ML20064K610: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:- | ||
l l | |||
9 . | |||
DUKE PowEn Godmixv o 8 P.O. IlOX 33180 l CIIAltLOTTE. N.C. 28242 II AL 11. TIICKER TELEPIIONE vn a reirmanyn (704) 373-4531 | |||
.. u ,.. r oo" == December 30, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370 | |||
==Dear Mr. Denton:== | |||
Enclosed for NRC Staff use and review are ten copies of the latest revision to the following McGuire Nuclear Station Emergency Plan Implementing Procedures: | |||
1). AP/0/A/5500/30 " Earthquake" (changes 0-1, dated December 20, 1982) | |||
: 2) HP/0/B/1009/3 " Recovery Plan" (changes 0-1, dated December 15, 1982) | |||
: 3) Health Physics Manual Section 18.2 (Revision 5, dated December 14, 1982) | |||
: 4) Health Physics Manual Section 18.3 (Revision 3, dated December 14, 1982) | |||
~ | |||
By cop'/ of this letter, three copies of each of the above documents Ere being provided to the NRC, Region II. | |||
Very truly yours, S. U e f. . | |||
Hal B. Tucker WHM/php Enclosures cc: (w/3 copies of enclosure) | |||
Mr. James P. O'Reilly, Regional Administrator | |||
( | |||
U. S. Nuclear Regulatory Commission 00' Region II $ | |||
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 jp (w/o enclosure) | |||
Senior Resident Inspector McGuire Nuclear Station t ) | |||
8301180538 830113 p PDR ADOCK 05000369 6 F PDR W __ - - - _ _ _ _ _ _ _ _ _ _ _ -}} | |||
Revision as of 12:55, 6 January 2021
| ML20064K610 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 12/30/1982 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20064K606 | List: |
| References | |
| NUDOCS 8301180538 | |
| Download: ML20064K610 (1) | |
Text
-
l l
9 .
DUKE PowEn Godmixv o 8 P.O. IlOX 33180 l CIIAltLOTTE. N.C. 28242 II AL 11. TIICKER TELEPIIONE vn a reirmanyn (704) 373-4531
.. u ,.. r oo" == December 30, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370
Dear Mr. Denton:
Enclosed for NRC Staff use and review are ten copies of the latest revision to the following McGuire Nuclear Station Emergency Plan Implementing Procedures:
1). AP/0/A/5500/30 " Earthquake" (changes 0-1, dated December 20, 1982)
- 2) HP/0/B/1009/3 " Recovery Plan" (changes 0-1, dated December 15, 1982)
- 3) Health Physics Manual Section 18.2 (Revision 5, dated December 14, 1982)
- 4) Health Physics Manual Section 18.3 (Revision 3, dated December 14, 1982)
~
By cop'/ of this letter, three copies of each of the above documents Ere being provided to the NRC, Region II.
Very truly yours, S. U e f. .
Hal B. Tucker WHM/php Enclosures cc: (w/3 copies of enclosure)
Mr. James P. O'Reilly, Regional Administrator
(
U. S. Nuclear Regulatory Commission 00' Region II $
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 jp (w/o enclosure)
Senior Resident Inspector McGuire Nuclear Station t )
8301180538 830113 p PDR ADOCK 05000369 6 F PDR W __ - - - _ _ _ _ _ _ _ _ _ _ _ -