ML20148E564: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:-
                                                                                                      :    .,
      ..-    ..
l
V        g..    ,
    4                                                  MAR 2l_lgss
  ,
                    In Reply Refer.To:
                    Dockets:    50-498/88-13-
                                50-499/88-13
                    ~ Houston Lighting & Power Company
                    ATTN:  J. H. Goldberg, Group Vice
                                President, Nuclear
                    P. O. Box 1700
                    Houston, Texas 77001
                    Gentlemen:
                    This refers to the inspection conducted by Mr.-Nemen M. Terc of this office
                    during the period March 1-3, 1988, of activities authorized by NRC.0perating-
                    License NPF-71 and Construction Permit CPPR-129 for the South Texas Project,
                    Units 1 and 2, respectively, and to the discussion of our. findings with
                    Mr. G. E. .Vaughn and other members of your staff at the conclusion of the
                    inspection.
                    Areas examined during the inspection included review of the emergency
                    preparedness training program and, in particular, the proficiency of shift
                    supervisors to implement the emergency plan. This is as a consequence of a-
                    deficiency (498/8808-07; 499/8808-07) identified during the previous inspection
                    of your emergency preparedness program. Within these areas, the inspection
                    consisted of selective examination of procedures and representative records,
                    interviews with personnel, and observations by the NRC inspector. The
                    inspection findings are documented in the enclosed inspection report.
                    Within the scope of the inspection, no violations or deviations were identified.
                    Should you have any questions concerning this inspection, we will be pleased to
                    discuss them with you.
                                                                Sincerely,
                                                                  Ni W 1'{p d 3p                            i
                                                                    $: 9.13EACH -[
                                                                L. J. Callan, Director
,
                                                                DivisionofReactorProjects
                    Enclosure:
                    Appendix - NRC Inspection Report
                      50-498/88-13
                      50-499/88-13
                    cc w/ enclosure:    (see next page)
                      IN :            C:NMEPB        C:h/D            D:                                    '
                                                                                                              .
                  3T                  WLFisher
                                      9/i?/88
                                                      GLCtInstable    LJCa lan
                                                                      3/2l/88
                    1 /17/88                        ^]/f/88
                                                                                                    l//
                  ee- g suke-                                                                          '\
                  PD8
                  d
 
9"' <      .                                  -
      .                                                    ,
          ^
;      -c    ,
l'
I
                Houston Lighting &. Power Company-    -2-
  ,
                cc w/ enclosure:
                Houston-Lighting &. Power Company
                ATTN: Ji. - A. McBurnett, Manager
                          Operations Support Licensing
                P. O. Box 289
                Wadsworth, Texas -77483
                Houston Lighting & Power' Company
                ATTN: Gerald E. Vaughn, Vice President
                        Nuclear Operations-
                P. O. Box 1700
                Houston, Texas- 77001
                Houston Power & Lighting Company
                ATTN:  S. L. Rosen
                P. O. Box 289
                Wadsworth, Texas 77483
                Chief, Technological Hazards Branch
                FEMA Region 6
                Federal Center
                800 North Loop 288
                Denton, Texas 76201-3698
                Central Power and Light Co.
                R. L. Range /R. P. Verret
                P. O. Box 2121
                Corpus Christi, TX 78403
                City Public Service Board
                ATTN:  R. J. Costello/M. T. Hardt
                P. O. Box 1771
                San Antonio, TX 78296
                City of Austin Electric Utility
                ATTN:  R. J. Miner, Chief Operating
                          Officer
                721 Barton Springs Road
                Austin, Texas 78704
                Texas Radiation Control Program Director
                bcc:  (see next page)
                                                              1
                                                              1
                                                              !
                                                              !
                                                              I
                                                              i
                                                              l
                                                              I
                                                            1
 
[,      .
                                                                          ,
1
    ...i...
  .
            Houston Lig'hting & Power Company .
                        .
                                                .3-
            'bec to DMB'(IE35)
            bec distrib. by RIV:
                              ~
              TSS                                  DRP-
            *RRI-0PS                              R. D. Martin, RA
            *D. Hunnicutt                        *Section Chief (DRP/D)
            *RIV File                            L. Shea, RM/ALF
            *RSTS Operator                        R. Bachmann, OGC
            * MIS System-                        *P.'Kadambi, NRR Project Manager
            * Project Inspector, RPB            *R. Hall
            * Inspector (s)                      R. L. Bangart
            *W. L.  Fisher                        D. B. Matthews, NRR
              NMEPB                              DRS
            *w/766
                                                                                      1
                                                                                      I
                                                                                      i
                                                                                  ._.
}}
}}

Revision as of 16:26, 21 July 2020

Forwards Insp Repts 50-498/88-13 & 50-499/88-13 on 880301-03.No Violations or Deviations Noted.Proficiency of Shift Supervisors to Implement Emergency Plan Examined
ML20148E564
Person / Time
Site: South Texas  
Issue date: 03/21/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20148E568 List:
References
NUDOCS 8803250255
Download: ML20148E564 (3)


See also: IR 05000498/1988013

Text

-

.,

..- ..

l

V g.. ,

4 MAR 2l_lgss

,

In Reply Refer.To:

Dockets: 50-498/88-13-

50-499/88-13

~ Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Mr.-Nemen M. Terc of this office

during the period March 1-3, 1988, of activities authorized by NRC.0perating-

License NPF-71 and Construction Permit CPPR-129 for the South Texas Project,

Units 1 and 2, respectively, and to the discussion of our. findings with

Mr. G. E. .Vaughn and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection included review of the emergency

preparedness training program and, in particular, the proficiency of shift

supervisors to implement the emergency plan. This is as a consequence of a-

deficiency (498/8808-07; 499/8808-07) identified during the previous inspection

of your emergency preparedness program. Within these areas, the inspection

consisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the NRC inspector. The

inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Ni W 1'{p d 3p i

$: 9.13EACH -[

L. J. Callan, Director

,

DivisionofReactorProjects

Enclosure:

Appendix - NRC Inspection Report

50-498/88-13

50-499/88-13

cc w/ enclosure: (see next page)

IN : C:NMEPB C:h/D D: '

.

3T WLFisher

9/i?/88

GLCtInstable LJCa lan

3/2l/88

1 /17/88 ^]/f/88

l//

ee- g suke- '\

PD8

d

9"' < . -

. ,

^

-c ,

l'

I

Houston Lighting &. Power Company- -2-

,

cc w/ enclosure:

Houston-Lighting &. Power Company

ATTN: Ji. - A. McBurnett, Manager

Operations Support Licensing

P. O. Box 289

Wadsworth, Texas -77483

Houston Lighting & Power' Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations-

P. O. Box 1700

Houston, Texas- 77001

Houston Power & Lighting Company

ATTN: S. L. Rosen

P. O. Box 289

Wadsworth, Texas 77483

Chief, Technological Hazards Branch

FEMA Region 6

Federal Center

800 North Loop 288

Denton, Texas 76201-3698

Central Power and Light Co.

R. L. Range /R. P. Verret

P. O. Box 2121

Corpus Christi, TX 78403

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P. O. Box 1771

San Antonio, TX 78296

City of Austin Electric Utility

ATTN: R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

Austin, Texas 78704

Texas Radiation Control Program Director

bcc: (see next page)

1

1

!

!

I

i

l

I

1

[, .

,

1

...i...

.

Houston Lig'hting & Power Company .

.

.3-

'bec to DMB'(IE35)

bec distrib. by RIV:

~

TSS DRP-

  • RRI-0PS R. D. Martin, RA
  • D. Hunnicutt *Section Chief (DRP/D)
  • RIV File L. Shea, RM/ALF
  • RSTS Operator R. Bachmann, OGC
  • MIS System- *P.'Kadambi, NRR Project Manager
  • Project Inspector, RPB *R. Hall
  • Inspector (s) R. L. Bangart
  • W. L. Fisher D. B. Matthews, NRR

NMEPB DRS

  • w/766

1

I

i

._.