ML20137V570: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:_ _ _ _ _ - - - - - _ _ - | ||
Y}, | |||
:i . . | |||
YANKEE ATOMIC NUCLEAR POWAR STATION MONTHLY STATISTICAL REPORT 85-11 FOR THE MONTH OF NOVEMBER 1985 l' | |||
[ | |||
t 0602190618 PDR ADOCM 85120505000029 PDR R | |||
I | |||
OPERATIN6 DATA REPORT DOCKET NO. 50-29 DATE B51205 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 OPERATING STATUS | |||
: l. Unit Name: Yankee Rome | |||
: 2. Reporting Period: Novreber, 1985 | |||
: 3. Licensed Thereal Power ( Mt): 600 | |||
: 4. Naseplate Rating (Gross Me): 185 | |||
: 5. Design Electrical Rating (Net Me): 175 | |||
: 6. Manteue Dependable Capacity (6ross Me): 180 | |||
: 7. Manteue Dependable Capacity (Net Me): 167 | |||
: 8. If Changes Occur in Capacity Ratings (itees Number 3 Through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted. If Any (Net Me): | |||
: 10. Reasons For Restrictions. If Any: | |||
This Month Yr.-to-Date Cuaulative | |||
: 11. Hours in Reporting Period 720.00 0,016.00 -- | |||
: 12. Number of Hours Reactor Nas Critical 0.00 6,990.20 174,913.30 | |||
: 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 14. Hours Generator On-Line 0.00 6,989.75 170,174.17 | |||
: 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00 | |||
: 16. Gross Thereal Energy Generated IMH) 0.00 3,952,952.00 92,443,604.52 | |||
: 17. Gross Electrical Energy Generated (MH) 0.00 1,191,869.90 28,010,673.20 | |||
: 18. Net Electrical Energy Generated (MWH) 0.00 1,114,907.71 26,209,458.16 | |||
: 19. Unit Service Factor 0.00 87.20 77.49 | |||
: 20. Unit Availability Factor 0.00 87.20 77.49 | |||
: 21. Unit Capacity Factor (Using MDC Net) 0.00 83.28 73.41 | |||
: 22. Unit Capacity Factor (Using DER Net) 0.00 79.48 69.96 | |||
: 23. Unit Forced Dutage Rate 0.00 0.00 5.26 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): | |||
: 25. If Shutdown ht End of Report Period, Estimated Date of Startup: December 6, 1985 | |||
: 26. Units in Test Status (Prior to Coseercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL DPERATION | |||
s , | |||
AVERA6E MILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT YANKEE RONE MTE 851205 COMP'ETED BY S. WHIPPLE TELEPHONE (617) 872-8100 MONTH NOVEMBER, 1985 MY ' AVERA6E NILY POWER LEVEL MY AVERAGE M ILY POWER LEVEL (Mue-Net) (Nue-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 | |||
.6 0- 22 0 7 0 23 0 8 0 24 0 9 0 3 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 6 | |||
14 0 30 0 15 0 31 1 16 0 INSTRUCT 10NS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. | |||
Compute to the nearest whole negawatt. | |||
I | |||
) | |||
i . | |||
: l. , | |||
WIT SHUTDOWS AND KNER REDUCTIONS DOCKET NO. 50-29 Wii YANKEE RONE REPORT MONTH NOVLMBER,1985 DATE B51205 COMPLETED BY S. WIPPLE TELEPHONE (617) 872-8100 Method Licensee Cause & Corrective 1 Duration 2 Of Shutting Event Systes Component Action to No. Date- Type (Hours) Reason Down Reactor 3 Report 4 Code 4 Code 5 Prevent Recurrence 85-!! 10/19/85 S 720 C 1 N/A N/A N/A Core IVI!! Refueling Continued with cycle IVill refueling all sonth. | |||
I 2 3 4 F: Forced Reason: Method: Exhibit 6-instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras. Entry Sheets for License C-Refueling 3-Automatic Scraa. Event Report (LER) File 9-Regulatory Restriction 4-Other (Explain) (NURE6-0161) | |||
E-Operator Training & Licensed Erasination F-Administrative - 5 6-Operational Error (Explain) Exhibit 1 - Saee Source H-Other (Explain) | |||
DOCKET NO. 50-29 WIT YAMEE ROME DATE 851205 COMPLETED BY S. MIPPLE TELEPHONE M17) 8724100 REPORT MONTH 110VEMBER,1985 SMMARY OF DPERATIH6 EIPERIEllCES Continued with Cycle IVill refueling all conth. | |||
a. | |||
!'}} |
Latest revision as of 18:19, 30 June 2020
ML20137V570 | |
Person / Time | |
---|---|
Site: | Yankee Rowe |
Issue date: | 11/30/1985 |
From: | Whipple S YANKEE ATOMIC ELECTRIC CO. |
To: | |
Shared Package | |
ML20137V556 | List: |
References | |
NUDOCS 8602190618 | |
Download: ML20137V570 (5) | |
Text
_ _ _ _ _ - - - - - _ _ -
Y},
- i . .
YANKEE ATOMIC NUCLEAR POWAR STATION MONTHLY STATISTICAL REPORT 85-11 FOR THE MONTH OF NOVEMBER 1985 l'
[
t 0602190618 PDR ADOCM 85120505000029 PDR R
I
OPERATIN6 DATA REPORT DOCKET NO. 50-29 DATE B51205 COMPLETED BY S. WHIPPLE TELEPHONE (617) 872-8100 OPERATING STATUS
- l. Unit Name: Yankee Rome
- 2. Reporting Period: Novreber, 1985
- 3. Licensed Thereal Power ( Mt): 600
- 4. Naseplate Rating (Gross Me): 185
- 5. Design Electrical Rating (Net Me): 175
- 6. Manteue Dependable Capacity (6ross Me): 180
- 7. Manteue Dependable Capacity (Net Me): 167
- 8. If Changes Occur in Capacity Ratings (itees Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net Me):
- 10. Reasons For Restrictions. If Any:
This Month Yr.-to-Date Cuaulative
- 11. Hours in Reporting Period 720.00 0,016.00 --
- 12. Number of Hours Reactor Nas Critical 0.00 6,990.20 174,913.30
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 0.00 6,989.75 170,174.17
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thereal Energy Generated IMH) 0.00 3,952,952.00 92,443,604.52
- 17. Gross Electrical Energy Generated (MH) 0.00 1,191,869.90 28,010,673.20
- 18. Net Electrical Energy Generated (MWH) 0.00 1,114,907.71 26,209,458.16
- 19. Unit Service Factor 0.00 87.20 77.49
- 20. Unit Availability Factor 0.00 87.20 77.49
- 21. Unit Capacity Factor (Using MDC Net) 0.00 83.28 73.41
- 22. Unit Capacity Factor (Using DER Net) 0.00 79.48 69.96
- 23. Unit Forced Dutage Rate 0.00 0.00 5.26
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown ht End of Report Period, Estimated Date of Startup: December 6, 1985
- 26. Units in Test Status (Prior to Coseercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL DPERATION
s ,
AVERA6E MILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT YANKEE RONE MTE 851205 COMP'ETED BY S. WHIPPLE TELEPHONE (617) 872-8100 MONTH NOVEMBER, 1985 MY ' AVERA6E NILY POWER LEVEL MY AVERAGE M ILY POWER LEVEL (Mue-Net) (Nue-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0
.6 0- 22 0 7 0 23 0 8 0 24 0 9 0 3 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 6
14 0 30 0 15 0 31 1 16 0 INSTRUCT 10NS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole negawatt.
I
)
i .
- l. ,
WIT SHUTDOWS AND KNER REDUCTIONS DOCKET NO. 50-29 Wii YANKEE RONE REPORT MONTH NOVLMBER,1985 DATE B51205 COMPLETED BY S. WIPPLE TELEPHONE (617) 872-8100 Method Licensee Cause & Corrective 1 Duration 2 Of Shutting Event Systes Component Action to No. Date- Type (Hours) Reason Down Reactor 3 Report 4 Code 4 Code 5 Prevent Recurrence 85-!! 10/19/85 S 720 C 1 N/A N/A N/A Core IVI!! Refueling Continued with cycle IVill refueling all sonth.
I 2 3 4 F: Forced Reason: Method: Exhibit 6-instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scras. Entry Sheets for License C-Refueling 3-Automatic Scraa. Event Report (LER) File 9-Regulatory Restriction 4-Other (Explain) (NURE6-0161)
E-Operator Training & Licensed Erasination F-Administrative - 5 6-Operational Error (Explain) Exhibit 1 - Saee Source H-Other (Explain)
DOCKET NO. 50-29 WIT YAMEE ROME DATE 851205 COMPLETED BY S. MIPPLE TELEPHONE M17) 8724100 REPORT MONTH 110VEMBER,1985 SMMARY OF DPERATIH6 EIPERIEllCES Continued with Cycle IVill refueling all conth.
a.
!'