1 OPERATING DATA REPORT LOCKET N0 50-255 DATE 4-09-84 COMPLETED BY AFDienes TELEPHONE (616)764-8913 I | |||
OPERATING STATUS , | |||
Notes- | |||
: 1. Unit Name: Palisades | |||
: 2. Reporting Period: 840301-840331 | |||
: 3. Licensed Thermal Power (MWt): 2530 | |||
: 4. Nameplate Rating (Gross MWe): 811.7 | |||
: 5. Design Electrical Rating (Net MWe): 805 6 Maximum Dependable Capacity (Gross MWe): *675 l | |||
: 7. Maximum Dependable Capacity (Net MWe): *635 , | |||
l | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons: - | |||
: 9. Power Level to Which Restricted, if any (Net MWe): _ __ | |||
= | |||
: 10. Reasons for Restrictions, if any: 1 This Month Yr-to-Date 'CusUlative | |||
: 11. Hours In Reporting Period ,74'4' '2184 107,679 | |||
: 12. Number of Hours Reactor Was Critical 0 0 . 59,259.7' | |||
: 13. Reactor Reserve Shutdown Hours - | |||
~~~ | |||
: 14. Hours Generator On-Line 0 . | |||
0 56,2/8.5 | |||
: 15. Unit Reserve Shutdown Hours - - | |||
: 16. Gross Thermal Energy Generated (MWH) 0 0 | |||
* 115,360,224 | |||
: 17. Gross Electrical Energy Generated (MWH) 0 _ | |||
0 35,750,440l 18 Net Electrical Energy Generated (MWH) 0 - | |||
0 33,628,014' | |||
: 19. Unit Service Factor 0 0 52.3 | |||
: 20. Unit Availability Factor . 0 - | |||
0 . | |||
52.3 | |||
: 21. Unit Capacity Factor (Using MDC Net) 0 ' | |||
0 49.2 - | |||
: 22. Unit Capacity Factor (Using DER Net) 0 0 ' | |||
3P..8 3 | |||
: 23. Unit Forced Outage Rate 0 0 ~ | |||
32.4 24 Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of En:h): | |||
: 25. If Shut Down at End of Report Period, Estimated Date of Start Up: 'May, 1984 | |||
: 26. Units in Test Status (Prior to Commercial Operatior.): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
*3:ced on condenser backpressure. | |||
I mil 083-0092A-TC03 840417010W: 840331 PDR ADOCK 05000255 i .y/(gg,k R PE ' | |||
5 | |||
. s - | |||
AVERACE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 4-09-84 | |||
- COMPLETED BY AFDienes | |||
/ - | |||
TELEPHONE (616)764-8913 MONTH March 1984 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 4 | |||
3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 _ _ _ | |||
25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 | |||
:j 16 0 INSTRUCTIONS On thfa format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. | |||
mil 083-0091A-TC03 l | |||
\ | |||
a | |||
.f- . | |||
DOCKET NO. | |||
50-255 UNirSifUTDOWNS AND POWER REDUCTIONS #"118"G*8 # | |||
* UNIT NAME DATE 4/9/04 COMPLETED BY DVanDenPerg REPORT MONTil March TELEPflONE (616) 76h-8913 m | |||
:. c | |||
-, .! E 3 4 Yij Licensee ,E g h Cause & Correctise | |||
%. DJte H | |||
;-~ 3g 4 jgy Event ~g g, & Action to 5 Zo g = | |||
u5V f- 5 Report e mV Prevent Recurrence | |||
- s 6 | |||
1 830812 s 744 .c 1 - - - | |||
/ | |||
I j l | |||
l I ' | |||
I4 2 .. 1 4 | |||
'' ' /- | |||
' ' IJ: Foiced . Reason: . | |||
Method: Exhibit G - Instructions y,. S: Scheduled A 1:tguipment Failure (Explain) 14!anual for Preparation of Data | |||
''.#~ 11 Maintenance of Test 2 Manual Scram. Entry Sheets t'or Licensee C Refueling 1 Automatic Scram. Event Repor1 (LER) File (NtIRI.G. | |||
^~ | |||
.. D-Regulatory Restriction 4 Other (Explain) 0161) | |||
E-Operator Training & License Examination F-Administratise 5 G-Operational l'r ror ( fixplain) Exhibit I Same Source | |||
, (9/77) Il-Other ( Explain) , - | |||
m | |||
*p | |||
's | |||
==SUMMARY== | |||
OF OPERATINC EXPERIENCE FOR MARCH 1984 The Plant remained shutdown for refueling. | |||
i ti e | |||
l mil 083-0096A-TC03 | |||
e 4 M* | |||
power | |||
@ Consumets Company Palisades Nuclear Plant: Route 2, Box 154, Covert, MI 49043 | |||
{ | |||
April 9, 1984 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1984. | |||
l Y~ | |||
Dewey VanDenBerg Reactor Engineer CC: JGKeppler, USNRC JRSchepers, P24-314 DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor l 'RCallen, Michigan-Public Service Commission | |||
! KMFarr, Palisades Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades JBToskey, P25-101 RLRosenfeld, P26-204A Document' Control, 950*22*35*10/L DV:84*012 | |||
-OC1083-0100A-TC03 | |||
$9 | |||
.}} | |||
Revision as of 22:36, 13 May 2020
| ML20083L096 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/31/1984 |
| From: | Dienes A, Vandenberg D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC |
| References | |
| NUDOCS 8404170136 | |
| Download: ML20083L096 (5) | |
Text
.
7 --
1 OPERATING DATA REPORT LOCKET N0 50-255 DATE 4-09-84 COMPLETED BY AFDienes TELEPHONE (616)764-8913 I
OPERATING STATUS ,
Notes-
- 1. Unit Name: Palisades
- 2. Reporting Period: 840301-840331
- 3. Licensed Thermal Power (MWt): 2530
- 4. Nameplate Rating (Gross MWe): 811.7
- 5. Design Electrical Rating (Net MWe): 805 6 Maximum Dependable Capacity (Gross MWe): *675 l
- 7. Maximum Dependable Capacity (Net MWe): *635 ,
l
- 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons: -
- 9. Power Level to Which Restricted, if any (Net MWe): _ __
=
- 10. Reasons for Restrictions, if any: 1 This Month Yr-to-Date 'CusUlative
- 11. Hours In Reporting Period ,74'4' '2184 107,679
- 12. Number of Hours Reactor Was Critical 0 0 . 59,259.7'
- 13. Reactor Reserve Shutdown Hours -
~~~
- 14. Hours Generator On-Line 0 .
0 56,2/8.5
- 15. Unit Reserve Shutdown Hours - -
- 16. Gross Thermal Energy Generated (MWH) 0 0
- 115,360,224
- 17. Gross Electrical Energy Generated (MWH) 0 _
0 35,750,440l 18 Net Electrical Energy Generated (MWH) 0 -
0 33,628,014'
- 19. Unit Service Factor 0 0 52.3
- 20. Unit Availability Factor . 0 -
0 .
52.3
- 21. Unit Capacity Factor (Using MDC Net) 0 '
0 49.2 -
- 22. Unit Capacity Factor (Using DER Net) 0 0 '
3P..8 3
- 23. Unit Forced Outage Rate 0 0 ~
32.4 24 Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of En:h):
- 25. If Shut Down at End of Report Period, Estimated Date of Start Up: 'May, 1984
- 26. Units in Test Status (Prior to Commercial Operatior.): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- 3:ced on condenser backpressure.
I mil 083-0092A-TC03 840417010W: 840331 PDR ADOCK 05000255 i .y/(gg,k R PE '
5
. s -
AVERACE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 4-09-84
- COMPLETED BY AFDienes
/ -
TELEPHONE (616)764-8913 MONTH March 1984 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 4
3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 _ _ _
25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0
- j 16 0 INSTRUCTIONS On thfa format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
mil 083-0091A-TC03 l
\
a
.f- .
DOCKET NO.
50-255 UNirSifUTDOWNS AND POWER REDUCTIONS #"118"G*8 #
- UNIT NAME DATE 4/9/04 COMPLETED BY DVanDenPerg REPORT MONTil March TELEPflONE (616) 76h-8913 m
- . c
-, .! E 3 4 Yij Licensee ,E g h Cause & Correctise
%. DJte H
- -~ 3g 4 jgy Event ~g g, & Action to 5 Zo g =
u5V f- 5 Report e mV Prevent Recurrence
- s 6
1 830812 s 744 .c 1 - - -
/
I j l
l I '
I4 2 .. 1 4
' /-
' ' IJ: Foiced . Reason: .
Method: Exhibit G - Instructions y,. S: Scheduled A 1:tguipment Failure (Explain) 14!anual for Preparation of Data
.#~ 11 Maintenance of Test 2 Manual Scram. Entry Sheets t'or Licensee C Refueling 1 Automatic Scram. Event Repor1 (LER) File (NtIRI.G.
^~
.. D-Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & License Examination F-Administratise 5 G-Operational l'r ror ( fixplain) Exhibit I Same Source
, (9/77) Il-Other ( Explain) , -
m
- p
's
SUMMARY
OF OPERATINC EXPERIENCE FOR MARCH 1984 The Plant remained shutdown for refueling.
i ti e
l mil 083-0096A-TC03
e 4 M*
power
@ Consumets Company Palisades Nuclear Plant: Route 2, Box 154, Covert, MI 49043
{
April 9, 1984 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1984.
l Y~
Dewey VanDenBerg Reactor Engineer CC: JGKeppler, USNRC JRSchepers, P24-314 DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor l 'RCallen, Michigan-Public Service Commission
! KMFarr, Palisades Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades JBToskey, P25-101 RLRosenfeld, P26-204A Document' Control, 950*22*35*10/L DV:84*012
-OC1083-0100A-TC03
$9
.