Line 9: Line 9:
| unit = 1, 2
| unit = 1, 2
| utype = W-4-LP, W-4-LP
| utype = W-4-LP, W-4-LP
| cfr = 10 CFR 50.72(b)(3)(xiii)
| cfr = <Br />
| emergency class =  Non Emergency  
50.72(B)(3)(Xiii)
| emergency class =  Non Emergency
| notification date = 01/13/2020 09:17
| notification date = 01/13/2020 09:17
| notification by = Jeff Sanders
| notification by = Jeff Sanders
| NRC officer = Andrew Waugh
| NRC officer = Andrew Waugh</Td>
| event date = 01/13/2020 09:10 EST
| event date = 01/13/2020 09:10 EST
| last update date = 01/13/2020
| last update date = 01/13/2020</td>
| title = Planned Technical Support Center Power Modification  
| title = Planned Technical Support Center Power Modification<Br />
| event text = This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.  
| event text = <br />
A planned modification to the Technical Support Center (TSC) power supplies started on January 13, 2020. The work activity includes installation of a permanent back-up diesel generator and rewiring of automatic and manual power transfer switches. The work duration is approximately three weeks.  
&quot;This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.<br />
If an emergency is declared requiring TSC activation during this period, the Emergency Coordinator and the TSC staff will assemble and staff the alternate location in accordance with applicable site procedures. The Emergency Response Organization team has been notified of the TSC modification and the need to assemble and staff the alternate location during an emergency.  
<br />
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.
&quot;A planned modification to the Technical Support Center (TSC) power supplies started on January 13, 2020. The work activity includes installation of a permanent back-up diesel generator and rewiring of automatic and manual power transfer switches. The work duration is approximately three weeks.<br />
<br />
&quot;If an emergency is declared requiring TSC activation during this period, the Emergency Coordinator and the TSC staff will assemble and staff the alternate location in accordance with applicable site procedures. The Emergency Response Organization team has been notified of the TSC modification and the need to assemble and staff the alternate location during an emergency.<br />
<br />
&quot;There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.&quot;
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200114en.html#en54472
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2020/20200114en.html#en54472
}}{{unit info
}}{{unit info
| Unit = 1  
| Unit = 1
| type =  
| type = W-4-LP
| Scram code = N  
| Scram code = N
| Reactor critical = Y  
| Reactor critical = Y
| Initial power = 100  
| Initial power = 100
| Initial reactor mode = Power Operation  
| Initial reactor mode = Power Operation
| Current power = 100  
| Current power = 100
| Current reactor mode = Power Operation  
| Current reactor mode = Power Operation
}}{{unit info
}}{{unit info
| Unit = 2  
| Unit = 2
| type =  
| type = W-4-LP
| Scram code = N  
| Scram code = N
| Reactor critical = Y  
| Reactor critical = Y
| Initial power = 100  
| Initial power = 100
| Initial reactor mode = Power Operation  
| Initial reactor mode = Power Operation
| Current power = 100  
| Current power = 100
| Current reactor mode = Power Operation  
| Current reactor mode = Power Operation
}}
}}


{{ENS-Nav}}[[Category:Power Reactor]]
{{ENS-Nav}}[[Category:Power Reactor]]

Revision as of 08:32, 1 January 2021

ENS 54472 +/-
Where
Mcguire Duke Energy icon.png
North Carolina (NRC Region 2)
Reporting

50.72(B)(3)(Xiii)
Time - Person (Reporting Time:+-4.88 h-0.203 days <br />-0.029 weeks <br />-0.00668 months <br />)
Opened: Jeff Sanders
09:17 Jan 13, 2020
NRC Officer: Andrew Waugh
Last Updated: Error: Invalid time.