OPERATING DATA REPORT 1
Docket No. 50-317 Date: August 13, 1986 Completed by R. Porter      1 Telephone: (301) 260-4868  l OPERATING STATUS
: 1. Unit Name:                                          Chlvert Cliffs No. 1
: 2. Reporting Period:                                  JULY
: 3. Licensed Thermal Power (MWT):                        2,700
: 4. Nameplate Rating (Gross MWe):                        918
: 5. Design Electrical Rating (Net MWe):                845
: 6. Maximum Dependable Capacity (Gross Mwe):            860
: 7. Maximum Dependable Capacity (Net MWe):              825
: 8. Change in Capacity Ratings:                        None
: 9. Power Level to Which Restricted (Net MWe):        N/A
: 10. Reasons for Restrictions:                          N/A This Month  Yr-to-Date    Cumulative
: 11. Hours in Reporting Period                        744^      5,087        98,460
: 12. Number of Hours Reactor was Critical            706.4      4,882.8      77,748.3
: 13. Reactor Reserve Shutdown Hours                    0.0          0.0      3,019.4
: 14. Hours Generator On-Line                        704.1      4,849.4      76,208.9
: 15. Unit Reserve Shutdown Hours                      0.0          0.0          0.0
: 16. Gross Thermal Energy Generated (MWH)        1,850,976  12,869,980  190,194,173 l
: 17. Gross Electrical Energy Generated (MWH)      607,564    4,324,446    62,927,258
: 18. Net Electrical Energy Generated (MWH)        580,549    4,143,505    60,059,800 l  19. Unit Service Factor                              94.6        95.3          77.4 l  20. Unit Availability Factor                        94.6        95.3          77.4
: 21. Unit Capacity Factor (Using MDC Net)            94.6        98.7          74.3
: 22. Unit Capacity Factor (Using DER Net)            92.3        96.4          72.2
: 23. Unit Forced Outage Rate                          5.4          4.7          8.8
: 24. Shutdowns Scheduled Over Next Six Months (type, date and duration):
Refueling Outage October 25, 1986 - January 4, 1987 l
: 25. If Shutdown at End of Report Period, Estimated Date of Startup: N/A 8608190641 DR        860813    ~"
ADOCK 05000317 PDR
 
                                            , . . __                                                                                m
                                                                      ..g                                    _                                  _      _
i UNIT SIRTITIOWNS AND IMMR REDUCTIONS                                        DOCKIE NO. 50-317 UNIT NA>E Calvert Cliffs 1 DAll? August '13, 1986 C(M'I.lMD llY R. Porter REI' ORT PS)N'lli      JULY                                            TEI.E11K)NE (301) 260_-4868
                                                                                    '7
                                                          # c-      e.      t uS I.icensee E
Canse & (..orrecLive
                                                      ~
                                                            ,o g      g      y ,c g                                            gag No.            Dat,e h  gg        g      jgy                  Event,              y            j-                                    Act,,t on t o
                                  -                    H    93      y      jjp                Repn L //              diu          o                          Prevent, Recierrence d                  . u> .s                                        v 8
86-06'      860720      F    39.9    A            3              86-04                CB      CKTBKR          The unit tripped when a surge.
capacitor for 12B Reactor Coolant s
i
                                                                                                                    'e                      Pump failed.
J
                                                                                                                                                      \
                                                              -                                                                        N                                    ,
s I                                                                                              3                                4 F: Forecci              Reason:                                                          on tlaxt:                          Exhibi t. G-Inst r,ict. ions S: Schedule <l          A-Ecinipment, Failure (Explain)                                  1-Mannat                            for Preparat ion 'of Dat,a B-Maintenance or Te.st,                                          2-Ftinnal Scram.                    Ent ry Sheet.s foi Licenv?
C-Refueling                                                      3-Antaxnat,ic Scram.                Event, Report, (LER) Fi.le D-Regulat.ory Rest,rict ion                                      4-Other (Explain)                  (NURFG-0161)
E-Operator Training & License Examinat, ion F-Administrat,ive g  p,,,3,g g _                                  g.
G-Operat,ional Error (Explain)
I!-Ot.her (Explain)
 
F_  '
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 Date: August 13, 1986 Completed by R. Porter Telephone: (301) 260-4868 JULY
{~                                                ****
Average Daily Power Level                        Average Daily Power Level Day                (MWe-Net)                    pay                (MWe-Net) 1                849                        17                  849 2                851                        18                  850 3                849                        19                  839 r          4                853                        20                  170 5                854                        21                    0 6                853                        22                  592 7                853                        23                  841
_        8                850                        24                  830 9                347                        25                  828 10                839                        26                  773 11                846                        27                  817 12                846                        28                  817 E-      13                846                        29                  821 m      14                844                        30                  836 15                841                        31                  835 16                797
[          INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.            Compute to the nearest whole megawatt.
t m
 
i                                          .
OPERATING DATA REPORT l
l l                                                                                                            Docket No. 50-318 Date:  August 13, 1986 l                                                                                                            Completed by R. Porter Telephone: (301) 260-4868 5
OPERATING STATUS
: 1. Unit Name:                                                                        Calvert Cliffs No. 2
: 2. Reporting Period:                                                                JULY
                  '3. Licensed Thermal Power (MWT):                                                        2,700
: 4. Nameplate Rating (Gross MWe):                                                      918
: 5.                    Design Electrical Rating (Net MWe):                            845
: 6. Maximum Dependable Capacity (Gross Mwe):                                          860
: 7. Maximum Dependable Capacity (Net MWe):                                            825
: 8.                    Change in Capacity Ratings:                                    None                                    '
9.
Power Level to Which Restricted (Net MWe):                    N/A
: 10. Reasons for Restrictions:                                                                    N/A This Month                Yr-to-Date          Cumulative
: 11. Hours in Reporting Period                                                              744            5,087              01,815
: 12. Number of Hours Reactor was Critical                                        592.3                  4,853.2            68,296.2
: 13. Reactor Reserve Shutdown Hours                                                        0.0            24.3              1,285.0
: 14. Hours Generator On-Line                                                      591.6                  4,841.7            67,253.0
: 15. Unit Reserve Shutdown Hours                                                            0.0              0.0                  0.0
: 16. Gross Thermal Energy Generated (MWH)                                    1,557,132                12,449,838          168,931,874
: 17. Gross Electrical Energy Generated (MWH)                                  515,538                4,202,500          55,724,024
: 18. Net Electrical Energy Generated (MWH)                                    493,574                4,026,032          53,176,289
: 19. Unit Service Factor                                                            79.5                  95.2                82.2
: 20. Unit Availability Factor                                                        79.5                  95.2                82.2
: 21. Unit Capacity Factor (Using MDC Net).,                                          80.4                  95.9                78.9
: 22. Unit Capacity Factor (Using DER Net)                                            78.5                  93.7                76.9
: 23. Unit Forced Outage Rate                                                          20.5                    4.3                  6.0
: 24. Shutdowns Scheduled Over Next Six Months (type, date and duration):                                                          None
: 25. If Shutdown at End of Report Period, Estimated Date of Startup:
August 2, 1986 i
 
UNIT SiltrI1MMNS AND IT)Wl'.R REINK'I' IONS                  IX)CKIN NO.      50-318 i
UNIT NAPE Calvert Cliffs 2 DNrF, August 13, 1986 C(NPI,FTED BY        R. J. Porter REI41RT MDN*lli        JULY                              TEI.Elill)NE    (301) 260-4868 2
c-                ei    ouS                                        E
                                                                        ~
                                                                                ,o j yg g y ,3 g jgg I,icensee Q
y gig                  t.ause & (.orrec t. s. ve No.                                                  Date    h                          g                  Event Reixn t, f/
J o
Action t.o H      s b,=                  g  yJ                                Nu                              Prevent, Reciarrence nut 5                                      o 8
86-08                                                  860707  F        0                11  N/A              N/A            N/A      N/A      Power was reduced when the load dispacther requested a reduction due to a problem on the Grid.
86-09                                                  860725  F    152.4                A      1            86-05              CB      INSTRU      The unit was shutdown to repair a failed flexible hose on a seal pressure transmitter for 21B Reactor Coolant Pump.
I                                                          2                                                                3                          4 p,                      ,, i - d          Reason-                                                        M Llu.xi-                    F.xhibit, G-Inst:1 ct, ions S: Schedtiled                              A-Equipment, Failure (Explain)                                  1-Manna]                    foi Preparation of Dat a B-Maint.enance or Test.                                        2-Runial Scram.            Ent.ry Sheets for License C-Refneling                                                    3-Aiitomat ic Scram.        Event Report (I ER) File D-Regislat.ory Restrict, ion                                    4-Other (Explain)          (N1TREG-0161)
E-Ogxtrator Training & I,icense Examinat, ion F-Administrative 5 Exhibit, t - Same Source G-Operat,jonal Error (Explain)
Il-Other (Explain)
 
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 Date: August 13, 1986 Completed by R. Porter Telephone: (301) 260-4868 JULY Average Daily Power Level              Average Daily Power Level Day                (MWe-Net)              Day            (MWe-Net) 1                  841                  17              838 2                  843                  18              838 3                  841                  19              837 4                  847                  20              837 5                  847                  21              833 6                  845                  22              838 7                  796                  23              837 8                  788                  24              837 9                  841                  25              412 l    10                  841                  26                0 11                  840                  27                0 12                  839                  28                0 13                  838                  29                0 14                  837                  30                0 15                  836                  31                0 16                  839 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
 
==SUMMARY==
OF UNIT 1 OPERATING EXPERIENCE July 1986                        ,
7/1  Unit 1 began this reporting period at full reactor power (825 MWe).
7/10 At 2055, Unit 1 reduced power to 720 MWe when No. 12 Circulating Water Pump was secured. The pump had to be secured when shear pins on No. 12 A&B Traveling Screens failed, causing high differential pressure.
7/15 At 2300, Unit.1 began reducing power to 700 MWe for Condenser Water Box cleaning .
7/16 At 1028, Unit 1 returned to full power (825 MWe).
7/20 At 0500, Unit 1 tripped because a failed surge capacitor caused No. 12B Reactor Coolant Pump (RCP) to trip.
7/21 At 1835, the Unit became critical, and the breaker was shut at 2054.
7/21 At 2230, the Unit stopped increasing power due to a 30%
chemistry hold.
7/22 At 0430, the chemistry hold was removed and the Unit was at full reactor power (825 MWe) by 1300.
7/26 At 0230, power was reduced to 700 MWe for Condenser Water Box cleaning. At 1230, power was increased to 815 MWe so Moderator Temperature Coefficient (MTC) testing could be performed.
7/29 At 2125, MTC testing was completed and the Unit was returned to full power (825 MWe).
7/31 The Unit was at full reactor power (825 MWe) at the end of this reporting period.
I
 
==SUMMARY==
OF UNIT 2 OPERATING EXPERIENCE July 1986 7/1 Unit 2 began this reporting period at full reactor power (825 MWe).
7/7  At 1940, Unit 2 reduced power to 495 MWe because of a tripped transformer at Waugh Chapel.
7/8  At 0150, the transformer was back in service and Unit 2 began increasing power. At 0530, Unit 2 was at full reactor power (825 MWe).
7/25 At 1345, commenced shutdown of Unit 2 due to unidentified Reactor Coolant System (RCS) leakage greater than 1 GPM.
7/25 At 1536, the breaker was opened. At 1617, the reactor was shut down. The leakage was found to be due to a failed flexible hose on a seal pressure transmitter. The Unit remained in a shutdown condition to investigate high vibration on #21B RCP.
7/31 Unit 2 was shutdown at the end of this reporting period.
l 4
I
 
e August 6,1986 REFUELING INFORMATION REQUEST
: 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
: 2. Scheduled date for next Refueling Shutdown: October 25,1986
: 3. Scheduled date for restart following refueling: January 4,1987
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical                -
Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
September 29,1986
: 6. Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous cycle.
: 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217                (b) 1000 Spent Fuel Pools are common to Units 1 and 2
: 8.  (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b)0
: 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991 s
 
August 6,1986 REFUELING INFORMATION REQUEST
: 1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
          .2. Scheduled date for next refueling shutdown: March 14,1987.
: 3. Scheduled date for restart following refueling: May 22,1987.
: 4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
: 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
February 13,1987
: 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
: 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217                (b) 1000 Spent Fuel Pool is common to Units 1 and 2.
: 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been req'uired or is planned, in number of fuel assemblies.
(a) 1830 (b)0
: 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
,}}

Revision as of 15:50, 29 December 2020

Monthly Operating Repts for Jul 1986
ML20205G858
Person / Time
Site: Calvert Cliffs  
Issue date: 07/31/1986
From: Porter R
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20205G840 List:
References
NUDOCS 8608190641
Download: ML20205G858 (10)


Text

OPERATING DATA REPORT 1

Docket No. 50-317 Date: August 13, 1986 Completed by R. Porter 1 Telephone: (301) 260-4868 l OPERATING STATUS

1. Unit Name: Chlvert Cliffs No. 1
2. Reporting Period: JULY
3. Licensed Thermal Power (MWT): 2,700
4. Nameplate Rating (Gross MWe): 918
5. Design Electrical Rating (Net MWe): 845
6. Maximum Dependable Capacity (Gross Mwe): 860
7. Maximum Dependable Capacity (Net MWe): 825
8. Change in Capacity Ratings: None
9. Power Level to Which Restricted (Net MWe): N/A
10. Reasons for Restrictions: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 744^ 5,087 98,460
12. Number of Hours Reactor was Critical 706.4 4,882.8 77,748.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 3,019.4
14. Hours Generator On-Line 704.1 4,849.4 76,208.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,850,976 12,869,980 190,194,173 l
17. Gross Electrical Energy Generated (MWH) 607,564 4,324,446 62,927,258
18. Net Electrical Energy Generated (MWH) 580,549 4,143,505 60,059,800 l 19. Unit Service Factor 94.6 95.3 77.4 l 20. Unit Availability Factor 94.6 95.3 77.4
21. Unit Capacity Factor (Using MDC Net) 94.6 98.7 74.3
22. Unit Capacity Factor (Using DER Net) 92.3 96.4 72.2
23. Unit Forced Outage Rate 5.4 4.7 8.8
24. Shutdowns Scheduled Over Next Six Months (type, date and duration):

Refueling Outage October 25, 1986 - January 4, 1987 l

25. If Shutdown at End of Report Period, Estimated Date of Startup: N/A 8608190641 DR 860813 ~"

ADOCK 05000317 PDR

, . . __ m

..g _ _ _

i UNIT SIRTITIOWNS AND IMMR REDUCTIONS DOCKIE NO. 50-317 UNIT NA>E Calvert Cliffs 1 DAll? August '13, 1986 C(M'I.lMD llY R. Porter REI' ORT PS)N'lli JULY TEI.E11K)NE (301) 260_-4868

'7

  1. c- e. t uS I.icensee E

Canse & (..orrecLive

~

,o g g y ,c g gag No. Dat,e h gg g jgy Event, y j- Act,,t on t o

- H 93 y jjp Repn L // diu o Prevent, Recierrence d . u> .s v 8

86-06' 860720 F 39.9 A 3 86-04 CB CKTBKR The unit tripped when a surge.

capacitor for 12B Reactor Coolant s

i

'e Pump failed.

J

\

- N ,

s I 3 4 F: Forecci Reason: on tlaxt: Exhibi t. G-Inst r,ict. ions S: Schedule <l A-Ecinipment, Failure (Explain) 1-Mannat for Preparat ion 'of Dat,a B-Maintenance or Te.st, 2-Ftinnal Scram. Ent ry Sheet.s foi Licenv?

C-Refueling 3-Antaxnat,ic Scram. Event, Report, (LER) Fi.le D-Regulat.ory Rest,rict ion 4-Other (Explain) (NURFG-0161)

E-Operator Training & License Examinat, ion F-Administrat,ive g p,,,3,g g _ g.

G-Operat,ional Error (Explain)

I!-Ot.her (Explain)

F_ '

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 Date: August 13, 1986 Completed by R. Porter Telephone: (301) 260-4868 JULY

{~ ****

Average Daily Power Level Average Daily Power Level Day (MWe-Net) pay (MWe-Net) 1 849 17 849 2 851 18 850 3 849 19 839 r 4 853 20 170 5 854 21 0 6 853 22 592 7 853 23 841

_ 8 850 24 830 9 347 25 828 10 839 26 773 11 846 27 817 12 846 28 817 E- 13 846 29 821 m 14 844 30 836 15 841 31 835 16 797

[ INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

t m

i .

OPERATING DATA REPORT l

l l Docket No. 50-318 Date: August 13, 1986 l Completed by R. Porter Telephone: (301) 260-4868 5

OPERATING STATUS

1. Unit Name: Calvert Cliffs No. 2
2. Reporting Period: JULY

'3. Licensed Thermal Power (MWT): 2,700

4. Nameplate Rating (Gross MWe): 918
5. Design Electrical Rating (Net MWe): 845
6. Maximum Dependable Capacity (Gross Mwe): 860
7. Maximum Dependable Capacity (Net MWe): 825
8. Change in Capacity Ratings: None '

9.

Power Level to Which Restricted (Net MWe): N/A

10. Reasons for Restrictions: N/A This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 744 5,087 01,815
12. Number of Hours Reactor was Critical 592.3 4,853.2 68,296.2
13. Reactor Reserve Shutdown Hours 0.0 24.3 1,285.0
14. Hours Generator On-Line 591.6 4,841.7 67,253.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,557,132 12,449,838 168,931,874
17. Gross Electrical Energy Generated (MWH) 515,538 4,202,500 55,724,024
18. Net Electrical Energy Generated (MWH) 493,574 4,026,032 53,176,289
19. Unit Service Factor 79.5 95.2 82.2
20. Unit Availability Factor 79.5 95.2 82.2
21. Unit Capacity Factor (Using MDC Net)., 80.4 95.9 78.9
22. Unit Capacity Factor (Using DER Net) 78.5 93.7 76.9
23. Unit Forced Outage Rate 20.5 4.3 6.0
24. Shutdowns Scheduled Over Next Six Months (type, date and duration): None
25. If Shutdown at End of Report Period, Estimated Date of Startup:

August 2, 1986 i

UNIT SiltrI1MMNS AND IT)Wl'.R REINK'I' IONS IX)CKIN NO. 50-318 i

UNIT NAPE Calvert Cliffs 2 DNrF, August 13, 1986 C(NPI,FTED BY R. J. Porter REI41RT MDN*lli JULY TEI.Elill)NE (301) 260-4868 2

c- ei ouS E

~

,o j yg g y ,3 g jgg I,icensee Q

y gig t.ause & (.orrec t. s. ve No. Date h g Event Reixn t, f/

J o

Action t.o H s b,= g yJ Nu Prevent, Reciarrence nut 5 o 8

86-08 860707 F 0 11 N/A N/A N/A N/A Power was reduced when the load dispacther requested a reduction due to a problem on the Grid.

86-09 860725 F 152.4 A 1 86-05 CB INSTRU The unit was shutdown to repair a failed flexible hose on a seal pressure transmitter for 21B Reactor Coolant Pump.

I 2 3 4 p, ,, i - d Reason- M Llu.xi- F.xhibit, G-Inst:1 ct, ions S: Schedtiled A-Equipment, Failure (Explain) 1-Manna] foi Preparation of Dat a B-Maint.enance or Test. 2-Runial Scram. Ent.ry Sheets for License C-Refneling 3-Aiitomat ic Scram. Event Report (I ER) File D-Regislat.ory Restrict, ion 4-Other (Explain) (N1TREG-0161)

E-Ogxtrator Training & I,icense Examinat, ion F-Administrative 5 Exhibit, t - Same Source G-Operat,jonal Error (Explain)

Il-Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 Date: August 13, 1986 Completed by R. Porter Telephone: (301) 260-4868 JULY Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 841 17 838 2 843 18 838 3 841 19 837 4 847 20 837 5 847 21 833 6 845 22 838 7 796 23 837 8 788 24 837 9 841 25 412 l 10 841 26 0 11 840 27 0 12 839 28 0 13 838 29 0 14 837 30 0 15 836 31 0 16 839 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

SUMMARY

OF UNIT 1 OPERATING EXPERIENCE July 1986 ,

7/1 Unit 1 began this reporting period at full reactor power (825 MWe).

7/10 At 2055, Unit 1 reduced power to 720 MWe when No. 12 Circulating Water Pump was secured. The pump had to be secured when shear pins on No. 12 A&B Traveling Screens failed, causing high differential pressure.

7/15 At 2300, Unit.1 began reducing power to 700 MWe for Condenser Water Box cleaning .

7/16 At 1028, Unit 1 returned to full power (825 MWe).

7/20 At 0500, Unit 1 tripped because a failed surge capacitor caused No. 12B Reactor Coolant Pump (RCP) to trip.

7/21 At 1835, the Unit became critical, and the breaker was shut at 2054.

7/21 At 2230, the Unit stopped increasing power due to a 30%

chemistry hold.

7/22 At 0430, the chemistry hold was removed and the Unit was at full reactor power (825 MWe) by 1300.

7/26 At 0230, power was reduced to 700 MWe for Condenser Water Box cleaning. At 1230, power was increased to 815 MWe so Moderator Temperature Coefficient (MTC) testing could be performed.

7/29 At 2125, MTC testing was completed and the Unit was returned to full power (825 MWe).

7/31 The Unit was at full reactor power (825 MWe) at the end of this reporting period.

I

SUMMARY

OF UNIT 2 OPERATING EXPERIENCE July 1986 7/1 Unit 2 began this reporting period at full reactor power (825 MWe).

7/7 At 1940, Unit 2 reduced power to 495 MWe because of a tripped transformer at Waugh Chapel.

7/8 At 0150, the transformer was back in service and Unit 2 began increasing power. At 0530, Unit 2 was at full reactor power (825 MWe).

7/25 At 1345, commenced shutdown of Unit 2 due to unidentified Reactor Coolant System (RCS) leakage greater than 1 GPM.

7/25 At 1536, the breaker was opened. At 1617, the reactor was shut down. The leakage was found to be due to a failed flexible hose on a seal pressure transmitter. The Unit remained in a shutdown condition to investigate high vibration on #21B RCP.

7/31 Unit 2 was shutdown at the end of this reporting period.

l 4

I

e August 6,1986 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
2. Scheduled date for next Refueling Shutdown: October 25,1986
3. Scheduled date for restart following refueling: January 4,1987
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Resumption of operation after refueling will require changes to Technical -

Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

September 29,1986

6. Important licensing considerations associated with the refueling.

Reload fuel will be similar to that reload fuel inserted into the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

(a) 217 (b) 1000 Spent Fuel Pools are common to Units 1 and 2

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

(a) 1830 (b)0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991 s

August 6,1986 REFUELING INFORMATION REQUEST

1. Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.

.2. Scheduled date for next refueling shutdown: March 14,1987.

3. Scheduled date for restart following refueling: May 22,1987.
4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?

Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

February 13,1987

6. Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuel inserted in the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.

(a) 217 (b) 1000 Spent Fuel Pool is common to Units 1 and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been req'uired or is planned, in number of fuel assemblies.

(a) 1830 (b)0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

April,1991

,