{{Adams
| number = ML20140B617
| issue date = 05/30/1997
| title = Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping
| author name = Hicks G
| author affiliation = NORTHEAST NUCLEAR ENERGY CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000423
| license number =
| contact person =
| document report number = B16497, NUDOCS 9706060272
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 4
}}
{{LER
| Title = Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping
| Plant =
| Reporting criterion =
| Power level =
| Mode =
| Docket = 05000423
| LER year = 2096
| LER number = 37
| LER revision =
| Event date =
| Report date =
| ENS =
| abstract =
}}
 
=text=
{{#Wiki_filter:.    --          .    - - - . -                  -.        -.                  -- - - ..-                            .-          .--
g.'                                                                                nope Ferry na. (nouie iso) waterrora, cT 00383 Northeast 4
[ NuclearEnergy                                                    mione sacar Power staiwn Northeas Nudear Energy Company P.O. Box 128                                          ,
Waterford, CF 06385-0128                              !
I-                                                                                      (860) 447 1791
>                                                                                      Fax (860) 444-4277 e
The Northeast Utihties System Docket No. 50-423                      -l B16497                  I
[                                                                                                             May 30.1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk
:                  Washington, DC 20555                                                                                                      l l
I Millstone Nuclear Power Station, Unit No. 3 i
j                                    Commitment Revision- Spent Fuel Pool (SFP) Cooling System                                              j
:                                                    Establishment Of Database                                                              i The purpose of this letter is to revise a commitment previously submitted to the NRC in LER 96-037-00 "Sp.gnt Fuel Pool Coolina System Potentially inoperable Followina an                                        1
                  - SSE Due to Failure of Non Seismic Connectina Pioina." regarding establishment of a                                        !
                  ' database linking licensing design basis to the component level for Maintenance Rule systems that are both safety related and risk significant. In the LER we stated that this
                  . database would be completed prior to entry into mode 4 from the current outage.
i Independent of this commitment Northeast Utilities initiated a program to develop                                        1 Design Bases Summary documents for Millstone Point Unit 3 safety related and risk                                        j significant systems as determined by the Millstone Unit 3 Maintenance Rule evaluation process. Included in each system's Design Bases Summary document are the                                                  ,
regulatory design bases for the system and its components.                      The Design Bases                        ;
Summary provides the link between the regulatory design bases and the                                                    !
system / components requirements in a cost effective manner within an achievable time                                    i frame. The Design Bases Summary documents for Maintenance Rule systems that are                                  ;      i both safety related and risk significant will be issued prior to August 13,1997.                                /
The revised commitment is provided in Attachment 1.
Should you have any questions regarding this matter, please contact Mr. D. A. Smith at                              6 (860)437-5840.
NORTHEAST NUCLEA ENERGY COMPANY 060031                . G. D. s O
D      r - Millstone Unit No. 3 9706060272 970530 O!$lllll5l$l$f!!!!
PDR      ADOCK 0500o423 s                        PDR;
 
i i
4 i                      cc:      H. J. Miller, Region l Administrator J. W. Andercen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 W. D. Travers, PhD, Director, Special Projects Office
]
i 4
l l
                                                                                                                        +
a W
f I
i f
I i
i                                                                                                                        ,
5 f
)
i 4
4 4
4 i
4 i
i f  s
  .4 4s g 1
                                                                                  -.-g--
 
e          -
Docket No. 50-423 B16497 E
i                                                                                                                                l i                                                                                                                                >
a i                                                          Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments i
I i
.i i
n d
2 4
5 May 1997
 
,      U,S. Nucirr R:gul:: tory Commission
  .. B16497\ Attachment 1\ Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.
Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No 3 of any questions regarding this document or any associated regulatory commitments.
Number                          Commitment                          Due B15963-07        Issue the Design Bases Summary                  August 13,1997 documents for Maintenance Rule systems that are both safety related and risk significant.
I i
l l
l 1
l I
}}
 
{{LER-Nav}}

Revision as of 05:03, 22 July 2020

Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping
ML20140B617
Person / Time
Site: Millstone 
Issue date: 05/30/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
B16497, NUDOCS 9706060272
Download: ML20140B617 (4)


LER-2096-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping
Event date:
Report date:
4232096037R00 - NRC Website

text

. -- . - - - . - -. -. -- - - ..- .- .--

g.' nope Ferry na. (nouie iso) waterrora, cT 00383 Northeast 4

[ NuclearEnergy mione sacar Power staiwn Northeas Nudear Energy Company P.O. Box 128 ,

Waterford, CF 06385-0128  !

I- (860) 447 1791

> Fax (860) 444-4277 e

The Northeast Utihties System Docket No. 50-423 -l B16497 I

[ May 30.1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk

Washington, DC 20555 l l

I Millstone Nuclear Power Station, Unit No. 3 i

j Commitment Revision- Spent Fuel Pool (SFP) Cooling System j

Establishment Of Database i The purpose of this letter is to revise a commitment previously submitted to the NRC in LER 96-037-00 "Sp.gnt Fuel Pool Coolina System Potentially inoperable Followina an 1

- SSE Due to Failure of Non Seismic Connectina Pioina." regarding establishment of a  !

' database linking licensing design basis to the component level for Maintenance Rule systems that are both safety related and risk significant. In the LER we stated that this

. database would be completed prior to entry into mode 4 from the current outage.

i Independent of this commitment Northeast Utilities initiated a program to develop 1 Design Bases Summary documents for Millstone Point Unit 3 safety related and risk j significant systems as determined by the Millstone Unit 3 Maintenance Rule evaluation process. Included in each system's Design Bases Summary document are the ,

regulatory design bases for the system and its components. The Design Bases  ;

Summary provides the link between the regulatory design bases and the  !

system / components requirements in a cost effective manner within an achievable time i frame. The Design Bases Summary documents for Maintenance Rule systems that are  ; i both safety related and risk significant will be issued prior to August 13,1997. /

The revised commitment is provided in Attachment 1.

Should you have any questions regarding this matter, please contact Mr. D. A. Smith at 6 (860)437-5840.

NORTHEAST NUCLEA ENERGY COMPANY 060031 . G. D. s O

D r - Millstone Unit No. 3 9706060272 970530 O!$lllll5l$l$f!!!!

PDR ADOCK 0500o423 s PDR;

i i

4 i cc: H. J. Miller, Region l Administrator J. W. Andercen, NRC Project Manager, Millstone Unit No. 3 A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 W. D. Travers, PhD, Director, Special Projects Office

]

i 4

l l

+

a W

f I

i f

I i

i ,

5 f

)

i 4

4 4

4 i

4 i

i f s

.4 4s g 1

-.-g--

e -

Docket No. 50-423 B16497 E

i l i >

a i Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments i

I i

.i i

n d

2 4

5 May 1997

, U,S. Nucirr R:gul:: tory Commission

.. B16497\ Attachment 1\ Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document.

Please notify the Manager - Nuclear Licensing at the Millstone Nuclear Power Station Unit No 3 of any questions regarding this document or any associated regulatory commitments.

Number Commitment Due B15963-07 Issue the Design Bases Summary August 13,1997 documents for Maintenance Rule systems that are both safety related and risk significant.

I i

l l

l 1

l I