = 05000416 | ||
| inspection report = IR 05000416/2008002 | | inspection report = IR 05000416/2008002 |
Latest revision as of 20:34, 20 February 2018
Site: | Grand Gulf |
---|---|
Report | IR 05000416/2008002 Section 4OA2 |
Date counted | Mar 31, 2008 (2008Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | R Deese P Elkmann R Smith A Barrett D Bollock |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |