ML20205A974: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. | ||
.. | |||
' | |||
.. | |||
. . | |||
pp | |||
OCT 0 6 1988 | |||
Docket No. 50-424 | |||
License No. NPF-68 | |||
feorgiaPowerCompany | |||
ATTH: Mr. W. G. Hairston, III | |||
Senior Vice President - | |||
Nuclear Operations | |||
P. O. Box 4545 | |||
Atlanta, GA 30302 | |||
Gentlemen: | |||
SUBJECT: INSPECTION REPORT N0. 50-424/88-43 | |||
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by | |||
J. F. Rogge on September 7 - September 30 1988. The inspection included a | |||
review of activities authorized for your Vogtle faciliti. At the conclusion of | |||
the inspection, the findings were discussed with those members of your staff | |||
identified in the enclosed inspection report. | |||
Areas examined during the inspection are identified in the report. Within | |||
these areas, the inspection consisted of selective examinations of procedures | |||
and representative records, interviews with personnel, and observation of | |||
activities in progress. | |||
Within the scope of the inspection, no violations or deviations were | |||
identified. | |||
In accordance with Section 2.790 of the NRC's "Rules cf Practice," Part 2, | |||
Title 10, Code of Federal Regulations, a copy of '.his letter ar.d the enclosure | |||
will be placed in the NRC Public Cecument Roca. | |||
Should you have any question's concerriing this letter, please contact us. | |||
Sincerely, | |||
CRIGINAL SIGNED DY | |||
VIRGlL L. BROWNLEE | |||
Virgil L. Brownlee, Chief | |||
Reactor Projects Branch 3 | |||
Division of Reactor Projects | |||
Enclosure: | |||
HRC Inspection Report | |||
cc w/ encl: (See page 2) | |||
8810260153 881006 g\ | |||
PDR ADOCK 05000424 | |||
0 PDC . | |||
_ | |||
- | |||
o | |||
-* , , | |||
* .. . | |||
4 | |||
Georgia Power Company 2 | |||
OCT 0 6 1988 | |||
, | |||
fcw/ | |||
R. P.encl: | |||
Mcdonald, Executive Vice | |||
President, Nuclear Operations r | |||
/P.D. Rice,VicePresident, Project . | |||
Director ! | |||
f..W. Hayes,VogtleQuality | |||
Assurance Manager | |||
/G. Bockhold, Jr., General Manager, | |||
Nuclear Operations | |||
/J.P.Xane, Manager,NuclearLicensingand | |||
. Engineering - Vogtle | |||
/J. A. Bailey, Project Licensing | |||
Manager | |||
/B. W. Churchill, Esq. , Shaw, | |||
Pittman, Potts and Trowbridge | |||
A.Kirkland,III, Counsel, | |||
Office of the Consumer's Utility | |||
Council | |||
/:D.-Feig,GeorgiansAgainst | |||
. | |||
Nuclear Energy | |||
be | |||
d E.cReis, | |||
w/ encl: | |||
OGC | |||
vd. Hopkins, NRR | |||
M. Sinkule, RII | |||
* | |||
, | |||
PRS Technical Assistant | |||
2 | |||
JNRC Resident Inspector | |||
Document Cor'uol Desk L | |||
i State of Georgia l | |||
k | |||
! | |||
} | |||
. | |||
4 | |||
? | |||
1 | |||
RIl RII Ril | |||
* | |||
th | |||
CPatterson:dd | |||
Gb | |||
MSinkule | |||
th | |||
VBrownlee | |||
' | |||
10/5'/88 10/f/88 10/f /88 | |||
}} | }} | ||
Revision as of 07:31, 30 December 2020
| ML20205A974 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 10/06/1988 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hairston W GEORGIA POWER CO. |
| Shared Package | |
| ML20205A980 | List: |
| References | |
| NUDOCS 8810260153 | |
| Download: ML20205A974 (2) | |
See also: IR 05000424/1988043
Text
.
..
'
..
. .
pp
OCT 0 6 1988
Docket No. 50-424
License No. NPF-68
feorgiaPowerCompany
ATTH: Mr. W. G. Hairston, III
Senior Vice President -
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: INSPECTION REPORT N0. 50-424/88-43
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
J. F. Rogge on September 7 - September 30 1988. The inspection included a
review of activities authorized for your Vogtle faciliti. At the conclusion of
the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules cf Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of '.his letter ar.d the enclosure
will be placed in the NRC Public Cecument Roca.
Should you have any question's concerriing this letter, please contact us.
Sincerely,
CRIGINAL SIGNED DY
VIRGlL L. BROWNLEE
Virgil L. Brownlee, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
HRC Inspection Report
cc w/ encl: (See page 2)
8810260153 881006 g\
PDR ADOCK 05000424
0 PDC .
_
-
o
-* , ,
- .. .
4
Georgia Power Company 2
OCT 0 6 1988
,
fcw/
R. P.encl:
Mcdonald, Executive Vice
President, Nuclear Operations r
/P.D. Rice,VicePresident, Project .
Director !
f..W. Hayes,VogtleQuality
Assurance Manager
/G. Bockhold, Jr., General Manager,
Nuclear Operations
/J.P.Xane, Manager,NuclearLicensingand
. Engineering - Vogtle
/J. A. Bailey, Project Licensing
Manager
/B. W. Churchill, Esq. , Shaw,
Pittman, Potts and Trowbridge
A.Kirkland,III, Counsel,
Office of the Consumer's Utility
Council
/:D.-Feig,GeorgiansAgainst
.
Nuclear Energy
be
d E.cReis,
w/ encl:
vd. Hopkins, NRR
M. Sinkule, RII
,
PRS Technical Assistant
2
JNRC Resident Inspector
Document Cor'uol Desk L
i State of Georgia l
k
!
}
.
4
?
1
RIl RII Ril
th
CPatterson:dd
Gb
MSinkule
th
VBrownlee
'
10/5'/88 10/f/88 10/f /88