ML20137F276: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000702/2008001]]
| number = ML20137F276
| issue date = 08/20/1985
| title = Notice of Violation from Insp on 850702-0801
| author name = Warnick R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name =
| addressee affiliation =
| docket = 05000454
| license number =
| contact person =
| document report number = 50-454-85-30, NUDOCS 8508260183
| package number = ML20137F265
| document type = NOTICE OF VIOLATION OF A REGULATION, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 2
}}
See also: [[see also::IR 05000702/2008001]]
 
=Text=
{{#Wiki_filter:.-
      ,
    .
i
                                                        Appendix
                                                  NOTICE OF VIOLATION
      Commonwealth Edison Company                                      Docket No. 50-454
      As a result of the inspection conducted on July 2 through August 1, 1985, and
      in accordance with the General Policy and Procedures for NRC Enforcement Actions
      (10 CFR Part 2, Appendix C), the following violation was identified:
            Technical Specification 6.8.1.a requires that written procedures shall be
            established, implemented, and maintained for procedures recommended in
            Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
            Appendix A to Regulatory Guide 1.33, Revision 2, February 1978 states, in
            part:    " Instructions for....startup, shutdown and changing modes of opera-
            tion should be prepared....for the.... Emergency Core Cooling System".
            Byron Operating Procedures BOP SI-17, " Placing the Refueling Water Storage
            Tank Heating Pump and Heater in Service" and 80P SI-18, " Removing the
            Refueling Water Storage Tank Heating Pump and Heater from Service,"
            implement this requirement. BOP SI-18, Paragraph F.1 states: "Stopgthe
            RWST Heating Pump (SIO3P) if the RWST temperature is greater than 52 F."
            Appendix A to Regulatory Guide 1.33, Revision 2, February 1978, requires
            that administrative procedures for " Bypass of Safety Functions" and
            " Authorities and Responsibilities for Safe Operation and Shutdown" should
            be covered by written procedures.
            Byron Administrative Procedure, BAP 300-22, " Conduct of Operations,"
            implements this requirement. Paragraph C.2.4.b states: "The following
            shall be considered mandatory.... Interlocks and other safety equipment
            shall be properly maintained, tested at regular intervals, and kept
            in-service at all times." Paragraph C.4.3.c mandatorily requires that
            equipment shall not be operated in a manner to intentionally avoid the
            proper functioning of its protective equipment.
            B0P SI-17, Paragraph F.1 requires that the control switches for the RWST
            Heating Pump and Heater be verified or placed in AUTO to start the
            system.
            Contrary to the above:
            a.    On June 16, 1985, whilein. Mode 2,theRWSTHeatiggPumpwasnot
                  secured when RWST temperature was greater than 52 F.
l
.
            b.    On June 16, 1985, while in Mode 1, the RWST Heating Pump was operated
                  in manual mode with the high temperature trip defeated.
t
l            This is a Severity Level IV violation (Supplement I) (454/85030-01(DRP))
          8508260183 850820
          PDR    ADOCK 05 % 4
          G
                            . _ , - - - _ . - - .                -._-- -  __-_- __.    - _ _ - . _ _
 
                                                        _. .                    _                _    ..
                                                                                                                                            '
                                                                                                                                              I
      .
  -
    .
                                                                                                                                            1
                                                                                                                                              l
  -                                                                                                                                          ,
      Appendix                                                                                      2
      Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this
      office within thirty days of the date of this Notice a written statement or
      explanation in reply, including for each violation: (1) corrective action
.    taRen and the results achieved; (2) corrective action to.be taken to avoid
      further violation; and (3) the date when full compliance will be achieved.
      Consideration may be given to extending your response time for good cause shown.
          AUG 201985
      Dated                                                                                              g..harnick,ChiefVidauude
                                                                                                          Reactor Projects Branch 1
2
                -,          ns-- - . - - - - - - - - - , - - - - . - - , - . , - - , - - - - . - .                              , - - . .
}}

Latest revision as of 16:20, 25 September 2020