ML13056A507: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000250/2013403]]
| number = ML13056A507
| issue date = 02/25/2013
| title = IR 05000250-13-403 and 05000251-13-403; 02/4/2013 - 02/8/2013; Turkey Point Nuclear Plant, Units 3 and 4; Security (Cover Letter) - OUO Removed
| author name = Desai B B
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Nazar M
| addressee affiliation = Florida Power & Light Co
| docket = 05000250, 05000251
| license number = DPR-031, DPR-041
| contact person =
| document report number = IR-13-403
| document type = Letter
| page count = 4
}}
See also: [[followed by::IR 05000250/2013403]]
 
=Text=
{{#Wiki_filter:
[[Issue date::February 25, 2013]]
 
Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
 
SUBJECT: TURKEY POINT NUCLEAR PLANT - NRC PHYSICAL SECURITY INSPECTION REPORT 05000250/2013403 AND 05000251/2013403
 
==Dear Mr. Nazar:==
On February 8, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Turkey Point Nuclear Plant, Units 3 and 4. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed Inspection Report documents the inspection results, which were discussed on February 8, 2013, with Mr. E. McCartney and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
No findings were identified during this inspection.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-250, 50-251 License No. DPR-31, DRP-41
 
===Enclosure:===
Inspection Report 05000250/2013403 and 05000251/2013403
 
===w/Attachment:===
Supp. Info (OUO)
cc w/encl.: (See page 3)
}}

Latest revision as of 22:17, 18 February 2018