ML20083L096: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
7 --
1 OPERATING DATA REPORT LOCKET N0                    50-255 DATE                  4-09-84 COMPLETED BY AFDienes TELEPHONE (616)764-8913 I
OPERATING STATUS                                                                            ,
Notes-
: 1. Unit Name: Palisades
: 2. Reporting Period:                840301-840331
: 3. Licensed Thermal Power (MWt):              2530
: 4. Nameplate Rating (Gross MWe):              811.7
: 5. Design Electrical Rating (Net MWe):        805 6    Maximum Dependable Capacity (Gross MWe): *675                                                                              l
: 7. Maximum Dependable Capacity (Net MWe):      *635                        ,
l
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:                                                                                      -
: 9. Power Level to Which Restricted, if any (Net MWe):                                                              _ __
                                                                                                                                              =
: 10. Reasons for Restrictions, if any:                                                                          1 This Month          Yr-to-Date              'CusUlative
: 11. Hours In Reporting Period                              ,74'4'                '2184                    107,679
: 12. Number of Hours Reactor Was Critical                      0                    0  .                  59,259.7'
: 13. Reactor Reserve Shutdown Hours                            -
                                                                                ~~~
: 14. Hours Generator On-Line                                    0      .
0                      56,2/8.5
: 15. Unit Reserve Shutdown Hours                              -                    -
: 16. Gross Thermal Energy Generated (MWH)                      0                    0
* 115,360,224
: 17. Gross Electrical Energy Generated (MWH)                  0          _
0                    35,750,440l 18  Net Electrical Energy Generated (MWH)                    0              -
0                    33,628,014'
: 19. Unit Service Factor                                        0                    0                        52.3
: 20. Unit Availability Factor                            .      0    -
0                    .
52.3
: 21. Unit Capacity Factor (Using MDC Net)                        0  '
0                        49.2                  -
: 22. Unit Capacity Factor (Using DER Net)                        0                    0          '
3P..8                  3
: 23. Unit Forced Outage Rate                                  0                    0            ~
32.4 24    Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of En:h):
: 25. If Shut Down at End of Report Period, Estimated Date of Start Up:                      'May, 1984
: 26. Units in Test Status (Prior to Commercial Operatior.):                  Forecast          Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
      *3:ced on condenser backpressure.
I mil 083-0092A-TC03          840417010W: 840331 PDR ADOCK 05000255 i                                  .y/(gg,k R                  PE      '
 
5
      . s -
AVERACE DAILY UNIT POWER LEVEL DOCKET NO      50-255 UNIT  Palisades DATE      4-09-84
    -                                                            COMPLETED BY  AFDienes
/          -
TELEPHONE (616)764-8913 MONTH        March 1984 DAY    AVERACE DAILY POWER LEVEL              DAY    AVERAGE DAILY POWER LEVEL (MWe-Net)                                    (MWe-Net) 1              0                            17                0 2              0                            18                0 4
3                0                            19                0 4                0                            20                0 5                0                            21                0 6                0                            22                0 7                0                            23                0 8                0                            24                0 9                0          _ _ _
25                0 10                0                            26                0 11                0                            27                0 12                0                            28                0 13                0                            29                0 14                0                            30                0 15                0                            31                0
:j            16                0 INSTRUCTIONS On thfa format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
mil 083-0091A-TC03                                                              l
                                                                                              \
 
a
                        .f-                                                                                                                                                                                      .
DOCKET NO.
50-255 UNirSifUTDOWNS AND POWER REDUCTIONS                                                                      #"118"G*8            #
* UNIT NAME DATE 4/9/04 COMPLETED BY DVanDenPerg REPORT MONTil March TELEPflONE (616) 76h-8913 m
:.                                                    c
                                                -,        .! E      3        4 Yij          Licensee                        ,E g            h        Cause & Correctise
                %.            DJte H
                                                    ;-~    3g        4      jgy              Event                        ~g g,              &              Action to 5        Zo g =
u5V f- 5                              Report e                    mV                            Prevent Recurrence
                                                                              -        s 6
1            830812                s      744    .c              1            -                      -                      -
                                                                        /
I                                                                                                                                                                                                  j l
l I                                      '
I4                            2                                    ..                    1                                            4
                                                            ''                ' /-
' '            IJ: Foiced                    . Reason:              .
Method:                                Exhibit G - Instructions y,.        S: Scheduled                    A 1:tguipment Failure (Explain)                                      14!anual                            for Preparation of Data
''.#~                                          11 Maintenance of Test                                            2 Manual Scram.                        Entry Sheets t'or Licensee C Refueling                                                          1 Automatic Scram.                  Event Repor1 (LER) File (NtIRI.G.
              ^~
                                            .. D-Regulatory Restriction                                        4 Other (Explain)                        0161)
E-Operator Training & License Examination F-Administratise                                                                                      5 G-Operational l'r ror ( fixplain)                                                                        Exhibit I Same Source
        , (9/77)                              Il-Other ( Explain)                                                                              , -
m
                                  *p
                                                        's
 
==SUMMARY==
OF OPERATINC EXPERIENCE FOR MARCH 1984 The Plant remained shutdown for refueling.
i ti e
l mil 083-0096A-TC03
 
e 4 M*
power
            @ Consumets        Company Palisades Nuclear Plant: Route 2, Box 154, Covert, MI 49043
{
April 9, 1984 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1984.
l Y~
Dewey VanDenBerg Reactor Engineer CC: JGKeppler, USNRC JRSchepers, P24-314 DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor l                'RCallen, Michigan-Public Service Commission
!                KMFarr, Palisades Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades JBToskey, P25-101 RLRosenfeld, P26-204A Document' Control, 950*22*35*10/L DV:84*012
          -OC1083-0100A-TC03
                                                                                                          $9
  .}}

Revision as of 22:36, 13 May 2020

Monthly Operating Rept for Mar 1984
ML20083L096
Person / Time
Site: Palisades 
Issue date: 03/31/1984
From: Dienes A, Vandenberg D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
References
NUDOCS 8404170136
Download: ML20083L096 (5)


Text

.

7 --

1 OPERATING DATA REPORT LOCKET N0 50-255 DATE 4-09-84 COMPLETED BY AFDienes TELEPHONE (616)764-8913 I

OPERATING STATUS ,

Notes-

1. Unit Name: Palisades
2. Reporting Period: 840301-840331
3. Licensed Thermal Power (MWt): 2530
4. Nameplate Rating (Gross MWe): 811.7
5. Design Electrical Rating (Net MWe): 805 6 Maximum Dependable Capacity (Gross MWe): *675 l
7. Maximum Dependable Capacity (Net MWe): *635 ,

l

8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons: -
9. Power Level to Which Restricted, if any (Net MWe): _ __

=

10. Reasons for Restrictions, if any: 1 This Month Yr-to-Date 'CusUlative
11. Hours In Reporting Period ,74'4' '2184 107,679
12. Number of Hours Reactor Was Critical 0 0 . 59,259.7'
13. Reactor Reserve Shutdown Hours -

~~~

14. Hours Generator On-Line 0 .

0 56,2/8.5

15. Unit Reserve Shutdown Hours - -
16. Gross Thermal Energy Generated (MWH) 0 0
  • 115,360,224
17. Gross Electrical Energy Generated (MWH) 0 _

0 35,750,440l 18 Net Electrical Energy Generated (MWH) 0 -

0 33,628,014'

19. Unit Service Factor 0 0 52.3
20. Unit Availability Factor . 0 -

0 .

52.3

21. Unit Capacity Factor (Using MDC Net) 0 '

0 49.2 -

22. Unit Capacity Factor (Using DER Net) 0 0 '

3P..8 3

23. Unit Forced Outage Rate 0 0 ~

32.4 24 Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of En:h):

25. If Shut Down at End of Report Period, Estimated Date of Start Up: 'May, 1984
26. Units in Test Status (Prior to Commercial Operatior.): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
  • 3:ced on condenser backpressure.

I mil 083-0092A-TC03 840417010W: 840331 PDR ADOCK 05000255 i .y/(gg,k R PE '

5

. s -

AVERACE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 4-09-84

- COMPLETED BY AFDienes

/ -

TELEPHONE (616)764-8913 MONTH March 1984 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 4

3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 _ _ _

25 0 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0

j 16 0 INSTRUCTIONS On thfa format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

mil 083-0091A-TC03 l

\

a

.f- .

DOCKET NO.

50-255 UNirSifUTDOWNS AND POWER REDUCTIONS #"118"G*8 #

  • UNIT NAME DATE 4/9/04 COMPLETED BY DVanDenPerg REPORT MONTil March TELEPflONE (616) 76h-8913 m
. c

-, .! E 3 4 Yij Licensee ,E g h Cause & Correctise

%. DJte H

-~ 3g 4 jgy Event ~g g, & Action to 5 Zo g =

u5V f- 5 Report e mV Prevent Recurrence

- s 6

1 830812 s 744 .c 1 - - -

/

I j l

l I '

I4 2 .. 1 4

' /-

' ' IJ: Foiced . Reason: .

Method: Exhibit G - Instructions y,. S: Scheduled A 1:tguipment Failure (Explain) 14!anual for Preparation of Data

.#~ 11 Maintenance of Test 2 Manual Scram. Entry Sheets t'or Licensee C Refueling 1 Automatic Scram. Event Repor1 (LER) File (NtIRI.G.

^~

.. D-Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & License Examination F-Administratise 5 G-Operational l'r ror ( fixplain) Exhibit I Same Source

, (9/77) Il-Other ( Explain) , -

m

  • p

's

SUMMARY

OF OPERATINC EXPERIENCE FOR MARCH 1984 The Plant remained shutdown for refueling.

i ti e

l mil 083-0096A-TC03

e 4 M*

power

@ Consumets Company Palisades Nuclear Plant: Route 2, Box 154, Covert, MI 49043

{

April 9, 1984 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1984.

l Y~

Dewey VanDenBerg Reactor Engineer CC: JGKeppler, USNRC JRSchepers, P24-314 DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor l 'RCallen, Michigan-Public Service Commission

! KMFarr, Palisades Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades JBToskey, P25-101 RLRosenfeld, P26-204A Document' Control, 950*22*35*10/L DV:84*012

-OC1083-0100A-TC03

$9

.