i Appendix NOTICE OF VIOLATION Commonwealth Edison Company Docket No. 50-454 As a result of the inspection conducted on July 2 through August 1, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violation was identified:
Technical Specification 6.8.1.a requires that written procedures shall be established, implemented, and maintained for procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.
Appendix A to Regulatory Guide 1.33, Revision 2, February 1978 states, in part:
" Instructions for....startup, shutdown and changing modes of opera-tion should be prepared....for the.... Emergency Core Cooling System".
Byron Operating Procedures BOP SI-17, " Placing the Refueling Water Storage Tank Heating Pump and Heater in Service" and 80P SI-18, " Removing the Refueling Water Storage Tank Heating Pump and Heater from Service,"
implement this requirement.
BOP SI-18, Paragraph F.1 states:
"Stop the g
RWST Heating Pump (SIO3P) if the RWST temperature is greater than 52 F."
Appendix A to Regulatory Guide 1.33, Revision 2, February 1978, requires that administrative procedures for " Bypass of Safety Functions" and
" Authorities and Responsibilities for Safe Operation and Shutdown" should be covered by written procedures.
Byron Administrative Procedure, BAP 300-22, " Conduct of Operations,"
implements this requirement.
Paragraph C.2.4.b states:
"The following shall be considered mandatory.... Interlocks and other safety equipment shall be properly maintained, tested at regular intervals, and kept in-service at all times." Paragraph C.4.3.c mandatorily requires that equipment shall not be operated in a manner to intentionally avoid the proper functioning of its protective equipment.
B0P SI-17, Paragraph F.1 requires that the control switches for the RWST Heating Pump and Heater be verified or placed in AUTO to start the system.
Contrary to the above:
a.
On June 16, 1985, whilein. Mode 2,theRWSTHeatiggPumpwasnot secured when RWST temperature was greater than 52 F.
l
.
b.
On June 16, 1985, while in Mode 1, the RWST Heating Pump was operated in manual mode with the high temperature trip defeated.
t l
This is a Severity Level IV violation (Supplement I) (454/85030-01(DRP))
8508260183 850820 ADOCK 05 % 4 PDR G
. _, - - - _. - -.
-._--
-
- -
.
- _ _ -. _ _
_..
_
_
..
'
.
-
.
l
-
,
Appendix
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:
(1) corrective action taRen and the results achieved; (2) corrective action to.be taken to avoid
.
further violation; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.
AUG 201985 g..harnick,ChiefVidauude Dated Reactor Projects Branch 1
-,