                                                                                                                                                          JUN 0 11988
                                Docke t ' Nos . 50-348, 50-364
                                License Nos. NPF-2 and NPF-8
                                Alabama Power Company
                              . ATTN: Mr. R. P. Mcdonald
                                          Senior Vice President
                                P. O. Box 2641
                                Birmingham, AL 35291-0400
                                Gentlemen:
                                SUBJECT:    NRC INSPECTION' REPORT NOS. 50-348/88-17 AND 50-364/88-17
                                This refers to the Nuclear Regulatory Commission (NRC) inspection conducted
                                by G. A. Hallstrom on May 2-6, 1988. The inspection included a review of
                                activities authorized for your Farley facility.                                                                                                At the conclusion of the    i
                                inspection, the findings were discussed with those' members of your staff
                                identified in the enclosed inspection report.
                                Areas examined -during the inspection are identified in the report. Within
                                these areas, the inspection consisted of selective examinations of procedures
                                and representative records, interviews with personnel, and observation of
                                activities in progress.
                                Within the scope of the inspection, no violations or deviations were identi-
                                fied.
                                Your attention is invited to unresolved item identified in the inspection report.
                                This matter will be pursued during future inspections.
                                In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
                                Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                                will be placed in the NRC Public Document Room.
                                Should you have any questions concerning this letter, please contact us.
                                                                                                                                                                  Sincerely,
                                                                                                                                                                    D
                                                                                                                                                                  Alan R. Herdt, Chief
i                                                                                                                                                                  Engineering Branch
!-                                                                                                                                                                Division of Reactor Safety
                                Enclosure:
l
                                NRC Inspection Report
                                cc:    (See page 2)
                            8806200359 880601                                                                                                                                                            \\
                            PDR      ADOCK 05000348
L
                            fJ                                                  nrn                                                /                                                                  3y
 
  r:
            '
  *  .          ,              -,
      .-        .      _ ,
          'si '
                    -Alabama'. Power Company                      2          JUN 0 11988
                      - cc>w/enci:
                  :    B. M. -Guthrie, Executive Vice President-
                        J. D. Woodard,; General Manager -
                            Nuciear. Plant
                        W. G. Hairston, III, Vice President -
                            Nuclear Support
                          J. W. McGowan, Manager-Safety Audit
                            and Engineering Review
                    '
                          S. Fulmer, Supervisor-Safety
                            Audit and Engineering Review
                                  -
                          bcc w/ enc 1:
                          NRC Resident Inspector
                          DRS Technical Assistant
                    ' E. Reeves, Project Manager, NRR
                      -
                          Document Control Desk
                          State of Alabama
l-
l
(
,
I
l
1
.
L
f
                          RII    g                                RII    g
                          GHallstrom:ser        81 ke              HDance
l.                        05////88              05  /88            05/S t/88
;
l
L-
}}
}}

Revision as of 04:52, 17 December 2020

Forwards Insp Repts 50-348/88-17 & 50-364/88-17 on 880502-06.No Violations or Deviations Noted.Attention Invited to Unresolved Item Identified in Insp Rept
ML20155H771
Person / Time
Site: Farley  
Issue date: 06/01/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20155H776 List:
References
NUDOCS 8806200359
Download: ML20155H771 (2)


See also: IR 05000348/1988017

Text

_ - _ - _ . . _

___________ _ _ - __ ___ -___-_ - __-_ _ _ __--_ - -__ _ _____ _ _-_--___ _ -- - ________ - -___-__- _ _ __

'

'

'

, . - 7,

f

v

JUN 0 11988

Docke t ' Nos . 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

. ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION' REPORT NOS. 50-348/88-17 AND 50-364/88-17

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted

by G. A. Hallstrom on May 2-6, 1988. The inspection included a review of

activities authorized for your Farley facility. At the conclusion of the i

inspection, the findings were discussed with those' members of your staff

identified in the enclosed inspection report.

Areas examined -during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identi-

fied.

Your attention is invited to unresolved item identified in the inspection report.

This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

D

Alan R. Herdt, Chief

i Engineering Branch

!- Division of Reactor Safety

Enclosure:

l

NRC Inspection Report

cc: (See page 2)

8806200359 880601 \\

PDR ADOCK 05000348

L

fJ nrn / 3y

r:

'

  • . , -,

.- . _ ,

'si '

-Alabama'. Power Company 2 JUN 0 11988

- cc>w/enci:

B. M. -Guthrie, Executive Vice President-

J. D. Woodard,; General Manager -

Nuciear. Plant

W. G. Hairston, III, Vice President -

Nuclear Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

'

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

-

bcc w/ enc 1:

NRC Resident Inspector

DRS Technical Assistant

' E. Reeves, Project Manager, NRR

-

Document Control Desk

State of Alabama

l-

l

(

,

I

l

1

.

L

f

RII g RII g

GHallstrom:ser 81 ke HDance

l. 05////88 05 /88 05/S t/88